Loading...
HomeMy WebLinkAboutContract 34204COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No.&aW WHEREAS, R/P LPC II Ltd., hereinafter called "Developer", desires to make certain improvements to River Elm Addition Phase 1, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended, is hereby incorporated into this Community Facilities Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. Developer acknowledges that there shall be no reduction in the amount of financial security prior to project completion and acceptance by the City. E. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. 11 [ C21lf�l•�l1:1 15�✓A �ii River Elm Addition Ph. 1 — 06-19-06 1 F. G H. I. J IIn L. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the Citv of Fort Worth, its officers, servants, or emplovees. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to River Elm Addition Ph. 1 — 06-19-06 2 construct current and future improvements provided for in this agreement. M. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof. Water (A) None; Sewer (A-1) None; Paving (B) Attached Storm Drain (B-1) Attached. N. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street and storm drainage and other community facilities improvements shown as "current improvements" on the attached Exhibits B and B-1. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street and storm drainage as shown on the attached Exhibits B and B-1. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $30,444.26. River Elm Addition Ph. 1 — 06-19-06 3 Item A. Construction 1. Streets 2. Storm Drainage B. Engineering Design C. Construction Engineering and Management by DOE (4%) D. Materials Testing by DOE (2%) TOTALS SUMMARY OF COST River Elm Addition Phase 1 Developer City Cost Total Cost Cost $ 16,395.00 $ 16,395.00 $ 12,326.00 $ 12,326.00 $ 1,148.84 $ 1,148.84 $ 574A2I $ 574.42I $ 30,444.26 $ 30,444.26 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. 4. Developer's column for Item D represents two percent (2%) of paving and storm drain costs for materials testing. River Elm Addition Ph. 1 — 06-19-06 4 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in triplicate, at Fort Worth, Texas this the day of ,2006. RECEIVED Approval Recommended: NO MR--C 1UQUII;ED ATTEST: Marty Hendri City Secretary ti 1 1 1,10 1. Corporate Secretary JUL 2 � 2006 Transportation and Public Works Department Robert Goode, P. E. Director C4fFW rth Marc Ott Assistant City Manager R/P LPC II Ltd. By: Michael A. Reilly President Sunrise Partners, Inc. G.P. River Elm Addition Ph. 1 — 06-19-06 5 PART B — PROPOSAL DEVELOPER AWARDED CONTRACTS This proposal must not be removed from this book of Contract Documents. TO: R/P LPC II Ltd. PROPOSAL: UNIT II — PUBLIC PAVING AND DRAINAGE IMPROVEMENTS RIVER ELM ADDITION — PHASE 1 D.O.E. NO.5324 FILE NO. W-1850 X NO. 18748 Includes the furnishing of all materials, except materials specified to be furnished by the City, equipment and labor for the installation of Unit II — Public Paving and Drainage Improvements to serve River Elm Addition, Phase 1 and all necessary appurtenances and incidental work to provide a complete and serviceable project designated as: Unit II — Public Paving and Drainage Improvements River Elm Addition — Phase 1 Fort Worth, Texas Pursuant to the foregoing 'Notice to Bidders', the undersigned Bidder, having thoroughly examined the Contract Documents, including plans, special contract documents, the General Contract Documents and General Specifications for Water Department Projects, the General Contract Documents and General specifications for Transportation and Public works Projects, the site of the project and understanding the amount of work to be done, and the prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment and material except as specified to be furnished by the City, which is necessary to fully complete the work as provided in the Plans and Contract Documents and subject to the inspection and approval of the Director of the Department of Engineering of the City of Fort Worth, Texas; and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums: B-1 Updated 05/16/2005 UNIT H: PUBLIC STORM DRAIN ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT (Furnish and install, including all appurtenant work, complete in place, the following items) (D-No. refers to related items in the Part D Special Conditions:) 1. 66 LF 30-inch storm drain pipe, Class III RCP (complete in place with trench excavation and trench compaction), per linear foot Sixty Dollars $ 60.00 $ 3.960.00 and Zero Cents 2. 6 LF 6' wide concrete flume with 6.5' x 4' x 0.75' bolted down diamond plate, per linear foot (See Detail on Sheet 20 of 25.) Seventv Five Dollars $ 75.00 $ 450.00 and Zero Cents 3. 117 SY Concrete pavement repair, per square yard (See Sheet 19 of 25.) Fifty Dollars $ 50.00 $ 5.850.00 and Zero Cents 4. 1 EA Connection to existing curb inlet, per each (See Sheet 20 of 25.) One Thousand Dollars $ 1,000.00 $ 1,000.00 and Zero Cents 5. 1 EA Connection to existing 72" RCP, per each (See Sheet 19 of 25.) One Thous�uid Dollars and Zero Cents $ 1.000.00 $ 1.000.00 B-2 ^?: U'pdeiied 05/16/2005 6. 66 LF Trench safety, per linear foot One Dollars and Zero Cents $ 1.00 $ 66.00 TOTAL AMOUNT BID STORM DRAIN: $ 12.326.00 B-3 Updated 05/16/2005 UNIT IT: PUBLIC PAVING NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT (Furnish and install, including all appurtenant work, complete in place, the following items) (D-No. refers to related items in the Part D Special Conditions:) 1. 78 SY 6-inch concrete paving for streets, including mountable 12" curb and joint sealing, per square yard Twenty Five Dollars $ 25.00 $ 1,950.00 and Zero Cents 2. 81 SY 6-inch Lime stabilized subgrade, per square yard Two Dollars $ 2.00 $ 162.00 and Zero Cents 3. 1.2 TON Lime for subgrade.(30 Ibs/s.y.), per ton One Hundred Dollars $ 100.00 $ 120.00 and Zero Cents 4. 319 SY 4' concrete sidewalk along River Park Drive (complete in place, per square yard Twenty Seven Dollars $ 27.00 $ 8.613.00 and Zero Cents 5. 3 EA Handicap ramp (complete in place), per each Eight Hundred Fifty Dollars $ 850.00 $ 2.550.00 and Zero Cents B-4 Updated 05/16/2005 6. 1 LS Traffic control, per lump sLm1 (See Sheet 13 of 25.) Three Thousand Dollars and Zero Cents $ 3-000.00 $ 3.000.00 TOTAL AMOUNT BID PAVING: $ 16.395.00 B-5 Updated 05/16/2005 BID SUMMARY TOTAL AMOUNT BID STORM DRAIN TOTAL AMOUNT BID PAVING 12.326.00 16.395.00 GRAND TOTAL AMOUNT BID $ 28.721.00 B-6 Updated 05/16/2005 PART B - PROPOSAL (Cont.) After acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security, if required is to become the property of the Developer. The undersigned bidder certified that he has obtained at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plaits. The successful bidder shall be required to perform the work in accord with the following publications, both of which are incorporated herein and made a part hereof for all purposes: 1. The General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, which may be purchased from the Water Department. 2. The Standard Specifications for Street and Storm Drain Construction which may be purchased from the Department of Transportation & Public Works. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction within / ' calendar days after issue of the work order, and to complete the contract within 3J working days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A or B below, as applicable:) A. The principal place of business of our company is in the State of Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non resident bidders in the State of , our principal place of business, are not required to underbid resident bidders. XB. The principal place of business of our company or our parent company or majority owner is in the State of Texas. B-7 Updated 0511612005 I (we) acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration on preparation of the foregoing bid: Addendum No. I (Initials) Addendum No. 3 (Initials) Addendum No. 2 (Initials) Addendum No. 4 (Initials) (Seal) Date: ` (;a (v C Respectfully submitted, Conatser. Co struc ' n LP By: Mark Pappas Title Vice President. Conatser Management Group. Inc. Address 5327 Wichita Street Port Worth. Texas 76115 Telephone: 817-534-1743 B-8 Updated 05/16/2005 III STREETLIGHTS I. STREETLIGHTS COST ESTIMATE: INTERSECTIONS MID -BLOCK RESIDENTIAL CHANGE OF DIRECTION RESIDENTIAL MID -BLOCK COLLECTOR MID -BLOCK ARTERIAL MID -BLOCK ARTERIAL MEDIAN RELOCATE EXISTING LIGHT DEVELOPERS COST: $0.00 QUANTITY UNIT COST TOTAL COST 0 EA $ 2,600 $00,000.00 0 EA $ 2,600 $00,000.00 0 EA $ 2,600 $00,000.00 0 EA $ 2,600 $00,000.00 0 EA $ 3,000 $0,000.00 0 EA $ 3,000 $00,000.00 0 EA $ 1,650 $00,000.00 Subtotal $0.00 City's Cost $00,000.00 Developer's Subtotal $0.00 4% Inspection fee $0.00 Project Total $00,000.00 Adjacent Developer's Cost $00.000.00 Developer's Cost $0.00 CFA CODE # 2006089 River Elm Addition, Phase I (Private Development) Fort Worth, Texas July 27, 2006 PAGE 1 OF EXHIBIT " C" II. STREETLIGHTS WORK DESCRIPTION: 1. The Developer shall provide for the installation of streetlights at the approximate locations shown in exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2. Streetlights on residential and/or collector streets can be installed using overhead or underground conductors with the approval of the director of transportation and Public Works, 3. The City of Fort Worth will install all the streetlights that use overhead or underground conductors on residential, and collector streets. The developer agrees to pay the City of Fort Worth the amount shown below prior to the City starting its design efforts, at the option of the developer and at their expense they may purchase the poles, fixtures, and mast arms from the City in order to assure compliance with city material standards 4. Street lights on arterial streets shall be installed with underground conductors 5. The developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operations of the street light system 6. The estimated cost of this streetlight installation is detailed on page (1) of exhibit "C" and is summarized below. The streetlights will remain the property of, and will be maintained by the City of Fort Worth. DEVELOPERS COST: $0.00 CFA CODE # 2006089 River Elm Addition, Phase I (Private Development) July 27, 2006 PAGE 2 OF EXHIBIT "C" III. STREETLIGHTS LOCATIONS: CFA CODE # 2006089 River Elm Addition, Phase I (Private Development) PAGE 3 OF EXHIBIT "C" Iv STREET NAME SIGNS 1. The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of $245.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3. This development creates the following zero (0) intersections at a cost to the Developer of $0.00: (Private development.) River Elm Addition, Phase I CFA code: 2006089 July 27, 2006 -RING CUMBER6AND\G .. I RA TTI � eR �I,I, yFNYANT SON DER, ?idglea VICINITY MAP RIVER ELM ADDITION r PHASE I -N^ Punawa Engineers n 1.s ml *1; y Planners urveyors Associates, L.P.L.r Landscape Architects 1501 Merrimac Circle, Suite 100, Fort Worth, TX 76107 - Tel: (617) 335-1121, Fax: (617) 335-7437 RlVkRftOLbOW ADDITION \ CABI1V9 71A, SLIDE -NO. 2560\ .xrT .T. / CP \ / \ / � t ADDITION, q „yyt� ' ./ ' PP 05-907� , \\ �D ' ja RIV&X PARIr CliB T A, SLIDE as �' / PROPOSED ADA 39 2 for, P.B. •�Tj' � i RAMP PROPOSED 6" Block 1 41 j.'- r, 10 STREET CONNECTION n,$ \ ; ! m 5 PROPOSED ADA ., gyp, \, 1 � 4 ji - `. \�? _ 9 Lot 40 �! RAM �. \ P ... ': .._.._. ..1! Block 1 / 1 1 s i 7 4zx - i PROPOSED 4' - _ ..._ _ � WIDE SIDEWALK ----- Ricer /truA ff("d. � .......... PROPOSED ADA RIVER WOOD ADDITION RAMP CA$l1__WT A,-SLIDlV.3030 /i _ .. P.B.T.CT. ........ ........_, '( r SCALE: 1 " = 200' �EGENo,. EXHIBIT "B" al Dunaway P1an;eB 6" THICK PAWIVG PA VING PLAN Associates L.P. Surveyors Landscape aomtede 0 4' SIDEWALK RIVER ELM ADDITION - PHASE 1 1501 Meniff i) �;Sru,'s 100, F� Worth, T 78107 4.3 \> . ..... R14RHOLLOW ADPMRN CARZN�, scams Iva mo Pi L r.p T. & X RIVEK ELM AliPMON, A( PP o497 4j —�v J6 37 35 S\ V % A xrOzz PARx CAFINAt A, 10 % 8 J, SCALE: .D 4 Lot ) Block 40C 42X-- J8 2 41 Block 1 /'/'11 //1 I EXISTING 24 " RCP 5 PROPOSED JO" RCP EXISTING 72" RCP /'j EXISTING 24" RCP PROPOSED 6' FLUME WIDE CONCRETE pEngine E-GEIVD.- EXHIBIT 19B- 1 99 unawa IP annersers PROPOSED STORM DRAIN & INLET STORM DRAIN SYSTEM Associates, ff Architects 1501 Mentnac Ckde, Sub 100, Fort Woffi. TX 76107 EXISTING STORM DRAIN & INLET RIVER ELM ADDITION — PHASE I Tel: (817) 335-1121, Fax (817) 3355-7437 L Landscape sunreyas