Loading...
HomeMy WebLinkAboutContract 34207COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary rr�� COUNTY OF TARRANT § Contract No.e��� WHEREAS, Fore Star Real Estate Groun, hereinafter called "Developer", desires to make certain improvements to Kin2srid2e Phase V, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended, is hereby incorporated into this Community Facilities Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. Developer acknowledges that there shall be no reduction in the amount of financial security prior to project completion and acceptance by the City. E. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. F. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. G. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damazes are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. H. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. I. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). J. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). K. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. L. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to 2 construct current and future improvements provided for in this agreement. M. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof: Water (A)None; Sewer (A-1) None; Paving (B)Attached Storm Drain (B-1) Attached, Street Lights and Signs (C) Attached. N. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B 1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $265,424.00. 3 SUMMARY OF COST Kingsridge Phase V Item Developer Cost A. Construction 1. Streets $6,800.00 2. Storm Drainage $243,600.00 3. Street Liqhts $0.00 4. Street Name Signs $0.00 B. Engineering Design C. Construction Engineering and Management by DOE $ (4%) 10,016.00 D. Materials Testing by DOE $ (2%) 5,008.00 I $ TOTALS 265,424.00 $ City Cost Total Cost $ 6,800.00 243,600.00 10,016.00 5,008.00 265,424.00 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. 4. Developer's column for Item D represents two percent (2%) of paving and storm drain costs for materials testing. M IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in triplicate, at Fort Worth, Texas this the day of .2006. ' L � AIJ G° t 2000 Approval Recommended: NO M&Q REQUIRED ATTES T: A/� Marty Hendrix , City Secretary Approved t16 Form: ATTEST: Corporate Secretary Transportation and Public Works Department Robert Goode, P. E. Director City of orth Marc Ott Assistant City Manager DEVELOPER Forestar (USA) Real Estate Group, Inc. By:' Gar�ttee, Vice President KINGSRIDGE, PHASE V, BLOCKS 6 KINGSRIDGE, PHASE V, BLOCK 6 OPINION OF PROBABLE COMMUNITY FACILITIES COST ITEM DESCRIPTION QTY. UNIT UNIT COST TOTAL I STORM DRAINAGE IMPROVEMENTS 1 7'x3' Box Culvert 820 LF $275.00 $225,500.00 2 7'X3' Headwall 1 EA $5,400.00 $5,400.00 3 4'x4' Drop Inlet/Junction Box 2 EA $2,800.00 $5,600.00 4 Removal 4'x4' Box Culvert 80 LF $40.00 $3,200.00 5 Removal Headwall 3 EA $800.00 $2,400.00 6 Trench Safety 1 LS $1,000.00 $1,000.00 7 Erosion Control per Plan 1 LS $500.00 $500.00 SUBTOTAL $243,600.00 II PAVING IMPROVEMENTS 1 Remove/Replace Asphalt Pavement 100 SY $45.00 $4,500.00 2 Traffic Control 1 LS $2,000.00 $2,000.00 3 Remove/Replace Existing Barricade 1 EA $300.00 $300.00 SUBTOTAL $6,800.00 TOTAL COSTS $250,400.00 RECEIVED JJ)N 0 W 2006 III STREETLIGHTS 1. STREETLIGHTS COST ESTIMATE: QUANTITY UNIT COST TOTAL COST INTERSECTIONS 0 EA $ 2,600 $00,000.00 MID -BLOCK RESIDENTIAL 0 EA $ 2,600 $00,000.00 CHANGE OF DIRECTION RESIDENTIAL 0 EA $ 2,600 $00,000.00 MID -BLOCK COLLECTOR 0 EA $ 2,600 $00,000.00 MID -BLOCK ARTERIAL 0 EA $ 3,200 $00,000.00 MID -BLOCK ARTERIAL MEDIAN 0 EA $ 3,200 $00,000.00 RELOCATE EXISTING LIGHT 0 EA $ 1,650 $00,000.00 Subtotal $00,000.00 City's Cost $00,000.00 Developer's Subtotal $00,000.00 4% Inspection fee $0,000.00 Project Total $00,000.00 Adjacent Developer's Cost $00.000.00 Developer's Cost $00,000.00 DEVELOPERS COST: $0.00 CFA CODE # 2006068 Kingsridge, Phase V Fort Worth, Texas June 14, 2006 PAGE 1 OF EXHIBIT "C" II. STREETLIGHTS WORK DESCRIPTION: 1. The Developer shall provide for the installation of streetlights at the approximate locations shown in exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2. Streetlights on residential and/or collector streets can be installed using overhead or underground conductors with the approval of the director of transportation and Public Works. 3. The City of Fort Worth will install all the streetlights that use overhead or underground conductors on residential, and collector streets. The developer agrees to pay the City of Fort Worth the amount shown below prior to the City starting its design efforts, at the option of the developer and at their expense they may purchase the poles, fixtures, and mast arms from the City in order to assure compliance with city material standards 4. Street lights on arterial streets shall be installed with underground conductors 5. The developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operations of the street light system 6. The estimated cost of this streetlight installation is detailed on page (1) of exhibit "C" and is summarized below. The streetlights will remain the property of, and will be maintained by the City of Fort Worth. DEVELOPERS COST: $0.00 June 12, 2006 CFA CODE # 2006068 Kingsridge, Phase V PAGE 2 OF EXHIBIT "C" J 0a ..:n—�c�lf fr R III. STREETLIGHTS LOCATIONS: (Streetlights are existing from previous phase) CFA CODE # 2006068 Kingsridge, Phase V PAGE 3 OF EXHIBIT "C" IV STREET NAME SIGNS 1. The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of $245.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3. This development creates the following zero (0) intersections at a cost to the Developer of $0.00: (Street name signs are existing) Kingsridge, Phase V CFA code: 2006068 June 12, 2006 —I KELLER H(i, S ROAD I— eo� GOLDEN TRIANR�' r1 NTH F� WAL = =I w � z 3i NAT 61HHS _ � I \ } W Q n 4 VICINITY MAP 1" = 2000' a PROJECT LOCATION PROJECT LOCATION MAP FOR... KINGSRIDGE PHASE V BLOCK 6 TEAGUE MALL AND PERKINS 12100 Abrams Road, suit• LOB Da It •, T.— 76Za9 !NC. Phone: 1211 /1!1-YD l7•i•r:(Z11)1 01-9804 w.w.r.tn0-on it...... pon�u+n v aov PA VING - EXHIBIT "B" KINGSRIDGE PHASE V BLOCK 6 -------------------------- r -------------- — WYNOROOK STREET I 7 i 9 I LEGEND r -7 _ ASPHALT PWW T REPAIR CHATSWORTH LANE GRAPHIC SCALE 100 0 50 100 200 1' _ I oo' 7EAGM NAIL AND PERKINS Della•, Taaa• TaasJ /NC. t�aaa:fi l�/�I1-JJIi♦/a ............ •. a, a,laa •�il��.aea KINGSRIDGE PHASE BLOCK 6 7 x3' RCB SD LINE A 15' D. E, S TORM - EXHIBI T "B-1 " V LEGEND PROP. STORM DRAIN PROP. INLETS = EXIST. STORM DRAIN r1 ' _—_ GRAPHIC SCALE ioo o so ioo zoo ,uu I ,- _ 100, 7F`ACUE NAU AND PERMW if roo�rr��• wrwl, •ulr• ooI DlI/l �, Tl+ll )f lli 11lll:fr rl/ll hill r.I. is (!/l/l11•Il/l t. r. �.Il1•�lll��.�.�