Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 34209
COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No.� WHEREAS, Hillwood Saratoga, L.P., hereinafter called "Developer", desires to make certain improvements to Saratoga Addition Phase 1„ an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: That said Developer, acting herein by and through Brian Carlock, its duly authorized Vice President of Hillwood Development Corp, General Partner of Hillwood Operatine, L.P. a Texas limited partnership, Qeneral partner of Hillwood Saratoga, LP, and the City, acting herein by and through Marc Ott, its duly authorized Assistant City Manager, for and in consideration of the covenants and conditions contained herein, do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. CFA-tpw-ph l .doc 1 E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused. in whole or in Part, by the allemed negligence of the Citv of Fort Worth, its officers, servants, or employees. G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). I. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. CFA-tpw-ph l .doc 2 Water (A) None; Sewer (A-1) None; Paving (B) attached, Storm Drain (13- 1) attached, Street Lights and Signs (C) attached. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B 1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $1,228,581.27. Item Developer City Cost Total Cost Cost A. Construction $ - 1. Streets $1,014,560.30I 1,,014,560.30 2. Storm Drainage $165,614.00 165,614.00 3. Street Lights(TRI-County) $0.00 $ - 4. Street Name Signs $1,200.00 1,200.00 IB. Engineering Design I $ - C. Construction Engineering and Management by DOE $ $ (4%) 47,206.97 47,206.97 TOTALS 1,228,581.27 $ 1,228,581.27 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. The developer is responsible for installation of sidewalk. 2. Developer's column for Item C represents four percent (4%) cost for construction CFA-tpw-phl.doc 3 inspection fees and materials testing. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in triplicate, at Fort Worth, Texas this the 91dh day of 2004 Approval Recommended: Ln A.f&C J?EQUIR D ATTEST: (��& rYl Q r-I-L: ,4 Jr, x City Secretary Approve As 'start 'ty ATTEST: Corporate Secretary CFA-tpw-phl .doc 4 Transportation and Public Works Department Robert Goode, P. E. Director City Of Fort., -Worth arc O Assistant City Ma� r DEVELOPER Hillwood Saratoga, L.P.; M-C Sam-to3a C-P, WC; By: Hillwood Operating, L.P. J+' /Jw«n( X-4nce R6sda,4,j, a Texas limited partnership, its general partner By: Hillwood Development Corp, A T=Vice ner By:. ,, ;Iy.+ o� ��2� = �!S J N �`' ,;1 i� �' S � U l�9 T C31;Etip E:R",1;'t I PROPOSAL (This Proposal must not be removed from this book of Contract Documents) TO: HILLWOOD SARATOGA, L.P. Fort Worth, Texas DEVELOPER MAY 2004 c/o CARTER & BURGESS, INC. FOR: STREET IMPROVEMENTS FOR SARATOGA ADDITION PHASE 1 D.O.E. NO. 4464 Pursuant to the foregoing "Notice to Bidders," the undersigned bidder having thoroughly examined the Contract Documents, Plans, Special Provisions, Standard Special Provisions, the site of the project, and understanding the amount of work to be done, and the prevailing conditions hereby proposes to do all the work as ,provided in the Plans and Contract Documents subject to inspection and approval by the Director of Public Works of the City of Fort Worth, Texas, and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved Performance Bond and Payment Bond, and such other bonds as may be required by the Contract Documents, for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums: SPEC PAY APPROXIMATE ITEM ITEM QUANTITY PART A — ONSITE STREETS 210 1 46,430 S.Y. DESCRIPTION OF ITEMS WITH BID PRICES WRITTEN IN WORDS 6" Lime Stabilized Subgrade (Includes Preparation of Subgrade), Complete in Place for the Sum of One Dollar & Fift -Five Cents per Square Yard -.. - -- 212 2 743 TON Lime for Subgrade (30#/S.Y.),' Complete in Place for the Sum of Eiahty-Three Dollars & No Cents per Ton UNIT AMOUNT PRICE BID $1.55 $71,966.50 t $83.00 $61,669.00 IN:\JOB\011765\specs\01176503.00C.doc P-1 DESCRIPTION OF ITEMS PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT ITEM QUANTITY WORDS PRICE BID 3 41,550 S.Y. 6" Reinforced Concrete Pavement (Includes Joint Sealer and 7" STD Attached Concrete Curb), Complete in Place for the Sum of Seventeen Dollars & Fiftv-Five Cents per Square Yard $17.55 $729,202.50 4 2,070 S.Y. 8" Reinforced Concrete Pavement (Includes Joint Sealer and 7" STD Attached Concrete Curb), Complete in Place for the Sum of 5 a 7 Twentv-Three Dollars & Sixty -Nine Cents per Square Yard $23.69 1,465 S.Y. 6" HMAC Transition Pavement, Complete in Place for the Sum of Fifteen Dollars & No Cents per Square Yard 356 L.F. End -of -Road Barricades per Details, Complete in Place for the Sum of $15.00 Fortv Dollars & No Cents per Linear Foot $40.00 403 L.F. Standard Concrete Street Header, , Complete in Place for the Sum of Eiqht , Dollars & No.. Cents per Linear Foot N:\JOB\01 1765\specs\01176503.00C. doc P-2 $49,038.30 $21,975.00 $14,240.00 $8.00 $3,224.00 SPEC PAY APPROXIMATE ITEM ITEM QUANTITY 8 585 S.Y. 9 92 L.F. 10 32 EA. 11 1,520 S.F. 12 1 L.S. DESCRIPTION OF ITEMS WITH BID PRICES WRITTEN IN UNIT AMOUNT WORDS PRICE BID Rock Rubble Rip Rap 18" Deep, 12" — 15" Nominal Size, Complete in Place for the Sum of Twentv-five Dollars & No Cents per Square Yard $25.00 $14,625.00 Sawcut/Remove and Replace Existing 6" HMAC, Complete in Place for the Sum of Ten Dollars & No, _ Cents per Linear Foot $10.00 Manhole Adjustments, Complete in Place for the Sum of One Hundred Dollars & No _ Cents per Each Brick Pavers (Includes transition and recessed concrete pavement), Complete in Place for the Sum of Five Dollars & No Cents per Sq. Foot Storm Water Pollution Prevention Maintenance, Complete in Place for the Sum of One Thousand Five Hundred Dollars & No Cents per Lump Sum $920.00 $100.00 $3,200.00 $5.00 $7,600.00 $1,500.00 $1,500.00 N:UOB\01 1765\specs\01 176503.00C.doc P-3 DESCRIPTION OF ITEMS SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT ITEM ITEM QUANTITY WORDS PRICE BID 13 1 L.S. Construction Material Testing per City of Fort Worth requirements, Complete in Place for the Sum of Thirteen Thousand Dollars & No Cents per Lump Sum $13,000.00 $13,000.00 14 28 EA. Barrier Free Ramps, Complete in Place for the Sum of Eiqht Hundred Dollars & No Cents per Each $800.00 $22,400.00 TOTAL $1,014,560.30 City of Fort Worth requires a minimum of 30#/SN, The Paving Contractor will be responsible for a lime series test as directed by the City of Fort Worth Construction Inspection Department. Owner shall be responsible for installation of all silt barriers, sediment traps, check dams, and seeding. The Earthwork contractor shall be responsible for the "Construction Entrance/Exit" installation. QUALIFICATIONS: 1. All work on this proposal will be performed with one move -in at one time 2. Final quantities will be determined using "Approved Plans" 3. Bond costs are included 4. No compaction, concrete, or geotechnical testing 5. No fence removal, replacement or repair 6. No grade to drain or channel excavation 7. No hand labor in tree area 8. No hazardous material removal 9. No landscape, irrigation, electrical adjustments or repairs 10. No maintenance, installation or removal of erosion control devices, unless moved or damaged by Contractor 11. No median paving stones, street pavers only 12. No permanent traffic markings or signage, unless shown on engineering plans 13. No permits, impact fees or fees of any kind 14. No respreading of topsoil, sod or seeding 15. Rock excavation and processing included 16. No sales tax on incorporated materials 17. No street lighting 18. No surveying N:\10B\01 1765\specs\01 176503.000.doc P-4 This contract is issued by an organization which qualifies for exemption pursuant to the provisions of Article 20.04(F) of the Texas Limited Sales, Excise and Use Tax Act. Taxes: All equipment and materials not consumed by or incorporated into the project construction, are subject to State sales taxes under House Bill 11, enacted August 15, 1991. The Contractor shall comply with City Ordinance 7278, as amended by City Ordinance 7400 (Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in, employment practices. The undersigned agrees to complete all work covered by these Contract Documents within 22 working days from and after the date for commencing work, as set forth in the written Work Order to be issued by the Owner, and to pay not less than the "Prevailing Wage Rates for Streets, Drainage and Utility Construction," as established by the City of Fort Worth, Texas. deliver v-n 7pprnvori Ci iro+� Rnnrl fnr the faithful porfvFmnnnn of +{-sic tmoo nrnpeFty of tho ity n���e� Texas, nr the a#a;P-he l RiddeF's Rena± is to be fnrfei+o rd i Trrc'--PrvPc'��i7 r Respectf s mi d, Mario o . 7�o�ns xcavat' Inc. ael nacol , Vic President Add e s: PO x 2329 Frisco, TX 76034 (S E A L) If Bidder is Corporation Date May 17, 2004 Receipt is acknowledged of the following addenda: Addendum No. 1 Addendum No. 2 Addendum No. 3 NN:\JOB\011765\specs\01176503.00C.doc I P-5 I cbn4w -5f'o-U SPEC I PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID ITEM i ITEM QUANTITY PRICES WRITTEN IN WORDS SECTION C - STORM DRAIN SYSTEM 440 1. 146 L.F. 21" Class III R.C. Pipe, Including Trench Excavation and Backfill, Complete in Place for the Sum of 440 2. 987 L.F. 440 3. 29 L. F 440 4. 61 L.F. Thirtv-Two Dollars & Zero Cents per Linear Foot 24" Class III R.C. Pipe, Including Trench Excavation and Backfill, Complete in Place for the Sum of Thirtv-Eight Dollars & Zero Cents per Linear Foot 27" Class III R.C. Pipe, Including Trench Excavation and Backfill, Complete in Place for the Sum of Fortv-Eight Dollars & Zero Cents per Linear Foot 30" Class III R.C. Pipe, Including Trench Excavation and Backfill, Complete in Place for the Sum of UNIT AMOUNT PRICE BID $32.00 $38.00 E, .: Fiftv-Four Dollars & Zero Cents per Linear Foot $54.00 $4,672.00 $37,506.00 $1,392.00 $3,294.00 NN:UOB\011765\specs\01176503.00B.doc P-11 SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID 440 5. 463 L.F. 33" Class III R.C. Pipe, Including Trench Excavation and Backfill, Complete in Place for the Sum of Sixtv Dollars & Zero Cents per Linear Foot $60.00 $27,780.00 440 6. 79 L.F. 39" Class III R.C. Pipe, Including Trench Excavation and Backfill, Complete in Place for the Sum of Eighty -Five Dollars & Zero Cents per Linear Foot $85.00 $6,715.00 440 7. 173 L.F. 42" Class III R.C. Pipe, Including Trench Excavation and Backfill, Complete in Place for the Sum of 525 444 Ninetv-Four Dollars & Zero Cents per Linear Foot $94.00 $16,262.00 8. 1,938 L.F. Trench Safety, Complete in Place for the Sum of One Dollars & Zero Cents per Linear Foot $1.00 9. 1 Ea. 10' Standard Curb Inlet, Complete in Place for the Sum of One Thousand $1,938.00 Nine Hundred Dollars & Zero Cents per Each $1,900.00 $1 900.00 NN:\JOB\011765\specs\01176503.00B. doc 'N��d 16 f Ll 'V L�'... �• u4� i� 11 ���,,1 P-12 SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID 444 10. 12 Ea. 15' Standard Curb Inlet, Complete in Place for the Sum of Two Thousand One Hundred Dollars & Zero Cents per Each $2,100.00 $25,200.00 444 11. 1 Ea. 20' Standard Curb Inlet, Complete in Place for the Sum of Three Thousand Five Hundred Dollars & Zero Cents per Each $3,500.00 $3,500.00 444 12. 5 Ea. Standard 4' Square Manhole, Complete in Place for the Sum of One Thousand Six Hundred Dollars & Zero Cents per Each $1,600.00 $8,000.00 444 13. 1 Ea. Standard 5' Square Manhole, Complete in Place for the Sum of One Thousand Eight Hundred Dollars & Zero Cents per Each $1,800.00 $1,800.00 410 14. 1 Ea. Type B Headwall for 24" R.C.P. (includes Grade to Drain Excavation), Complete in Place for the Sum of One Thousand Two Hundred Dollars & Zero Cents per Each $1,200.00 $1,200.00 NN:\JOB\011765\specs\01176503.00B.doc P-13 SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID 444 15. 1 Ea. Type C Headwall for 24" R.C.P. (includes Grade to Drain Excavation), Complete in Place for the Sum of One Thousand Three Hundred Dollars & Zero Cents per Each $1,300.00 $1,300.00 444 16. 1 Ea. Type C Headwall for 33" R.C.P. (includes Grade to Drain Excavation), Complete in Place for the Sum of One Thousand Eight Hundred Dollars & Zero Cents per Each $1,800.00 $1,800.00 444 17. 1 Ea. Type C Headwall for 39" R.C.P. (includes Grade to Drain Excavation), Complete in Place for the Sum of Two Thousand Dollars & Zero Cents per Each $2,000.00 $2,000.00 444 18. 1 Ea. Type C Headwall for 42" R.C.P. (includes Grade to Drain Excavation), Complete in Place for the Sum of Two Thousand Three Hundred Dollars & - Zero Cents per Each $2,300.00 $2,300.00 S.P. 19. 237 S.Y. Rock Rubble Rip Rap (24" Deep, 18% 24" Minimal Size)(Utilize Existing Material Onsite), Complete in Place IL for the Sum of Fifty -Five Dollars & Zero Cents per Square Yard $55.00 $13,035.00 NN:\JOB\011765\specs\01176503.00b.doc P-14 SPEC ITEM S.P. 525 S.P. PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID ITEM QUANTITY PRICES WRITTEN IN WORDS 20. 46 S.Y. Rock Rubble Rip Rap (18" Deep, 12" Minimal Size)(Utilize Existing Material Onsite), Complete in Place for the Sum of UNIT PRICE AMOUNT BID Fortv-five Dollars & Zero Cents per Square Yard $45.00 $2,070.00 21 290 L.F. Grade to Drain, Complete in Place for the Sum of Five Dollars & Zero Cents per Linear Foot 22. 1 L.S. Storm Water Pollution Prevention Maintenance, Complete in Place for the Sum of $5.00 $1,450.00 Five Hundred Dollars & Zero Cents per Lump Sum $500.00 $500.00 SECTION C - - - STORM DRAIN SYSTEM $165,614.00 NN:UOB\011765\specs\01176503.00Bb.doc P-15 0 14�`L�� v+' 4 '. L :� ii I. STREET LIGHT COST ESTIMATE INTERSECTIONS MID -BLOCK RESIDENTIAL CHANGE OF DIRECTION RESIDENTIAL MID -BLOCK COLLECTOR MID -BLOCK ARTERIAL PARKWAY MID -BLOCK ARTERIAL MEDIAN QUANTITY UNIT COST TOTAL COST 13 EA $ 0,000 $00,000.00 51 EA $ 01000 $00,000.00 5 EA $ 01000 $00,000.00 0 EA $ 01000 $ --0-- 0 EA $ 01000 $ --0- 0 EA $ 0,000 $ __0__ RELOCATE EXISTING LIGHT 0 EA $ 01000 $ --0-- 0 (200 watt lights) x $7.05 (per light) x 24 months = $00,000.00 70 (100 watt lights) x $6.50 (per light) x 24 months = $10,764.00 Total: $10,764.00 The Street Lights will be installed by TRI County Electric Cooperative the developers initial 24- month power charge will be $10,764.00. After the initial 24-month power charge the City of Fort Worth, WILL ASSUME THE POWER COST. (REVISED 09-29-2004) SARATOGA, PHASE I May 6, 2004 Fort Worth, Texas PAGE I OF EXHIBIT C September 30, 2004 II. STREET LIGHTS WORK DESCRIPTION: 1. The Developer shall provide for the installation of streetlights at the approximate locations shown in Exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2. Streetlights on residential and /or collector streets can be installed using overhead or underground conductors with the approval of THE Director. 3. Streetlights on arterial streets shall be installed with underground conduit and conductors. 4. The Developer shall provide for the installation of a 2-inch schedule 40 PVC conduit at a depth not less than 30 inches and at least 18-inch behind the curb, "clear from all other utilities". 5. The Developer shall provide for the installation of a 2-inch schedule 40 PVC conduit between streetlights proposed for installation and the power source to become operational. 6. A 3-inch schedule 80 PVC conduit is required when crossing streets at a depth not less than 30 inches, unless indicated otherwise on the plans concrete pull boxes shall be provided at the crossing points. 7. The developer shall pay the initial two year power cost to TRI- COUNTY ELECTRIC COOPERATIVE, after the initial two year cost the City of Fort Worth, will assume the power cost. 8. The developer or their contractor shall contact City's street light division 48 hours prior to starting any installation of conduit and/or streetlights at (817) 871-6596 to insure proper inspection of work. TOTAL DEVELOPER'S COST $10,764.00 SARATOGA, PHASE I May 6, 2004 Fort Worth, Texas May 6, 2004 (REVISED 09-29-2004) PAGE II OF EXHIBIT C "STREET LIGHTS" INTERSECTIONS CHAMPION VIEW PKWY & SARATOGA SPRINGS CIR 2 CHAMPION VIEW PKWY & NORTH BEACH ST 2 CHAMPION VIEW PKWY & ALTA VISTA RD 2 CHAMPION VIEW PKWY & TRAVERS TRAIL 1 CHAMPION VIEW PKWY & LIZZIE PLACE 1 LIZZIE PLACE & GASPIAN COVE 1 LIZZIE PLACE & BEEKMAN DR 1 TRAVERS TRAIL & GASPIAN COVE 1 WELSH WALK & GASPIAN COVE 1 NOMA WAY & FURLONG WAY 1 MID -BLOCK SARATOGA SPRINGS CIR 6 CHAMPION VIEW PKWY 9 TRAVERS TRAIL 9 LIZZIE PLACE 12 BEEKMAN DR 6 FURLONG WAY 4 GASPIAN COVE 5 CHANGE OF DIRECTIONS LIZZIE PLACE 3 TRAVERS TRAIL 2 (REVISED 09-29-2004) SARATOGA, PHASE I PAGE III OF EXHIBIT C IV STREET NAME SIGNS 1. The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of $100.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. This development creates the following twelve (12) intersections at a cost to the Developer of $1,200.00: Alta Vista Rd & Champions View Pkwy N Beach St & Champions View Pkwy Lizzie P1 & Champions View Pkwy Travers Tr & Champions View Pkwy Saratoga Springs Cir & Champions View Pkwy Lizzie P1 & Travers Tr Caspian Cove & Welsh Walk Caspian Cove & Lizzie P1 Caspian Cove & Travers Tr Beekman Dr & Lizzie Pl Furlong Way & Lizzie P1 Noma Way & Furlong Way Saratoga Addition Phase 1 CFA code: 2004029 Date: March 30, 2004 12-CAYLOR RD. LOCATION MAP LOCATION MAP SARATOGA PHASE 1 NOT TO SCALE Carter ., Burgess CARTER & BURGESS, INC 777 MAN STREET FORT WORTH, TX 76102 (8771735-6000 Irt"r Kin M I I 'pr Pon q n,4n 1 nc�n � � N I J /7 4 L IO I 9 B �S SCALES 1" = 300' 7 P ti0 I l0 e 5 .�. I 14 5 7 4 /6 6 IT J H O 5 9 ? 4 Rs 70 3 21 6 5 / 17 if 7 I ♦ ••�, _ C 5 74 z J 73 J /\ � 7 4 5 1 77 5 6 7/ 6 7 /0 14 70 7 _._.... .. 8 a 9 15 B 9 9 A- W 9 /0 U Z B 6 , IB ..._ ,typ .._. .. 17 O 18 \ 5 16 /7 i3 .. .. 19 I 4 /5 /3 /d 20 \ P J z/ /4 15 \ 5 18 x 7 10 16 a 7 4J 44 45 46 T47111 73 79 77 /7 ` 1 3l \\ JZF co 1 7819 1 / /H 17 l6� � 14 IJ 17 11 /O 9 � 8 7 6 5 � 77O i \ 7 1 16 O 74 75 36 J54� 70 71 122 171 748 75 76 �77 78 ` 29 30 31 JI 33 34 351 - \ 1 J36 9 7 J d 5 6 7 8 9 /0 11 17 13 14 15 16 17 IB d0 f9 Qy� 1 4l 49 © I{ d8 47 96 45 44 aJ a7 ai do 39 38 JT 36 35 ON_ 47 IJ 44 45 46 07 48 09 50 SI 57 53� 1<63 LEGEND 'ROD. 29' B/B �11111A 20AQWAY/50' ROW STREETS 3ROP. 37' B/B EXHIBIT 'B' IOADWAY/ 60' ROW SARATOGA 'ROP. 1-28' B/ B G PHASE 1 M""'WAY IN HALF OW Carter Burgess 'R0P. 4' SIDEWALK CARTER &BURGESS, INC. 777 MAIN STREET FORT WORTH, A 76102 I M I T S OF PROJECT (817) 735-6000 PPn.lFrT Nn n+»rs nzn 1 nczn A. 1 6 15 14 N 1 J /2 1110 9 O I_ B 7 QQ�o�/ / SCALE, 1 " = 300' / I Ip J 2T6" 9 � 24" / y 15' 15' B 5 HOWL / I6 17 6 I 9 4 z ' q+ M 15' '+ O 1 s+ 20 J / 0-00 e 7 zr� 6 17 5 O 4 zJ / / 9 10 11 S 1 24 IJ 1 \ l Sp 15 14 2 3 , I 24" HOWL 94++ 24" z 23 ° 5 M77 5 d ......,.\ 1 / /J ,..,...,.. 2/ 6 7 f..\ to /4 I 7 I y l5 19 u w � I �� _ ,✓ I U 16 B I tr 7 /7 10is O IB /9 A 4 01. 15' 15 /3 P4 3 VMH 14 15 9 S 22 21 5 x 7a5ll 3OMH 15' /6 3 a4 45746 47 4B I \ 31 / ," 32 5' GASP AN CO ✓E 1 Z6 9 \ 27" 15' 33 IB I l7 16 15 14 /J 11 /l 10 9 B 7 6 5 T7 3 34 �42 26 ✓ FIOWL Js 20 I 11 25 Jd 4S4'M 15' 11 11 73 74 75 26 27 !78 19 30 3/ 37 33 34 35 1 24 37 21' D1y�VE JB 101 39 2 X ] 4 5 6 7 B 9 /O Il 11 IJ /I is 16 l7 /B 19 40 : i i ` 49 O 1 41 15 15' : 30' 30" 4B 47 1 46 145 44 43 47 41 40 39 JB 37 36 35 48" HOWL 8 — 3ZQN2_RAY — MH �1 1 41 14J 44 L6.LlaB 49 50 5/ I57 53 a6J 6 0 zz 3 J STO RM D RAI N LEGEND EXHIBIT 'B-1' ROP. STORM DRAIN LINE SARATOGA ROP. I NLET r PHASE 1 f MANHOLE —� ROP. HEADWALL Carter BYI'g@SS 0 K I ST. STORM DRAIN LINE CARTER & BURGESS, INC. T77 MAJN SWEf IMITS OF PROJECT (00�73!5T.76102 C 26 25 1 24 39 1 40 1 1 4/ LEGEND PROP. SINGLE STREET LIGHT N SCALEo l" = 300' sr I °a 1.-** 0000�� / F 40000, 00, 3z �r ( ASP LAN CO 3 9 l8 17 16 15 14 /3�12 // 10 9 8 7- 6- 5 20O 1 22 223 24 25 26 27 28 29 30 31 334 2 33 35 I RFM TAN D i 11 2 3 4 5 6 7 8 9 10 11 12 /3 /4 /5 /6 /7 /B 19�+ \ `(' 47 46 45 44 43 42 4/ 40 39 38 J7 36 35 - 42 43 44 45 46 47 621 49 50 5/ 152 53 363 EXIST. SINGLE STREET LIGHT O (ON STEEL POLE WITH STREET AND STOP SIGNS ATTACHED) PROP. STREET SIGN A EXIST. STREET SIGN 0 LIMITS OF PROJECT — — - STREET LIGHTS EXHIBIT 'C' SARATOGA PHASE 1 Carter Burgess CARTER & BURGESS, INC 777 MAIN STREET FORT WORTH, T% 76102 (8171 735-6000 PROJECT NO. 011765.030.1.0630