Loading...
HomeMy WebLinkAboutContract 34215COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary r COUNTY OF TARRANT § Contract No.� WHEREAS, Morrison Homes of Texas, Inc., hereinafter called "Developer", desires to make certain improvements to Heritage Addition Phase 3D-B Section 211, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: That said Developer acting herein byy and through C964 U�l� ,: I sm&jTof r&v5TcUGnW its duly authorized fw- Mvafso"' fb�015 OF and the City, acting herein by and through Marc Ott, its duly authorized Assistant City Manager, for and in consideration of the covenants and conditions contained herein, do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. CFA-TPW-sec2B.doc 1 F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such iniuries. death or damages are caused, in whole or in Part, by the alleged neelieence of the City of Fort Worth. its officers, servants, or emplovees. G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). I. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof: CFA-TPW-sec2B.doc 2 Water (A) None; Sewer (A-1) None; Paving (B) attached; Storm Drain (13- 1) attached; Street Lights and Signs (C) attached. Il. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B. B1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B 1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $487,316.20. Item Developer City Cost Total Cost Cost A. Construction $ - 1. Streets $315,516.00 315,516.00 2. Storm Drainage $119,764.00 119,764.00 3. Street Lights $34,200.00 34,200.00 4. Street Name Signs $425.00 425.00 B. Engineering Design I $ - l C. Construction Engineering and Management by DOE $ $ (4%) 17,411.20 17,411.20 $ $ TOTALS 487,316.20 $ - 487,316.20 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. The developer is responsible for installation of sidewalk. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees and materials testing. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. 4. Submitted bond in amount of $209,931.20 for future improvements for Shiver Road. CFA — TPW — sec2B-rev.doc 3 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in triplicate, at Fort Worth, Texas this the day of .2006. RECEIVEL I s Approval Recommended: 2 v N Transportation and Public Works Department NO M&C REQU11Z De._� ATTEST: Mar E'ndr1'x City ecre ary tc Assistant ATTEST: Corporate Secretary CFA-TPW-sec2B.doc Robert Goode, P. E. Director City Of Fo orth By. - Marc Ott Assistant City Manager DEVELOPER Morrison Homes of Texas, Inc. B y. c��rs►�ev�rCAI (print name and title) t 4 2� 1 PROPOSAL (This Proposal must not be removed from this book of Contract Documents) TO: MORRISON HOMES OF TEXAS, INC. Fort Worth, Texas DEVELOPER April 2006 c/o CARTER & BURGESS, INC. FOR: STREET IMPROVEMENTS FOR HERITAGE ADDITION PHASE 3D-B SECTION 2B D.O.E. NO. 4934 FILE NO. W-1683 Pursuant to the foregoing "Notice to Bidders," the undersigned bidder having thoroughly examined the Contract Documents, Plans, Special Provisions, Standard Special Provisions, the site of the project, and understanding the amount of work to be done, and the prevailing conditions hereby proposes to do all the work as provided in the Plans and Contract Documents subject to inspection and approval by the Director of Public Works of the City of Fort Worth, Texas, and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved Performance Bond and Payment Bond, and such other bonds as may be required by the Contract Documents, for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums: SPEC I PAY I APPROXIMATE I DESCRIPTION OF ITEMS WITH BID ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS STREET IMPROVEMENTS 210 1. 12,800 S.Y. 6" Lime Stabilized Subgrade (Includes Preparation of Subgrade), complete in place for the sum of 212 314 One Dollar & Eighty Five Cents per Square Yard 2. 190 TON Lime for Subgrade (30#/S.Y.) , complete in place for the sum of Ninetv Eiqht Dollars & No Cents per Ton 3. 12,200 S.Y. 6" Reinforced Concrete Pavement (Includes Joint Sealer and 7" STD Attached Concrete Curb), complete in place for the sum of Twentv Two No Dollars & Cents per Square Yard UNIT I AMOUNT PRICE BID $ 1.85 $ 23,680.00 $ 98.00 $ 18,620.00 $ 22.00 $ 268,400.00 N:WOB10131941SPECS101319401-Streets. doc B-1 SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID 4. 167 S.Y. Temporary Asphalt Pavement, complete in place for the sum of Eighteen Dollars & No Cents per Square Yard $18.00 $ 3,006.00 5. 195 S.F. 4' Wide Concrete Sidewalk, complete in place for the sum of Three Dollars & No Cents per Square Foot $ 3.00 $ 585.00 6. 145 L.F. Remove and Haul Off Existing End Of Road Barricades Five Dollars & No Cents per Linear Foot $ 5.00 $ 725.00 7. 1 L.S. Storm Water Pollution Prevention Maintenance" Five Hundred Dollars & No Cents per Lump Sum $ 500.00 $ 500.00 TOTAL STREET IMPROVEMENTS --- I $ 315,516.00 City of Fort Worth requires a minimum of 30#/S.Y. The Paving Contractor will be responsible for a lime series test as directed by the City of Fort Worth Construction Inspection Department. ** Owner shall be responsible for installation of all silt barriers, sediment traps, check dams, and seeding. The Earthwork contractor shall be responsible for the "Construction Entrance/Exit" installation. NAJ013\013194\SPECS\01319401-Streets.doc B-2 This contract is issued by an organization which qualifies for exemption pursuant to the provisions of Article 20.04(F) of the Texas Limited Sales, Excise and Use Tax Act. Taxes: All equipment and materials not consumed by or incorporated into the project construction, are subject to State sales taxes under House Bill 11, enacted August 15, 1991. The Contractor shall comply with City Ordinance 7278, as amended by City Ordinance 7400 (Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in, employment practices. The undersigned agrees to complete all work covered by these Contract Documents within 30 working days from and after the date for commencing work, as set forth in the written Work Order to be issued by the Owner, and to pay not less than the "Prevailing Wage Rates for Streets, Drainage and Utility Construction," as established by the City of Fort Worth, Texas. NMMM�. M MMI ter:■_-r..r.�nsr.�. Respectfully submitted, By: Jerry Conaster Title: President Address: Conaster Construction TX. L.P. 5327 Wichita Street Fort Worth, TX 76119 (S E A L) If Bidder is Corporation Date Receipt is acknowledged of the following addenda: Addendum No. 1 Addendum No. 2 Addendum No. 3 NAJOB\01 3194\SPECS\01 319401 -Streets.doc B-3 SPEC PAY PPROXIMAT A ID DEPR ITEM I ITEM QUANTITI(E I CIESIWRITT NE N WORDS I SECTION C - STORM DRAIN SYSTEM 440 1. 228 L.F. 42" Class III R.C. Pipe, Including Trench Excavation and Backfill, Complete in place for the sum of One Hundred Ten Dollars & No Cents per Linear Foot 440 2. 356 L.F. 36" Class III R.C. Pipe, Including Trench Excavation and Backfill, Complete in place for the sum of Eiahty Dollars & No Cents per Linear Foot 440 3. 17 L.F. 30" Class III R.C. Pipe, Including Trench Excavation and Backfill, Complete in place for the sum of Sixtv Eight Dollars & No Cents per Linear Foot 440 4. 199 L.F. 27" Class III R.C. Pipe, Including Trench Excavation and Backfill, Complete in place for the sum of Fiftv Eight Dollars & No Cents per Linear Foot 440 5. 151 L.F. 24" Class III R.C. Pipe, Including Trench Excavation and Backfill, Complete in place for the sum of Fortv Five Dollars & No Cents per Linear Foot N:1JOB10131941SPECS1013194.010.00A.doc B-9 UNIT I AMOUNT PRICE BID $110.00 $25,080.00 $80.00 $28,480.00 $68.00 $1,156.00 $58.00 $11, 542.00 $45.00 $6,795.00 SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT ITEM ITEM I QUANTITY PRICES WRITTEN IN WORDS PRICE 440 6. 120 L.F. 21" Class III R.C. Pipe, Including Trench Excavation and Backfill, Complete in place for the sum of Fortv Two Dollars & No Cents per Linear Foot 444 7. 4 Ea. 15' Standard Curb Inlet, complete in place for the sum of Two Thousand Five Hundred Dollars & No Cents per Each 444 8. 4 Ea. 10' Standard Curb Inlet, complete in place for the sum of Two Thousand Dollars & No Cents per Each 444 9. 2 Ea. Standard 4' Square Manhole, complete in place for the sum of Two Thousand Five Hundred Dollars & No Cents per Each 410 10. 1 Ea. Type C Headwall for 42" R.C.P., Complete in place for the sum of Three Thousand Dollars & No Cents per Each 11. 1 Ea. Type C Headwall for 36" R.C.P., Complete in place for the sum of Two Thousand Eiqht Hundred Dollars & No Cents per Each NAJOB\013194\SPECS\013194.010.00A.doc B-10 AMOUNT BID $42.00 $5,040.00 $2,500.00 $10,000.00 $2,000.00 $8,000.00 $2, 500.00 $5, 000.00 $3,000.00 $3,000.00 $2,800.00 $2,800.00 SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID 12. 2 Ea. Type C Headwall for 24" RCP., Complete in place for the sum of Two Thousand Six Hundred Dollars & No Cents per Each $2,600.00 $5,200.00 S.P. 13. 122 S.Y. Rock Rubble Rip Rap Fiftv Dollars & No Cents per Square Yard $50.00 $6,100.00 525 14. 1,071 L.F. Trench Safety One Dollar & No Cents per Linear Foot $1.00 $1,071.00 S.P. 15. 1 L.S. Storm Water Pollution Prevention Maintenance Five Hundred Dollars & No Cents per Lump Sum $500.00 $500.00 SECTION C - - - STORM DRAIN SYSTEM $119,764.00 N AJOB\013194\SPECS\013194.010.00A. d oc B-11 Section A - Water Section B - Sanitary Sewer Section C - Storm Drain N :\JOB\013194\SPECS\013194.010.00A. d oc SUMMARY TOTAL B-12 $ 135.714.00 $ 123,855.00 $ 119.764.00 $ 379,333.00 PART B - PROPOSAL (cont.) �� , n vprre the aFFIGURt Of 0 The undersigned bidder certifies that he has been furnished at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and these specific Contract Documents and appurtenant plans. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction within 10 calendar days after issue of the work order by the Owner, and to complete the contract within 30 working days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A or B below, as applicable:) [ ] A. The principal place of business of our company is in the State of [ ] Nonresident bidders in the State of , our principal place of business are required to be _ percent lower than resident bidders by state law. A copy of the statute is attached. [ ] Nonresident bidders in the State of , our principal place of business, are not required to underbid resident bidders. [ X ] B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. N AJOB\013194\SPECS\013194.010.00A. d oc B-13 Receipt is acknowledged of the following addenda: Addendum No. 1 Addendum No. 2 Addendum No. 3 (SEAL) If Bidder is Corporation. Respectfully submitted, BY: Jerry Conaster TITLE: President ADDRESS: Conaster Construction TX. L.P. 5327 Wichita Street Fort Worth, TX 76119 NAJOB\013194\SPECS\013194.010.00A.doc B-14 CFA Estimate for: HERITAGE ADDITION PHASE 3D-B, SECTION 2B 05-08-2006 1_, STREET IMPROVEMENTS ITEM# DESCRIPTION CITY UNIT PRICE AMOUNT11 1 Unclassified Excavation 1,500 CY $ 3.50 $ 5,250.00 2 6"Lime Subgrade 2,810 S.Y. $2.25 $6,322.50 3 Hydrated Lime (30#/sy) 42 TON 105.00 4,410.00 4 6" R.C. Pvmt w/7" Curb 2,740 S.Y. 25.00 68,500.00 5 Traffic Markings 1,200 L.F. 2.00 2,400.00 6 4'x4" Sidewalk 1,160 L.F. 14.00 16,240.00 7 Remove & Dispose of Exist Asphalt (12" 1,600 SY 10.00 16,000.00 8 SWPPP 1 L.S. 1,000.00 1,000.00 9 Traffic control 1 L.S. 2,500.00 2,500.00 TOTAL - STREET IMPROVEMENTS $ 122,622.50 CADocuments and Settings\WoliverMocal Settings\Temporary Internet Files\0LK33\CFA-H3D-BSec2B- Final.AsShiver 5-08-06 GARTER & BURGESS, INC. 7 MAIN STREET, FORT WORTIH, TEXAS 7 IONS NO. (817) 735-6000 or Meiro (817) 429' CFA Estimate for: HERITAGE ADDITION PHASE 3D-B, SECTION 213 05-08-2006 STORM DRAIN SYSTEM ITEM# DESCRIPTION 1 Unclassified Channel Excavation 2 3-8'x6' Box Culvert * 3 Remove & Dispose of Exist 5'x3' Culvert 4 24" RCP 5 10' Curb Inlet 6 Trench Safety 7 SWPPP TOTAL - STORM DRAINAGE SYSTEM CITY UNIT PRICE AMOUNT I 500 CY $ 3.50 $ 1,750.00 30 L.F. 850.00 25,500.00 0.25 LS 1,000.00 250.00 50 LF 44.00 2,200.00 1 EA 2,200.00 2,200.00 80 L. F. 1.00 80.00 1 L.S. 500.00 500.00 * Price is for 1/2 of the cost of the north 30 L.F. of the box culvert $ 32,480.001 CADocuments and SettingsNoliveMLocal Settings\Temporary Internet Files\0LK33\CFA-H3D' 13�eq2B JJLb c';V1c L:1. FinaLxlsShiver 5-08-06 2 � � CFA Estimate for: HERITAGE ADDITION PHASE 3D-B, SECTION 2B 05-08-2006 pu�Axe. STREET LIGHTS RECEIVED ITEM# DESCRIPTION OT6ITI II 1M IStreet Lights I EA$1,900OO $ 1,400.00 TOTAL STREET LIGHTS $ 11,400.001 * $1900.00 unit cost per Mark Mathis for subdivisions in which Tri-County will install conduit systems and light foundations. 11SUBTOTAL PAVING AND STM DRAINAGE $ 155,102.50 1 Contingency 155,103 L.S. 10% 15,510.25 2 Engineering and Survey 155,103 L.S. 12% 18,612.30 3 Inspection Fee & Material Testing 155,103 L.S. 6% 9,306.15 TOTAL PAVING AND STM DRAINAGE $ 198,531.20 I TOTAL STREET LIGHTING $ 11,400.001 GRAND TOTAL $ 209,931.20 1 C:\Documents and Settings\WoliverT\Local Settings\Temporary Internet Files\OLK33\CFA-H3D-BSec2B- Final.xlsShiver 5-08-06 III STREETLIGHTS I. STREETLIGHTS COST ESTIMATE: QUANTITY UNIT COST TOTAL COST INTERSECTIONS 5 EA $ 1,900 $9,500.00 MID -BLOCK RESIDENTIAL 12 EA $ 1,900 $22,800.00 CHANGE OF DIRECTION RESIDENTIAL 1 EA $ 1,900 $1,900.00 MID -BLOCK COLLECTOR 0 EA $ 2,600 $00,000.00 MID -BLOCK ARTERIAL 0 EA $ 3,000 $00,000.00 MID -BLOCK ARTERIAL MEDIAN 0 EA $ 3,000 $00,000.00 RELOCATE EXISTING LIGHT 0 EA $ 1,650 $00,000.00 Subtotal $34,200.00 City's Cost $00,000.00 Developer's Subtotal $10,400.00 4% Inspection fee $0.00 Project Total $00,000.00 Adjacent Developer's Cost $00.000.00 Developer's Cost $34,200.00 DEVELOPERS COST: $34,200.00 CFA CODE # 2005058 Heritage Addition, Phase 3D-13, Section 26 Fort Worth, Texas July 25, 2006 PAGE 1 OF EXHIBIT "C" II. STREETLIGHTS WORK DESCRIPTION: 1. The Developer shall provide for the installation of streetlights at the approximate locations shown in exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2. Streetlights on residential and/or collector streets can be installed using overhead or underground conductors with the approval of the director of transportation and Public Works. 3. The City of Fort Worth will install all the streetlights that use overhead or underground conductors on residential, and collector streets. The developer agrees to pay the City of Fort Worth the amount shown below prior to the City starting its design efforts, at the option of the developer and at their expense they may purchase the poles, fixtures, and mast arms from the City in order to assure compliance with city material standards 4. Street lights on arterial streets shall be installed with underground conductors 5. The developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operations of the street light system 6. The estimated cost of this streetlight installation is detailed on page (1) of exhibit "C" and is summarized below. The streetlights will remain the property of, and will be maintained by the City of Fort Worth. DEVELOPERS COST: $34,200.00 July 25, 2006 CFA CODE # 2005058 Heritage Addition, Phase 3D-B, Section 213 PAGE 2 OF EXHIBIT "C" III. STREETLIGHTS LOCATIONS: INTERSECTIONS: Shiver Rd & Hawley Dr 1 Grinstein Dr & Hawley Dr 1 Cliburn Dr & Hawley Dr 1 Cliburn Dr & McFarland Way 1 Friedman Lane & McFarland Way_1 MID - BLOCK Grinstein Dr 3 Cliburn Dr 1 McFarland Way 4 Hawley Dr 4 CHANGE OF DIRECTION Grinstein Dr 1 CFA CODE # 2005058 Heritage Addition, Phase 3D-B, Section 2B PAGE 3 OF EXHIBIT "C" Iv STREET NAME SIGNS 1. The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of $85.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3. This development creates the following five (5) intersections at a cost to the Developer of $425.00: Hawley Dr & Shiver Rd Hawley Dr & Grinstein Dr Hawley Dr & Cliburn Dr Wiggins Way & Cliburn Dr Wiggins Way & Friedman Lane Note: This development is a PID, the developer (Hillwood {Brian Carlock}) pays a private contractor (Identitec) to install the signs on custom brackets. The $85 per intersection is for four (4) sign faces (decals) per intersection. Heritage Addition, Phase 3D-B, Section 2B CFA code: 2005058 May 3, 2005 \`\\y1` _._. __. i t EN To 1 GOLDEN: 1 RRIaNC1�—•' 1� 'RAY rITE r —...—+.nr 1 .. 1 1 L , .1 bl0L ' � m �►� `� `; 1 _ PROJECT ,LCZ40N _.. _..__._ .'F - f T- a ASS NOT TO SCALE LOCATION MAP HERITAGE PHASE 3D-B SEC.2B DON=q'\Jo0\ 013194\civ\ 194100.40n RECEIVED Carter - Burgess CARTER d BURGESS, INC. 777 mum mffr FMT WORKTA 761W 0171 735-dOW PROJECT NO. 013194.010.1.0630 PAGE I OF 7 ^zi � 36 is ji If 52 30 zo 27 21 25 28 21 �° 21 Z5 ^ it|26 | 29 -—ld 1508 - LEGEND pnup' ue'e/e nOxOwxv/50'ROW K1111A pnm"' 41'a/a ROADWAY/60'ROW ffm PROP. *'SiDEwxLx (BY *nwEBu|LDEm peup. 4's|ocwxLx (o' ocvcLoPcn) LIMITS OF PROJECT ------------- om^^Q,`/°m v','owC/v\ 'yw",a.dgn ° ^ " ~ is � " 2z 23 Z4 26 17 28 = STREETS EXHIBIT 'B' HERrrAGE PHASE3D—B SEC.2B Carter -- Burgess CARTER & BURGESS, INC. PROJECT NO. mav^wu'.000 PAGE ^vF, (fNl) 45 SCALES 1" = 200' „ ltk �4 �d 6 I 42 • � J7 41 35 r� 35 ~, / 1434 ,� • Q Q�LQ PQ4. / • �. •33 II yy JI / 14 ••� IB j\• 10 / 64 30 19 115 1 \ ` 20 16 ---.-- 21 J . 1 • ' 17 ,0 ✓✓1 B I J 27 22 14 • � � � ." qPy�• ... ........ 23 / f5 I9 CiRTNS"I'H_'TN DRIVE . 4�, -� 25 • (24 20 l6 (� • -54 25 I 24 21 \ ) I 17 77 PUBLIC 6 1B PARK . _, ......,_. _. ... . ..__. .............. ---.. _... ... _. I 27 22 73 b 19./ 74 28 71 70 C;LTBLJR/� DRIVE _ _ (I_TB DRIVE 26 1 1 I 23 24 25 26 27 28 27 I J -� 28 T 1-I� �•� �� Q j` 28 I- / I14 13 12 If 10 9 8 7 6 5 4 3 3l 32 73 34 35 36 37 38 39 40 41 47 43 44 45 46 /© SHIY ?R R@►D — LEGEND--------------—�k�-'u.re,._ STREETS PROP. 29' B/B /j EXHIBIT 'B' ROADWAY/ 50' ROW / /I HERITAGE PROP. 41' B/B> ESCROW HALF OF ROADWAY/60' ROW 41' B/B ROADWAY/60' ROW I PHASE 3D-B SEC. 2B WITH 4' SIDEWALK PROP. 4' SIDEWALK •••••••••••••••••••. ( BY HOMEBU I LDER) Carter =" Burgess PROP. 4' S I DEWALK CARTER & BURGESS, INC. 777 ( BY DEVELOPER) FORT WM STREET FORT WORTH,TX 76102 (817) 735-OW LIMITS OF PROJECT PROJECT NO. 013194. 010. 1. 063C DGN=p•\Job\ 013194\civ\ 1941cfa.dOn PAGE 4 OF 44 43 /3T 4z is I;zN SCALE: i' 200' 1' 30 1 IS Irl z 73 65 I U 27 I I 1 rH 1 a j6 r9 !: 1n IS 15I i i0 I I I6 QI I I a. I al I zz jjI PUBLIC I I I 1 PARK 12 y i 13 1 l9 1 2H 10' 10' 2l z0 CUBUR,II/ DRIVE 1 ° I ' EXIST 27" RCP—/ aJ d4 a9 26 77 26 I 2-8 ra 13 12 II !0 9 d f 4 5 4 3 2 1 2? G 1 D I J0 21 --4l a :4 3r `i1 S R tr 22 N I is I 6 t47 � I `2"HDWL I zs lI I i a9 ' J 4' 4II 46 �1g30 36"HDWL / STORM DRAIN LEGEND EXHIBIT 'B-1' PROP. STORM DRAIN LINE HERITAGE PROP. INLET % PHASE 3D—B SEC.213 PROP. MANHOLE —�— PROP. HEADWALL —{ Carter 4Bvrgess EXIST. STORM DRAIN LINE =____= LIMITS OF PROJECT -- — — — — — DON=qr\job\ 013194\civ\ 1941cfo.ogn CARTER & BURGESS, INC. 7" 144104 57W toff wom,7X 76102 IH1717354ow PROJECT NO. 013194. 010. 1. 0630 PAGE 5 OF 7 a¢5F'�a r 1C, 45 . C`L ` \y e . SCALEi l" = 200' 44 43 42 J7 41 J6 `tom e J5 14 34 ✓ 5 33 16 J7 17 Ile- \ J1 14 I IB D 64 30 /9 /5 I II 29 •• ` zo j I 16 66 f ze • ..-.. .. ... zi I 17 I 1 ,J 77 zz 1 18 ell, I 4 I I wwe� 76 s o 23 9 I bRTNSFETN DRTVli @� S CfI I 25 2.0 I 16 QI .. [[ 27 P(lBLfC LI I .. .. ... .�... .. _..- IB 21 PAIIX 27 I I 9 ' IUJ�yj 21 I 20 CLITIUR7� DVG — _ --- CLO D" 10, I I — — — f / 1 —4� ������ C4 2" HDNL I 10 / 26 EXIST 27";RCP I 23 24 25 26 27 ze � aB � © I l 14 /J /z 11 10 9 B 7 6 5 4 3 2 I 29 I / 29 — _ CAR MIS DRIW 15' 30 i 4' I Jo I / 15' I 31 / JIZ32 33 34 35 36 37 JB 39 40 41 42 43 44 45 46 u ® SW IR RC" � 15' 15' 35" HDNL 6a row 10' ESCROWHALF OF 30 LF OF 3—e' X6' BOX CULVERT NOTES IMPROVEMENTS IN SHIVER ROAD ARE ,�LL re - TO BE ESCROWED STOFW DRAIN LEGEND PROP. STORM DRAIN LINE PROP. INLET PROP. MANHOLE PROP. HEADWALL EXIST. STORM DRAIN LINE LIMITS OF PROJECT EXHIBIT 'B-1' HERITAGE PHASE 3D-B SEC.2B Carter Burgess CARTER & BURGESS, INC. 777 MOUN STREET FORT WORTH, TK 76102 (817) 735-6000 PROJECT NO. 013194. 010. 1. 0630 ON=pi\Jab\ 013194\olv\ 1941ofa.dgn PACE 5 OF 1 44 a`P 47 / ' \ 29 p \ t - ........ 7e a 71 � lJ \ \ n , yC. 27 14 Is 7! N 1 7S �I w(^7, SCALEl j" = 200' I !J ( I 17 I I I 1 la ( 19 I I I PUBLIC I I i i i i O 7 Is PARR I 1 ) • .. I 71 1 77 � I 7] 19 I �^ II N I alwRN DRTVL• 1..�C! -Q 'AOI 1 Ids CIJBURII DRIVE -- --- -- - -- --- -_ I 26 7J 74 25 76 77 79 -. l4 IJ f7 01 10 9 d I 6 S 4 ) 7 I I29 7) I)0 1 s I )1C'E: -V is is !) is STREET LIGHTS LEGEND EXHIBIT 'C' PROP. SINGLE STREET LIGHT HERITAGE EXIST. SINGLE STREET LIGHT O PHASE 31)-B SEC. 2B (ON STEEL POLE WITH STREET AND STOP SIGNS ATTACHED) PROP. STREET SIGN A Carter Burgess EXIST. STREET SIGN Q CARTER& BURGESS, INC. LIMITS OF PROJECT --------- m MNN mar TK76 FO; � PROJECT NO. 0 13194. 010. 1. 0630 OGN=q.\joD\ 013194\Civ\ 194100.00n PAGE 6 OF 7