HomeMy WebLinkAboutContract 34484 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS,f0liS6r Slyare Pbr g hereinafter called "Developer", desires to make certain improvements to I r`C���St2r S,�I I Lre_ an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended, is hereby incorporated into this Community Facilities Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. Developer acknowledges that there shall be no reduction in the amount of financial security prior to project completion and acceptance by the City. E. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. (� McAlister Square CFA 1 �� �vJln1 HCOI N October 19,2006 � ELS F. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. G. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees H. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. I. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). J. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). K. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. L. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to McAlister Square CFA 2 October 19,2006 construct current and future improvements provided for in this agreement. M. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof. Water (A)None; Sewer (A-1) None; Paving (B)Attached Storm Drain(B-1)Attached; Street Lights and Signs (C) Attached. N. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B 1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, BI, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $273,583.97. McAlister Square CFA 3 October 19,2006 SUMMARY OF COST McAlister Square Item Developer City Cost Total Cost Cost A. Construction $ 1. Streets $64,603.76 64,603.76 2. Storm Drainage $183,683.00 183,683.00 3. Street Lights $10,400.00 10,400.00 4. Street Name Signs $0.00 $ B. Engineering Design $ C. Construction Engineering and Management by DOE $ $ 4% 9,931.47 9,931.47 D. Materials Testing by DOE $ $ 2%) 4,965.74 4,965.74 TOTALS 273,583.97 $ - 273,583.97 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. 2. Developer's column for Item C represents four percent(4%) cost for construction inspection fees. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. 4. Developer's column for Item D represents two percent (2%) of paving and storm drain costs for materials testing. 5. Paid $57,078.63 for future improvements for McAlister Road. McAlister Square CFA 4 October 19,2006 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, d IDumo_oo executed this instrument in triplicate, at Fort Worth,Texas this the M'of 2006. RECEIVED OCT 25 2006 Approval Recommended: Transportation and Public Works Department Robert Goode,P. E. Director Cit o W ENE&C7!`QLU Marc Ott D Assistant City Manager I ATTEST: CiHendrix ty Secretary Approved orm: Assi ant Cit tto ey ATTEST: (J DEVELOPER B McAlister Square CFA 5 October 19,2006 Community Facilities Agreement for MCALISTER SQUARE August 11,2006 Description Quantity Unit Unit Price Total Exhibit B* Paving A. 6" Lime stabilized subgrade 607 S.Y. $ 3.01 $ 1,827.07 B. Hydrated Lime 30#/s ) 9 TON $ 115.00 $ 1,047.08 C. 6"concrete pavement 345 S.Y. $ 30.00 $ 10,350.00 D. 8"concrete pavement 262 S.Y. $ 33.93 $ 8,889.66 E. 4'sidewalk 2,395 L.F. $ 12.08 $ 28,931.60 F. Type I sidewalk ramp 12 Ea. $ 150.00 $ 1,800.00 G. 6"Concrete Curb 1,161 L.F. $ 4.90 $ 5,688.90 H. Sawcut and connect to ex. 645 L.F. 1 $ 9.41 $ 6,069.45 Subtotal $ 64,603.76 4% Inspection fee $ 2,584.15 2%Testing Fee $ 1,292.08 Exhibit B-1 *Storm Drain A. 30" RCP 96 L.F. $ 55.00 $ 5,280.00 B. 30"x24"Concrete Collar 14 L.F. $ 250.00 $ 3,500.00 C. 33" RCP 81 L.F. $ 60.00 $ 4,860.00 D. 36" RCP 971 L.F. $ 69.00 $ 66,999.00 E. 5'X3'RCB 367 L.F. $ 132.00 $ 48,444.00 F. 30" Headwall 1 Ea. $ 2,500.00 $ 2,500.00 G. 33" Headwall 1 Ea. $ 2,600.00 $ 2,600.00 H. 36" Headwall 1 Ea. $ 2,700.00 $ 2,700.00 I. Flared Wingwalls for 5'X3' RCB 2 Ea. $ 5,500.00 $ 11,000.00 J. 5'X5' Drop Inlet-Outlet Structure 1 Ea. $ 2,900.00 $ 2,900.00 K. 4'X4'Junction Box 1 Ea. $ 2,600.00 $ 2,600.00 L. 7'X7'Junction Box 1 Ea. $ 4,000.00 $ 4,000.00 M. 3'X3'Drop Inlet-Outlet Structure 1 Ea. $ 2,100.00 $ 2,100.00 N. 4'X4'Drop Inlet-Outlet Structure 1 Ea. $ 2,500.00 $ 2,500.00 0. Connect to Fac.24" RCP 1 Ea. $ 200.00 $ 200.00 P. Remove 24"Headwall 1 Ea. $ 250.00 $ 250.00 Q. Rip Rap at Outlet 1 L.S. $ 3,200.00 $ 3,200.00 R. Grading at TXDOT Connection 1 L.S. $ 2,850.00 $ 2,850.00 S. Grading Detention 1 1 L.S. $ 3,500.00 $ 3,500.00 T. Grading Detention 2 1 L.S. $ 5,500.00 $ 5,500.00 U. Grading Detention 3 1 L.S. $ 6,200.00 $ 6,200.00 Subtotal $ 183,683.00 4% Inspection fee $ 7,347.32 2%Testing Fee $ 3,673.66 Total Insp/Test Fee $ 14,897.21 Total Construction Cost $ 248,286.76 125% Total Const. Cost $ 310,358.44 G:1Office Data1WORK14791011CFA-PAVING (H&W).xlsCFA-PAVING (H&W).xis Community Facilities Agreement for MCALISTER SQUARE August 11,2006 Description Quantity Unit Unit Price Total Exhibit B*Paving(Future) A. 6"Lime stabilized subgrade 1,865 S.Y. $ 2.25 $ 4,196.25 B. Hydrated Lime(30#/s ) 28 TON $ 105.00 $ 2,937.38 C. 7"concrete pavement 1,865 S.Y. $ 25.00 $ 46,625.00 G. 6"Concrete Curb 750 L.F. $ 2.00 $ 1,500.00 H. Sawcut and connect to ex. 910 L.F. $ 2.00 $ 1,820.00 I. Subtotal $ 57,078.63 4% Inspection fee $ 2,283.15 2%Testing Fee $ 1,141.57 Total Insp/Test Fee $ 3,424.72 Total Construction Cost $ 57,078.63 125% Total Const.Cost $ 71,348.28 G:\Office Data\WORK\479\01\CFA-PAVING (H&W).xlsCFA- �!> M III STREETLIGHTS I. STREETLIGHTS COST ESTIMATE: QUANTITY UNIT COST TOTAL COST INTERSECTIONS 0 EA $ 2,600 $00,000.00 MID-BLOCK RESIDENTIAL 0 EA $ 2,600 $00,000.00 CHANGE OF DIRECTION RESIDENTIAL 0 EA $ 2,600 $00,000.00 MID-BLOCK COLLECTOR 4 EA $ 2,600 $10,400.00 MID-BLOCK ARTERIAL 0 EA $ 3,200 $00,000.00 MID-BLOCK ARTERIAL MEDIAN 0 EA $ 3,200 $00,000.00 RELOCATE EXISTING LIGHT 0 EA $ 1,650 $00,000.00 Subtotal $10,400.00 City's Cost $00,000.00 Developer's Subtotal $10,400.00 4% Inspection fee $0.00 Project Total $00,000.00 Adjacent Developer's Cost $00.000.00 Developer's Cost $10,400.00 DEVELOPERS COST: $10,400.00 CFA CODE # 2006064 McAlister Square Fort Worth, Texas August 24, 2006 PAGE 1 OF EXHIBIT "C" II. STREETLIGHTS WORK DESCRIPTION: 1. The Developer shall provide for the installation of streetlights at the approximate locations shown in exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2. Streetlights on residential and/or collector streets can be installed using overhead or underground conductors with the approval of the director of transportation and Public Works. 3. The City of Fort Worth will install all the streetlights that use overhead or underground conductors on residential, and collector streets. The developer agrees to pay the City of Fort Worth the amount shown below prior to the City starting its design efforts, at the option of the developer and at their expense they may purchase the poles, fixtures, and mast arms from the City in order to assure compliance with city material standards 4. Street lights on arterial streets shall be installed with underground conductors 5. The developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operations of the street light system 6. The estimated cost of this streetlight installation is detailed on page (1) of exhibit "C" and is summarized below. The streetlights will remain the property of, and will be maintained by the City of Fort Worth. DEVELOPERS COST: $10,400.00 August 24, 2006 CFA CODE # 2006064 McAlister Square PAGE 2 OF EXHIBIT "C" III. STREETLIGHTS LOCATIONS: MID — BLOCK COLLECTOR: McAlister Rd 4 CFA CODE # 2006064 McAlister Square PAGE 3 OF EXHIBIT "C" Iv STREET NAME SIGNS 1. The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of$245.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3. This development creates the following zero (0) intersections at a cost to the Developer of$0.00: (Existing intersections.) Mc Allister Square CFA code: 2006064 August 24, 2006 CROWLEY BURLESON F FORT FORT WORTH WORTH 9uaL sOH Hc LISTER SPINKS AIRPORT LIMIT Sl TE 39 LIMIT f� �P fq Q� O L®CAT l l ■ VI MAP MAPSCO 119P NOT TO SCALE w,:.N�nra�I>�cIl�aa�r�� SULIING A Acacenf>tme, Rime.CIVIL ENGINEERS - SURVEYORS (9 72)490-7090 FAX (972)490-7099 Scale I"= 120 Date : 5/16106 JOHN STEELE SURVEY, ABSTRACT NO. 1381 SHEET Design : M.D.C. CITY OF FORT WORTH VICINNY MAP TARRANT COUNTY, TEXAS 1 Drown W.A.I. ,.,m MCALISTER SQUARE Dwg. Fe : 47901CFA.dwg N3 CAPITAL, LLC OF 301 COMMERCIALSTREET, SUITE 3131 Project No. : 47901.00 20 FORT WORTH, TEXAS 76102 FORT WORTH, TARR07 COUNTY TEXAS 6 6" CURB PROP. 8" CONC. PROP. 4' PVMT. (DRIVEWAY) i SIDEWALK vi. L — I 6" CURB PROP. 4' \ SIDEWALK 1 . . PF70P:'4" } III SID WA 1 z 3 ` . CURB a 0 UIIIIIIIIITT� .�. 1 6" CURB IIS <am I \ I 11111 'iWl ill1 I IIS I (D 1 liSI E 111111111 Hill 10 hmIIIIIIII111 WA 1 I -pill 11111011111 ill Ill]10 �3 } I I I oy S I � U j11 n I U Co Ov J! � � � -� 4 d I a s fO o sj ao f a a I u H o j a t I In " CURB 0 11H IN iiiii''H I� I 9 I 11 I a is a- t I 6" CURB j to 1 HC RAMP1111 Jill I I I �,' A®®®cEll®111�®, Elmo. ROP. 4' 6" CURB PROP. 4' SIDEWALK CONSULTING CIVIL ENGINEERS " SURVEYORS SIDEWALK " CURB " CURB (97x) 490-7090 FAX(972) 490-7099 PROP. 6" PROP. 6" PROP. 6" CONC. PVMT. CONC. PVMT. CONC. PVMT. Scale : I"= 200 Dote : 5/-1-6-/70-6 JOHN STEELE SURVEY, ABSTRACT NO. 1381 PAVING EXIi1B1T SHEET Design M.O.C. CITY OF FORT WORTH Drown W.A.I. TARRANT COUNTY, TEXAS EXHIBIT B ow,cz N3 CAPITAL, LLC MCALISTER S ���,,t. o,R, Dwg. File 479018CFA.dw 301 COMMERCIAL STREET, SUITE 3131 5 Project No. : 47901.00 20 FORT WORTH, TEXAS 76102 FORT WORTH, TARRANT CO Si!1 7 m 1'I son S. J I O I II I :I I I II PROP, STREET LIGHT a (TYPICAL) I <€ IW DETEN I I :< �1 > 204 N •` c 2" PVC CONDUIT (TYP.) , a Ll PROP. STREET LIGHT (TYPICAL) I I 1 , , PROP. STREET LIGHT " (TYPICAL) ; L Js r07 O, K I O \I I O 3 I I 1 I 2" PVC CONDUIT (TYP.) X11 I I PROP. STREET LIGHT Al I \` (TYPICAL) B CONSULTING CIVIL ENGINEERS • SURVEYORS (9 72) 490-7090 FAX (972) 490-7099 I T. a SN Scole I"= 100' Dote : 5/16/06 JOHN STEELE SURVEY. ABSTRACT NO. 1381 STREET LIGHT EXHIBIT SHEET Design M.D.C. CITY OF FORT WORTH Drawn W.A.I. TARRANT COUNTY, TEXAS EXHIBIT C 6 N3 CAPITAL, LLC MCAIJSTER SQUARE OF Dwg. File 47901 B 1 CFA.dw 301 COMMERCIAL STREET, SUITE 3131 Project No. : 47901.00(20) FORT WORTH, TEXAS 76102 FORT WORTH, TARRANT COUNTY, TEXAS 6 I L Li'l f I I jI 9 � I - ---------------------------- =— Ij \ j� -- �� i JTffTTTTI-ff�fffl.l 11 I LIIIIIIIIIIIII 1 111 LiTTTlllllll j s l11 110 11111111 PIIIIIIIIIIII I lju I I I I I 111 pq I I I I I I I I I U � Is u I I I I I I I I I I I I 111,1111 HIM AJ 1� I J I I 6 w o a ti, a I m OL - s I y CURB 1w. `' Lis A�9Z®CCfi9Itt(VD, II1TiO. �- - ---- PROP. 7" CONSULTING CIVIL ENGINEERS • SURVEYORS CURB CONC. PVMT. CONC. PVMT. (9 72) 490-7090 FAX(972) 490-7099 PROP. 7" CONC. PVMT. Scale I"= 200 Dote : 5/16/06 JOHN STEELE SURVEY, ABSTRACT NO. 1381 PAVING EXHIBIT (FUTURE) SHEET Design M.O.C. CITY OF FORT WORTH Drawn W.A.I. TARRANT COUNTY, TEXAS EXHIBIT B ]( —M N3 CAPITAL, LLC MCALISTER SQUARE OF Dwg. File 47901 BCFA.dwg 301 COMMERCIAL STREET, SUITE 3131 Project No. : 47901.00(20) FORT WORTH, TEXAS 76102 FORT WORTH, TARRANT COUNTYTEXAS 1