HomeMy WebLinkAboutContract 34484 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS,f0liS6r Slyare Pbr g hereinafter called "Developer", desires to
make certain improvements to I r`C���St2r S,�I I Lre_ an addition to the
City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth and subsequently amended, is hereby incorporated into this
Community Facilities Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section II, of the Policy.
D. Developer acknowledges that there shall be no reduction in the amount
of financial security prior to project completion and acceptance by the
City.
E. The Developer shall award all contracts for the construction of
community facilities in accordance with Section II, paragraph 7 of the
Policy.
(�
McAlister Square CFA 1 �� �vJln1 HCOI N
October 19,2006 � ELS
F. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the
Policy.
G. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or
damages are caused, in whole or in part, by the alleged negligence of
the City of Fort Worth, its officers, servants, or employees
H. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
I. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104.100, Ordinance 7234).
J. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104.100, Ordinance 7234).
K. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
L. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to
McAlister Square CFA 2
October 19,2006
construct current and future improvements provided for in this
agreement.
M. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof. Water (A)None; Sewer (A-1) None; Paving (B)Attached
Storm Drain(B-1)Attached; Street Lights and Signs (C) Attached.
N. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B 1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, BI,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $273,583.97.
McAlister Square CFA 3
October 19,2006
SUMMARY OF
COST
McAlister Square
Item Developer City Cost Total Cost
Cost
A. Construction $
1. Streets $64,603.76 64,603.76
2. Storm Drainage $183,683.00 183,683.00
3. Street Lights $10,400.00 10,400.00
4. Street Name Signs $0.00 $
B. Engineering Design $
C. Construction Engineering
and Management by DOE $ $
4% 9,931.47 9,931.47
D. Materials Testing by DOE $ $
2%) 4,965.74 4,965.74
TOTALS 273,583.97 $ - 273,583.97
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
2. Developer's column for Item C represents four percent(4%) cost for construction
inspection fees. The City will pay additional inspection fee over 4%.
3. City not preparing plans and specifications.
4. Developer's column for Item D represents two percent (2%) of paving and storm drain
costs for materials testing.
5. Paid $57,078.63 for future improvements for McAlister Road.
McAlister Square CFA 4
October 19,2006
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by
its City Secretary, with the corporate seal of the City affixed, d IDumo_oo
executed this instrument in triplicate, at Fort Worth,Texas this the M'of
2006. RECEIVED
OCT 25 2006
Approval Recommended:
Transportation and Public Works
Department
Robert Goode,P. E.
Director
Cit o W
ENE&C7!`QLU Marc Ott
D Assistant City Manager
I
ATTEST:
CiHendrix
ty Secretary
Approved orm:
Assi ant Cit tto ey
ATTEST: (J DEVELOPER
B
McAlister Square CFA 5
October 19,2006
Community Facilities Agreement
for
MCALISTER SQUARE
August 11,2006
Description Quantity Unit Unit Price Total
Exhibit B* Paving
A. 6" Lime stabilized subgrade 607 S.Y. $ 3.01 $ 1,827.07
B. Hydrated Lime 30#/s ) 9 TON $ 115.00 $ 1,047.08
C. 6"concrete pavement 345 S.Y. $ 30.00 $ 10,350.00
D. 8"concrete pavement 262 S.Y. $ 33.93 $ 8,889.66
E. 4'sidewalk 2,395 L.F. $ 12.08 $ 28,931.60
F. Type I sidewalk ramp 12 Ea. $ 150.00 $ 1,800.00
G. 6"Concrete Curb 1,161 L.F. $ 4.90 $ 5,688.90
H. Sawcut and connect to ex. 645 L.F. 1 $ 9.41 $ 6,069.45
Subtotal $ 64,603.76
4% Inspection fee $ 2,584.15
2%Testing Fee $ 1,292.08
Exhibit B-1 *Storm Drain
A. 30" RCP 96 L.F. $ 55.00 $ 5,280.00
B. 30"x24"Concrete Collar 14 L.F. $ 250.00 $ 3,500.00
C. 33" RCP 81 L.F. $ 60.00 $ 4,860.00
D. 36" RCP 971 L.F. $ 69.00 $ 66,999.00
E. 5'X3'RCB 367 L.F. $ 132.00 $ 48,444.00
F. 30" Headwall 1 Ea. $ 2,500.00 $ 2,500.00
G. 33" Headwall 1 Ea. $ 2,600.00 $ 2,600.00
H. 36" Headwall 1 Ea. $ 2,700.00 $ 2,700.00
I. Flared Wingwalls for 5'X3' RCB 2 Ea. $ 5,500.00 $ 11,000.00
J. 5'X5' Drop Inlet-Outlet Structure 1 Ea. $ 2,900.00 $ 2,900.00
K. 4'X4'Junction Box 1 Ea. $ 2,600.00 $ 2,600.00
L. 7'X7'Junction Box 1 Ea. $ 4,000.00 $ 4,000.00
M. 3'X3'Drop Inlet-Outlet Structure 1 Ea. $ 2,100.00 $ 2,100.00
N. 4'X4'Drop Inlet-Outlet Structure 1 Ea. $ 2,500.00 $ 2,500.00
0. Connect to Fac.24" RCP 1 Ea. $ 200.00 $ 200.00
P. Remove 24"Headwall 1 Ea. $ 250.00 $ 250.00
Q. Rip Rap at Outlet 1 L.S. $ 3,200.00 $ 3,200.00
R. Grading at TXDOT Connection 1 L.S. $ 2,850.00 $ 2,850.00
S. Grading Detention 1 1 L.S. $ 3,500.00 $ 3,500.00
T. Grading Detention 2 1 L.S. $ 5,500.00 $ 5,500.00
U. Grading Detention 3 1 L.S. $ 6,200.00 $ 6,200.00
Subtotal $ 183,683.00
4% Inspection fee $ 7,347.32
2%Testing Fee $ 3,673.66
Total Insp/Test Fee $ 14,897.21
Total Construction Cost $ 248,286.76
125% Total Const. Cost $ 310,358.44
G:1Office Data1WORK14791011CFA-PAVING (H&W).xlsCFA-PAVING (H&W).xis
Community Facilities Agreement
for
MCALISTER SQUARE
August 11,2006
Description Quantity Unit Unit Price Total
Exhibit B*Paving(Future)
A. 6"Lime stabilized subgrade 1,865 S.Y. $ 2.25 $ 4,196.25
B. Hydrated Lime(30#/s ) 28 TON $ 105.00 $ 2,937.38
C. 7"concrete pavement 1,865 S.Y. $ 25.00 $ 46,625.00
G. 6"Concrete Curb 750 L.F. $ 2.00 $ 1,500.00
H. Sawcut and connect to ex. 910 L.F. $ 2.00 $ 1,820.00
I. Subtotal $ 57,078.63
4% Inspection fee $ 2,283.15
2%Testing Fee $ 1,141.57
Total Insp/Test Fee $ 3,424.72
Total Construction Cost $ 57,078.63
125% Total Const.Cost $ 71,348.28
G:\Office Data\WORK\479\01\CFA-PAVING (H&W).xlsCFA- �!> M
III STREETLIGHTS
I. STREETLIGHTS COST ESTIMATE:
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 0 EA $ 2,600 $00,000.00
MID-BLOCK RESIDENTIAL 0 EA $ 2,600 $00,000.00
CHANGE OF DIRECTION RESIDENTIAL 0 EA $ 2,600 $00,000.00
MID-BLOCK COLLECTOR 4 EA $ 2,600 $10,400.00
MID-BLOCK ARTERIAL 0 EA $ 3,200 $00,000.00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 3,200 $00,000.00
RELOCATE EXISTING LIGHT 0 EA $ 1,650 $00,000.00
Subtotal $10,400.00
City's Cost $00,000.00
Developer's Subtotal $10,400.00
4% Inspection fee $0.00
Project Total $00,000.00
Adjacent Developer's Cost $00.000.00
Developer's Cost $10,400.00
DEVELOPERS COST: $10,400.00
CFA CODE # 2006064
McAlister Square
Fort Worth, Texas August 24, 2006
PAGE 1 OF EXHIBIT "C"
II. STREETLIGHTS WORK DESCRIPTION:
1. The Developer shall provide for the installation of streetlights at the approximate locations
shown in exhibit "C", immediately after final acceptance of the street construction, in
accordance with engineering plans and specifications approved by the Transportation and
Public Works Department.
2. Streetlights on residential and/or collector streets can be installed using overhead or
underground conductors with the approval of the director of transportation and Public
Works.
3. The City of Fort Worth will install all the streetlights that use overhead or underground
conductors on residential, and collector streets. The developer agrees to pay the City of
Fort Worth the amount shown below prior to the City starting its design efforts, at the option
of the developer and at their expense they may purchase the poles, fixtures, and mast arms
from the City in order to assure compliance with city material standards
4. Street lights on arterial streets shall be installed with underground conductors
5. The developer agrees to dedicate all easements required for the installation and
maintenance of the street lights and to provide for the installation of any electrical
transformers required for the proper operations of the street light system
6. The estimated cost of this streetlight installation is detailed on page (1) of exhibit "C" and is
summarized below. The streetlights will remain the property of, and will be maintained by
the City of Fort Worth.
DEVELOPERS COST: $10,400.00
August 24, 2006
CFA CODE # 2006064
McAlister Square
PAGE 2 OF EXHIBIT "C"
III. STREETLIGHTS LOCATIONS:
MID — BLOCK COLLECTOR:
McAlister Rd 4
CFA CODE # 2006064
McAlister Square
PAGE 3 OF EXHIBIT "C"
Iv
STREET NAME SIGNS
1. The City of Fort Worth will install the street name signs upon final
approval of the street construction. The street name signs will remain
the property of, and will be maintained by, the City of Fort Worth.
2. The Developer will pay for the street name sign installations required
for this development to the extent of$245.00 per intersection. This
unit cost will be revised annually by the Department of Transportation
and Public Works to reflect prevailing costs of materials and labor.
3. This development creates the following zero (0) intersections at a cost
to the Developer of$0.00:
(Existing intersections.)
Mc Allister Square
CFA code: 2006064 August 24, 2006
CROWLEY BURLESON
F
FORT
FORT WORTH WORTH
9uaL sOH
Hc LISTER SPINKS
AIRPORT
LIMIT Sl TE
39 LIMIT
f�
�P
fq
Q�
O
L®CAT l l ■ VI MAP
MAPSCO 119P
NOT TO SCALE
w,:.N�nra�I>�cIl�aa�r��
SULIING
A Acacenf>tme, Rime.CIVIL ENGINEERS - SURVEYORS
(9 72)490-7090 FAX (972)490-7099
Scale I"= 120 Date : 5/16106 JOHN STEELE SURVEY, ABSTRACT NO. 1381 SHEET
Design : M.D.C. CITY OF FORT WORTH VICINNY MAP
TARRANT COUNTY, TEXAS 1
Drown W.A.I. ,.,m MCALISTER SQUARE
Dwg. Fe : 47901CFA.dwg N3 CAPITAL, LLC OF
301 COMMERCIALSTREET, SUITE 3131
Project No. : 47901.00 20 FORT WORTH, TEXAS 76102 FORT WORTH, TARR07 COUNTY TEXAS 6
6" CURB
PROP. 8" CONC.
PROP. 4' PVMT. (DRIVEWAY)
i SIDEWALK vi.
L — I 6" CURB
PROP. 4' \
SIDEWALK
1 . .
PF70P:'4" }
III SID WA 1 z 3
` . CURB
a
0
UIIIIIIIIITT� .�.
1 6" CURB
IIS <am I \ I
11111
'iWl ill1
I
IIS I (D 1
liSI E 111111111 Hill 10 hmIIIIIIII111 WA
1 I -pill 11111011111
ill Ill]10
�3
}
I
I I oy
S I � U
j11 n I U Co Ov
J! � � � -� 4 d
I a s fO o sj
ao f a a
I u
H o
j a t I
In " CURB
0 11H IN iiiii''H
I� I
9 I
11 I a
is a- t I 6" CURB
j to
1 HC RAMP1111 Jill
I I
I
�,' A®®®cEll®111�®, Elmo. ROP. 4' 6" CURB PROP. 4' SIDEWALK
CONSULTING CIVIL ENGINEERS " SURVEYORS SIDEWALK " CURB " CURB
(97x) 490-7090 FAX(972) 490-7099 PROP. 6" PROP. 6" PROP. 6"
CONC. PVMT. CONC. PVMT. CONC. PVMT.
Scale : I"= 200 Dote : 5/-1-6-/70-6 JOHN STEELE SURVEY, ABSTRACT NO. 1381 PAVING EXIi1B1T SHEET
Design M.O.C. CITY OF FORT WORTH
Drown W.A.I. TARRANT COUNTY, TEXAS EXHIBIT B
ow,cz N3 CAPITAL, LLC MCALISTER S ���,,t. o,R,
Dwg. File 479018CFA.dw 301 COMMERCIAL STREET, SUITE 3131 5
Project No. : 47901.00 20 FORT WORTH, TEXAS 76102 FORT WORTH, TARRANT CO Si!1
7
m 1'I
son S.
J I
O I II
I :I
I I
II
PROP, STREET LIGHT a
(TYPICAL) I <€
IW
DETEN
I
I :<
�1
> 204
N
•` c
2" PVC CONDUIT (TYP.) ,
a Ll PROP. STREET LIGHT
(TYPICAL)
I I
1 , ,
PROP. STREET LIGHT "
(TYPICAL) ;
L
Js
r07
O,
K
I O \I
I O
3
I
I 1
I
2" PVC CONDUIT (TYP.) X11 I I
PROP. STREET LIGHT
Al
I \`
(TYPICAL)
B
CONSULTING CIVIL ENGINEERS • SURVEYORS
(9 72) 490-7090 FAX (972) 490-7099 I T. a SN
Scole I"= 100' Dote : 5/16/06 JOHN STEELE SURVEY. ABSTRACT NO. 1381 STREET LIGHT EXHIBIT SHEET
Design M.D.C. CITY OF FORT WORTH
Drawn W.A.I. TARRANT COUNTY, TEXAS EXHIBIT C 6
N3 CAPITAL, LLC MCAIJSTER SQUARE OF
Dwg. File 47901 B 1 CFA.dw 301 COMMERCIAL STREET, SUITE 3131
Project No. : 47901.00(20) FORT WORTH, TEXAS 76102 FORT WORTH, TARRANT COUNTY, TEXAS 6
I
L
Li'l f I
I
jI
9 �
I - ---------------------------- =—
Ij \
j� --
�� i JTffTTTTI-ff�fffl.l 11
I
LIIIIIIIIIIIII
1
111 LiTTTlllllll j s
l11 110 11111111
PIIIIIIIIIIII
I
lju I I I I I 111 pq I I I I I I I I I U �
Is
u I I I I I I I I I I I I
111,1111 HIM
AJ
1� I J
I
I 6
w o a ti, a I
m OL
-
s
I y
CURB
1w.
`' Lis A�9Z®CCfi9Itt(VD, II1TiO. �- - ---- PROP. 7"
CONSULTING CIVIL ENGINEERS • SURVEYORS CURB CONC. PVMT. CONC. PVMT.
(9 72) 490-7090 FAX(972) 490-7099 PROP. 7"
CONC. PVMT.
Scale I"= 200 Dote : 5/16/06 JOHN STEELE SURVEY, ABSTRACT NO. 1381 PAVING EXHIBIT (FUTURE) SHEET
Design M.O.C. CITY OF FORT WORTH
Drawn W.A.I. TARRANT COUNTY, TEXAS EXHIBIT B ](
—M N3 CAPITAL, LLC MCALISTER SQUARE OF
Dwg. File 47901 BCFA.dwg 301 COMMERCIAL STREET, SUITE 3131
Project No. : 47901.00(20) FORT WORTH, TEXAS 76102 FORT WORTH, TARRANT COUNTYTEXAS 1