HomeMy WebLinkAboutContract 34830STATE OF TEXAS
AMENDMENT NO. 1
� CITY SECRETARY CONTRACT NO.
(No M&C Needed)
COUNTY OF TARRANT �
WHEREAS, the City of Fort Worth (City) and Teague Nall and
Perkins, (Engineer) made and entered into City Secretary Contract
No. 32301, (the Contract) which was authorized by the City Council
by M&C C-20925 on the 30th day of August, 2005; and
WHEREAS, the Contract involves engineering services for the
following project:
2004 CIP Stream WF-4 (Lebow Channel) Hydrologic and Hydraulic
Analysis (City Project No. 00084)
WHEREAS, it
to said Contract
maximum fee;
has become necessary to execute Amendment No. 1
to include an increased scope of work and revised
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
1.
Article I of the Contract is amended to include the
additional engineering services specified in a proposal letter
dated October 27, 2006 a copy of which is attached hereto and
incorporated herein. The cost to City for the additional services
to be performed by Engineer total $17,600.00
2.
Article II of the Contract is amended to provide for an
increase in the maximum fee to be �aid to Engineer for all work
and services performed under the Contract, a amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $261,500.00
���)'��1�.1 ��s�'��,�'[�,
�����'�j �� `���'s��t+, ��'7
1��� 6 v�G1:uL�-�t'�
-���
��� .:�,��J:�U� ����e
3.
All other provisions of the Contract which are not expressly
amended herein shall remain in full force and effect.
EXECUTED on this the f� day of I� ,
200�� in Fort Worth, Tarrant County, Texas.
n 1 I
ATTEST : I�O
Contract Authorization
�� � -- 1 `
� �.
Marty Hend 'x, City Secretary Date
APPROVAL RECOD�NDED:
�a.�5 (.
��
Robert ode, P.E.
Director, Dept of Transportation
and Public Works
TEAGUE NALL AND PERKINS, INC.
ENGINE R ,
,
sy . ��' ' � l - �-� ,
�
�-
Name: Michael A. Z�ones
Principal
1100 Macon Street
Fort Worth, Texas 76102
APPROVED AS T1dr FORM AND
Assistan�City jd4t
APPROVE `
_ l
Mar �A. Ott
Assistant City Manager
� ; �, � ;.
�;���J� �).':� 1:�'�u.�:'c'
�� +� �I V�� ��'��j�'���� ��;11U �l
\; � . � 1•
;�' C� f 1��
o ..';i1.��11'� �����
�.�_ �. � �
�,� TEAGUE NALL AND PERK/NS
Civil Engineering ; Surveying j Landscape Architecture ,' Planning
October 27, 2006
Mr. Don McChesney, P.E.
Project Manager
Transportation/Public Works
City of Fort Worth
1000 Throckmorton Street
Fort Worth, Texas 76102-6311
RE: 2004 CIP Stream WF-4 (Lebow Channel)
Fee Proposal for Contract Amendment No. 1
DOE No. 4964
TNP No. FTW 05200
Dear Mr. McChesney:
As you recall, the original contract for this project included $20,000 for Special Services related to
the Lebow Channei study and design. These special services were to be performed at the specific
request of the City. Teague Nall and Perkins, Inc. is submitting this Amendment No. 1 to the above
referenced contract based on additional special services requested and provided, beyond the allotted
budget in the original contract. The following is a brief description and cost for all of the Special
Services provided on this project:
I. Description of Special Services:
1. Special Services to Abandon a Portion of 32"d Street and Oscar Street
This amendment adds the design for abandoning a portion of Oscar Street and a portion of
32"d Street. The original contract only included the design of pavement improvements for
Vera Cruz.. The scope and fee for these additional services also includes the design of
utility relocations required to avoid proposed storm drain and pavement construction.
■ Engineering Services: $ 27,500.00
2. Special Services to Lebow Hydrologic and Hydraulic Analyses
■ This amendment covers preparation of the iterative calculations associated with multiple
improvement alternatives at the Long Avenue crossing.
■ Long Avenue Analyses: $ 10,100.00
Total Cost for Special Services:
$37,600.00
�v'r�J����:`.1 �'_ ���'�_ � �' �
�.L�I�Ja,'D
�����' ;� �'yo,:5�;'� �r
c��c ,,; �
��7 ;�;" �S�U' Slr �^
1100 Macon Street ;' Fort Worth, Texas 76102 � 817.336.5773 phone i 817.336 81��fa�r"�:>i:l��;� u',�(:
www. tnp-online. com _—_-__ . _
. . •. i-s .. .- ....
II. Summa of S ecial Services:
Total Special Services:
Less A�location in Original Contract:
AMENDMENT NO. 1
$37,600.00
(20,000.00)
$17,600.00
Mr. Don McChesney, P.E.
October 11, 2006
Page 2 of 2
As mentioned previously, a portion ($20,000) of the Total Special Services fee shown above
was anticipated and included in the original contract as Special Services. Therefore, the
amount shown above for Amendment No. 1 includes only the difference between the
allocation for special services in the original contract and the actual services requested and/or
anticipated at this time.
III. Summary of Contract Fee•
� �-, � „ ,
Original Contract Amount:
Original Special Services:
Amendment No. 1:
Revised Contract Amount
$ 223,900.00
$ 20,000.00
$ 17,600.00
$ 261,500.00
Thank you for consideration of this contract amendment request. If you have any questions, please
do not hesitate to call me.
Sincerely,
TEAGUE NALL AND PERKINS, INC.
�
Kelly Dillard, P.E., CFM
Copy: Mr. Richard Argomaniz, PE — Fort Worth DOE
Mr. Steve Eubanks, P.E. — Fort Worth TPW
q:\Idt\ftw05200\docs\contractLcontract amend Oi.doc