Loading...
HomeMy WebLinkAboutContract 34801-A7AMENDMENT No . 7 TO CITY SECRETARY CONTRACT �'-�''�� � � ` �"��� WHEREAS, the City of Fort Worth (CITY) and Teague Nall and Perkins, Inc., (ENGINEER) made and entered into City Secretary Contract No. 34801, (the CONTRACT) which was authorized by M&C C-21918 on the 9th day of January, 2007 in the amount of $668,038.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $19,000.00 which was administratively authorized by the City on the 19th day of June, 2007; and subsequently revised by Amendment #2 in the amount of $89,000.00 which was authorized by the City Council on the 18th day of March, 2008 (M&C C-22712); and subsequently revised by Amendment #3 in the amount of $190,400.00 which was authorized by the City Council on the 3rd day of February, 2009 (M&C C-23325); and subsequently revised by Amendment #4 in the amount of $50,000.00 which was administratively authorized by the City on the 20th day of December 2010; and subsequently revised by Amendment #5 in the amount of $113,128.00 which was authorized by the City Council on the 6th day of December, 2011 (M&C C-25310); and subsequently revised by Amendment #6 in the amount of $132,115.00 which was authorized by the City Council on the 5th day of March, 2013 (M&C C-26127); and WHEREAS, the CONTRACT involves engineering services for the following project: Keller-Hicks Road from 750 feet west of Ridgeview Street to Park Vista Boulevard and North Beach Street from Golden Triangle to Keller-Hicks Road, Project Nos. 00653, 00791 and 01455; and WHEREAS, it has become necessary to execute Amendment No. 7 to the CONTRACT to include a revised scope of work. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: l. Article I of the CONTR.ACT is amended to include the additional engineering services specified in a proposal dated February 2, 2015, a copy of which is attached hereto and incorporated herein. There is no additional cost to City for the revised design services to,be performed by Engineer . _ _ � ; . ,�� ' ����Il��d ��� �� ��f� �1 ��F��IA� ������� ' C�6i: ��CRETWRY �B �A�Y�1, TX Page -1- t = __—=— � _-, 2. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. ATTEST: City Sec APPROVED: �� Fernando Costa Assistant City Manager APPR L RECOMMENDED: I �� V� .. � Douglas� . Wiersig, P.E. Director, Transportation ublic Works Department ENGINEER Teague Nall and Perkins, Inc. ���� Mark Berry, P.E. Principal APPROVED AS TO FORM AND LEGALITY: M&C: Date: Douglas W. Black Assistant City Attorney _----- .- .-_-- _ -- , OPFICIAL RECO�� CITY SECRETARY �'. WORTH, TX Page -2- February 02, 2015 Mr. Michael R. Weiss P.E. City of Fort Worth Transportation and Public Works Department 1000 Throckmorton Fort Worth, Texas 76102 �������tn ��� p teague nall & perkins ' w,,,w.�„P;,,�.�om �, engineers surveyors landsmpe orchite� Re: UNIT 1: Keller Hicks Road (750' west of Ridgeview thru Alta Vista Intersection) UNIT 2: Keller Hicks Road (Alta Vista to Park Vista Boulevard), North Beach Street (Golden Triangle Boulevard to Keller Hicks Road) Fee Proposal for Contract Amendment No. 7(Revised - Final) Dear Mr. Weiss: Teague Nall and Perkins, Inc. is submitting this fee Amendment to the above referenced contract b�sed on c�dditic�nal services requested. The following is a brief description and cost for the additional services provided on this project: Additional Services to provide Engineering and Surveying Services associated with UNIT 2: Keller bicks Road (Alt� Vis4a 4o Park Vista Boulevard), As requested, engineering services would be provided to design new headwall improvements at the �14wnstrec�m end �f the existing cu[vert crossing, to the east of Park Vista Boulevard and Keller Hicks Roc�� intersecti�n: In ndditien, bik_s !anes �xers requested to be added t� th� north �nd south si�es �f the road. P.evisions to Sta�rr Drrin Line `P' cir-e -r��uir��i c�u� po �He cc�nTlicis wiih fihe elevaiion of an cxis�i���j ur�UEryr�uiiU ei�ciric iin� ownep by iri-Couniy. This section or fine iJNii2 r�roject wns under construction and required plan revisions, Opinion of Probable Construction Cost, and revised quantities. The ��ditioral Surveyir� Scrvices e��isisis oi �r�parir�� exhibi'rs associaied with a new drainag� eas�ment f�r the headwal! improvements. This fee aenendment also accovnts for final adjustments based on actual services provided. • Additional Engineering Services o Revised Plans to incorp�rei�� bike lahes on north and south sides of road o Revised Storm Drain Line `B' pt Kenny Drive to avoid Tri-County underground electric fine o Revise plans and quantities to account for a new headwall and associated drainage improvements. o Preparation and Coordination of US�4CE Pre-Construction Notifieation o Wetlands delineation for North Beach Street o Administration fee (10%) on Sub consultants $ 900 $ 1,600 $4,919.85 (� 1,969.0� ($ 5,500) ($ 674.53) i`� Fart Worlh � 1 100 Macon Street� ForT Worth, Texas 76102 � 817.336.5773 9allas � 17304 Preston Road, Suite 1340� Dallas, Texas 75252� 214.461.9867 DenPon � 1517 Centre Place Drive, Suite 320� Denton, Texas 76205 � 940.383.4177 Sherman � 200 North Travis Street, SuiTe 500 � Sherman, Texas 75090 � 903.970.1089 Regisfered by fhe Texas Board of Professional Engineers, firm No. F-230 � Repistered by ihe Texas Board of Professional Surveyon; Firm Nn. Ipp116-Qp Mr. Michael R. WEiss, I�E, Februury 02, 2015, Puye 2 uf 2 Additional Surveying Services o Storm Drain re-staking for Keller Hicks (UNIT 2) 723.75 Total Contract Amendment No. 7(Revised - Final): �ur�mary �f C�ntrccct Fee: Original Contract Amount• � 66�3 03$ Amendment No. 1: $ 19,000 Amendment No. 2: $ 89,000 Amendment No. 3: $ 190,400 Amendment No. 4: $ 50,000 Amendment No. 5: $ 1 13,128 Amendment No. 6(Revised): $ 1 32,1 15 Amendment No. 7(Revised - Final)• $ 0 REvised Contract Amount $1,261,601 $0 Thank you for consideration of this contract amendment request. If you have any questions, please do not hesitate to cpll me. Sincerely, tnp teague nall & perkins Scott A. Gibson, P.E. 5r. Project Manager Copy: Mr. Tom Rutledge — TNP o:lprojectslftw06319\fee proposall_contract amend 07.doc