HomeMy WebLinkAboutContract 34801-A7AMENDMENT No . 7
TO CITY SECRETARY CONTRACT �'-�''�� � � ` �"���
WHEREAS, the City of Fort Worth (CITY) and Teague Nall and Perkins,
Inc., (ENGINEER) made and entered into City Secretary Contract No. 34801,
(the CONTRACT) which was authorized by M&C C-21918 on the 9th day of
January, 2007 in the amount of $668,038.00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number
1 in the amount of $19,000.00 which was administratively authorized by
the City on the 19th day of June, 2007; and subsequently revised by
Amendment #2 in the amount of $89,000.00 which was authorized by the City
Council on the 18th day of March, 2008 (M&C C-22712); and subsequently
revised by Amendment #3 in the amount of $190,400.00 which was authorized
by the City Council on the 3rd day of February, 2009 (M&C C-23325); and
subsequently revised by Amendment #4 in the amount of $50,000.00 which
was administratively authorized by the City on the 20th day of December
2010; and subsequently revised by Amendment #5 in the amount of
$113,128.00 which was authorized by the City Council on the 6th day of
December, 2011 (M&C C-25310); and subsequently revised by Amendment #6 in
the amount of $132,115.00 which was authorized by the City Council on the
5th day of March, 2013 (M&C C-26127); and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Keller-Hicks Road from 750 feet west of Ridgeview Street to Park
Vista Boulevard and North Beach Street from Golden Triangle to
Keller-Hicks Road, Project Nos. 00653, 00791 and 01455; and
WHEREAS, it has become necessary to execute Amendment No. 7 to the
CONTRACT to include a revised scope of work.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
l.
Article I of the CONTR.ACT is amended to include the additional
engineering services specified in a proposal dated February 2, 2015, a
copy of which is attached hereto and incorporated herein. There is no
additional cost to City for the revised design services to,be performed
by Engineer . _ _ � ; . ,��
' ����Il��d ��� �� ��f�
�1 ��F��IA� �������
' C�6i: ��CRETWRY
�B �A�Y�1, TX
Page -1- t = __—=—
� _-,
2.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date last written by a signatory,
below.
ATTEST:
City Sec
APPROVED:
��
Fernando Costa
Assistant City Manager
APPR L RECOMMENDED:
I �� V� .. �
Douglas� . Wiersig, P.E.
Director, Transportation ublic Works Department
ENGINEER
Teague Nall and Perkins, Inc.
����
Mark Berry, P.E.
Principal
APPROVED AS TO FORM AND LEGALITY: M&C:
Date:
Douglas W. Black
Assistant City Attorney
_----- .-
.-_-- _ -- ,
OPFICIAL RECO��
CITY SECRETARY
�'. WORTH, TX
Page -2-
February 02, 2015
Mr. Michael R. Weiss P.E.
City of Fort Worth
Transportation and Public Works Department
1000 Throckmorton
Fort Worth, Texas 76102
�������tn ���
p
teague nall & perkins ' w,,,w.�„P;,,�.�om
�, engineers
surveyors
landsmpe orchite�
Re: UNIT 1: Keller Hicks Road (750' west of Ridgeview thru Alta Vista Intersection)
UNIT 2: Keller Hicks Road (Alta Vista to Park Vista Boulevard),
North Beach Street (Golden Triangle Boulevard to Keller Hicks Road)
Fee Proposal for Contract Amendment No. 7(Revised - Final)
Dear Mr. Weiss:
Teague Nall and Perkins, Inc. is submitting this fee Amendment to the above referenced contract
b�sed on c�dditic�nal services requested. The following is a brief description and cost for the
additional services provided on this project:
Additional Services to provide Engineering and Surveying Services associated with UNIT 2:
Keller bicks Road (Alt� Vis4a 4o Park Vista Boulevard),
As requested, engineering services would be provided to design new headwall improvements at the
�14wnstrec�m end �f the existing cu[vert crossing, to the east of Park Vista Boulevard and Keller Hicks
Roc�� intersecti�n: In ndditien, bik_s !anes �xers requested to be added t� th� north �nd south si�es �f
the road. P.evisions to Sta�rr Drrin Line `P' cir-e -r��uir��i c�u� po �He cc�nTlicis wiih fihe elevaiion of an
cxis�i���j ur�UEryr�uiiU ei�ciric iin� ownep by iri-Couniy. This section or fine iJNii2 r�roject wns under
construction and required plan revisions, Opinion of Probable Construction Cost, and revised
quantities. The ��ditioral Surveyir� Scrvices e��isisis oi �r�parir�� exhibi'rs associaied with a new
drainag� eas�ment f�r the headwal! improvements. This fee aenendment also accovnts for final
adjustments based on actual services provided.
• Additional Engineering Services
o Revised Plans to incorp�rei�� bike lahes on north and south sides of road
o Revised Storm Drain Line `B' pt Kenny Drive to avoid Tri-County
underground electric fine
o Revise plans and quantities to account for a new headwall and
associated drainage improvements.
o Preparation and Coordination of US�4CE Pre-Construction Notifieation
o Wetlands delineation for North Beach Street
o Administration fee (10%) on Sub consultants
$ 900
$ 1,600
$4,919.85
(� 1,969.0�
($ 5,500)
($ 674.53)
i`�
Fart Worlh � 1 100 Macon Street� ForT Worth, Texas 76102 � 817.336.5773 9allas � 17304 Preston Road, Suite 1340� Dallas, Texas 75252� 214.461.9867
DenPon � 1517 Centre Place Drive, Suite 320� Denton, Texas 76205 � 940.383.4177 Sherman � 200 North Travis Street, SuiTe 500 � Sherman, Texas 75090 � 903.970.1089
Regisfered by fhe Texas Board of Professional Engineers, firm No. F-230 � Repistered by ihe Texas Board of Professional Surveyon; Firm Nn. Ipp116-Qp
Mr. Michael R. WEiss, I�E, Februury 02, 2015, Puye 2 uf 2
Additional Surveying Services
o Storm Drain re-staking for Keller Hicks (UNIT 2) 723.75
Total Contract Amendment No. 7(Revised - Final):
�ur�mary �f C�ntrccct Fee:
Original Contract Amount• � 66�3 03$
Amendment No. 1: $ 19,000
Amendment No. 2: $ 89,000
Amendment No. 3: $ 190,400
Amendment No. 4: $ 50,000
Amendment No. 5: $ 1 13,128
Amendment No. 6(Revised): $ 1 32,1 15
Amendment No. 7(Revised - Final)• $ 0
REvised Contract Amount $1,261,601
$0
Thank you for consideration of this contract amendment request. If you have any questions, please do
not hesitate to cpll me.
Sincerely,
tnp
teague nall & perkins
Scott A. Gibson, P.E.
5r. Project Manager
Copy: Mr. Tom Rutledge — TNP
o:lprojectslftw06319\fee proposall_contract amend 07.doc