HomeMy WebLinkAboutContract 34234COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARR.ANT § Contract No. �4a; � WHEREAS, ALL STORAGE BOAZ/BOAT CLUB, L.P., hereinafter called "Developer", desires to make certain improvements to ALL STORAGE BOAT CLUB ADDITION, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended, is hereby incorporated into this Community Facilities Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. Developer acknowledges that there shall be no reduction in the amount of financial security prior to project completion and acceptance by the City. E. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. r F. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. G. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in hart, by the alleged negligence of the Citv of Fort Worth. its officers. servants. or employees. H. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. I. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104,100, Ordinance 7234). J. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). K. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. L. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to FA construct current and future improvements provided for in this agreement. M. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof. Water (A)None; Sewer (A-1) None; Paving (B)Attached Storm Drain (B-1) None; Street Lights and Signs (C) None. N. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibit B. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibit B . The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $24,210.93. 3 SUMMARY OF COST All Storage Boat Club Addition Item Developer City Cost Total Cost Cost f A. Construction $ - 1. Streets $22,840.50 22,840.50 2. Storm Drainage $0.00 $ - 3. Street Lights $0.00 $ - 4. Street Name Signs $0.00 $ - B. Engineering Design $ - C. Construction Engineering and Management by DOE $ $ (4%) 913.62 913.62 D. Materials Testing by DOE $ $ (2%) 456.81 456.81 I 124,210.93 TOTALS 24,210.93 $ - Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. 4. Developer's column for Item D represents two percent (2%) of paving and storm drain costs for materials testing. 5. Paid $90,899.00 for future improvements for W. J. Boaz Road. 4 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in triplicate, at Fort Worth, Texas this the day of 2006. �'LIVEL Approval Recommended: Transportation and Public Works Department Robert Goode, P. E. Director City of� Marc Ott LIN 0 M&C; i(EQ ?i%ED Assistant City Manager ATTEST: Marty Hendrix City Secretary Approv to Form: Assistant ity ttorney ATTEST: DEVELOPER R""� j4p By: Corporate Secretary Mark McDowell All -Storage Boaz/Boat Club, L.P. Its General Partner All Storage Boaz/Boat Club, G.P., L.L.C. MI-3 5 UNIT IV: PAVING DESCRIPTIONID 'TOTAL (ITME NO. QUANTITY UNIT WRITTEN IN WORDS I PRICE I AMOUNT (Furnish & install, including all appurtenant work, complete in place, the following items) 7" Reinforced Concrete Pavement, complete and in place. TWENTY TWO DOLLARS AND ZERO CENTS PER 1 332 Sy SQUARE YARD. $22.00 i $7,304.00 ' Sidewalk, complete and in place. FOURTEEN DOLLARS AND ZERO 2 791 LF CENTS PER LINEAR FEET. , $14.00 $11,074.00 Type I Sidewalk Ramp, complete and in place. THREE HUNDRED FIFTY DOLLARS AND ZERO CENTS PER 3 4 EA EACH. $350.00 $1,400.00 Sawcut and pavement removal. TEN DOLLARS AND ZERO CENTS PER 4 167 SF SQUARE FEET. $10.00 $1,670.00 Lime Stabilized Subgrade. TWO DOLLARS AND FIFTY CENTS PER 5 332 Sy SQUARE YARD. $2.50 $830.00 Lime (27 lbs / SY). ONE HUNDRED FIVE DOLLARS AND ZERO CENTS 6 4.5 TON PER TON. $105.00 $472.50 6" Concrete curb. TWO DOLLARS AND ZERO CENTS PER LINEAR 7 45 LF FEET. $2.00 $90.00 TOTAL AMOUNT BID PAVING: $22,840.50 BMW5006 All -Storage Boat Club Addition Printed 7/3/2006 / 12:45 PM Cost Estimate for Future Paving on W. J. Boaz Road UNIT TOTAL 11ITMENO. 11 QUAN O TY I) UNIT11DEIPCRIPTON RIICESIWRITTEN INS WIT WORDS BID II RIICE'I AMOUNT II (Furnish & install, including all appurtenant work, complete in place, the following item: 1 Pa 3 rd 5 Street Excavation, complete and in place. THREE DOLLARS AND FIFTY 61 Sy CENTS PER SQUARE YARD. $3.50 $213.50 Lime (27 Lbs. / SY). ONE HUNDRED FIVE DOLLARS AND ZERO CENTS 104 TON PER TON. $105.00 $10,920.00 Lime stabilization subgrade, complete and in place. TWO DOLLARS AND TWENTY FIVE CENTS PER SQUARE 2,798 Sy YARD. $2.25 $6,295.50 6" Reinforced concrete curb, complete and in place. TWO DOLLARS AND 1,760 LF ZERO CENTS PER LINEAR FEET. $2.00 $3,520.00 7" Reinforced Concrete Pavement, complete and in place. TWENTY FIVE DOLLARS AND ZERO CENTS PER 2,798 Sy SQUARE YARD. $25.00 $69,950.00 TOTAL AMOUNT BID PAVING: $90,899.00 BMW5006 All -Storage Boat Club Addition Printed 2/13/2006 / 3:55 PM I. STREET LIGHT COST ESTIMATE INTERSECTIONS MID -BLOCK RESIDENTIAL CHANGE OF DIRECTION RESIDENTIAL MID -BLOCK COLLECTOR MID -BLOCK ARTERIAL MID -BLOCK ARTERIAL MEDIAN RELOCATE EXISTING LIGHT CFA CODE #2006005 DEVELOPERS COST: $ QUANTITY UNIT COST TOTAL COST 0 EA $ 2,600 $00,000.00 0 EA $ 2,600 $00,000.00 0 EA $ 2,600 $00,000.00 0 EA $ 2,600 $00,000.00 0 EA $ 3,000 $00,000.00 0 EA $ 3,000 $00,000.00 0 EA $ 1,650 $00,000.00 Subtotal $00,000.00 City's Cost $00,000.00 Developer's Subtotal $00,000.00 4% Inspection fee $00,000.00 Project Total $00,000.00 Adjacent Developer's Cost $00.000.00 Developer's Cost $00,000.00 ALL STORAGE BOAT CLUB ADDITION March 7, 2006 Fort Worth, Texas March 7, 2006 PAGE I OF EXHIBIT "C" II STREET LIGHTS WORK DESCRIPTION: 1. The Developer shall provide for the installation of street lights at the approximate locations shown in exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2. Streetlights on residential and/or collector streets can be installed using overhead or underground conductors with the approval of the director of transportation and Public Works. 3. The City of Fort Worth will install all the street lights that use overhead or underground conductors on residential, and collector streets. The developer agrees to pay the City of Fort Worth the amount shown below prior to the City starting its design efforts, at the option of the developer and at their expense they may purchase the poles, fixtures, and mast arms from the City in order to assure compliance with city material standards 4. Street lights on arterial streets shall be installed with underground conductors 5. The developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operations of the street light system 6. The estimated cost of this street light installation is detailed on page (1) of exhibit "C" and is summarized below. The street lights will remain the property of, and will be maintained by the City of Fort Worth March 7, 2006 DEVELOPERS COST: $ ALL STORAGE BOAT CLUB ADDITION CFA CODE #2006005 PAGEII OF EXHIBIT "C" III "NO STREET LIGHTS INVOLVED" ALL STORAGE BOAT CLUB ADDITION PAGE III OF EXHIBIT "C" Iv STREET NAME SIGNS 1. The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of $245.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3. This development creates the following zero (0) intersections at a cost to the Developer of $0.00: (Storage facility, no new intersections.) All Storage Boat Club Addition CFA code: 2006005 January 27, 2006 A C) ry om N ::) J U !L- Q m W J BOAZ RD \SITE LOCATION MAP IV Ts RECEIVED O R CTOR TO Cou-N lE AT DRIVE PER CITY 0 FOIArR E aj, LOCATONI FORT TH VAN D ARI ID �"�� I I 7, V J3 I I - Q- I L q S I i ! =I I 'FULL OEPTN SAAC.T EMDVE . 11 ? ' .. •Y CIE. a EUITCR AHOa REMOVE .3O' ERISTNO ..Or tONSTAUCT IAHCINU1NAt BUR JOINT PER R. W STANDARDS. WTCX EX. RAIMENTELEVATIONS. I L I I g`.- REFERENCE TFDRT TCP ((2-3))-03 DURx1G I I �- FOR IAAFnC COM1101 CONSTRUCTION OF DWEWAY APRON I ! _ - jCONT-R BHALL REPAIR NSS•I � lPo CONDUIT a LOOP WIRES AS •-`•'d REQUIRED AT CONTRACTOR-1 DPENSE. I LOT ] BIOCR 4cam oat AYVUDCD WORM SiANOARDS. JO ENENT ELEVATIONS. -- aTTTTCP (2-I61-9a RE M IT PO OF DRIVEWAY APRON CO REMOVE ! REPLACE EXISTING CONCRETC PAVEMENT FOR SAN.SEWER RISTALLATION. MATCH Ex. PAVEMENT ELEVATIONS. ISAMUT. REFERENCE T D T TOP S(2-3c-03) M TRAFFIC CON1110L YVRING CONSTRUCTION OE B SAN. SEWER �AZ RQ�----------------------- --- --------- -�_-PuaKv P, -� •G��. uIM '- c nibcShil ,. T n I A I e 1 1 ^A I I X 0 x GRAPHIC SCALE DI FEET ) 1 Inch - BO IL Barragan, Martinez & lWaUs, LLC Consulting Civil Engineers ap�yLca 832 S. CARRIER PARKWAY, STE. 300 CONTACT: Dc,a Wanz GRAND PRNRIE. TEXAS 75051 PHONE: (214) )24-O9B] LEGEND `•a NOTE: CONTRACTOR SHALL OBTAIN ME LATEST COPY OF ME CRY DF FORT WORTH l Exlsnxc WATCR METER 21 . vAT w/ 4UY ANCHOR ` Paving Plan \ STANDARp DETAILS TO USE IN CDIIJUNCTON 1ITTH THESE PLANS FOR THE REMOVA AND INSTALLATION OF PAVEMENT IN PUBLIC R.O.W. EXISTING UH0ERwoUND CABLE MARKER THE SEAL APPEARING ON IS i EMSF G FF1C BOX O 0.AN0NW. WALLS. P.C. a3pB6 AB g _ " TIN' WATEF VALI SEC Boat Club Road & W. 1. Boaz Road 6 chmrk Q,,,,, E-NC BUMPER POLE EMSON6 TRANSFOHMER Eti Lots 1, 2, & 3, Block A / All -Storage Boat Club Addition pOc oleo.1 inbl B65' hem Iha SEc cl Bool CIRb Rood antl WJ. Boaz Read CQSTNO P-OR FIRE NIYD PROPo5E0 RE NYDFANi City of Fort Wont, Tarrant County, TExas E ti- - BITSB T., RI 1-h- f 0 noHN A the mmar ♦ PF-0 T' HEA Vr DUTY CONCRETE -T, I�,� �O C'$ DESIGN PRAWN TE SCALE NO- FILE SHEEL III W.J. BRaa PRRdTh Bowmen R beM Rd. MCL /23/0 N. `-/� na 5O 1 '7 Elevation-c83<06 R, ; `Walla / VIWJW&Or# ' 7A _ FUTURE R.O.W. VARIABLE WIDTH R.O.W. >FU yFUTURE PAVEMENT FUTURE PAVEMENT _ _ — _ _ L _ .- _ TUR — - !/ `EXISTING ASPHALT PAVEMENfiEXISTING '-. �y •. `� � a., � � � � KIS C ASPHALT PAVEMENT H 1x /� FUTURE DRIVEWAY FUTURE'PAV�N� r' A A c5 0 i., _m..� GON51.,.9 ,SIDEWALK `. _ ._. - , _ ___._ — - �m _ - — S 89°4548" H 469.18' 89 4548 E 8121 g S 89°4548" E -- 225.00' ��- 1 " 1 210.00• 30�- CoNS . 4• SIDEWALK 454 18• FUTURE DRIVEWAY _ 30' CONSi. 4' SIDEWALK ,n LOT 3, BLOCK A LOT ,, BLOCK A I I I I I I I I I I I I V 9.878 ACRES LOT 2, BLOCK A 9.878 ACRES �i3 ALL STORGAE BOAZ/BOAT CLUB, L.P. ALL STORGAE BOAZ/BOAT CLUB, LP o INST. NO. D2O5158115 I INST. NO. D2O5158115 c h D.R.LC.T I D.R.T.C.T. o I Nlrn L I LEGEND - -I FUTURE PAVEMENT FUTURE PAVEMENT BEING FUNDED BY THIS PROJECT 2626 SY (23,635 SF) FUTURE DRIVEWAY BEING FUNDED BY THIS PROJECT 72 SY (1,548 SF) GRAPHIC SCALE I (m reer ) r nMn = eo a 33 BarragAn, Martinez & Walls, LLC Consulting Civil Engineers w8® e01 NiLiER .. DRIVE CO"IICi: Oaw Mope \�R GWNO PPNRIE rEeAS )5050 vIp Q1l) ]3e-090] W. J. Boaz Rd Future Pavement Exhibit 1 All Stange Boat club SEC Boat Club Road & W. L Boaz Road Loa 1, 2 do 3, Bbrt A / All -Stange Boat Club Addition City of Fan Werth, Ta=nt Cowty, Teaae OE— aMMR MTE II —E ".TES F1E 9r1EEr *Iua 1/09/oj " './;° �� I ]°oa 1 of 1 I J