HomeMy WebLinkAboutContract 34234COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary COUNTY OF TARR.ANT § Contract No. �4a;
�
WHEREAS, ALL STORAGE BOAZ/BOAT CLUB, L.P., hereinafter called
"Developer", desires to make certain improvements to ALL STORAGE BOAT CLUB
ADDITION, an addition to the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth and subsequently amended, is hereby incorporated into this
Community Facilities Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section II, of the Policy.
D. Developer acknowledges that there shall be no reduction in the amount
of financial security prior to project completion and acceptance by the
City.
E. The Developer shall award all contracts for the construction of
community facilities in accordance with Section II, paragraph 7 of the
Policy.
r
F. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the
Policy.
G. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub -contractors,
officers, agents or employees, whether or not such iniuries, death or
damages are caused, in whole or in hart, by the alleged negligence of
the Citv of Fort Worth. its officers. servants. or employees.
H. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
I. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104,100, Ordinance 7234).
J. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104.100, Ordinance 7234).
K. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
L. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to
FA
construct current and future improvements provided for in this
agreement.
M. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof. Water (A)None; Sewer (A-1) None; Paving (B)Attached
Storm Drain (B-1) None; Street Lights and Signs (C) None.
N. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibit B.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibit B . The
estimated total cost of current improvements and related support services
specified in this agreement, including design, construction and inspection
is estimated to $24,210.93.
3
SUMMARY OF
COST
All Storage Boat Club
Addition
Item
Developer City Cost
Total Cost
Cost
f
A. Construction
$ -
1. Streets
$22,840.50
22,840.50
2. Storm Drainage
$0.00
$ -
3. Street Lights
$0.00
$ -
4. Street Name Signs
$0.00
$ -
B. Engineering Design
$ -
C. Construction Engineering
and Management by DOE
$
$
(4%)
913.62
913.62
D. Materials Testing by DOE
$
$
(2%)
456.81
456.81
I
124,210.93
TOTALS
24,210.93 $ -
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees. The City will pay additional inspection fee over 4%.
3. City not preparing plans and specifications.
4. Developer's column for Item D represents two percent (2%) of paving and storm drain
costs for materials testing.
5. Paid $90,899.00 for future improvements for W. J. Boaz Road.
4
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by
its City Secretary, with the corporate seal of the City affixed, and said Developer has
executed this instrument in triplicate, at Fort Worth, Texas this the day of
2006.
�'LIVEL
Approval Recommended:
Transportation and Public Works
Department
Robert Goode, P. E.
Director
City of�
Marc Ott
LIN
0 M&C; i(EQ ?i%ED Assistant City Manager
ATTEST:
Marty Hendrix
City Secretary
Approv to Form:
Assistant ity ttorney
ATTEST: DEVELOPER
R""� j4p By:
Corporate Secretary Mark McDowell
All -Storage Boaz/Boat Club, L.P.
Its General Partner All Storage Boaz/Boat Club, G.P., L.L.C.
MI-3
5
UNIT IV: PAVING
DESCRIPTIONID
'TOTAL
(ITME NO.
QUANTITY
UNIT
WRITTEN IN WORDS
I PRICE I
AMOUNT
(Furnish & install, including all appurtenant work, complete in place, the following items)
7" Reinforced Concrete Pavement,
complete and in place. TWENTY TWO
DOLLARS AND ZERO CENTS PER
1 332
Sy SQUARE YARD.
$22.00 i
$7,304.00
' Sidewalk, complete and in place.
FOURTEEN DOLLARS AND ZERO
2 791
LF
CENTS PER LINEAR FEET.
, $14.00
$11,074.00
Type I Sidewalk Ramp, complete and in
place. THREE HUNDRED FIFTY
DOLLARS AND ZERO CENTS PER
3 4
EA EACH.
$350.00
$1,400.00
Sawcut and pavement removal. TEN
DOLLARS AND ZERO CENTS PER
4 167 SF SQUARE FEET. $10.00 $1,670.00
Lime Stabilized Subgrade. TWO
DOLLARS AND FIFTY CENTS PER
5 332 Sy SQUARE YARD. $2.50 $830.00
Lime (27 lbs / SY). ONE HUNDRED
FIVE DOLLARS AND ZERO CENTS
6 4.5 TON PER TON. $105.00 $472.50
6" Concrete curb. TWO DOLLARS
AND ZERO CENTS PER LINEAR
7 45 LF FEET. $2.00 $90.00
TOTAL AMOUNT BID PAVING:
$22,840.50
BMW5006 All -Storage Boat Club Addition Printed 7/3/2006 / 12:45 PM
Cost Estimate for Future Paving on W. J. Boaz Road
UNIT TOTAL
11ITMENO. 11
QUAN O TY I) UNIT11DEIPCRIPTON
RIICESIWRITTEN INS WIT WORDS
BID II RIICE'I AMOUNT II
(Furnish & install, including all appurtenant work, complete in place, the following item:
1
Pa
3
rd
5
Street Excavation, complete and in place.
THREE DOLLARS AND FIFTY
61
Sy CENTS PER SQUARE YARD.
$3.50 $213.50
Lime (27 Lbs. / SY). ONE HUNDRED
FIVE DOLLARS AND ZERO CENTS
104
TON PER TON.
$105.00 $10,920.00
Lime stabilization subgrade, complete
and in place. TWO DOLLARS AND
TWENTY FIVE CENTS PER SQUARE
2,798
Sy YARD.
$2.25 $6,295.50
6" Reinforced concrete curb, complete
and in place. TWO DOLLARS AND
1,760
LF ZERO CENTS PER LINEAR FEET.
$2.00 $3,520.00
7" Reinforced Concrete Pavement,
complete and in place. TWENTY FIVE
DOLLARS AND ZERO CENTS PER
2,798
Sy SQUARE YARD.
$25.00 $69,950.00
TOTAL AMOUNT BID PAVING: $90,899.00
BMW5006 All -Storage Boat Club Addition Printed 2/13/2006 / 3:55 PM
I. STREET LIGHT COST ESTIMATE
INTERSECTIONS
MID -BLOCK RESIDENTIAL
CHANGE OF DIRECTION RESIDENTIAL
MID -BLOCK COLLECTOR
MID -BLOCK ARTERIAL
MID -BLOCK ARTERIAL MEDIAN
RELOCATE EXISTING LIGHT
CFA CODE #2006005
DEVELOPERS COST: $
QUANTITY UNIT COST TOTAL COST
0
EA
$
2,600
$00,000.00
0
EA
$
2,600
$00,000.00
0
EA
$
2,600
$00,000.00
0
EA
$
2,600
$00,000.00
0
EA
$
3,000
$00,000.00
0
EA
$
3,000
$00,000.00
0
EA
$
1,650
$00,000.00
Subtotal $00,000.00
City's Cost $00,000.00
Developer's Subtotal $00,000.00
4% Inspection fee $00,000.00
Project Total $00,000.00
Adjacent Developer's Cost $00.000.00
Developer's Cost $00,000.00
ALL STORAGE BOAT CLUB ADDITION
March 7, 2006
Fort Worth, Texas
March 7, 2006
PAGE I OF EXHIBIT "C"
II STREET LIGHTS WORK DESCRIPTION:
1. The Developer shall provide for the installation of street lights at the
approximate locations shown in exhibit "C", immediately after final
acceptance of the street construction, in accordance with engineering plans
and specifications approved by the Transportation and Public Works
Department.
2. Streetlights on residential and/or collector streets can be installed using
overhead or underground conductors with the approval of the director of
transportation and Public Works.
3. The City of Fort Worth will install all the street lights that use overhead
or underground conductors on residential, and collector streets. The
developer agrees to pay the City of Fort Worth the amount shown below prior
to the City starting its design efforts, at the option of the developer and
at their expense they may purchase the poles, fixtures, and mast arms from
the City in order to assure compliance with city material standards
4. Street lights on arterial streets shall be installed with underground
conductors
5. The developer agrees to dedicate all easements required for the installation
and maintenance of the street lights and to provide for the installation of
any electrical transformers required for the proper operations of the street
light system
6. The estimated cost of this street light installation is detailed on page (1)
of exhibit "C" and is summarized below. The street lights will remain the
property of, and will be maintained by the City of Fort Worth
March 7, 2006
DEVELOPERS COST: $
ALL STORAGE BOAT CLUB ADDITION
CFA CODE #2006005
PAGEII OF EXHIBIT "C"
III
"NO STREET LIGHTS INVOLVED"
ALL STORAGE BOAT CLUB ADDITION
PAGE III OF EXHIBIT "C"
Iv
STREET NAME SIGNS
1. The City of Fort Worth will install the street name signs upon final
approval of the street construction. The street name signs will remain
the property of, and will be maintained by, the City of Fort Worth.
2. The Developer will pay for the street name sign installations required
for this development to the extent of $245.00 per intersection. This
unit cost will be revised annually by the Department of Transportation
and Public Works to reflect prevailing costs of materials and labor.
3. This development creates the following zero (0) intersections at a cost
to the Developer of $0.00:
(Storage facility, no new intersections.)
All Storage Boat Club Addition
CFA code: 2006005 January 27, 2006
A
C)
ry
om
N ::)
J
U
!L- Q
m
W J BOAZ RD
\SITE
LOCATION MAP
IV Ts
RECEIVED
O R CTOR TO Cou-N lE AT DRIVE PER CITY 0
FOIArR E aj, LOCATONI FORT TH VAN D ARI
ID �"��
I I
7,
V
J3
I I
- Q-
I
L
q
S
I i
!
=I I
'FULL
OEPTN SAAC.T EMDVE
.
11
? ' .. •Y
CIE. a EUITCR AHOa
REMOVE .3O' ERISTNO ..Or
tONSTAUCT IAHCINU1NAt BUR
JOINT PER R. W STANDARDS.
WTCX EX. RAIMENTELEVATIONS.
I L
I
I
g`.-
REFERENCE TFDRT TCP ((2-3))-03
DURx1G
I I
�-
FOR IAAFnC COM1101
CONSTRUCTION OF DWEWAY APRON
I
!
_
-
jCONT-R BHALL REPAIR
NSS•I � lPo
CONDUIT a LOOP WIRES AS
•-`•'d REQUIRED AT CONTRACTOR-1
DPENSE. I
LOT ] BIOCR
4cam oat AYVUDCD
WORM SiANOARDS. JO
ENENT ELEVATIONS. --
aTTTTCP (2-I61-9a RE
M IT
PO
OF DRIVEWAY APRON CO
REMOVE ! REPLACE
EXISTING CONCRETC PAVEMENT
FOR SAN.SEWER RISTALLATION.
MATCH Ex. PAVEMENT ELEVATIONS.
ISAMUT.
REFERENCE T D T TOP S(2-3c-03)
M TRAFFIC CON1110L YVRING
CONSTRUCTION OE B SAN. SEWER
�AZ RQ�-----------------------
---
---------
-�_-PuaKv
P, -� •G��.
uIM
'-
c nibcShil ,.
T
n
I A
I
e
1
1
^A
I
I
X
0
x
GRAPHIC SCALE
DI FEET )
1 Inch - BO IL
Barragan, Martinez & lWaUs, LLC
Consulting Civil Engineers
ap�yLca 832 S. CARRIER PARKWAY, STE. 300 CONTACT: Dc,a Wanz
GRAND PRNRIE. TEXAS 75051 PHONE: (214) )24-O9B]
LEGEND
`•a
NOTE:
CONTRACTOR SHALL OBTAIN ME LATEST COPY OF ME CRY DF FORT WORTH
l
Exlsnxc WATCR METER
21 . vAT w/ 4UY ANCHOR
` Paving Plan \
STANDARp DETAILS TO USE IN CDIIJUNCTON 1ITTH THESE PLANS FOR THE
REMOVA AND INSTALLATION OF PAVEMENT IN PUBLIC R.O.W.
EXISTING UH0ERwoUND CABLE MARKER
THE SEAL APPEARING ON IS
i EMSF G FF1C BOX
O
0.AN0NW. WALLS. P.C. a3pB6
AB g
_
" TIN' WATEF VALI
SEC Boat Club Road & W. 1. Boaz Road
6 chmrk
Q,,,,,
E-NC BUMPER POLE
EMSON6 TRANSFOHMER
Eti
Lots 1, 2, & 3, Block A / All -Storage Boat Club Addition
pOc oleo.1 inbl B65' hem Iha SEc
cl Bool CIRb Rood antl WJ. Boaz Read
CQSTNO P-OR FIRE NIYD
PROPo5E0 RE NYDFANi
City of Fort Wont, Tarrant County, TExas
E ti- - BITSB
T., RI 1-h- f 0 noHN A the mmar
♦
PF-0 T' HEA Vr DUTY CONCRETE -T,
I�,� �O C'$
DESIGN PRAWN TE SCALE NO- FILE SHEEL
III W.J. BRaa PRRdTh Bowmen R beM Rd.
MCL /23/0 N. `-/� na 5O 1 '7
Elevation-c83<06
R, ;
`Walla
/
VIWJW&Or# ' 7A
_ FUTURE R.O.W.
VARIABLE WIDTH R.O.W.
>FU
yFUTURE PAVEMENT FUTURE PAVEMENT _ _ — _ _ L _ .- _ TUR — -
!/ `EXISTING ASPHALT PAVEMENfiEXISTING
'-.
�y •. `� � a., � � � � KIS C ASPHALT PAVEMENT
H
1x /� FUTURE DRIVEWAY FUTURE'PAV�N� r' A A c5 0
i., _m..�
GON51.,.9 ,SIDEWALK `. _ ._. - , _ ___._ — -
�m
_ - — S 89°4548" H 469.18' 89 4548 E 8121 g
S 89°4548" E -- 225.00' ��- 1 " 1
210.00• 30�- CoNS . 4• SIDEWALK 454 18• FUTURE DRIVEWAY _ 30' CONSi. 4' SIDEWALK ,n
LOT 3, BLOCK A
LOT ,, BLOCK A I I I I I I I I I I I I V
9.878 ACRES LOT 2, BLOCK A 9.878 ACRES �i3 ALL STORGAE BOAZ/BOAT CLUB, L.P. ALL STORGAE BOAZ/BOAT CLUB, LP o
INST. NO. D2O5158115 I INST. NO. D2O5158115 c h
D.R.LC.T I D.R.T.C.T. o
I Nlrn
L I
LEGEND
- -I FUTURE PAVEMENT
FUTURE PAVEMENT BEING FUNDED BY THIS PROJECT
2626 SY (23,635 SF)
FUTURE DRIVEWAY BEING FUNDED BY THIS PROJECT
72 SY (1,548 SF)
GRAPHIC SCALE
I
(m reer )
r nMn = eo a
33 BarragAn, Martinez & Walls, LLC
Consulting Civil Engineers
w8®
e01 NiLiER .. DRIVE CO"IICi: Oaw Mope
\�R GWNO PPNRIE rEeAS )5050 vIp Q1l) ]3e-090]
W. J. Boaz Rd Future Pavement Exhibit 1
All Stange Boat club
SEC Boat Club Road & W. L Boaz Road
Loa 1, 2 do 3, Bbrt A / All -Stange Boat Club Addition
City of Fan Werth, Ta=nt Cowty, Teaae
OE— aMMR MTE II —E ".TES F1E 9r1EEr
*Iua 1/09/oj " './;° �� I ]°oa 1 of 1
I J