HomeMy WebLinkAboutContract 34888STATE OF TEXAS
AMENDMENT NO. 1
$ CITY SECRETARY CONTRACT NO.
(No M&C Needed)
COUNTY OF TARRANT S
WHEREAS, the City of Fort Worth (City) and TCB, Inc.,
(Engineer) made and entered into City Secretary Contract No.
34097, (the Contract) which was authorized by the City Council by
M&C C-21714 on the 26th day of September 2006; and
WHEREAS, the Contract involves engineering services for the
following project:
Engineering Design Services: Street Reconstruction, Water an.d
Sewer Replacement on Edney Street (Hemphill St to S. Adams St and
6�' Ave to Sharondale St) and Southcrest Drive (Townsend Dr to W.
Dead End), 2004 CIP Contract Year 4& 5, Contract 54, Project No.
00448; DOE No. 5408
WHEREAS, it
to said Contract
maximum fee;
has become necessary to execute Amendment No. 1
to include an increased scope of work and revised
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
1.
Article I of the Contract .is amended to include the
additional engineering services specified in a proposal letter
dated December 20,2006, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional design
services to be performed by Engineer total $8,030.00.
F�
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, -�-that the
total fee paid by the City for all work and service `,'�h��l, , not ,.�
exceed the sum of $119, 754 . 00 . ;;�'� i� `, ;;
.� i � i .. ' �L,. �: ,
', 6r•�� , u�
II�''��',;�!'�;���, �i�!, - ..
!I, . � J Y
�
�ORIGINAL
All other provisions of the
herein shall remain in full force
EXECUTED on this the ��
Tarrant County, Texas.
3.
Contract which are not expressly amended
and effect.
day of � � 2007, in Fort Worth,
ATTEST: —�
Marty Hendr
City Secretary =_��_�-�=�
�� ���; a;, Sf ���J�R�I)
APPROVAL RECONlD�NDED :
/r'��/ �I�-ddl "L�'t.L.11aVl ,r'�
A. Douglas Rademaker, P.E.
Director, Department of
Engineering
TCB, Inc.
APPROVED:
�
Marc . �tt
Assistant City Manager
Name: Ann E. Kovich, AICP
Vice President
1200 Summit Ave, Suite 600
Fort Worth, Texas 76102
APPROVED
,
Assis ant
FORM AND LEGALITY:
>'_� - - �
.t�,r` Attorney
�,,
-2-
�� � � ��=.�,01
'�� � r �':,- � �;� l :6''�'�; U �:.D
;N��,�l ;���' �l ���:1 ( U
V C�b V s V J�. L I.n: �1�
�
cr:� r,cn
� '.����✓J.II�� �$L�Sa
��� ? � �= ��;�,
���
1%OG �ummit Avenue, Suite 600, FoR ��1�erth, Texas 76102-1409
i �g t � .698.6'00 F 31 ,-'.698.6701 �wn��N.icb.a2com.r_om
December 20, 2006
Mr. Richard Argomaniz, PE
City of Fort Worth
Department of Engineering
1000 Throckmorton Street
Fort Worth, Texas 76102
Subject: Supplemental Authorization Request No. 1
Pavement Reconstruction and Water and Sanitary Sewer Main
Replacement on Edney and Southcrest — Contract 54
Contract No. 34097, DOE 5408
Dear Mr. Argomaniz:
As requested by the City, TCB is providing this supplemental authorization request for geotechnical
services relating to the project referenced above. Below is a summary of services to be provided
under this request:
1. Take seven (7) borings to a depth of ten (10) feet;
2. Backfill borings with bentonite chips / sacrete;
3. Perform laboratory testing on samples including Atterberg limits, moisture content,
continuous PP strength / swell profile, swell testing, sulfates and lime series;
4. Prepare geotechnical report with recommended pavement and subgrade sections in
accordance with the current City of Fort Worth Pavement Design Standards Manual.
TCB proposes to utilize Mas-Tek Engineering & Associates, Inc. for the geotechnical work and will
perform these services for a lump sum fee of $8,030 as shown in the breakdown below:
Mas-Tek - $7,300
10% Markup - 730
Total - $8,030
Should you have any questions or need additional information, please contact our Project Manager,
Bryan Jann, at 817.698.6787.
Sincerely,
Ann Kovich, AICP
Vice President