HomeMy WebLinkAboutContract 34883�I
AMENDMENT NO. 2
STATE OF TEXAS 8 CITY SECRETA.RY CONTRACT NO. �,U�
(No M&C Needed)
COUNTY OF TA.R.RANT $
WHEREAS, the City of Fort Worth (City) and LopezGarcia Group,
Inc.,Engineer) made and entered into City Secretary Contract No.
32157, (the Contract) which was authorized by the City Council by
M&C C-20822 on the 28th day of June 2005; and
WHEREAS, the Contract involves engineering services for the
foZlowing project:
Engineering Design Services: Street Reconstruction, Water and
Sewer Replacement on Ma.rtha Lane (Milam. St to Barron Ln) , Ma.linda
Lane North (Jenson Rd to Malinda I�n S)and Malinda Lane South
(Malinda Ln N to Jenson Rd), 2004 CIP Contract Year 2, Contract
17, Project No. 0016Z; DOE No. 4879
Water Project No. P253-604170016183
Sewer Project No. P258-704170016183
Paving Project No. C200-204400016183
WHEREAS, it has become necessary to execute Amendment No. 2
to said Contract to include an increased scope of work and revised
max�*�►»*►� fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
F_*
Article I of the Cantract is amended to include the
additional engineering services specified in a proposal letter
dated August 23, 2006, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional design
services to be performed by Engineer total $6,320.00.
F�
Article II of the Contract is amended to provide for an
increase in the max��►►►»n, fee to be paid to Engineer for 11 ,�wo;x-k ,,J\,; J�,�U,
and services performed under the Contract, as amended, so hat the_'.
��,�;?
total fee paid by the City for all work and services s all�not �������
� ' _ . .:n��n
exceed the sum of $118, 861. 00 . ? . .. .. . . '� y �, ,
��.�
� aRr�iNa �,
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
�yr� `� �/I
EI�CUTED on this the "l' ' day of k...��.1���� '2007, in Fort Worth,
Tarrant County, Texas.
ATTEST :
v` - J
Ma.rty Hendrix _ ,_ _ _ _
City Secretary � ��
�Ii��P��g<` ;��a��7d�$�li �
-----"
APPROVAL RECOI�►�NDED :
A. Douglas Rademaker, P.E.
Director, Department of
Engineering
LopezGarcia Group , Inc .
ENGINEER
By:
APPROVE �•
�
/
rc A. Ott ��
Assistant City Manager
Name: Douc�las C Mikeworth, P.E.
Vice President
100 E. 15� Street, Suite 200 _
Fort Worth, Texas 76102
A.PPROVED. � TO FORM AND LEGALITY:
` ��. '/���/ ;�� s ,
Assistan�.' Gity
-2-
..,, 2 a'=� ; l;�%''S �' �, J �! J�
t:; '� �"'
C✓ f I�����."1 .V �0I
IN.;;'I,�`� ., .� J��� �L�����`�J I
•\� �f
� �.':n f�(�j'� lf ��I��{
'!����;�;!�,J'::U�J�:� U�.fr�.a
� ,,..
��'-.... �... = .-
� � � � � � � � � U � � � � � �
August 23, 2006
Mr. Joseph Bergeron, P.E.
Project Manager
City of Fort Worth - Engineering Department
Consulting Services Division
1000 Throckmorton Street
Fort Worth, Texas 76102
RE: Request for Supplemental Agreement
(Amendment No. 2)
Pavement Reconstruction, Water and Sanitary Sewer Main Replacement
on Martha Lane, Malinda Lane North and Malinda Lane South
UNIT IA — Water Project No. P253-531200 604170016183
UNIT IB — Sanitary Sewer Project No. P258-531200 704170016183
UNIT II — Paving Project No. C200-531200 204400016183
D.O.E. No. 4879
LOPEZGARCIA GROUP Project No. 205084.00
Dear Mr. Bergeron:
This letter is in response to the following design changes requested by the City of Fort Worth for
the above mentioned project.
Descriptions of the requested design changes are as follows:
Realign the proposed 42" diameter storm drain within the existing 15' drainage easement
located in Lot B of the Valentin Gracia subdivision. This realignment will require vertical
adjustments both upstream and downstream as shown in Exhibit A- attached. This
realignment will require revisions to sheets 21-23 of the construction drawings.
Modify the three previously prepared drainage easement documents to temporary
construction easement documents for use with the adjoining sanitary sewer improvements
project.
The additional fiee to provide the above mentioned increases in scope is $6,320.00.
(See Cost Prnposal Summary and Detail - atfached)
If you have any questions or need additional information concerning this request,
please feel free to call me at (817) 390-1000.
Sincerely,
�QPEZGARCIA GROUP
���ir� � c�� w
Brent E. Lewis, P.E.
Praject Manager
I�aaroupi��c.co�,� tNa�er Gardens Place,100 East 15th Stieet, Suiie 200, Fort Worth,Texas, 76102 (817) 390-1000 (817) 8�32-9�462 Fax
�
0
0
�
0
0
N
�
i
a�
MEADOWBROOK MUNICIPAL
GOLF COURSE
VERTICAL ADJUSTMENT
�ouo , � i�
U � � —�—
i�
,,
o i�
i,�� :I � �0� 2��
ow� i,
� �z1� ;, , ' ;
�
�: !� _���� GRAP� � I C SCALE I N FE� T
,i ,
io �I� ,-_
1 � � I �, �
I' N g�� �
�� � '-'-'I ,'� � �---------
m� I d No. 10 w� � �-' % '
I � GRE�N j� I
I a- in; � � j
X� � PREVI OUySD. ALIGNMENT �
I w' i' / �
PROP. SDMH I =____--____ ���, i � I
,- �
-' � ' I
-------�------------�� r--------------� I� �-' j �
�
��.�� � ill� �-" �� I
j� � �u — ------------------ --------
, .:.
i F�-�� � ' �ii7� i i
-t �.o I �II� � PROP. 10' TEMPORARY �I
� �s� ��' 9 ' �II ��� CONSTRUCTI ON EASEMENT� �
p� ��- I �II� I I
� 'pq��,� s0 ��II� \
II��I ��
� I I
j �9G'�,� \�. � ' � I I � `' �
� � I �II� PROP. DRAldyAGE EASEMENT �I I
� �9�F\�\�� � �II� BY THE CI TY'�OF FORT WORTH ; __ _
y___-___
� �(n�i� \ � ��1� � '� �
� � � iii� �y,
! VALENTIN GRACIA \��1II�� PROP. SDMH VERTICAL AD;JUSTMENT
! �UBDIVISION N '- `_._�` ! �,------ --�------
� LOT B ���-----__. -.--- — _ _
� ,,z�� — — — _ PROP. q2_�- .. _. . -
SD — l
� �� i EX. 20' DRAINAGE 1.
' EASEMENT I
� �`'� I
� `�'j I PROP. SDMH I
x� I '
, �
I------------- w�-------------- �
I I LOT A � � PROP. 10' Y�
' ' i � SD I NLET i
I I . ,I
I I �
�� PROP.10' �
�I SD INLET�,;/
I �7.
; LEGEND I,--------------�
� _ �I I
i -__= PREVI OUS ALI GNMENT �
� II I J
i REVI SED ALI GNMENT j I /I
� ;I I
�=�----� VERTI CAL Al.l GNMENT � I I
MODI FI CATI ONS �
____ � � PROP. SDMH �
-- ------ ----------�� ---
JENSON RD. ---�'
18� '
--- --------- �/ '
-� - -�---------------- �
�������,�,�� LOPEZGARCIA GRDUP
�`��y��y� 100E.i5th5treet (g1n39o-1000
�—j_— Suite200 (81n682-94b2Fa�c
Fo�rwo�n,Te�s76102
w+rwlopezgarciagroup.mm
CTTY OF FORT VJORTH, TEXAS
TTLANSPORTAT'ION AND PUBLIC WORKS DEPT.
ENGINEERING DIVISION
2004 CIP CONTRACT #17
UNIT II - PAVING PROJECT NO. C20�541200 204400016183
�ccaoua
?ROJECT N0.
205084.00
�xr.ie! T
�
Page 1 of 2
City of Fort;Worth `. . . ;, . ..
Cost Proposal Summary and Detail
Contract,No. D.O.E. No. 4879 ,'
LGGROUP.Job No. 205084.00 :
,: ; . � � ��
Amendmenf No, 2
8-23-06; : ; '
LOPEZGARCIA GROUP ; , � > ` � � "
__ .
Direct Labor
Item
1
2
3
4
5
Labor
Princi�
Surveyor - RPLS
Civil Designer
CADD Technician
Hours
1
15
3
16
32
Subtotal for Direct Labor
Overhead (if applicable) Rate:
Professional Fee (if applicable) Rate:
Total Direct Labor
$
$
$
$
Rate
165.00 $
155.00 $
130.00 $
85.00 $
65.00 $
Labor Cost
165.00
2,325.00
390.00
1,360.00
2,080.00
6,320.00
6,320.00
N
�
0
N
�
�
(LS
�
.�
d
0
C � O
ta � �'
�' �
�' o a
� o o �
� Z N O
.� �w oN C�
�e�pz
� y � � z U
`o oZ�- a�i Q
oa `� ��C�
� � � w
>+N CU� �Mn.
UUUJQoo�
Y
N
N
�-"
O
w
R
�+
O
H
C
� ,N
Q .0
Q L
U �
F-
�
J
�
Q..'
O
A
N
�
7
�
L
�
= c
'> o�
U ��
�
N
�
f0
Z
Y
�
0
z
►f0
II � M r N ~
d' �
N
�.
N
r
�
d'
00 N � N N
r'
C C C
N p N N
� � � C C
f�6 �- O ++ � Ci
N � � V � �
� � c := ..
� d -p � C3
a�i rn � � 'o
a` o w �
0 0 0 0 o I
� cV <+i '•7 tn
0
0
O
N
M
ti �
c0
d
O C
O C
I.fj C
(O G
C
M �
�? <s
o c
o c
O C
M G
c-- C�;
M
EA d9
O O
O O
lf) O
� �
:��i
co �
T
i E» �i
0 0
0 0
�ri �ri
� M
t!') N
�
� �
0 0
0 0
�ri �ri
cD cD
T r
� �
3 v f�/)
� � U
2
O �
J J
r.+ �
V ,w
0 ~
:°
0