WHEREAS, the City of Fort Worth (City) and TranSystems
Corporation Consultants, (Engineer) made and entered into City
Secretary Contract No. 34116, (the Contract) which was authorized
by the City Council by M&C C-21715 on the 26th day of September
2006; and
WHEREAS, the Contract involves engineering services for the
following project:
Engineering Design Services: Street Reconstruction, Water and
Sewer Replacement on Fain Street (N. Beach St to Airport Fwy),
Fairview Street (Airport Fwy to Maurice Ave), Harper Street (S.
Dead End to Parrish Rd),.Karnes Street (Airport Fwy to Race St)
and Primrose Ave (Gwynne St to Eagle Dr), 2004 CIP Contract Year
4& 5, Contract 46, Project No. 00445; DOE No. 5398
WHEREAS, it
to said Contract
maximum fee;
has become necessary to execute Amendment No. 1
to include an increased scope of work and revised
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
1.
Article I of the Contract is amended to include the
additional engineering services specified in a proposal letter
dated January 5,2007, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional design
services to be performed by Engineer total $11,660.00.
2.
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $227,627.00.
�ORIGINAL
�� ,� I _, . ':. J +, _ �
�1 'r ;��
h ' J �� ;, � C 'l� � ° �
`� i i' ;�1, : Si lf' i� �y: M
l�.c.. `:J �� �� �� p��: u'�'.. P
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the � day ofv �( � 2007, in Fort Worth,
Tarrant County, Texas.
ATTEST: •
,_ 1' �-V" _/ �
Marty Hendrix � �w __�,� _
City Secretary o�������
NQ �+`i���: �� ; ,
APPROVAL RECOMI��NDED :
.�,�1,P�1
A. Douglas Rademaker, P.E.
Director, Department of
Engineering
A
Ma�c A. �Ott
Assista t City Manager
Name: Raul Pena III, P.E. _
Recrional Vice President
500 W 7�' Street. Suite 600_
Fort Worth, Texas 76102
APPROVED AS
Assistant
ITY:
-2- .__. ��_.
,_-. ,
�;'��]'��1;`:� :`'��:;i'J���:�
�V�U'U! �:�`v'jo;`�%?,;,1,U��J,
I2�7 :', U �.--o,
� u, .,r�,�' ,�✓ P:1 � I" �'S i`(
�y LL a
. Systems
�
AMENDMENT NO. 1
TranSystems
Bank of America Building
500 West 7'� Street
Suite 1100
Fort Worth, TX 76102
Te1 817 339 8950
Fax 817 336 2247
www.transystems.com
SUMMARY OF DESIGN FEE
January 5, 2007
Ms. Dena Johnson, P.E.
Department of Engineering
City of Fort Worth
1000 Throckmorton Street
Fort Worth, TX 76102-6311
RE: Amendment No.1
2004 CIP Contract No. 46
City Secretary No. 34116
Water, Sanitary Sewer, Paving & Drainage Improvements for:
Fain St., Fairview St., Harper St., KarneslNoble St., and Primrose Avenue
Dear Ms. Johnson,
In accordance with your request, we are pleased to present this proposal for your consideration. Per 1he
requirements of the Department of Engineering, TranSystems proposes to provide Geotechnical
Investigation and Design services with respect to the above r�ferenced project. Specific seNices will be
applied to all streets that have been scheduled for pavement reconstruction under our existing conUact.
The scope of these services will include:
• Exploration of subsurface conditions;
• Determination of physical soil properties by laboratory testing; and,
• Provision of geotechnical recommendations for use in determining subgrade treatment, pavement
thickness, reinforcement, and joint requirements in accordance with the City of Fort Worth 2005
Pavement Design Standards Manual and AASHTO standarcls.
A total of 12 soil borings emplaced to a depth of 10-feet below the existing pavements are proposed for
these services. Borings will be allocated to each street segment as follows:
• Kames Street — 2 Borings
• Harper Street — 3 Borings
• Fairview Street — 3 Borings
• Fain Street — 2 Borings
• Primrose Avenue — 2 borings
�
, System�
The geotechnical consultant that will perform the work as noted above is Kleinfelder. The work will be
conducted from their Fort Worth office. The additional fee for this work has been estimated at a11,660.
This figure includes a 10% administrative fee for TranSystems to manage the geotechnical consultant.
These costs will be specifically applied to the Paving design portion of our contract as noted below:
Summarv of Total Fee:
Service Description Water Sewer Paving Total
Engineering Services $66,754 $47,939 $84,584" $199,277*
Survey Services $9,923 $7,087 $11,340 $28,350
Total $67,667 $55,026 $95,924" $227,627*
* Revised per this Amendment No.1
Original Contract Fee: $215,967.00
Amendment No.1:
TOTAL CONTRACT
$ 11,660.00
$ 227,627.00
We thank you for the opportunity to be of service and look forward to working with you on this project.
Please do not hesitate to contact me should you require any additional information.
Sincerely,
TranSystems Corporation Consultants
� - �/�-��i
/,/
aig P. Schellbach, P.E.