HomeMy WebLinkAboutContract 34878Amendment No. 2 STATE OF TEXAS § CITY SECRETARY NO. /U (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and TCB, Inc., formerly known as Turner, Collie & Braden, Inc., (Engineer) made and entered into City Secretary Contract No. 31145 (the Contract) which was authorized by the City Council by M&C G20451; and WHEREAS, the Contract involves engineering services for the following project: Ryan Southeast Drainage Improvements WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated November 30, 2006, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $4,860.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $110,544.00. 3. �;�f�''): �'ls° S�U�:O' .� ��: a/���r cSi (dr���� � All other provisions of the Contract, which are not expressly am�nde�d ���;,;�����/°���r,'l herein, shall remain in full force and effect. ;�n .;� ,; ;, ;�,�r j��r�p, 1�.� ..����1�:��i� ULSG+,a i �ORIGINAL Contract Amendment No. 2 Page 1 of 2 Executed on this the � day of � , 2007, in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: . Douglas Rademaker, P.E. Director, Department of Engineering TCB, Inc. ENGINEER �- ' ,l' � � �,, By : ,�_ - __ � Name: Ann E. Kovich, AICP Vice President 1200 Summit Avenue, Suite 600 Fort Worth, TX 76102-4409 APPROV�� AS TO ,. �, Arriy Rarn'se�' Assistant City Attorney LEGALITY: APPROVED: Mar . Q t �—� Assis ant Ci y Manager ATTEST: Marty Hendri , City Secretary Contract Amendment No. 2 Page2of2 No ��� 1���;�����D � ,�. ;,j�j �,.-,- ,�, -,.. �� � c I;� I„ r,��} �,.r�r'�, ,�i li' � � 1 �,� 1!,S �� .`; 6 l:; �'J �,\:lj ^aJU�� 'i�.i�,^�C� �ijl! V L 'c, '� �'�:; .La � �;,� � � �7 c '� ,-�Q 4 I; ijTji;�b��. �I lf � C�!7 t L � .: ��:i : ft� � �!�G�� � , _ TC� I AECO� ,-CB 1200 Summit Avenue, Suite 600, Fort Worth, Texas 76102-4409 T 817.698.6700 F 817.698.6701 www.tcb.aecom.com November 30, 2006 Mr. Richard Argomaniz, PE City of Fort Worth Department of Engineering 1000 Throckmorton Street Fort Worth, Texas 76102 Subject: Ryan SE Drainage Improvements (DOE 4797) Supplemental Authorization Request No. 2 Dear Mr. Argomaniz: As part of the Ryan SE Drainage Improvements, installation of storm drain facilities will be required within the right-of-way (ROW) of Riverside Drive (Bus. 287). Because this roadway segment is on the TxDOT system, a utility crossing permit will be required for construction of the facilities. In addition, a portion of the proposed storm drain improvements will be installed by open cut methods within the ROW and therefore TxDOT will require the preparation of a traffic control plan to be submitted with the permit application. Although the permit application is included as part of our original scope of work, the preparation of traffic control plans were excluded during the contract negotiation phase with the understanding that if a plan was required, TCB would submit a request for supplemental authorization to prepare the plans. Based on recent conversations with TxDOT regarding this project, we have been informed that a traffic control plan, in conformance with TxDOT standards, will be required for approval of the application and issuance of the permit. Because a traffic control plan was not included in our original contract, we are requesting supplemental authorization in the amount of $4,860 to prepare the necessary plans and select the applicable standard details. A breakdown of this fee can be found in Attachment A. Should you have any questions or need additional information, please our Project Manager, Bryan Jann, at 817.698.6787. 'ncerely Ann Kovich, ICP Vice President AK Attachments �� �?'�'::� �:'-:� � � � v �i;��'�%� � ro� ; �/',:�;Si�r,`f�lr.i � � J`i.' ��'� �,:� !�' � Il-,!'�r V ����''`��'1':' :���lf Sj;� 1�n � ��'1 �i i Il'S��! e