HomeMy WebLinkAboutContract 34878Amendment No. 2
STATE OF TEXAS § CITY SECRETARY NO. /U
(No M&C Needed)
COUNTY OF TARRANT §
WHEREAS, the City of Fort Worth (City) and TCB, Inc., formerly known
as Turner, Collie & Braden, Inc., (Engineer) made and entered into City
Secretary Contract No. 31145 (the Contract) which was authorized by the
City Council by M&C G20451; and
WHEREAS, the Contract involves engineering services for the following
project:
Ryan Southeast Drainage Improvements
WHEREAS, it has become necessary to execute Amendment No. 2 to
said Contract to include an increased scope of work and revised maximum
fee;
NOW THEREFORE, City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following agreement
which amends the Contract:
1.
Article I of the Contract is amended to include the additional
engineering services specified in a proposal letter dated November 30, 2006,
a copy of which is attached hereto and incorporated herein. The cost to City
for the additional services to be performed by Engineer total $4,860.00.
2.
Article II of the Contract is amended to provide for an increase in the
maximum fee to be paid to Engineer for all work and services performed
under the Contract, as amended, so that the total fee paid by the City for all
work and services shall not exceed the sum of $110,544.00.
3. �;�f�''): �'ls° S�U�:O' .�
��: a/���r cSi (dr���� �
All other provisions of the Contract, which are not expressly am�nde�d ���;,;�����/°���r,'l
herein, shall remain in full force and effect. ;�n .;� ,; ;, ;�,�r j��r�p,
1�.� ..����1�:��i� ULSG+,a
i
�ORIGINAL
Contract Amendment No. 2
Page 1 of 2
Executed on this the � day of � , 2007, in
Fort Worth, Tarrant County, Texas.
APPROVAL RECOMMENDED:
. Douglas Rademaker, P.E.
Director, Department of
Engineering
TCB, Inc.
ENGINEER
�- ' ,l'
� � �,,
By : ,�_ - __ �
Name: Ann E. Kovich, AICP
Vice President
1200 Summit Avenue, Suite 600
Fort Worth, TX 76102-4409
APPROV�� AS TO
,.
�,
Arriy Rarn'se�'
Assistant City Attorney
LEGALITY:
APPROVED:
Mar . Q t �—�
Assis ant Ci y Manager
ATTEST:
Marty Hendri , City Secretary
Contract Amendment No. 2
Page2of2
No ��� 1���;�����D �
,�. ;,j�j �,.-,- ,�, -,..
�� � c I;� I„ r,��} �,.r�r'�, ,�i
li' � � 1 �,� 1!,S �� .`; 6 l:; �'J �,\:lj
^aJU�� 'i�.i�,^�C� �ijl!
V L 'c, '� �'�:; .La � �;,� � �
�7 c '� ,-�Q
4 I; ijTji;�b��. �I lf � C�!7
t L � .: ��:i : ft� � �!�G�� �
, _
TC� I AECO�
,-CB
1200 Summit Avenue, Suite 600, Fort Worth, Texas 76102-4409
T 817.698.6700 F 817.698.6701 www.tcb.aecom.com
November 30, 2006
Mr. Richard Argomaniz, PE
City of Fort Worth Department of Engineering
1000 Throckmorton Street
Fort Worth, Texas 76102
Subject: Ryan SE Drainage Improvements (DOE 4797)
Supplemental Authorization Request No. 2
Dear Mr. Argomaniz:
As part of the Ryan SE Drainage Improvements, installation of storm drain facilities will be required
within the right-of-way (ROW) of Riverside Drive (Bus. 287). Because this roadway segment is on the
TxDOT system, a utility crossing permit will be required for construction of the facilities. In addition, a
portion of the proposed storm drain improvements will be installed by open cut methods within the
ROW and therefore TxDOT will require the preparation of a traffic control plan to be submitted with the
permit application. Although the permit application is included as part of our original scope of work,
the preparation of traffic control plans were excluded during the contract negotiation phase with the
understanding that if a plan was required, TCB would submit a request for supplemental authorization
to prepare the plans. Based on recent conversations with TxDOT regarding this project, we have
been informed that a traffic control plan, in conformance with TxDOT standards, will be required for
approval of the application and issuance of the permit. Because a traffic control plan was not included
in our original contract, we are requesting supplemental authorization in the amount of $4,860 to
prepare the necessary plans and select the applicable standard details. A breakdown of this fee can
be found in Attachment A.
Should you have any questions or need additional information, please our Project Manager, Bryan
Jann, at 817.698.6787.
'ncerely
Ann Kovich, ICP
Vice President
AK