Loading...
HomeMy WebLinkAboutContract 34876i�i i �r SC�REiARY GONTRACT f�0 , RELOCATION AGREEMENT THIS LOCATION AGREEMENT ("Agreement"), is made and entered into as of the�1 day of �, 2007, by and between the City of Fort Worth, a municipal corporation situated in Tarrant, Denton, Parker, and Wise Counties, Texas, hereinafter referred to as the "City" and Qwest Communications Corporation, a Delaware Corporation, having an office at 1860 Lincoln Street, Suite 200, Denver, Colorado 80295, hereinafter referred to as the "Company." City and Company may be refeired to herein individually as a party or collectively as the parties. WITNESSETH: WHEREAS, Company owns and operates a communications conduit system (the "Facilities") along and upon the right of way described in Exhibit A, which is attached hereto and incorparated herein by this reference (the "Right Of Way"); and WHEREAS, other communications companies (the "Cooperating Carriers") also have interests in communications conduit systems along and upon the Right of Way; and WHEREAS, the City is preparing plans, specifications and estimates of costs of constructing its own facilities in the Right Of Way, and has determined that the facilities of Company and the other communications companies must be relocated to accommodate the construction activities of City; and WHEREAS, Company and the Cooperating Carriers have entered into a Joint Relocation Agreement wher•eby Company has been authorized to act as the lead carrier to coordinate relocation and to secure reimbursement from the City for relocation of facilities; and WHEREAS, Company and City have reached an agreement for reimbursement of the costs of such relocation. NOW, THEREFORE, in consideration of the foregoing, and for other good and sufficient consideration, the receipt and sufficiency of which are hereby acknowledged, it is agreed by and between the parties as follows: 1. The Company shall relocate the communications conduit systems owned by Company and the Cooperating Carriers (collectively the "Carrier Facilities") in the Right Of Way. A substitute location for the communications facilities, and the materials and methods used in the relocation, are subject to the prior review and approval by Owner. The Company shall not perform any construction until authorized in writing by both the City and the owner of the Right Of Way (the "Owner"). h: \tori\agreement�rel o_gov � �'f'r�����i%°::'l 1:5'vU�:�' ;;' �;'�;5�'�� � i��r,7 u���' =` �����.�,lir f c'�1::.�b� 1. 6 �`7 ,,•�,��L� � r � �;�,',���'1. l�; �� ���'1 ( � 9 �4'.• 8. This Agreement constitutes the entire agreement of the parties with respect to the subject matters hereof, and supersedes any and all prior negotiations, understanding and agreements with respect hereto, whether oral or written. Qwest Communications Corparation City of Fort Worth � `;/ .-= - By: � -- , By: Name: Gregory ��inz � M tt � Assistant City ����c n��e ,�- Title: Director of Construction Date: ��I�G'% h:\tori\agreem ent�re lo_gov Approved as to Form and Legality: Attest: Marty Hendrix City Secretary , Authorization:�s � C'�� �� �9�p 7 �rr�'��).�� l. ���'��11� ;G' � � '`�S�'i '��'�' cr,�'�t��l �'� e v � � �� i� :�� 5 L� �l, ��� �:,,�,�y;; u U, ���:�� �-- , EXHIBIT A DESCRIPTION OF THE RIGHT OF WAY This project is a joint development agreement with the City of Ft Worth, City of Haslett, and Hillwood Assoc. to re-align Hwy. 156. Qwest Communications Corporation (QCC) is joining in with 4 other carriers (ATT, AboveNet, and McLeod USA & Lightlinlc) to relocate facilities in the same existing 18 duct pacicage. QCC has two (2) 1.5" HDPE in the system. QCC will have the same duct configuration in the new system. Qwest like all the carriers will submit peimit applications individually for their new duct systems. AboveNet has agreed to talce the lead on this project. h: \t ori\agre em e nt�-e 1 o_gov �✓'�lJ�\, � /�.�y �'St�' �' � �,. � , 1-. :.SVIiT.0 VJ�J'�� ��I���1'?�U11;J�!�% � ; � ';',;,;�}, �:; �,U y7,5;� + 'r�� ..�:;�:���, U�c��o L�_: _�_ � . EXHIBIT B ESTIMATE OF RELOCATION COSTS This estimate is based upon the prices of materials and labor current as of the date of said estimate. The estimate does not account for increases due to unlcnown and unforeseen hardships in accomplishing the worl< or increases in materials between the time estimates given and commencement of work and reimbursement shall not be limited by such estimated figures. The details of said estimate follow: Project Name Project Location Detail of OSP, FOC and Splicirn rial Cost (Qwest Supplied) OSP Malerials Splice Materials Fiber Optic Cable (FOC) 5hipping on Materiats & FOC Shipping COST ESTIMATE FM 156 Realignment Haslet, TX on Materials & FOC Taxes on Materials and FOC UOM Estimated Cost 119.96 1,650.00 3,500 If 5,425.00 Total Material Cost (Qwest) 7,194.96 600 mi 810.00 Total Shipping Cost 810.00 539.62 Total Tax Cost 539.62 Labor Costs External OSP Construction Costs (Labor 8 All Remaining Materials) 1o,2ss.4s External Splicing Costs 5,844.00 Engineering Contractor - u 2,040.00 Inspection Services / Redlines - days 1,220.00 Total External Costs 19,403.46 Other Fees Including Permit & Right of Way Costs Railroad ROW fees Private ROW fees Miscellaneous ROW fees 0 0 0 0 0 Internal Labor & Flagging Costs Field Support Construction Field Operations Construction Support Field Support Engineering Field Support Splicing Field Operations Splicing Support Testing 8 Acceptance Support PM / Office Support CSM Support CAD Support Railroad Flagging Total Estimated Construction Cost o.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Other Fees 0.00 40 hrs 2,343.20 - hrs 0.00 - hrs 0.00 40 hrs 2,343.20 10 hrs 471.80 - hrs o.00 - hrs 0.00 - hrs 0.00 - hrs 0.00 - days 0.00 TotalJnternal Support & Flagging Costs 5,158.20 TOTAL ESTIMATED COST TO AGENCY IS $33,106.24 5 h:\tori\agreement�relo_gov 106.24 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 1/9/2007 DATE: Tuesday, January 09, 2007 LOG NAME: 30ALLIANCE RELO REFERENCE NO.: *�C-21922 SUBJECT: Authorize the Execution of Utility Relocation Reimbursement Agreements with AboveNet Communications, Inc., TCG Dallas, Southwestern Gas Pipeline, Inc., McLeodUSA Telecommunications Services, Inc., Qwest Communications Corporation, Southwestern Bell Telephone, L.P., Sunoco Pipeline, L.P. and TXU Electric Delivery Company as Required for the Relocation of FM 156 as Part of the Runway Extension Project at Fort Worth Alliance Airport (DOE 4867) � ..�,�- � -� �:�-�..�_. ��_�a-.�: �..-� RECOMMENDATION: It is recommended that the City Council authorize the execution of utility relocation reimbursement agreements with AboveNet Communications, Inc., TCG Dallas, Southwestern Gas Pipeline, Inc., McLeodUSA Telecommunications Services, Inc., Qwest Communications Corporation, Southwestern Bell Telephone, L.P., Sunoco Pipeline L.P., and TXU Electric Delivery Company totaling $1,172,312.04 as required for the relocation of FM 156 as part of the runway extension project at Fort Worth Alliance Airport.. DISCUSSION: These utility relocation reimbursement agreements are required in connection with the realignment of approximately 4.53 miles of FM 156 from downtown Haslet north to the existing FM 156 south of the SH 114 Interchange macle necessary by the runway extension at Fort Worth Alliance Airport. In order to construct the new location of FM 156, it is necessary to relocate all private utility service conflicts located on the proposed FM156 and the existing FM 156. In order to eliminate these conflicts, the utility facilities must be relocated and the owners of the facilities reimbursed as follows: Abovenet Communications, Inc. TCG Dallas Southwestern Gas Pipeline, Inc. McLeodUSA Telecommunications Services Qwest Communications Corporation Southwestern Bell Telephone, L.P. Sunoco Pipeline, L.P. TXU Electric Delivery Company Total The project is located in COUNCIL DISTRICT 2. $319,064.40 $43,695.00 $98, 881.00 $151,378.00 $33,106.00 $43,975.66 $138, 902.00 $343, 309. 98 $1,172,312.04 FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available, as appropriated, in the current capital budget of the Airport Grants Fund. TO Fund/Account/Centers GR14 539120 055218035800 $323,675.34 GR14 534120 055218086800 $848,363.70 Submitted for City Manager's Office bv: Originating Department Head: FROM Fund/Account/Centers Marc A. Ott (8476) A. Douglas Rademaker (6157) Additional Information Contact: Mark Thigpen (8366)