Loading...
HomeMy WebLinkAboutContract 34235COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No.?411�bl WHEREAS, Panel Installers, Ltd., hereinafter called "Developer", desires to make certain improvements to Village Creek Road, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. ACE Hardware Facility -Newer CFA 4% andlUtilities 12 09 05.doc{T�,1!�j F G I:I I J K. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in Part, by the alleeed neeli,zence of the Citv of Fort Worth, its officers, servants, or employees. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. ACE Hardware Facility -Newer CFA 4% and?Utilities 12 09 05.doc II L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof. Water (A)None; Sewer (A-1) None; Paving (B)Attached Storm Drain (B-1) Attached; Street Lights and Signs (C) Attached. M. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $117,452.65. ACE Hardware Facility (rvsd)-Newer CFA 4% and Utilities 08 22 06.doc SUMMARY OF COST ACE Hardware Facility Item Developer City Cost Total Cost Cost A. Construction $ - 1. Streets $92,873.70 92,873.70 2. Storm Drainage $11,600.00 11,600.00 3. Street Lights $8,800.00 8,800.00 4. Street Name Signs $0.00 $ B. Engineering Design $ C. Construction Engineering and Management by DOE $ $ (4%) 4,178.95 4,178.95 TOTALS 117,452.65 $ - 117,452.65 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. wt2.i i T,� ACE Hardware Facility (rvsd)-Newer CFA 41% and Utilities 08 22 06.doc IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said vel per has executed this instrument in triplicate, at Fort Worth, Texas this the day of . 200k Approval Recommended: NO AII& : I®SQUIRED ATTEST: Marty Hendrix City Secretary Appro as t< Assistant ity ATTEST: Corporate Secretary Transportation and Public Works Department Robert Go&e, P. E. Director City of o 0 Marc Ott Assistant City Manager DEVEL ER By: ACE Hardware Facility -Newer CFA 4% ancbUtilities 12 09 05.doc VILLAGE CREEK EXTENSION FT. WORTH, TEXAS October 31, 2005 SECTION 1 - SCHWOB CONSTRUCTION ITEM DESCRIPTION UNIT 1 -WATER 1 16" Water Main - PVC 2 8" Water Main 3 6" Water Main 4 Std Fire Hydrant 5 8" Gate Valve 6 6" Gate Valve 7 6" Blow -Off 8 Connection to Exist Main 9 1" Meter Set (Domestic) 10 1" Meter Set (Irrigation) 11 Trench Safety plan 12 Horizontal & Vertical Control 13 Testing & Sterilization 14 Fire Vault SUBTOTAL UNIT 1 - WATER ITEM DESCRIPTION UNIT 2 - SEWER 1 8° Sanitary Sewer (U-17) SDR 35 2 4' Dia Manhole 3 6" Sanitary Sewer Service 4 Connection to Exist Sewer Main 5 Horizontal & Vertical Control 6 Trench Safety Plan SUBTOTAL UNIT 2 - SEWER ITEM DESCRIPTION UNIT 3 - STORM DRAIN 1 Storm Drainage System 2 Horizontal & Vertical Control 3 Erosion Control Measures �4hwob FA M144 a -Awfr I TO UNIT TOTAL QTY UNIT PRICE PRICE 520 LF $45.00 $23,400.00 400 LF $25.00 $10,000.00 30 LF $20.00 $600.00 2 EA $2,100.00 $4,200.00 3 EA $7%00 $2,250.00 2 EA $600.00 $1,200.00 1 EA $2,600.00 $2,600.00 1 EA $750.00 $750.00 1 EA $500.00 $500.00 1 EA $500.00 $500.00 1 LS $1,000.00 $1.000.00 1 LS $1,000.00 $1,000.00 1 LS $1,500.00 $1,500.00 1 LS $8,000.00 $8,000.00 $S7,500.00 QTY UNIT 0 LF $24.00 $0.00 0 EA $2.200.00 $0.00 10 LF $18.00 $180.00 1 EA $500.00 $500.00 1 LS $1,500.00 $1,500.00 1 LS $1,000,00 $1,000.00 S3,180.00 QTY UNIT 0% LS $0.00 0 LS $2,000.00 $0.00 0 LS $1.400.00 $0.00 SUBTOTAL UNIT 3 $0.00 ITEM DESCRIPTION OTY UNIT UNIT 4 - PAYING 1 6" Reinf. Conc. Pavement 1,950 SY $27.50 $63,625.00 2 6' Lime Stabilization 2,082 SY $4.35 $9,056.70 3 6" Integral Curb 470 LF $2.00 $940,00 4 Street Header 521 LF $12.00 $6.252.00 5 Concrete Sidewalk 1,940 SF $4.00 $7,780.00 6 Earthwork 3,080 CY $3.00 $9,240.00 7 Horizontal & Vertical Control 1 LS $2,000.OD $2,000.00 8 SWPPP 1 LS $1,500.OD $1,500.00 9 Erosion Control Measures 1 LS $2,500.00 $2,500.00 SUBTOTAL UNIT 4 $92,873.70 UNIT 1 -WATER $57,500.00 UNIT 2 - SEWER $3,180.00 UNIT 3 - STORM $0.00 UNIT 4 -PAVING "2,873.70 MISCELLANEOUS COST Street Lights 1 Ea $2,750.00 $2,750.00 TOTAL CONSTRUCTION COST - SCHWOB SECTION 1 $156,363.70 Professional Fees Engineering 7.4% $11,600.00 Design Topographic/Boundary LS $3,ODO.00 TOTAL PROJECT COST - SCHWOB SECTION 1 Bill McDonnell Project Manager Schwob Building Company Ud. 9 7'r /0711r- - $170,903,70 Date UNIT IIL• STORM DRAIN ITEM. APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT (Furnish and install, including all appurtenant work, complete in place, the following items) Item Approx. Unit Item Description Unit Price Total . No. Quantity Measurement "D" Item reference Amount 1 115 L.F. 24-Inch Storm Sewer Pipe, Per Linear Foot: Four Thousand Six Hundred Dollars and 00 Cents $ 40.00 $ 4.600 2 1 Ea. 10-Ft. Depressed Curb Inlet, Per Each: Five Thousand Dollars and 00 Cents $ 5,000 $ 5.000 3 1 Ea. Connection to Existing Storm Drain with Conc. Collar; Per Each: One Thousand Dollars and 00 Cents $ 1,000 $ 1.000 4 1 L.S. Horizontal and Vertical Control; Per Lump Sum: One Thousand Dollars and 00 Cents $ 1,000 $ 1.000 TOTAL AMOUNT BID STORM DRAIN $ 11.600 B-7 Updated 05/16/2005 I. STREET LIGHT COST ESTIMATE INTERSECTIONS MID -BLOCK RESIDENTIAL CHANGE OF DIRECTION RESIDENTIAL MID -BLOCK COLLECTOR MID -BLOCK ARTERIAL PARKWAY MID -BLOCK ARTERIAL MEDIAN RELOCATE EXISTING LIGHT QUANTITY UNIT COST 0 EA $ 2,000 0 EA $ 2,000 0 EA $ 2,000 4 EA $ 2,000 0 EA $ 2,500 0 EA $ 2,500 0 EA $ 11500 Subtotal City's Cost Developer's Subtotal 10% Contingency Project Total Adjacent Developer's Cost Developer's Cost 2% Inspection Fee CFA CODE #2005151 DEVELOPER'S COST: $8,800.00 ACE HARDWARE FACILITY November 23, 2005 Fort Worth, Texas PAGE I OF Exhibit C TOTAL COST $0,000.00 $0,000.00 $0,000.00 $8,000.00 $0,000.00 $0,000.00 $0,000.00 $8,000.00 $00,000.00 $8,000.00 $0,800.00 $8,800.00 $00,000.00 $8,800.00 $00,000.00 November 23, 2005 0 la 1':'1'`V II. STREET LIGHTS WORK DESCRIPTION: 1. The Developer shall provide for the installation of streetlights at the approximate locations shown in Exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2. Streetlights on residential and /or collector streets can be installed using overhead or underground conductors with the approval of the Director of Transportation and Public Works. 3. The City will install all the streetlights that use overhead or underground conductors on residential, and collector streets. The developer agrees to pay the city the amount shown below prior to the City starting its design efforts. 4. Streetlights on arterial streets shall be installed with underground conduit and conductors. 5. The Developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operation of the street lights 6. The estimated cost of this street light installation is detailed on page 1 of exhibit C and is summarized below, the street lights will remain the property of, and will be maintained by the City of Fort Worth. DEVELOPER'S COST: $8,800.00 ACE HARDWARE FACILITY November 23, 2005 FORT WORTH, TEXAS CFA CODE #2005151 Page II of Exhibit C III "STREETLIGHTS" MID BLOCK VILLAGE CREEK RD ACE HARDWARE FACILITY Page III of Exhibit C IV STREET NAME SIGNS 1. The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of $100.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3. This development creates the following zero (0) intersections at a cost to the Developer of $0.00: (Street name signs exist at Martin & Village Creek.) Ace Hardware Facility CFA code: 2005151 November 21, 2005 V1TY uS`'I1 5 iE u PIEF!C 287 FA RLANE MARTIN w w p O 2 F- J_ � _ = KELL S W-- PECOS o� w 0 uj zd L� a MAXEY V w /d U MARTIN MARTIN I ! WILBARGER LAKE ARLINGTON S IT 11 DAVID STRICKLAND DAVID STRICKLAND VESTA FAR, _EY VESTA FARLEY � o LASTZR = (ASTER SUN VALLEY O EF KALTENBRL,N oI KALTEMBRUN 0 d SAUNDERS w a LOCATION MAP N.T.S. MAPSCO 93E ACE TRUCKING LOCATION MAP ell mam DR= L -4 SCALE: 1 160 I ) I to I RLD BLUE CIRCLE LEGEND PUBLIC PAVEMENT PRIVATE PAVEMENT ]FOFFICE1 EXHIBIT 991311 PAVING ACE TRUCKING SCALE: 1 " = 160' _ WILLOW SPRINGS LANE \ DI I� I to I OLD BLUE CIRCLE I � v Ex4"RCP iL1RTIN DRIVE FILEW-462 za— — — —sa— —as=s���a��= II � II 'a I I I II I� I I II I I I I II I II I I I I � FOFFICE 11 _j _ — — II I 1 I I I �1 I W W I Op, I I 1 �Ro�LL I III11 I o;:ao I I I I I I II I II I I I �I I II I II I I I I I II I I I o I I I II I LEGEND PROPOSED STORM DRAIN _ _ = EXISTING STORM DRAIN EXHIBIT "B-1 " STORM DRAINAGE SYSTEM ACE TRUCKING IQI � � 'f• Ii �� [ 1'% A V SCALE: 1 " = 160' �I I� I 0 I OLD BLUE CIRCLE EX. EX. STREET i(&MW DRIVE STREET \�- I(i,LIGHT dip LIGHT — — — — — — I I I = I it II I II I� I I I I I I I I I 1 -PRO I 1 1 1 I I STREET III I I I III I j I 1 c � I I I i oI, I I II I fl II II II I I I I I I I I I II I m I (I w I II lal I wl v � 111 THOMAS L �I i LEGEND PROPOSED STREET LIGHTS EXISTING STREET LIGHTS EXHIBIT "C" STREET LIGHTS ACE TRUCKING