Loading...
HomeMy WebLinkAboutContract 34236COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 34934 WHEREAS, One Prairie Meadows, Ltd. , hereinafter called "Developer", desires to make certain improvements to The Villages of Woodland Springs West, Timberland Boulevard Phase 2b, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: That said Developer, acting herein by and through Mehrdad Moavedi , its duly authorized General Partner , and the City, acting herein by and through Marc Ott, its duly authorized Assistant City Manager, for and in consideration of the covenants and conditions contained herein, do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section 11, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. U CFA TPW Timb Ilb.doc F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). I. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof: CFA TPW Timb IIb 2 Water (A) None; Sewer (A-1) None; Paving (B) attached; Storm Drain (B- 1) attached; Street Lights and Signs (C) attached. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $ 1,209,286.05 . Item Developer City Cost Total Cost Cost IA. Construction I1. Streets 2. Storm Drainage 3. Street Lights 4. Street Name Signs IB. Engineering Design C. Construction Engineering and Management by DOE 14%) TOTALS $590,312.55 $ $590,312.551 $519,866.50 $ $519,866.50 $54,600.00 $ - $54,600.00 $100.00 $ $100.00I $44,407.00 O $44,407.00 $1,209,286.05 $ I $1,209,286.05 Notes; 1. All Preliminary Plats filed after July 2000, will require sidewalks on all streets. Sidewalk cost is included under street cost. The developer is responsible for installation of sidewalk. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees and materials testing. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. CFA TPW Timb IIb 20060119.doc 3'aSS�r� 1tD uN14ji ,�yl�`� r, a I41,1'A L7 J V VIIr �'1�� �ti �� � 4. Street Lights to be installed by Tri-County Electric Co-operative IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said ve'op has executed this instrument in triplicate, at Fort Worth, Texas this the,�Pday of ,2006 Approval Recommended: Y �l aC' pIt ATTEST: f�� kA--- iYlar� � l drllX City Secretary Approved a to Form: Assistant Cit A�orne� ATTEST: 1 d i L 1a i,'�., /a t Ufa Corporate Secretary Transportation and Public Works Department Robert toode, P. E. Director City OAFort By: Marc Ott Assistant City Manager DEVELOPER By: One Prairie Meadows, Ltd., a Texas limited partnership By: Centamtar Terras, L.L.C., A Texas limited liability company, Its General Partner By: Mehrdad Moayedi, anager RECEIVED CFA TPW Timb IIb 4 PART B - PROPOSAL (This Proposal must not be removed from this book of Contract Documents) TO: ONE PRAIRIE MEADOWS, LTD. Fort Worth, Texas DEVELOPER May 2005 c/o CARTER & BURGESS, INC. FOR: STORM DRAIN FACILITIES FOR THE VILLAGES OF WOODLAND SPRINGS, WEST TIMBERLAND BOULEVARD PHASE 2B DEPARTMENT OF ENGINEERING NO. 4627 FILE NO. K-1889 Includes the furnishing of all materials (except as specified to be furnished by the City), equipment and labor for the installation of a water distribution system, a sanitary sewer system, storm drain system, all necessary appurtenances and incidental work to provide a complete and serviceable project. Pursuant to the foregoing "Notice to Bidders," including plans, special contract documents, and the General Contract Documents and General Specifications for Water Department Projects, the site of the project and understanding the amount of work to be done, and the prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment and material except as specified to be furnished by the City, which is necessary to fully complete the inspection and approval of the Director of the City Water Department of the City of Fort Worth, Texas; and binds himself upon acceptance of this proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums (Furnish and install, including all appurtenant work, complete in place, the following items): DESCRIPTION OF ITEMS SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT ITEM ITEM QUANTITY WORDS PRICE BID SECTION A - STORM DRAIN SYSTEM 681 L.F. 30" Class III R.C. Pipe, including trench excavation and backfill, complete in place for the sum of Fiftv-Seven Dollars & No Cents per Linear Foot $ 57.00 $ 38,817.00 N:%JOB\010648\SPEM10648.020B.doc P_1 v' r1'T )EL°'�;�! i �T �jU qr DESCRIPTION OF ITEMS SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN ITEM ITEM QUANTITY WORDS 2. 167 L.F. 24" Class III R.C. Pipe, including trench excavation and backfill, complete in place for the sum of Forty -Four Dollars & No Cents per Linear Foot $ 3. 172 L.F. 21" Class III R.C. Pipe, including trench excavation and backfill, complete in place for the sum of Thirty -Seven Dollars & No Cents per Linear Foot $ 525 4. 1,020 L.F. Trench Safety UNIT AMOUNT PRICE BID 44.00 $ 7,348.00 37.00 $ 6,364.00 One Dollar & No Cents per Linear Foot $ 1.00 $ 1,020.00 5. 1 Ea. 4' Square Manhole, complete in place for the sum of Two Thousand Six Hundred Dollars & No Cents per Each $ 2,600.00 $ 2,600.00 NAJ0B\010648\SPEC\010648.020B.doc P-2 444 6 7 T 0 10. 4 Ea. 20' Recessed Curb Inlet, complete in place for the sum of Three Thousand Seven Hundred Fiftv Dollar & No Cents per Each $ 3,750.00 $ 15,000.00 3 Ea. 10' Recessed Curb Inlet, complete in place for the sum of Two Thousand Six Hundred Twenty -Five Dollars & No Cents per Each $ 2,625.00 $ 7,875.00 1 Ea. 24" Type B Headwall, Including Grade to Drain Excavation, complete in place for the sum of 1,150 S.Y 1 L.S. One Thousand Dollars & No Cents per Each $ 1,000.00 $ Rock Rubble Rip Rap, complete in place for the sum of Forty -Eight Dollars & No Cents per Square Yard $ Installation & Maintenance of Storm Water Management, complete in place for the sum of Five Hundred Dollars & No Cents per Lump Sum $ 1,000.00 48.00 $ 55,200.00 500.00 $ 500.00 N:\JOB\010648\SPEC\010648.020B.doc P-3 11. 12 13. 14. 298 C.Y. 4 — 8' x 7' Multiple Box Culvert, complete in place for the sum of Four Hundred Twentv- Seven Dollars & No-..--- Cents per Lump Sum $ 427.00 $ 127,246.00 300 C.Y. 3 - 8' x 4' Multiple Box Culvert, complete in place for the sum of Four Hundred Twentv-Five Dollars & No Cents per Lump Sum $ 425.00 $ 127,500.00 143 C.Y. Parallel Wing Walls for 4 - 8' x 7' Multiple Box Culvert, complete in place for the sum of Four Hundred Thirtv Dollars & No Cents per Lump Sum $ 430.00 $ 61,490.00 86 C.Y. Parallel Wing Walls for 3 - 8' x 4' Multiple Box Culvert, complete in place for the sum of Four Hundred Thirtv Dollars & No Cents per Lump Sum $ 430.00 $ 36,980.00 N:\10B\010648\SPEC\010648.020B.doc P_4 DESCRIPTION OF ITEMS SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT ITEM ITEM QUANTITY WORDS PRICE BID 16. 390 L.F. Guardrail & Ballasts for MBC's as shown on plans, complete in place for the sum of Fifteen Dollars & Thirty -Five Cents per Lump Sum $ 15.35 $ 5,986.50 SECTION A - - - STORM DRAIN SYSTEM: $ 519,866.50 Summary Section A Storm Drain System $ 519,866.50 Payment, Performance, & Maintenance Bonds $ 11,113.00 Total Amount of Contract $ 53Q,9D 50 NAJOB\01 0648\SPEC\01 0648.020B.doc SI-5 M PART B - PROPOSAL (cont.) Within ten (10) days after acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security in the amount of 5% is to become the property of the City of Fort Worth, Texas, in the event the contract and bond or bonds are not executed and delivered within the time above set forth, as liquidated damages for delay and additional work caused thereby. The undersigned bidder certifies that he has been furnished at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and these specific Contract Documents and appurtenant plans. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City.Ordinance No. 7400. The Bidder agrees to begin construction within 10 calendar days after issue of the work order by the Owner, and to complete the contract within 55 working days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A or B below, as applicable:) [ ] A. The principal place of business of our company is in the State of [ ] Nonresident bidders in the State of , our principal place of business are required to be _ percent lower than resident bidders by state law. A copy of the statute is attached. [ ] Nonresident bidders in the State of , our principal place of business, are not required to underbid resident bidders. [x] B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. N:\)OB\010648\SPEC\010648.020B.doc P-6 Receipt is acknowledged of the following addenda: Addendum No. 1 Addendum No. 2 Addendum No-3 (SEAL) If Bidder is Corporation. TITLE: ADDRESS NAJOB\010648\SPEC\010648.020B.doc P_7 Respectfully submitted, Fouy Cons\\*u4 ion, 1 nc son �JI?a , el � V.P. of Operations 11200 Old Seaqoville Road Balch Springs, TX 75180 PROPOSAL (This Proposal must not be removed from this book of Contract Documents) TO: ONE PRAIRIE MEADOWS, LTD. DEVELOPER c/o CARTER & BURGESS, INC. FOR: STREET IMPROVEMENTS FOR THE VILLAGES OF WOODLAND SPRINGS WEST, TIMBERLAND BOULEVARD PHASE 2B DEPARTMENT OF ENGINEERING No. 4627 FILE NO. K-1889 Pursuant to the foregoing "Notice to Bidders," the undersigned bidder having thoroughly examined the Contract Documents, Plans, Special Provisions, Standard Special Provisions, the site of the project, and understanding the amount of work to be done, and the prevailing conditions hereby proposes to do all the work as provided in the Plans and Contract Documents subject to inspection and approval by the Director of Public Works of the City of Fort Worth, Texas, and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved Performance Bond and Payment Bond, and such other bonds as may be required by the Contract Documents, for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums: (Furnish and Install, including all appurtenant work, complete in place, the following items): SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM I ITEM I QUANTITY I PRICES WRITTEN IN WORDS I PRICE I BID STREET IMPROVEMENTS 210 1. 21,910 S.Y. 212 6" Lime Stabilized Subgrade (Includes Preparation of Subgrade), complete in place for the sum of One Dollar & Seventy Eiqht Cents per S.Y. $1.78 $ 38,999.80 2. 329 Tons Lime for Subgrade (30#/S.Y.)* complete in place for the sum of Eiqhty Two Dollars & Twenty Five Cents per Ton $ 82.25 $ 27,060.25 N:1JOB10106481SPEC\010648.010C.doc 2Z i PLC PAY s ITEM I ITEM I APPROXIMATE Q ANTIYDEPR CESIWRITTT NE N WORDS ID 314 3. 19,650 S.Y. 7" Reinforced Concrete Pavement with 7" Curb, complete in place for the sum of UNIT I AMOUNT PRICE BID Nineteen Dollars & Ephty Two Cents per S.Y. $ 19.82 $ 389,463.00 4. 410 S.Y. 6" Reinforced Concrete Pavement with 7" Curb, complete in place for the sum of Eiqhteen Dollars & Fifty Four Cents per S.Y. $ 18.54 $ 7,601.40 5. 6 EA. ADA sidewalk Ramps, complete in place for the sum of One Thousand Fiftv Dollars & No Cents per EA. $1,050.00 $6,300.00 6 23,610 S.F. 4' Wide Reinforced Concrete Sidewalk, complete in place for the sum of Two Dollars & Seventv Six Cents per S.F. $ 2.76 $ 65,163.60 7. 1 L.S. Storm Water Management One Thousand One Hundred Dollars & No Cents per L.S. $ 1,100.00 $ 1,100.00 N:WOB\010648\SP EC\010648.010C.doc P - 2 SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE 8. 1,852 S.Y. Temporary Asphalt Transition pavement as shown on plans, complete in place for the sum of AMOUNT BID Nineteen Dollars & Fifteen Cents per S.Y. $ 19.15 $ 35,465.80 9. 544 EA. Type W-4 Pavement Markers, complete in place for the sum of Five Dollars & Twenty Five Cents per EA. $ 5.25 $ 2,856.00 10. 166 EA. Type II CR - 4 Pavement Markers, complete in place for the sum of Five Dollars & Twenty Five Cents per EA. 11. 1,420 EA. Type Y - 4 Pavement Markers, complete in place for the sum of Five Dollars & Twenty Five Cents per EA. 12. 396 EA. Type 11 — AA - 4 Pavement Markers, complete in place for the sum of Six Twenty Five N AJOB\010648\SPEC\010648.010C.doc P - 3 Dollars & Cents per EA. $5.25 $ 871.50 $ 5.25 $7,455.00 $ 6.25 $ 2,475.00 SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE 13. 1 EA. Type W6 — 3A Warning Sign as shown on plans, complete in place for the sum of 14 15. 16 Three Hundred Ten Dollars & No Cents per EA. 1 EA. Type 4 — 2L Warning Sign as shown on plans, complete in place for the sum of 1 EA 2 EA. Three Hundred Ten Dollars & No Cents per EA. Type W4 — 2R Warning Sign as shown on plans, complete in place for the sum of Three Hundred Ten Dollars & No Cents per EA. Type W13 — I Warning Sign as shown on plans, complete in place for the sum of Three Hundred Ten Dollars & No Cents per EA. N:\J O B\010648\SPEC\010648.010C.doc P - 4 $ 310.00 $ 310.00 $ 310.00 $ 310.00 AMOUNT BID $ 310.00 $ 310.00 $ 310.00 $ 620.00 SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID 17 1 EA. Type W9 — 2L Warning Sign as shown on plans, complete in place for the sum of Three Hundred Ten Dollars & No . Cents per EA. $ 310.00 $ 310.00 18 1 EA. Type W9 — 2R Warning Sign as shown on plans, complete in place for the sum of Three Hundred Ten Dollars & No Cents per EA. $ 310.00 $ 310.00 19 2,082 L.F. 4" Wide White Edgeline paint striping as marked on plans, complete in place for the sum of One Dollars & Sixty Cents per L.F. $ 1.60 $ 3,331.20 TOTAL STREET IMPROVEMENTS --- $ 590,312.55 City of Fort Worth requires a minimum of 30#/S.Y. The Paving Contractor will be responsible for a lime series test as directed by the City of Fort Worth Construction Inspection Department. SUMMARY Total Street Improvements $ 590,312.55 Payment, Performance & Maintenance Bond $ 7,220.00 Total Amount of Contract $ 597.532a5. N:1J01310106481SPEC1010648.010C.doc P - 5 V- r a� � C` 0 16 �'E"C"P, 1�1L1"b:Y Thiel Contract is issued by an organization which qualifies for exemption pursuant to the provisions of Article 20.04(F) of the Texas Limited Sales, Excise and Use Tax Act. Taxes: All equipment and materials not consumed by or incorporated into the project construction, are subject to State sales taxes under House Bill 11, enacted August 15, 1991. The successful Bidder shall be required to complete the attached Statement of Materials and Other charges at the time of executing the contract. The Contractor shall comply with City Ordinance 7278, as amended by City Ordinance 7400 (Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in, employment practices. The undersigned agrees to complete all work covered by these Contract Documents within 30 working days from and after the date for commencing work, as set forth in the written Work Order to be issued by the Owner, and to pay not less than the "Prevailing Wage Rates for Streets, Drainage and Utility Construction," as established by the City of Fort Worth, Texas. Within ten (10) days of receipt of notice of acceptance of this bid, the undersigned will execute the formal contract, and will deliver an approved Surety Bond for the faithful performance of this contract. The attached deposit check in the sum of 5% GAB Dollars (Bid Bond) is to become the property of One Prairie Meadows, Ltd. or the attached Bidder's Bond is to be forfeited in the event the contract and bond are not executed within the time set forth as liquidated damages for delay and additional work caused thereby. Respectfully submitted, Austin Bridge and Road . T,P By: &A.t Steve Vincent, Vice President Title: Austin Bridge & Road, Inc. General Partner Address: 6330 Commerce Drive, Suite 150 Trvi nrz Tasrac 7-10L3 (S E A L) If Bidder is Corporation Date Receipt is acknowledged of the following addenda: Addendum No. 1 Addendum No. 2 Addendum No. 3 N AJ 0610106481S P E C1010648.010C.d oc P - 6 III. STREET LIGHTS: 1. STREET LIGHT COST ESTIMATE INTERSECTIONS MID -BLOCK RESIDENTIAL CHANGE OF DIRECTION RESIDENTIAL MID -BLOCK COLLECTOR MID -BLOCK ARTERIAL PARKWAY MID -BLOCK ARTERIAL MEDIAN QUANTITY UNIT COST TOTAL COST 0 EA $ 0,000 $00,000.00 0 EA $ 0,000 $00,000.00 0 EA $ 0,000 $00,000.00 0 EA $ 01000 $ --0-- 0 EA $ 0,000 $ --0— 1.1 EA $ 0,000 $ __0__ RELOCATE EXISTING LIGHT 0 EA $ 0,000 $ --0-- 22 (200 watt lights) x $7.05 (per light) x 24 months = $3,722.40 0(100 watt lights) x $6.50 (per light) x 24 months = $00,000.00 TOTAL $3,722.40 The Street Lights will be installed by TRI County Electric Cooperative the developers initial 24- month power charge will be $3,722.40 After the initial 24-month power charge the City of Fort Worth, WILL ASSUME THE POWER COST. CFA CODE #2005100 THE VILLAGES OF WOODLAND SPRINGS WEST TIMBERLAND BLVD B August 27, 2005 Fort Worth, Texas August 31, 2005 PAGE I OF EXHIBIT C 2. STREET LIGHTS WORK DESCRIPTION: 1. The Developer shall provide for the installation of streetlights at the approximate locations shown in Exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2. Streetlights on residential and /or collector streets can be installed using overhead or underground conductors with the approval of THE Director. 3. Streetlights on arterial streets shall be installed with underground conduit and conductors. 4. The Developer shall provide for the installation of a 2-inch schedule 40 PVC conduit at a depth not less than 30 inches and at least 18-inch behind the curb, "clear from all other utilities". 5. The Developer shall provide for the installation of a 2-inch schedule 40 PVC conduit between streetlights proposed for installation and the power source to become operational. 6. A 3-inch schedule 80 PVC conduit is required when crossing streets at a depth not less than 30 inches, unless indicated otherwise on the plans concrete pull boxes shall be provided at the crossing points. 7. The developer shall pay the initial two year power cost to TRI- COUNTY ELECTRIC COOPERATIVE, after the initial two year cost the City of Fort Worth, will assume the power cost. 8. The developer or their contractor shall contact City's street light division 48 hours prior to starting any installation of conduit and/or streetlights at (817) 871-6596 to insure proper inspection of work. TOTAL DEVELOPER'S COST $3,722.40 THE VILLAGES OF WOODLAND SPRINGS WEST TIMBERLAND BLVD B August 27, 2005 Fort Worth, Texas August 27, 2005 PAGE II OF EXHIBIT C CFA CODE #2005100 III "STREET LIGHTS" MID BLOCK ARTERIAL TIMBERLAND BLVD 11 (DOUBLE ARMS 22 LIGHTS) THE VILLAGES OF WOODLAND SPRINGS WEST TIMBERLAND BLVD PAGE III OF EXHIBIT C „ IV STREET NAME SIGNS 1. The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of $100.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3. This development creates the following one (1) intersections at a cost to the Developer of $100.00: Alta Vista Rd & Timberland Blvd Villages of Woodland Springs West, W Timberland B CFA code: 2005100 August 13, 2005 KE- L COD 0 WESTPO T Z PKW Q �� Q SN KELLER- . SLET D. o zF o' Jai o2 oL- = 00 ♦ U CAYLOR RD. W m 1 -- — PROJECT .0 SITE wjm j -- KELLER H CKS. GOLDEN _ TRIANGLE BLV � FM illTT 09 ------ N Q NOT TO SCALE i III LOCATION MAP THE VILLAGES OF WOODLAND SPRINGS WEST TIMBERLAND BOULEVARD PHASE 2B ono\Inh\ mnA4A\nly\ Tlmhwrlmd Rlvd\ 94ACFA.clnn Carter Burgess CARTER d BURGESS, INC illAWN STUFFY FORT WOM'Ta 76102 PROJECT NO. 010648.010.1.0001 £Y , . Pik T LEGEND PROP. 2-29' B/ B ROADWAY/ 120' ROW PROP. 29' B/ B ROADWAY/ 1/2 of 1 20' ROW PROP. 4' S I DEWALK (BY DEVELOPER) LIMITS OF PROJECT N SCALE) 1" = 300' STREETS EXHIBIT ' 8' THE VILLAGES OF WOODLAND SPRINGS WEST TIMBERLAND BOULEVARD PHASE 2B Camwr11ri CARTER & BURGESS, INC. 777 MN STREET FORT WORTH, T% 76102 (817) 735-6000 )GN=pl\)ob\ 010648\oiv\ Ttmberlond Blvd 648CFA.dgn PROJECT NO. 010648.010.1.0001 PAGE 2 OF T i am wo LEGEND PROP. 2-29' B/ B KIIII14 ROADWAY/ 120' ROW PROP. B/ B ROADWAY/ 1/2 of 120' ROW PROP. 4' S I DEWALK ............••••.••. (BY DEVELOPER) LIMITS OF PROJECT ce SCALE1 1" = 300' STREETS EXHIBIT 'B" THE VILLAGES OF WOODLAND SPRINGS WEST TIMBERLAND BOULEVARD PHASE 2B Carter Burgess CARTER & BURGESS, INC. 777 AWN STREET FORT WORTH, TX 76102 (Rl17173Sb0M )ON=p1\)ob\ 010648\oly\ Timberland Blvd\ 648CFA.dgn PROJECT NO. 010648.010.1.0001 PACE 3 OF T I I N SCALEF 1" = 300' cT � IJ ` 1J J .Aj iz Lo", TRpF L4NE N I I 1 I 10 1 9 1 6I „ C I WWW o Id F I r 10 y • YJ 43 Ix `'+ QI • JLL J s• in e d a0 000-000 / /• _ RIAND BOULE AkD� "•�••� �� �� •�� -101 / x4MB/ `+^ -101 A _ r� I LEGEND PROP. STORM DRAIN LINE PROP. INLET PROP. MANHOLE PROP. HEADWALL EXIST. STORM DRAIN LINE 0 LIMITS OF PROJECT — — �• STORM DRAIN EXHIBIT 'B- THE VILLAGES OF WOODLAND SPRINGS WEST TIMBERLAND BOULEVARD PHASE 2B Carter Burgess CARTER & BURGESS, INC. 777 AWN STREET FORT WORTH, Tx 76102 (M7) 735-6000 PROJECT NO. 010648. 010. 1. 0001 =qe\Job\ 010648\oiv\ TiBterland Blvd\ 648CFA.dgn PACE 4 OF T rA w o' ISLET 21 " �4" HONL d r3-81x4'MBC 0-100 FUTURE H � 21 .1 3-B' x4' MBC 10' INLET W LEGEND PROP. STORM DRAIN LINE r PROP, INLET PROP, MANHOLE —� PROP. HEADWALL C 0 EXIST. STORM DRAIN LINE _ _ _ zl= = = LIMITS OF PROJECT �r li�l SCALEo l" = 300' STORM DRAIN EXHIBIT '13-1 ' THE VILLAGES OF WOODLAND SPRINGS WEST TIMBERLAND BOULEVARD PHASE 2B Carter - Burgess CARTER & BURGESS, INC 777 AWN STREET FORT WORM, TX 76102 I8171 735-6000 PROJECT NO. 010648.010. 1.0001 =pl\)ob\ 010648\civ\ Timberland Blvd\ 648CFA.dgn PAGE 5 OF 7 r t 11 it LONE 7REE LANE to I A O ��tc ,°7 � .e a O1 I t i r�i�H 000-100 000000 LEGEND 7ROP. DOUBLE STREET LIGHT N :XIST. SINGLE STREET LIGHT O ON STEEL POLE WITH STREET AND STOP SIGNS ATTACHED) 'ROP. STREET SIGN :XIST. STREET SIGN IMITS OF PROJECT SCALEo l" = 300' STREET LIGHTS EXHIBIT 'C' THE VILLAGES OF WOODLAND SPRINGS WEST TIMBERLAND BOULEVARD PHASE 2B Carter Burgess CARTER 6 BURGESS, INC. 7" MmN PIM PT WORM, 7X 76M 11I7) 73S-OW PROJECT NO. 010648.010.1.0001 =al\lob\ 010648\civ\ Timberland Blvd\ 648CFA.dan PACE 6 OF T ��'% �/ f � F 4h a, y r P ooe at S, ' as ss Ir 0 ' / / �)I z� �r w END TREET LIGHT M LIST. SINGLE STREET LIGHT O )N STEEL POLE WITH STREET JD STOP SIGNS ATTACHED) 20P. STREET SIGN ( I ST. STREET SIGN IMITS OF PROJECT 0 SCALE1 1" = 300' STREET LIGHTS EXHIBIT 'C' THE VILLAGES OF WOODLAND SPRINGS WEST TIMBERLAND BOULEVARD PHASE 2B Carter Burgess CARTER & BURGESS, INC. FORT WORM, TX 76101 PROJECT NO. 010648.010.1.0001 p.\Job\ 010648\civ\ Timberland Blvd\ 648CFA.dgn PAGE 7 OF T