HomeMy WebLinkAboutContract 34236COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 34934
WHEREAS, One Prairie Meadows, Ltd. , hereinafter called "Developer",
desires to make certain improvements to The Villages of Woodland Springs West,
Timberland Boulevard Phase 2b, an addition to the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through Mehrdad Moavedi , its
duly authorized General Partner , and the City, acting herein by and through Marc
Ott, its duly authorized Assistant City Manager, for and in consideration of the covenants
and conditions contained herein, do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copy
herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor
of this Agreement.
C. Developer shall provide financial security in conformance with paragraph
6, Section 11, of the Policy.
D. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the Policy.
U
CFA TPW Timb Ilb.doc
F. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub -contractors, officers, agents or
employees, whether or not such iniuries, death or damages are caused,
in whole or in part, by the alleged negligence of the City of Fort Worth,
its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees that
no street construction or storm drainage will begin prior to City Council
approval of this Community Facilities Agreement. (Article 104.100,
Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed
(Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications and
cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part hereof:
CFA TPW Timb IIb 2
Water (A) None; Sewer (A-1) None; Paving (B) attached; Storm Drain (B-
1) attached; Street Lights and Signs (C) attached.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, B1,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $ 1,209,286.05 .
Item Developer City Cost Total Cost
Cost
IA. Construction
I1. Streets
2. Storm Drainage
3. Street Lights
4. Street Name Signs
IB. Engineering Design
C. Construction Engineering
and Management by DOE 14%)
TOTALS
$590,312.55
$
$590,312.551
$519,866.50
$
$519,866.50
$54,600.00
$
- $54,600.00
$100.00
$
$100.00I
$44,407.00
O $44,407.00
$1,209,286.05
$
I $1,209,286.05
Notes;
1. All Preliminary Plats filed after July 2000, will require sidewalks on all streets.
Sidewalk cost is included under street cost. The developer is responsible for
installation of sidewalk.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
CFA TPW Timb IIb 20060119.doc 3'aSS�r� 1tD
uN14ji ,�yl�`� r, a I41,1'A
L7 J V VIIr �'1�� �ti �� �
4. Street Lights to be installed by Tri-County Electric Co-operative
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said ve'op
has executed this instrument in triplicate, at Fort Worth, Texas this the,�Pday of
,2006
Approval Recommended:
Y �l aC' pIt
ATTEST:
f�� kA---
iYlar� � l drllX
City Secretary
Approved a to Form:
Assistant Cit A�orne�
ATTEST:
1
d i L 1a i,'�., /a t Ufa
Corporate Secretary
Transportation and Public Works
Department
Robert toode, P. E.
Director
City OAFort
By:
Marc Ott
Assistant City Manager
DEVELOPER
By: One Prairie Meadows, Ltd.,
a Texas limited partnership
By: Centamtar Terras, L.L.C.,
A Texas limited liability company,
Its General Partner
By:
Mehrdad Moayedi, anager
RECEIVED
CFA TPW Timb IIb
4
PART B - PROPOSAL
(This Proposal must not be removed from this book of Contract Documents)
TO: ONE PRAIRIE MEADOWS, LTD. Fort Worth, Texas
DEVELOPER May 2005
c/o CARTER & BURGESS, INC.
FOR: STORM DRAIN FACILITIES FOR
THE VILLAGES OF WOODLAND SPRINGS, WEST
TIMBERLAND BOULEVARD PHASE 2B
DEPARTMENT OF ENGINEERING NO. 4627
FILE NO. K-1889
Includes the furnishing of all materials (except as specified to be furnished by the City),
equipment and labor for the installation of a water distribution system, a sanitary sewer system,
storm drain system, all necessary appurtenances and incidental work to provide a complete and
serviceable project.
Pursuant to the foregoing "Notice to Bidders," including plans, special contract documents, and
the General Contract Documents and General Specifications for Water Department Projects,
the site of the project and understanding the amount of work to be done, and the prevailing
conditions, hereby proposes to do all the work, furnish all labor, equipment and material except
as specified to be furnished by the City, which is necessary to fully complete the inspection and
approval of the Director of the City Water Department of the City of Fort Worth, Texas; and
binds himself upon acceptance of this proposal to execute a contract and furnish an approved
Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may
be required by the Contract Documents for the performing and completing of the said work.
Contractor proposes to do the work within the time stated and for the following sums (Furnish
and install, including all appurtenant work, complete in place, the following items):
DESCRIPTION OF ITEMS
SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT
ITEM ITEM QUANTITY WORDS PRICE BID
SECTION A - STORM DRAIN SYSTEM
681 L.F. 30" Class III R.C. Pipe, including
trench excavation and backfill,
complete in place for the sum of
Fiftv-Seven Dollars &
No Cents per Linear Foot
$ 57.00 $ 38,817.00
N:%JOB\010648\SPEM10648.020B.doc P_1
v' r1'T )EL°'�;�! i �T
�jU qr
DESCRIPTION OF ITEMS
SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN
ITEM ITEM QUANTITY WORDS
2. 167 L.F. 24" Class III R.C. Pipe, including
trench excavation and backfill,
complete in place for the sum of
Forty -Four Dollars &
No Cents per Linear Foot $
3. 172 L.F. 21" Class III R.C. Pipe, including
trench excavation and backfill,
complete in place for the sum of
Thirty -Seven Dollars &
No Cents per Linear Foot $
525 4. 1,020 L.F. Trench Safety
UNIT AMOUNT
PRICE BID
44.00 $ 7,348.00
37.00 $ 6,364.00
One Dollar &
No Cents per Linear Foot $ 1.00 $ 1,020.00
5. 1 Ea. 4' Square Manhole, complete in
place for the sum of
Two Thousand
Six Hundred Dollars &
No Cents per Each $ 2,600.00 $ 2,600.00
NAJ0B\010648\SPEC\010648.020B.doc P-2
444 6
7
T
0
10.
4 Ea. 20' Recessed Curb Inlet,
complete in place for the sum of
Three Thousand
Seven Hundred Fiftv Dollar &
No Cents per Each $ 3,750.00 $ 15,000.00
3 Ea. 10' Recessed Curb Inlet,
complete in place for the sum of
Two Thousand Six Hundred
Twenty -Five Dollars &
No Cents per Each $ 2,625.00 $ 7,875.00
1 Ea. 24" Type B Headwall, Including
Grade to Drain Excavation,
complete in place for the sum of
1,150 S.Y
1 L.S.
One Thousand Dollars &
No Cents per Each $ 1,000.00 $
Rock Rubble Rip Rap, complete
in place for the sum of
Forty -Eight Dollars &
No Cents per Square Yard $
Installation & Maintenance of
Storm Water Management,
complete in place for the sum of
Five Hundred Dollars &
No Cents per Lump Sum $
1,000.00
48.00 $ 55,200.00
500.00 $ 500.00
N:\JOB\010648\SPEC\010648.020B.doc P-3
11.
12
13.
14.
298 C.Y. 4 — 8' x 7' Multiple Box Culvert,
complete in place for the sum of
Four Hundred
Twentv- Seven Dollars &
No-..--- Cents per Lump Sum
$ 427.00 $ 127,246.00
300 C.Y. 3 - 8' x 4' Multiple Box Culvert,
complete in place for the sum of
Four Hundred
Twentv-Five Dollars &
No Cents per Lump Sum
$ 425.00 $ 127,500.00
143 C.Y. Parallel Wing Walls for 4 - 8' x 7'
Multiple Box Culvert, complete in
place for the sum of
Four Hundred
Thirtv Dollars &
No Cents per Lump Sum
$ 430.00 $ 61,490.00
86 C.Y. Parallel Wing Walls for 3 - 8' x 4'
Multiple Box Culvert, complete in
place for the sum of
Four Hundred
Thirtv Dollars &
No Cents per Lump Sum
$ 430.00 $ 36,980.00
N:\10B\010648\SPEC\010648.020B.doc P_4
DESCRIPTION OF ITEMS
SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT
ITEM ITEM QUANTITY WORDS PRICE BID
16. 390 L.F. Guardrail & Ballasts for MBC's
as shown on plans, complete in
place for the sum of
Fifteen Dollars &
Thirty -Five Cents per Lump Sum $ 15.35 $ 5,986.50
SECTION A - - - STORM DRAIN SYSTEM: $ 519,866.50
Summary
Section A Storm Drain System $ 519,866.50
Payment, Performance, & Maintenance Bonds $ 11,113.00
Total Amount of Contract $ 53Q,9D 50
NAJOB\01 0648\SPEC\01 0648.020B.doc SI-5
M
PART B - PROPOSAL (cont.)
Within ten (10) days after acceptance of this Proposal, the undersigned will execute the formal contract and will
deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful
performance of the Contract. The attached bid security in the amount of 5% is to become the property of the
City of Fort Worth, Texas, in the event the contract and bond or bonds are not executed and delivered within
the time above set forth, as liquidated damages for delay and additional work caused thereby.
The undersigned bidder certifies that he has been furnished at least one set of the General Contract
Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has
read and thoroughly understands all the requirements and conditions of those General Documents and these
specific Contract Documents and appurtenant plans.
The undersigned assures that its employees and applicants for employment and those of any labor
organization, subcontractors or employment agency in either furnishing or referring employee applicants to the
undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended
by City.Ordinance No. 7400.
The Bidder agrees to begin construction within 10 calendar days after issue of the work order by the Owner,
and to complete the contract within 55 working days after beginning construction as set forth in the written
work order to be furnished by the Owner.
(Complete A or B below, as applicable:)
[ ] A. The principal place of business of our company is in the State of
[ ] Nonresident bidders in the State of , our principal place of business are
required to be _ percent lower than resident bidders by state law. A copy of the statute is
attached.
[ ] Nonresident bidders in the State of , our principal place of business, are not
required to underbid resident bidders.
[x] B. The principal place of business of our company or our parent company or majority owner is
in the State of Texas.
N:\)OB\010648\SPEC\010648.020B.doc P-6
Receipt is acknowledged of the following addenda:
Addendum No. 1
Addendum No. 2
Addendum No-3
(SEAL)
If Bidder is Corporation.
TITLE:
ADDRESS
NAJOB\010648\SPEC\010648.020B.doc P_7
Respectfully submitted,
Fouy Cons\\*u4 ion, 1 nc
son �JI?a , el �
V.P. of Operations
11200 Old Seaqoville Road
Balch Springs, TX 75180
PROPOSAL
(This Proposal must not be removed from this book of Contract Documents)
TO: ONE PRAIRIE MEADOWS, LTD.
DEVELOPER
c/o CARTER & BURGESS, INC.
FOR: STREET IMPROVEMENTS FOR
THE VILLAGES OF WOODLAND SPRINGS WEST,
TIMBERLAND BOULEVARD PHASE 2B
DEPARTMENT OF ENGINEERING No. 4627
FILE NO. K-1889
Pursuant to the foregoing "Notice to Bidders," the undersigned bidder having thoroughly
examined the Contract Documents, Plans, Special Provisions, Standard Special Provisions, the
site of the project, and understanding the amount of work to be done, and the prevailing
conditions hereby proposes to do all the work as provided in the Plans and Contract Documents
subject to inspection and approval by the Director of Public Works of the City of Fort Worth,
Texas, and binds himself upon acceptance of this Proposal to execute a contract and furnish an
approved Performance Bond and Payment Bond, and such other bonds as may be required by
the Contract Documents, for the performing and completing of the said work. Contractor
proposes to do the work within the time stated and for the following sums:
(Furnish and Install, including all appurtenant work, complete in place, the following items):
SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT
ITEM I ITEM I QUANTITY I PRICES WRITTEN IN WORDS I PRICE I BID
STREET IMPROVEMENTS
210 1. 21,910 S.Y.
212
6" Lime Stabilized Subgrade
(Includes Preparation of Subgrade),
complete in place for the sum of
One
Dollar &
Seventy Eiqht Cents per S.Y. $1.78 $ 38,999.80
2. 329 Tons Lime for Subgrade (30#/S.Y.)*
complete in place for the sum of
Eiqhty Two Dollars &
Twenty Five Cents per Ton $ 82.25 $ 27,060.25
N:1JOB10106481SPEC\010648.010C.doc
2Z
i
PLC PAY
s ITEM I ITEM I APPROXIMATE Q ANTIYDEPR CESIWRITTT NE N WORDS ID
314 3. 19,650 S.Y. 7" Reinforced Concrete Pavement
with 7" Curb, complete in place for
the sum of
UNIT I AMOUNT
PRICE BID
Nineteen Dollars &
Ephty Two Cents per S.Y.
$ 19.82
$ 389,463.00
4. 410 S.Y.
6" Reinforced Concrete Pavement
with 7" Curb, complete in place for
the sum of
Eiqhteen Dollars &
Fifty Four Cents per S.Y.
$ 18.54
$ 7,601.40
5. 6 EA.
ADA sidewalk Ramps, complete in
place for the sum of
One Thousand
Fiftv Dollars &
No Cents per EA.
$1,050.00
$6,300.00
6 23,610 S.F.
4' Wide Reinforced Concrete
Sidewalk, complete in place for the
sum of
Two Dollars &
Seventv Six Cents per S.F.
$ 2.76
$ 65,163.60
7. 1 L.S.
Storm Water Management
One Thousand
One Hundred Dollars &
No Cents per L.S.
$ 1,100.00
$ 1,100.00
N:WOB\010648\SP EC\010648.010C.doc
P - 2
SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT
ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE
8. 1,852 S.Y. Temporary Asphalt Transition
pavement as shown on plans,
complete in place for the sum of
AMOUNT
BID
Nineteen Dollars &
Fifteen Cents per S.Y. $ 19.15 $ 35,465.80
9. 544 EA. Type W-4 Pavement Markers,
complete in place for the sum of
Five Dollars &
Twenty Five Cents per EA.
$ 5.25 $ 2,856.00
10. 166 EA. Type II CR - 4 Pavement Markers,
complete in place for the sum of
Five Dollars &
Twenty Five Cents per EA.
11. 1,420 EA. Type Y - 4 Pavement Markers,
complete in place for the sum of
Five Dollars &
Twenty Five Cents per EA.
12. 396 EA. Type 11 — AA - 4 Pavement Markers,
complete in place for the sum of
Six
Twenty Five
N AJOB\010648\SPEC\010648.010C.doc
P - 3
Dollars &
Cents per EA.
$5.25 $ 871.50
$ 5.25 $7,455.00
$ 6.25 $ 2,475.00
SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT
ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE
13. 1 EA. Type W6 — 3A Warning Sign as
shown on plans, complete in place for
the sum of
14
15.
16
Three Hundred Ten Dollars &
No Cents per EA.
1 EA. Type 4 — 2L Warning Sign as shown
on plans, complete in place for the
sum of
1 EA
2 EA.
Three Hundred Ten Dollars &
No Cents per EA.
Type W4 — 2R Warning Sign as
shown on plans, complete in place for
the sum of
Three Hundred Ten Dollars &
No Cents per EA.
Type W13 — I Warning Sign as shown
on plans, complete in place for the
sum of
Three Hundred Ten Dollars &
No Cents per EA.
N:\J O B\010648\SPEC\010648.010C.doc
P - 4
$ 310.00
$ 310.00
$ 310.00
$ 310.00
AMOUNT
BID
$ 310.00
$ 310.00
$ 310.00
$ 620.00
SPEC PAY
APPROXIMATE
DESCRIPTION OF ITEMS WITH BID
UNIT
AMOUNT
ITEM ITEM
QUANTITY
PRICES WRITTEN IN WORDS
PRICE
BID
17
1 EA.
Type W9 — 2L Warning Sign as
shown on plans, complete in place for
the sum of
Three Hundred Ten Dollars &
No . Cents per EA.
$ 310.00
$ 310.00
18
1 EA.
Type W9 — 2R Warning Sign as
shown on plans, complete in place for
the sum of
Three Hundred Ten Dollars &
No Cents per EA.
$ 310.00
$ 310.00
19
2,082 L.F.
4" Wide White Edgeline paint striping
as marked on plans, complete in
place for the sum of
One Dollars &
Sixty Cents per L.F.
$ 1.60
$ 3,331.20
TOTAL STREET IMPROVEMENTS ---
$ 590,312.55
City of Fort Worth requires a minimum of 30#/S.Y. The Paving Contractor will be responsible for a
lime series test as
directed by the City
of Fort Worth Construction Inspection Department.
SUMMARY
Total Street Improvements $ 590,312.55
Payment, Performance & Maintenance Bond $ 7,220.00
Total Amount of Contract $ 597.532a5.
N:1J01310106481SPEC1010648.010C.doc
P - 5
V- r a� �
C` 0 16 �'E"C"P, 1�1L1"b:Y
Thiel Contract is issued by an organization which qualifies for exemption pursuant to the provisions of Article
20.04(F) of the Texas Limited Sales, Excise and Use Tax Act.
Taxes: All equipment and materials not consumed by or incorporated into the project construction, are subject
to State sales taxes under House Bill 11, enacted August 15, 1991.
The successful Bidder shall be required to complete the attached Statement of Materials and Other charges at
the time of executing the contract.
The Contractor shall comply with City Ordinance 7278, as amended by City Ordinance 7400 (Fort Worth City
Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in, employment practices.
The undersigned agrees to complete all work covered by these Contract Documents within 30 working days
from and after the date for commencing work, as set forth in the written Work Order to be issued by the Owner,
and to pay not less than the "Prevailing Wage Rates for Streets, Drainage and Utility Construction," as
established by the City of Fort Worth, Texas.
Within ten (10) days of receipt of notice of acceptance of this bid, the undersigned will execute the formal
contract, and will deliver an approved Surety Bond for the faithful performance of this contract. The attached
deposit check in the sum of 5% GAB Dollars (Bid Bond) is to become the property of One Prairie Meadows,
Ltd. or the attached Bidder's Bond is to be forfeited in the event the contract and bond are not executed within
the time set forth as liquidated damages for delay and additional work caused thereby.
Respectfully submitted,
Austin Bridge and Road . T,P
By: &A.t
Steve Vincent, Vice President
Title: Austin Bridge & Road, Inc.
General Partner
Address:
6330 Commerce Drive, Suite 150
Trvi nrz Tasrac 7-10L3
(S E A L) If Bidder is Corporation
Date
Receipt is acknowledged of the following addenda:
Addendum No. 1
Addendum No. 2
Addendum No. 3
N AJ 0610106481S P E C1010648.010C.d oc
P - 6
III. STREET LIGHTS:
1. STREET LIGHT COST ESTIMATE
INTERSECTIONS
MID -BLOCK RESIDENTIAL
CHANGE OF DIRECTION RESIDENTIAL
MID -BLOCK COLLECTOR
MID -BLOCK ARTERIAL PARKWAY
MID -BLOCK ARTERIAL MEDIAN
QUANTITY UNIT COST TOTAL COST
0
EA
$
0,000
$00,000.00
0
EA
$
0,000
$00,000.00
0
EA
$
0,000
$00,000.00
0
EA
$
01000
$ --0--
0
EA
$
0,000
$ --0—
1.1
EA
$
0,000
$ __0__
RELOCATE EXISTING LIGHT 0 EA $ 0,000 $ --0--
22 (200 watt lights) x $7.05 (per light) x 24 months = $3,722.40
0(100 watt lights) x $6.50 (per light) x 24 months = $00,000.00
TOTAL $3,722.40
The Street Lights will be installed by TRI County Electric Cooperative
the developers initial 24- month power charge will be $3,722.40
After the initial 24-month power charge the City of Fort Worth, WILL
ASSUME THE POWER COST.
CFA CODE #2005100
THE VILLAGES OF WOODLAND SPRINGS WEST TIMBERLAND BLVD B
August 27, 2005
Fort Worth, Texas August 31, 2005
PAGE I OF EXHIBIT C
2. STREET LIGHTS WORK DESCRIPTION:
1. The Developer shall provide for the installation of streetlights at
the approximate locations shown in Exhibit "C", immediately after
final acceptance of the street construction, in accordance with
engineering plans and specifications approved by the Transportation
and Public Works Department.
2. Streetlights on residential and /or collector streets can be
installed using overhead or underground conductors with the approval
of THE Director.
3. Streetlights on arterial streets shall be installed with underground
conduit and conductors.
4. The Developer shall provide for the installation of a 2-inch
schedule 40 PVC conduit at a depth not less than 30 inches and at
least 18-inch behind the curb, "clear from all other utilities".
5. The Developer shall provide for the installation of a 2-inch
schedule 40 PVC conduit between streetlights proposed for
installation and the power source to become operational.
6. A 3-inch schedule 80 PVC conduit is required when crossing streets
at a depth not less than 30 inches, unless indicated otherwise on
the plans concrete pull boxes shall be provided at the crossing
points.
7. The developer shall pay the initial two year power cost to TRI-
COUNTY ELECTRIC COOPERATIVE, after the initial two year cost the
City of Fort Worth, will assume the power cost.
8. The developer or their contractor shall contact City's street light
division 48 hours prior to starting any installation of conduit
and/or streetlights at (817) 871-6596 to insure proper inspection of
work.
TOTAL DEVELOPER'S COST $3,722.40
THE VILLAGES OF WOODLAND SPRINGS WEST TIMBERLAND BLVD B
August 27, 2005
Fort Worth, Texas August 27, 2005
PAGE II OF EXHIBIT C
CFA CODE #2005100
III
"STREET LIGHTS"
MID BLOCK ARTERIAL
TIMBERLAND BLVD 11 (DOUBLE ARMS 22 LIGHTS)
THE VILLAGES OF WOODLAND SPRINGS WEST TIMBERLAND BLVD
PAGE III OF EXHIBIT C
„
IV
STREET NAME SIGNS
1. The City of Fort Worth will install the street name signs upon final
approval of the street construction. The street name signs will remain
the property of, and will be maintained by, the City of Fort Worth.
2. The Developer will pay for the street name sign installations required
for this development to the extent of $100.00 per intersection. This
unit cost will be revised annually by the Department of Transportation
and Public Works to reflect prevailing costs of materials and labor.
3. This development creates the following one (1) intersections at a cost
to the Developer of $100.00:
Alta Vista Rd & Timberland Blvd
Villages of Woodland Springs West, W Timberland B
CFA code: 2005100 August 13, 2005
KE-
L
COD
0
WESTPO T
Z
PKW
Q
�� Q
SN KELLER- . SLET D.
o
zF
o'
Jai
o2
oL-
=
00
♦ U CAYLOR RD. W
m 1 -- —
PROJECT .0
SITE wjm
j
--
KELLER H CKS.
GOLDEN _
TRIANGLE BLV �
FM illTT
09
------
N
Q NOT TO SCALE
i III
LOCATION MAP
THE VILLAGES OF
WOODLAND SPRINGS WEST
TIMBERLAND BOULEVARD
PHASE 2B
ono\Inh\ mnA4A\nly\ Tlmhwrlmd Rlvd\ 94ACFA.clnn
Carter Burgess
CARTER d BURGESS, INC
illAWN STUFFY
FORT WOM'Ta 76102
PROJECT NO. 010648.010.1.0001
£Y , . Pik T
LEGEND
PROP. 2-29' B/ B
ROADWAY/ 120' ROW
PROP. 29' B/ B
ROADWAY/ 1/2 of 1 20' ROW
PROP. 4' S I DEWALK
(BY DEVELOPER)
LIMITS OF PROJECT
N
SCALE) 1" = 300'
STREETS
EXHIBIT ' 8'
THE VILLAGES OF
WOODLAND SPRINGS WEST
TIMBERLAND BOULEVARD
PHASE 2B
Camwr11ri
CARTER & BURGESS, INC.
777 MN STREET
FORT WORTH, T% 76102
(817) 735-6000
)GN=pl\)ob\ 010648\oiv\ Ttmberlond Blvd 648CFA.dgn
PROJECT NO. 010648.010.1.0001
PAGE 2 OF T
i
am
wo
LEGEND
PROP. 2-29' B/ B KIIII14
ROADWAY/ 120' ROW
PROP. B/ B
ROADWAY/
1/2 of 120' ROW
PROP. 4' S I DEWALK ............••••.••.
(BY DEVELOPER)
LIMITS OF PROJECT
ce
SCALE1 1" = 300'
STREETS
EXHIBIT 'B"
THE VILLAGES OF
WOODLAND SPRINGS WEST
TIMBERLAND BOULEVARD
PHASE 2B
Carter Burgess
CARTER & BURGESS, INC.
777 AWN STREET
FORT WORTH, TX 76102
(Rl17173Sb0M
)ON=p1\)ob\ 010648\oly\ Timberland Blvd\ 648CFA.dgn
PROJECT NO. 010648.010.1.0001
PACE 3 OF T
I
I
N
SCALEF 1" = 300'
cT �
IJ ` 1J
J .Aj iz Lo", TRpF L4NE N I I 1 I 10 1 9 1 6I
„ C I WWW o
Id F I r 10 y • YJ
43 Ix `'+ QI • JLL
J s• in
e d a0
000-000
/ /• _ RIAND BOULE AkD� "•�••� �� �� •��
-101 /
x4MB/ `+^
-101
A
_
r�
I LEGEND
PROP. STORM DRAIN
LINE
PROP. INLET
PROP. MANHOLE
PROP. HEADWALL
EXIST. STORM DRAIN
LINE
0
LIMITS OF PROJECT
— — �•
STORM DRAIN
EXHIBIT 'B-
THE VILLAGES OF
WOODLAND SPRINGS WEST
TIMBERLAND BOULEVARD
PHASE 2B
Carter Burgess
CARTER & BURGESS, INC.
777 AWN STREET
FORT WORTH, Tx 76102
(M7) 735-6000
PROJECT NO. 010648. 010. 1. 0001
=qe\Job\ 010648\oiv\ TiBterland Blvd\ 648CFA.dgn PACE 4 OF T
rA
w o' ISLET
21 " �4" HONL
d r3-81x4'MBC 0-100
FUTURE
H � 21 .1 3-B' x4' MBC
10' INLET
W
LEGEND
PROP. STORM DRAIN LINE r
PROP, INLET
PROP, MANHOLE —�
PROP. HEADWALL C
0
EXIST. STORM DRAIN LINE _ _ _ zl= = =
LIMITS OF PROJECT
�r
li�l
SCALEo l" = 300'
STORM DRAIN
EXHIBIT '13-1 '
THE VILLAGES OF
WOODLAND SPRINGS WEST
TIMBERLAND BOULEVARD
PHASE 2B
Carter - Burgess
CARTER & BURGESS, INC
777 AWN STREET
FORT WORM, TX 76102
I8171 735-6000
PROJECT NO. 010648.010. 1.0001
=pl\)ob\ 010648\civ\ Timberland Blvd\ 648CFA.dgn PAGE 5 OF 7
r
t 11
it LONE 7REE LANE to
I A
O
��tc ,°7 � .e a O1 I t i r�i�H
000-100
000000
LEGEND
7ROP. DOUBLE STREET LIGHT N
:XIST. SINGLE STREET LIGHT O
ON STEEL POLE WITH STREET
AND STOP SIGNS ATTACHED)
'ROP. STREET SIGN
:XIST. STREET SIGN
IMITS OF PROJECT
SCALEo l" = 300'
STREET LIGHTS
EXHIBIT 'C'
THE VILLAGES OF
WOODLAND SPRINGS WEST
TIMBERLAND BOULEVARD
PHASE 2B
Carter Burgess
CARTER 6 BURGESS, INC.
7" MmN PIM
PT WORM, 7X 76M
11I7) 73S-OW
PROJECT NO. 010648.010.1.0001
=al\lob\ 010648\civ\ Timberland Blvd\ 648CFA.dan PACE 6 OF T
��'% �/ f
� F
4h
a, y
r P
ooe
at
S,
' as
ss
Ir
0
' / / �)I
z�
�r
w
END
TREET LIGHT M
LIST. SINGLE STREET LIGHT O
)N STEEL POLE WITH STREET
JD STOP SIGNS ATTACHED)
20P. STREET SIGN
( I ST. STREET SIGN
IMITS OF PROJECT
0
SCALE1 1" = 300'
STREET LIGHTS
EXHIBIT 'C'
THE VILLAGES OF
WOODLAND SPRINGS WEST
TIMBERLAND BOULEVARD
PHASE 2B
Carter Burgess
CARTER & BURGESS, INC.
FORT WORM, TX 76101
PROJECT NO. 010648.010.1.0001
p.\Job\ 010648\civ\ Timberland Blvd\ 648CFA.dgn PAGE 7 OF T