HomeMy WebLinkAboutContract 51712 12/28/2018
:04 a.m.
District and Project Information Cover Sheet:
Governmental Entity/ISD Name: Viridian Municipal Management District
Address,State,Zip Code: 3100 McKinnon St., Suite 1100,Dallas,TX 75201
Phone&Email: 214.981.9090 ccrawford@crawlaw.net
Authorized Signatory, Title: Roger Wurtele,Chairman
Project Name and Brief Calloway Cemetery Road T.R.E. Railroad Crossing
Description: Paving, Storm Drain, Street Lights
Project Location: 1295 Calloway Cemetery Rd.
Plat Case Number: None Plat Name: None
Mapsco: 55Y Council District: 5 City Project Number: 101442
CFA Number: 2018-028 DOE Number: None
OFFICIAL.RECORD
Cut of Fort Worth,Texas CITY SECRETARY
Governmental Entity/ISD Community Facilities Agreement FT. WORTH,TX
CFA Official Release Date:07.30.2015
Paste 1 of 11
GOVERNMENTAL ENTITY/ISD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. 51712
WHEREAS, the undersigned Governmental Entity ("District") desires to make certain
specific improvements as described below and on the exhibits attached hereto ("Improvements")
related to a project generally described as Calloway Cemetery Road T.R.E. Railroad Crossing
("Project")within the City of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS, any future City participation in this CFA is subject to the availability of
City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the District and the City desire to enter into this Community Facilities
Agreement("CFA"or"Agreement") in connection with the Improvements and the Project.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein,the City and the District do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved
by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this
Agreement as if copied herein verbatim. District agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder and to cause all contractors
hired by District to comply with the Policy in connection with the work performed by said
contractors.
B. District shall provide financial security in conformance with paragraph 6, Section 11, of the
Policy or by providing written certification from the District's Chief Financial Officer (or equivalent
position regardless of title) that the District (governmental entity) has appropriated sufficient funds to
pay its contractor for all work to be performed under this Agreement. District recognizes that there
shall be no reduction in the any financial security held by the City until the Project has been
City of Fort Worth,Texas
Governmental Entity/ISD Community Facilities Agreement [FT.
AL RECORD
CFA Official Release Date:07.30.2015 ECRETARY
Page 2 of 11
OR-rH,TX
completed and the City has officially accepted the Improvements. District further
acknowledges that the said acceptance process requires the District's contractor(s) to submit
an affidavit of bills paid signed by its contractor and consent of surety signed by its surety to
ensure the contractor has paid any sub-contractors and suppliers in full. Additionally, the
contractor must also provide in writing that the contractor has been paid in full by District
for all the services provided under their contract.
. District agrees to cause the construction of the Improvements contemplated by this Agreement
and that said construction shall be completed in a good and workmanlike manner and in
accordance with all City standards and the City-approved construction plans, specifications and
cost estimates provided for the Project and the exhibits attached hereto.
. The following checked exhibits describe the Improvements and are incorporated herein: Water
(A) ❑. Sewer(A-1) El- Paving(B) M_ Storm Drain(B-1) N_ Street Lights & Signs (C). X
If there is City financial participation in the Project, the District shall award all contracts for the
construction of the Improvements in accordance with Section II, paragraph 7 of the Policy,
subject to any limitations in Texas Local Government Code Chapter 212, Subchapter, or under
statutes governing District's award of public works contracts. The contracts for the
construction of the public infrastructure shall be administered in conformance with paragraph 8,
Section II, of the Policy.
For all Improvements included in this Agreement for which the District awards construction
contract(s), District agrees to the following:
i. To employ a construction contractor who is approved by the director of the department
having jurisdiction over the infrastructure to be constructed, said contractor to meet City's
requirements for being prequalified, insured, licensed and bonded to do work in public
streets and/or to perform water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in the
names of the City and the District for one hundred percent(100°/x)of the contract price of
the Improvements, and a maintenance bond in the name of the City for one hundred
percent (100%) of the contract price of the Improvements valid for a period of two (2)
years from the date of final acceptance insuring the maintenance and repair of the
constructed infrastructure during the term of the maintenance bond. All bonds to be
City of Fort Worth,Texas
Governmental Entity/ISD Community Facilities Agreement
CFA Official Release Date:07.30.2015
Page 3 of 11
furnished before work is commenced and to meet the requirements of Chapter 2253,
Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work contemplated herein
to provide insurance equal to or in excess of the amounts required by the City's standard
specifications and contract documents for District-awarded infrastructure construction
contracts. The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the Certificate of Insurance (ACORD or
other state-approved form) supplied by the contractor's insurance provider and bound in
the construction contract book.
iv. To require its contractor to give at least 48 hours' advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces, to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector
is present and gives his consent to proceed, and to make such laboratory tests of materials
being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to the City
in order to schedule a Pre-Construction Meeting. The submittal should occur no less than
10 working days prior to the desired date of the meeting.No construction will commence
without a City-issued Notice to Proceed to the District's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains constructed
under this Agreement until said sewer and water mains and service lines have been
completed to the satisfaction of the Water Department.
G. District shall provide, at its expense, all engineering drawings and documents necessary to
construct the improvements under this Agreement.
H. District shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements contemplated herein.
I. City shall not be responsible for any costs that may be incurred by District in the relocation of
any utilities that are or may be in conflict with any of the community facilities to be installed
hereunder.
City of Fort Worth,Texas
Governmental Entity/ISD Community Facilities Agreement
CFA Official Release Date:07.30.2015
Page 4 of 11
.1. To the extent permitted by law, the District hereby releases and agrees to indemnify,
defend and hold the City harmless for any inadequacies in the preliminary plans,
specifications and cost estimates supplied by the District for this Agreement.
:. District agrees to provide, at its expense, all necessary rights of way and easements across
property owned by District and required for the construction of the current and future
improvements provided for by this Agreement.
To the extent permitted by law, the District further covenants and agrees to, and by these
presents does hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character, whether real or
asserted, brought for or on account of any injuries or damages sustained by any persons
(including death) or to any property, resulting from or in connection with the
construction, design, performance or completion of any work to be performed by said
District, his contractors, subcontractors, officers, agents or employees, or in consequence
of any failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said DISTRICT, his contractors, sub-contractors,
officers,agents or employees_
District will further require its contractors to indemnify, defend and hold harmless the
City, its officers, agents and employees from and against any and all claims, suits or causes
of action of any nature whatsoever, whether real or asserted, brought for or on account of
any injuries or damages to persons or property, including death, resulting from, or in any
way connected with, the construction of the infrastructure contemplated herein. Further,
District will require its contractors to indemnify, and hold harmless the City for any losses,
damages, costs or expenses suffered by the City or caused as a result of said contractor's
failure to complete the work and construct the improvements in a good and workmanlike
manner, free from defects, in conformance with the Policy, and in accordance with all plans
and specifications.
N Upon completion of all work associated with the construction of the Improvements, District will
assign to the City a non-exclusive right to enforce the contracts entered into by the District with
its contractor along with an assignment of all warranties given by the contractor, whether express
or implied. Further, District agrees that all contracts with any contractor shall include provisions
City of Fort Worth,Texas
Governmental Entity/ISD Community Facilities Agreement
CFA Official Release Date:07.30.2015
Page 5 of 11
granting to the City the right to enforce such contracts as an express intended third party
beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. District shall pay in cash water and wastewater inspection fees and material testing fees
equal to two percent (2%) for a total of 4% of the District's share of the total construction
cost as stated in the construction contract.
ii. District shall pay in cash paving and storm drain inspection fees equal to four percent
(41/o) and material testing fees equal to two percent(2%)for a total of 6%of the District's
share of the total construction cost as stated in the construction contract.
iii. District shall pay in cash the total cost of streetlights or if the city is not installing the
streetlights, inspection fees equal to four percent (4%) of the District's share of the
streetlight construction cost as stated in the construction contract.
iv. District shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. District shall complete the Improvements within two (2) years, provided, however, if
construction of the Improvements has started within the two year period, the District may
request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the District's obligations under the
Policy, this Agreement, its financial guarantee, its agreement with its contractor or
other related agreements.
iii. The City may utilize the District's financial guarantee submitted for this Agreement to
cause the completion of the construction of the Improvements if at the end of two (2)
years from the date of this Agreement (and any extension period)the Improvements have
not been completed and accepted.
iv. The City may utilize the District's financial guarantee to cause the completion of the
construction of the Improvements or to cause the payment of costs for construction of
same before the expiration of two (2) years if the District breaches this Agreement,
becomes insolvent or fails to pay costs of construction and the financial guarantee is not a
Completion Agreement. If the financial guarantee is a Completion Agreement and the
District's contractors and/or suppliers are not paid for the costs of supplies and/or
City of Fort Worth,Texas
Governmental Entity/ISD Community Facilities Agreement
CFA Official Release Date:07.30.2015
Page 6 of 11
construction, the contractors and/or suppliers may put a lien upon the property which is
the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Ci of Fort Worth,Texas
G vernmental Entity/ISD Community Facilities Agreement
A Official Release Date:07.30.2015
Page 7 of 11
Cost Summary Sheet
Project Name: Calloway Cemetery Road T.R.E. Railroad Crossing
CFA No.: 2018-028 CP No.: 101442
An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $
2.Sewer Construction $ -
Water and Sewer Construction Total $ -
B. TPW Construction
1.Street $ 799,029.00
2.Storm Drain $ 172,796.00
3.Street Lights Installed by Developer $ 61,025.00
TPW Construction Cost Total $ 1,032,850.00
Total Construction Cost(excluding the fees): $ 1,032,850.00
Constriction Fees:
C. Water/Sewer Inspection Fee(2%) $
D. Water/Sewer Material Testing Fee(2%) $
Sub-Total for Water Construction Fees $ -
E. TPW Inspection Fee(4%) $ 38,873.00
F. TPW Material Testing(2%) $ 19,436.50
G. Street Light Inspsection Cost $ 2,441.00
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ 60,750.50
Total Construction Fees: $ 60,750.50
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond=100% $ 1,032,850.00
Completion Agreement=100%/Holds Plat $ 1,032,850.00
Cash Escrow Water/Sanitary Sewer-125% $
Cash Escrow Paving/Storm Drain=125% $ 1,291,062.50
Letter of Credit=125%w/2yr expiration period $ 1,291,062.50
Statement of Appropriated Fundin For Governmental EntitylISDs ONLY) X
City of Fort Worth,Texas
Governmental Entity/ISD Community Facilities Agreement
CFA Official Release Date:07.30.2015
Page 8 of 11
ACCORDINGLY,the City of Fort Worth and District have each caused this instrument to be executed
in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the
date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DISTRICT
VIRIDIAN MUNICIPAL
MANAGEMENT DISTRICT
Jesus J.Chapa(Dec 21,2018)
Jesus J. Chapa Rog Wurtele(Dec 20,2018)
Assistant City Manager Name: Roger Wurtele
Title: Chairman
Date: Dec 21,2018
Date: Dec 20,2018
Recommended by:
ATTEST: (Only if required by District)
Eue(yn Roberfs
Evelyn Roberts(Dec 20,2018)
Evelyn Roberts
Contract Compliance Specialist Signature
Planning and Development Name:
OO
XF
Approved as to Form &Legality: ATTEST:
r
/1
-J �
-ley. i / IiRN -7 CABl
Richard A.MCCracl,en(Dec 21,2018) Mary J. ayser(Dec 21,20
,.••_
�Ir
Richard A. McCracken Mary J. Kayser
Assistant City Attorney City Secretary
M&C No. N/A
Date: Contract Compliance Manager:
By signing I acknowledge that I am the person
responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
it �---
Jennifer Ezemack(Dec 20,2018)
Janie S. Morales
Development Manager
Cjy of Fort Worth,Texas OFFICIAL RECORD
Governmental Entity/ISD Community Facilities Agreement
CFA Official Release Date:07.30.2015 CITY SECRETARY
Pr 9 of 11
FT. WORTH,TX
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
Attachment 1 -Changes to Standard Community Facilities Agreement
® Location Map
❑ Exhibit A: Water Improvements
S Water Cost Estimate
El Exhibit A-1: Sewer Improvements
Sewer Cost Estimate
Exhibit B: Paving Improvements
® Paving Cost Estimate
Exhibit 13-1: Storm Drain Improvements
Storm Drain Cost Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Governmental Entity/ISD Community Facilities Agreement
CFA Official Release Date:07.30.2015
Page 10 of 11
ATTACHMENT"1"
Changes to Standard Agreement
Governmental Entity/ISD Community Facilities Agreement
City Project No. 100826
None
C' of Fort Worth,Texas
Governmental Entity/ISD Community Facilities Agreement
CIA Official Release Date:07.30.2015
Page 11 of 11
i
00474) i
DAP-BID PROP.1Z
Page 1 44
SECTION 00 42 43
Developer Awarded Projecls-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project hurl Information Bidder's Proposal
Hidlist Item SpecificaGnn Unit of Bid
No. Description Scciiun I•fD. Measure Quantity Unit Price Bid Value
UNIT III:DRAINAGE IMPROVEMENTS _
1 0241.0800 Remove Rip Rop - - --0241 13SF__ _ 1800 $1.00 $1,800.00
2 0241.3017 Remove 30"Storm Line _ _ 02 41 14 -LF i 56 $22.00 $1,232.00 E
3 0241.3106 30"Storm Abandonment Plug _ - __ 02 4l 14 EA 1 $630.00 $630.00
4 0241.4401 Remove Hendwall/SET 0241 14 EA 1 $575.00 $575.00
5_ 3137.0104 Medium Stooe Riprop,dry --- 31 37 00 Sy -
70 _$85.00 $5,950.00 j
-6 3305.0109 Trench Safe 3305 10 LF 352 - $1.00 $352.00
ty- ----- ----- - ---
7 3341.0203 21"RCP,Class V 3341 10 LF 77 $106.00 $8,162.00
8 3341.0205 24"RCP,Class Ill _ _33 41 10 __LF _ _ 47 $111.00 $5,217.00
- 9 3341.0207 24"RCP,Class V - - - 33 41 10 _ LF _ _ 122 - - $121.00 $14,762.00
10 3341.0309 36"RCP,Class 111 3141 10 - LF 26 $162.00 $4,212.00 i
11 3341.0311 36"RCP,Class V33 41 10 LF 80 $255.00 $20,400.00
12 3349.0001 4'Storm Junction Box 3349 10 EA 1 $5,200.00 $5,200.00
13 3349.4104 21"SET,1 piee_-_ --- - --33 49 40_-_EA _ _ 1_ $2,000.00 $2,000.00
I
14 3349.5001 10'Curb Inlet 33 49 20 EA 2 $6,300.00 $12,600.00
-15 3349.7001 4'Drop __ 33 49 20 EA_ _ _3_ _$4,800.00 $14,400.00
16 3305.0116 Concrete_Enc asement for Utility Pipes _ 33 05 10 -_ CY __ 11.8_ $1,000.00 $11,800.00
17 9999.0001 Concrete Flume 32 13 13 Sy - 7 $144.00 $1,008.00
18 9999.0002 30"Steel Pie LF 72 $183.00 $13,178.00
19 9999.0003 Bore for 30"Steel Pie LF 72 $885.00 $49.320.00 j
TOTAL UNIT 111:DRAINAGEROVEMENTS $1172,796.00
i
z
t
i
1
I
CITY OF PORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUNIENTS•DEVELOPER AWARDED PROJECTS
Form V"rrian Sapl<mber 1.2015 Catlaay Cemwvy Rd Adm al•Pon W"rIh
l
00 42 43
DAP•DIDPROPOSAL
Faae2 er4 t
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
i
Project Item Information Bidder's Proposal
Bidlist teem Specification Unit of Bid
No. Description Section No. I Measure Quantity Unit Price Bid Value
UNIT IV:PAYING IMP OVEME TS _
1 0135.0101 Railroad Coordination 01 35 l3 LS 1 $3,700.00 $3,700.00
2 0135.0102 Railroad Flagmen _ 0135 13 _WD 30 $1,000.00 $30,000.00
3 0170.0100 Mobilization 017000 _ LS - 1 $65,000.00 $65,000.00
4 0241.0401 Remove Concrete Drive 02 41 13 SF 810 $3.00 $2,430.00
5 _0241.0402 Remove Asphalt Drive ___ - 0241 13SF 8_80 $2.00_-$1,760.00 '
6 0241.0500 Remove Fence 02 41 13 - LF 524 $10.00 $5,240.00
70241.1100 Remove Asphalt Pvmt-...... - _ 0241 15 _SY - 372.1 _ $14.00 $52,094.00
- 8-3110.0102 122`18"Tree Removal - _ - 71 10 00 _ EA -_ 2 _$2,100.00 $4,200.00
9 3123.0101 Unclassified Excavation by Plan 3123 16 __CY__ _ _ 99 $50.00 $4,950.00
10_3124.0101 Embankment B+ZPlan - _-_ __ 312400 _ CY_ _._ _ 102_8 $53.00_ $54,484.00
11 3125.0101 SWPPP2lacre 312500 LS 1 $10,000.00 $10,000.00
12 3211.0122 6"Flcxlble Base TyRS A OR-2 __- __ 321123 _ SY___- 732_-_$36.00 $26,352.00
13 3211.0600 Cement _ _ 321133_- TN _35 $300.00 $10,500.00
14 -3211.0702 8"Cement Treatmet ---- - - - - -32 1133 _ - SY -2557 $i 6.00 $40,912.00
15 3212.0201 2"Asphalt Pvmt Type C -_�-_- __-•_321216 _ SY _ - 315 $27,00_ $8,505.00
16 L_3212.0504 T'Asphalt Base Type B- --^ 721216 _-_SY 316 $69.00 $21,735.00
_17 3213.0104 9"Colo Pvmt __321313-_ SY_ _- 2105 __$115.00 $242,075.00
18 _3213.0401 6"Concrete Driveway-_ _-_- -321320_--SF _-- 5222 $13.00 $67,886.00
19 3217.0002 4"SLD Pvmt Marking HAS(Y) __- _- 32,1723____LF_ 1550_ $1.00 $1,550.00
20 3217.0501 24"SLD Pvntt Marking HAE JWV _�2 l7 23 _ LF - _ _ 90_ $6.00 $640.00
21 3217.1001 Lane Legend RR_ 321723 -EA _ 2_ $500.00 $1,000.00
_ 22 3217.2103 REFL Raised Marker TY It-A-A -_321723 EA 22 $10.00 $220.00
23 rE32
.0113 6'Chain Link Steel - 32 31 13____LF 519- $35.00 $18,165.00
24 .0307 20'Oate,Steel _ 323126 EA _ 2_$1,500.00 $3,000.00
_25 psoil ---- - _ - -__ -_32 9119 -_CY __-_ 290 $60.00 $17,400.00
26 ckSadPlacement 329213 SY 1066 $6.00 $6,396.00
27 ding Hydromuich 32 9213 SY 3835 $2.00 $7,670.00
28 nishlinstall Alum Sign Ground Mount City .344130EA10 $525.00 $6,250.00
29 .0001 Traffic Control 34 7113 MO 6 $2,000.00 i j12,000.00
_30 3305.0111 Valve HoxAdjustment _ --_ J __ 33 05 14 -__EA_ _ 2_ $650.00 $1,300.00
31 3305.0114 Manhole Adlustmcnt,Maior w/Cover _ -_ _�3 05 M EA „^_ 2 $20,000.00- $40,000.00
32 9999.0004 Remove Concrete Traffic Rail _ _ LF_ _ _300 _ $35.00_ $10,500.00
_339999.00OS Remove Steel Bollard_ _ EA _ 9 - $35.00 $315.00
34 -9999.0006 Temporary 6"Flexible Base Type A GR-2 _- _321123-SY - _-_ 355-` $36.00_ $12,780.00
35 9999.0007 Concrete Street Header 32 1613 LF 130 $24.00 $3,120.00
36 9999.0008 30'Gate,Steel i23126 EA 1 2 $3,000.00 $6,000.00
TOTAL UNIT IV:MVING IMPROVEMENTS $799,029.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCMIENTS-DEVELOPER AWARDED PROJECTS
Penn Ytntta 3"awd or 1,2013 C43eweT CwtaYat Rd Ma III-Fat 1Yw*
I
004243
DAP-BID PROPOSAL
Pae.)d4
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
s
UNIT PRICE BID Bidder's Application
Project Item Information Diddera Proposal {{
Bidlist Item Specification Unit of Bid 1
No. l3escdMlon Section No. I
Measure Quantity Unit Price I Bid Value
UNIT V:STREET LIG- TING IMPROVEME TS
1 2605.0121 Furnisll/install Elec Scry Sery Pole ivint _ 26 05 00EA _ _ 2_$5,200.00 $10,400.00
2- 2605.3015 2"CONDT PVC SCH 80 26— _ __ 05 33___LF — _ 450 —$23.00 $10,350.00
_3 _3441.1410 NO 10 Insulated Elec Condr _ i441 10 _ __LF___ 1_425 _ _ $3.00 $4,275.00
4 3441.1502 OroundBoxpeB%v/Apron344110 EA 3 $1_200.004 $3,800.00
5 3441.1633 Install Type 33B Ann_ 34 4120 _ -A _ _4 $240`00 $960.00
6 _3441.3201 LED Lighting Fixture----..---.-- 344120 _EA 4 _ $460.00_ $1,840.00
7 3441.3301 R1!!TIHum Foundation TY 1,2,and 4344120 _— EA 4 $2,900.00 _$11,600.00
8 3441.3312 Contact Enclosurg Pad Mount_ _ —_344120 EA 2 $4,600.00 $9,200.00
9 3441.3340 Rd Ilium TY 8 Polo 344120 EA 4 $2,200.00 $8,800.00
TOTAL UNIT V:STREET LIGHTING IMEROaM= $61,025.00
j
{
i
r
a
1
t
a
a
j
CITY OF FORT%VORTH
STANDARD CONSTRUCTION SPECNICATION DOCUMENTS-DEVELOPERAWARDED PROTECTS 1
Etat Venion September 1.2015 Cellawq Cam.ata y Rd Ado fl•Fat%Yank 3
404243
DAP•80 PROPOSAL
Pae.4 oro
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Infoanalion Bidder's Proposal
Bidlist Item Specification Unit of Bid
� Description Section No. Measure Quantity Unit Prue Bid Value
BId Summary }
UNIT III:DRAINAGE IMPROVEMENTS $172,796.00
UNIT IV:PAVING IMPROVEMENTS $799,029.0
UNIT V.STREET LIGHTING IMPROVEMENTS _ _ 181,025.00 !
Total Construction Rtd $1,032,850.00
1
Contractor agrees to complete WORK for FINAL ACCEPTANCE within 180 calendardays after the date when the
CONTRAI:T commences to run as provided In the Genernl Conditions.
END OFSRCTION
1
t
E
t
CITY OF FORT IVORTN
STANDARD CONSTRIICTFON SPECOWATION DOCIAIENTS-DEVSLOPIR.AWARDED PROJECTS
• Von Yresian Sept—sir t.2012 Cdb-*Y Ceeeamy Rd Adm All-Fan WoAA
�0
gN• 6VJp.
.pl• r�
x
ui
z
JO'
0�
r
TRINITY z
r
CALLOWAY CEMETERY RD. z
Q
ui
uj
MOSIER VALLEY RD. w
w
w
PROJECT
LOCA TION
z
Z
J
J
O
U_
n
LL
VICINITY MAP
CALLOWAY CEMETERY ROAD TRE RAILROAD CROSSING
Graham Associates,Inc. NOT TO SCALE
CONSULTING ENGINEERS & PLANNERS MAPSCO NO. 55Y
600 SIX FLAGS DRIVE,SUITE 500 [nn
ARLINGTON,TEXAS 76011 (817)640-8535 COUNCIL DISTRICT #5
TBPE FIRM:F-119l/TBPLS FIRM:101538-00
DRAWN BY: JHL DATE: 9/12/2017
PROJECT NO.: 2345-1215A SHEET 1 OF 1
I
I �
�I
GALLOWAY CEMETER ROAAD-
Q
ROA
L
M1 f^I_
� I
� I
NOTE: ALL OF PAVING
i
INCLUDED IN PROJECT.
CALLOWAY CEMETERY ROAD TRE RAILROAD CROSSING
PAVING IMPROVEMENTS
Graham Associates,lnc. GRAPHIC SCALE 1"=100'
CONSULTING ENGINEERS & PLANNERS
600 SIX FLAGS DRIVE,SUITE 500 [nn
ARLINGTON,TEXAS 76011 (817)640-8535 0 100 200
TBPE FIRM:F-1191(TBPLS FIRM:101538-00
DRAWN BY: JHL DATE: 9112/2017
PROJECT NO.: 2345-1215A SHEET 1 OF 1
4'x4' "Y"
INLET
21 R.C.P. 36" R.C.P.
CALLOWAY CEMETERY ROAD
LOW-AY"CEMETERY(ROAD
-771
-o- 24" R.C.P. 'r -0
r
44 ''Y
��.RpPD INLET ' - - 10' CURB
jRE Rpm INLET
4x4, 'Y"
36 STEEL I I /- INLET - -
PIPE
II
II
THIS PORTION OF STORM NOT
�- - - - - INCLUDED WITH THIS PROJECT
I
I
II
II
CALLOWAY CEMETERY ROAD TRE RAILROAD CROSSNG
STORM DRAINAGE IMPROVEMENTS
Graham Associates,lnc. GRAPHIC SCALE 1"=200'
CONSULTING ENGINEERS & PLANNERS
600 SIX FLAGS DRIVE,SUITE 500 n-
ARLINGTON,TEXAS 76011 (817)640-8535 D 200 400
TBPE FIRM:F-1191(TBPLS FIRM:101538-00
DRAWN BY: JHL DATE: 9/12/2017
PROJECT NO.: 2345-1215A SHEET 1 OF 1
CEMETERY -STORM DRAIN.DWG
2" PVC
CONDUIT
CALLOWAY CEMETERY R0
ROAD
CG)
137 W\LED MP
TYPE 8 'POLE V/3313 ARM
TYPE 1FOUNDATION
4 TOTAL
CALLOWAY CEMETERY ROAD TRE RAILROAD CROSSING
STREET LIGHT IMPROVEMENTS
@ Graham Associates,lnc. GRAPHIC SCALE 1"=100'
CONSULTING ENGINEERS & PLANNERS
600 SIX FLAGS DRIVE,SUITE 500 _nn
ARLINGTON,TEXAS 76011 (817)640-8535 0 100 200
TBPE FIRM:F-1 191rrBPLS FIRM:101538-00
DRAWN BY: JHL DATE: 9/12017
PROJECT NO.: 2345-1215A SHEET I OF I
--,, , - -- �,7- -, ' -
I
Di .,,TRE\CALLOWAY CEMETERY u== LIGHTS.DWG