Loading...
HomeMy WebLinkAboutContract 348480 DISTit1:.UT'ION: `'v�-nTE-FI�E CITY OF FORT WORTH C:IiY �ECRETARY CANARY - CONSTRUCTION FILE PINK-PROJECTMANAGER CHANGE ORDER REQiTEST �����A/�T A,^ e GOLDENROD-CONTRACTOR ���� �yV CHANGE ORDER NO. TWO DATE: January 26, 2007 D.O.E. NO. (N/A) PROJECT NO. P164-060164052004 PROJECT DESCRIPTION: Eagle Mountain Raw Water Pump Station Improvements CITY SECRETARY CONTRACT NO. 32568 ORIGINAL CONTRACT AMOiJNT ....................................................... $ 6. 888.500.00 EX'TEtAS TO DATE ........................................................ $ 24,346.10 (CO # 11 CREDTI'S TO DATE ....................................................... $ CONTRACTCOST TO DATE....--••-•----•--�•---• .................................................................................................................................................................$ 6.912.846.10 AMOUNT OF PROPOSED CHANGE ORDER ..............................................................................................................................................................$ 172.609.84 REVISEDCON"IRACT AMOi7N'I' .................................................................................................................................................................................$ 7.085.455.94 ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS ........................................................................................................................................$ 206.655.00 ADDITIONALFiINDING (IF NECESSAR� ................................................................................................................................................................$ 0.00 REMAINING FUNDS AVAII.ABLE FOR CHANGE ORDER ......................................................................................................................................$ 9.699.06 IN ACCORDANCE WI'I'II THIS CHANGE ORDER, 'THE CONTRACTOR SHAI.L: modify/change the contract as shown below to provide a complete, functional, and operational plant. These changes aze as listed below. Further descriplions and Cost Breakdowns are attached. Change Order No. 2 is required due to a steel pile quantity overrua During the course of the work, it was discovered that the quantity of steel piles included in the bid proposa( was underestimated by 3,282 lineaz fee� At the $80/LF bid price for steel piles installation, the city faced a potential change order of $262,000.00. However, by working with the Engineer and the Contractor, a solution was developed whereby the amount of required piles was reduced to a cost of $135,748.80. Structural and foundation improvemeuts to the retaining wall resulted in a cost increase of $36,861.Q4. The total cost of the change order based on the revised dcsign is $172,609.84_ Staff has reviewed this change order and is in agreement with the scope of work and the costs associated with the work. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both in time and money) for all costs arising out of, or incidental to, the Change Order. ORIGINAL CONTRACT TIME � ADDTI'IONAL APPROVED 'I'IME TO DAT'E 690 Calendaz CITY MANAGER ays � None ��L-f1�j;�' lC�,�����% i1 , l'ur`�'7 � > SER. �`� APPROVED CONTRACT TIME TO DATE 690 Calendar Davs DATE PROJECT MANAGER f' ,� � 1% /� � Z (v-��' � �i�— �`-� c�-c� DATE �2-t/�7 DATE �/, � DATE � � � �� O DIRECTOR/MANAGING DEPT. COUNCIL ACTION � %�1.I:i����!: -'-� ;/'. ADDITIONAL "I'II��E FOR THIS CHANGE ORDER 0 Calendaz Da s DATE i_7L_u":� DATE DATE t�!-/�� DATE ❑ nTHER_ ��_ -� -- ' �s����,�r x���._� �.;itj� Se�t�ec�<r �, _ 2�� � v�iJ� �, ;:l � ��::��J ��; ;�°i ?�i ;:�,r::�i�?'�``iu��y' v��% �,,�1'�a: �'}.: � ��r! �'�. � 7 � . � lF �,�'�.� ;�n'..'n, 5 � ,�i:q !rl�:��J� t �5�'i o :'V � ;v i Page 1 of 2 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 1/23/2007 DATE: Tuesday, January 23, 2007 LOG NAME: 60ARCHERWESTERN REFERENCE NO.: **C-21943 SUBJECT: Authorize Execution of Change Order No. 2 to City Secretary Contract No. 32568 with Archer Western Constructors, Ltd. for Construction of the Eagle Mountain Raw Water Pump Station Improvements RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Change Order No. 2 to City Secretary Contract No. 32568 with Archer Western Constructors, Ltd. in the amount of $172,609.84, thereby increasing the amount to $7,085,455.94 for the Eagle Mountain Raw Water Pump Station Improvements. DISCUSSION: On October 25, 2005, (M&C C-21109) the City Council authorized the City Manager to execute a contract with Archer Western Constructors, Ltd. for the Eagle Mountain Raw Water Pump Station Improvements. This project consists of the installation of a new raw water pump station located south of the Eagle Mountain Dam, along the West Fork of the Trinity River. On March 30, 2006, Change Order No. 1 was authorized by the City Manager in the amount of $24,346.10, thereby increasing the contract to $6,912,846.10. Change Order No. 1 consisted of the work to reroute overhead and underground dual feeds to the proposed pump station resulting from construction conflicts due to incorrect field locates and as-built information. Change Order No. 2 is required due to a steel pile quantity overrun. During the course of the work, it was discovered that the quantity of steel piles included in the bid proposal was underestimated by 3,282 linear feet. At the $80/LF bid price for steel pile installation, the city faced a potential change order of $262,500.00. However, by working with the Engineer and the Contractor, a solution was developed whereby the amount of required piles was reduced to a cost of $135,748.80. Structural and foundation improvements to the retaining walls resulted in a cost increase of $36,861.04. The total cost of the change order based on the revised design is $172,609.84. City staff considers the proposed change order amount to be fair and reasonable and recommends approval. Archer Western Constructors, Ltd is in compliance with the City's M/WBE ordinance by committing to 8 percent M/WBE participation on this Change Order No. 2. The City's goal on this Change Order is 8 percent. http://www.cfwnet.org/council�acket/Reports/mc�rint.asp 2/6/2007 Page 2 of 2 FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Water Capital Projects Fund. TO Fund/Account/Centers Submitted for City Manager's Office b� Originating Department Head: Additional Information Contact: FROM Fund/Account/Centers P164 541200 060164052005 $172,609.84 Marc Ott (8476) S. Frank Crumb (8207) S. Frank Crumb (8207) http://www. cfwnet. org/council�acket/Reports/mc�rint. asp 2/6/2007