Loading...
HomeMy WebLinkAboutContract 51713 Received Date: 12/28/18 Received Time: 8:40 AM Developer and Project Information Cover Sheet: Developer Company Name: FLake Vista Development,LP Address, State,Zip Code: 1038 Texan Trail,Grapevine,TX,76058 Phone&Email: 817-849-5282,bruce.french(a)historymaker.com Authorized Signatory,Title: Bruce French,Vice President Project Name: Lake Vista Ranch 4 Brief Description: Water,Sewer,Paving, Storm Drain, Street Lights Project Location: Boaz Rd.between Boat Club&Bowman Roberts Rd. Plat Case Number: None Plat Name: Lake Vista Ranch Mapsco: Council District: 7 CFA Number: 2018-066 City Project Number: 101461 City of Fort Worth,Texas Standard Community Facilities Agreement-Lake Vista Ranch 4 OFFICIAL RECORD CFA Official Release Date:02.20.2017 CITY SECRETARY Page 1 of 11 FT. WORTH,TX STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary 51713 COUNTY OF TARRANT § Contract No. WHEREAS, BNM Lake Vista Development, LP, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Lake Vista Ranch 4 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement-Lake Vista Ranch 4 LOFFICIALRIELURDCFA Official Release Date:02.20.2017 RETARYPage 2 of 11TH,TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) N, Sewer(A-1) 2, Paving(B) D4_ Storm Drain(B-1) X_. Street Lights & Signs (C) N. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured,licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2)years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Lake Vista Ranch 4 CFA Official Release Date:02.20.2017 Page 3 of 11 iii. To require the contractor(s)it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Lake Vista Ranch 4 CFA Official Release Date:02.20.2017 Page 4 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein,whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Lake Vista Ranch 4 CFA Official Release Date:02.20.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent(2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent(4%) and material testing fees equal to two percent(2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent(4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two(2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Lake Vista Ranch 4 CFA Official Release Date:02.20.2017 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and(2)will not boycott Israel during the term of the contract. IMMIGRATION AND NATIONALITY ACT R. Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form(I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. City of Fort Worth,Texas Standard Community Facilities Agreement-Lake Vista Ranch 4 CFA Official Release Date:02.20.2017 Page 7 of 11 Cost Summary Sheet Project Name: Lake Vista Ranch 4 CFA No.: 2018-066 CityProject No.: 101461 An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 358,099.89 2.Sewer Construction $ 272,982.51 Water and Sewer Construction Total $ 631,082.40 B. TPW Construction 1.Street $ 650,657.40 2.Storm Drain $ 497,151.91 3.Street Lights Installed by Developer $ 77,197.93 4. Signals $ - TPW Construction Cost Total $ 1,225,007.24 Total Construction Cost(excluding the fees): $ 1,856,089.64 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 12,621.65 D. Water/Sewer Material Testing Fee(2%) $ 12,621.65 Sub-Total for Water Construction Fees $ 25,243.30 E. TPW Inspection Fee(4%) $ 45,912.37 F. TPW Material Testing(2%) $ 22,956.19 G. Street Light Inspsection Cost $ 3,087.92 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 71,956.47 Total Construction Fees: $ 97,199.77 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 1,856,089.64 x Completion Agreement=100%/Holds Plat $ 1,856,089.64 Cash Escrow Water/Sanitary Sewer—125% $ 788,853.00 Cash Escrow Paving/Storm Drain=125% $ 1,531,259.05 Letter of Credit=125%w/2yr expiration period $ 2,320,112.05 City of Fort Worth,Texas Standard Community Facilities Agreement-Lake Vista Ranch 4 CFA Official Release Date:02.20.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER BNM Lake Vista Development,LP rBy:IMI Development,Inc. Its General Jesus J.Chapa(Dec 22,2018) Partner Jesus J. Chapa Assistant City Manager Date: Dec 22,2018 Brace-PrNtdt, Bruce French(Dec 21,2018) Recommended by: Name: Bruce French Title: Vice President E✓e�vn Roberts Dec 21 2018 Evelyn Roberts(Dec 21,2018) Date: ' Evelyn Roberts/Jennifer Ezemack Project Assistant Planning and Development Contract Compliance Manager: By signing, I acknowledge that I am the Approved as to Form &Legality: person responsible for the monitoring and administration of this contract, including ,&h6W, W,4 XtC`6I IOIV ensuring all performance and reporting Richard A.McCracken(Dec 22,2018) requirements. Richard A. McCracken Assistant City Attorney M&C No. NSA a Scarlett Morales(Dec 21.2018) Date: Name: Janie Morales Title: Development Manager Form 1295: NSA FOR 0A. TALO ATTEST: J U _ Mary T. Ka sv er Mary J.Kayser(Dec 28,2018) ••�' Mary J. Kayser/Ronald Gonzales �XA • �j r" City Secretary/Assistant City Secretary City of Fort Worth,Texas Standard Community Facilities Agreement-Lake Vista Ranch 4 CFA Official Release Date:02.20.2017 Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Attachment 1 -Changes to Standard Community Facilities Agreement z Location Map ® Exhibit A: Water Improvements Exhibit A-1: Sewer Improvements Water and Sewer Cost Estimates Exhibit B: Paving Improvements ® Paving Cost Estimate I Exhibit B-1: Storm Drain Improvements ® Storm Drain Cost Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Lake Vista Ranch 4 CFA Official Release Date:02.20.2017 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 101461 None. City of Fort Worth,Texas Standard Community Facilities Agreement-Lake Vista Ranch 4 CFA Official Release Date:02.20.2017 Page 11 of 11 UTILITIES 064241 DAP-RID PROPOSAL Pep 1 au SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application ProjectLem rnfoamdon Biddeb Ropoeal i Daeription 8pKi6cadonsadouNO,fiv ue ra tits Unit Price Bid Value NITI:WTR ItA ENTS 1 3311.0261 8"PVC Water Pipe_ _ 331112 LF w3827_____ 25.15 _ $96,249.05 2 i 3312.3003 8"Gate Valve 331220 r --21. 528,132.82 33312.3002 6"Gate Vatve 331220 _ _EA 9 34 98 514. _ &4 . 4__ 3312.0001 331240 _E 9 _A _ --. 928.4 28337.60 5 _3312.2003 1"Water Service______ �331210 - _ _ -_EA- 82 � 925L10 _ 6,@5 -_20 1_ 3305,0109 Trench Safely _ 33 0510 -__.._.. LF- _fin _. .ftl __F2�j3 7 3311.0001 Ductile lion Water Fittings w/Restraint 331111 TON 3 y $5882.3917,647.171 _' 8 3312A117 Cctx+act to t_xistittg Water Mains_ �__--3312 25EA. 2 _ $888.18 1372.32 SUBTOTAL + _-- !_ _ _ w $261,838.93 - -� OFFSITE MATERIALS y 9x_3311.0461 12"PVC Water Pipe+ _ 331112 ��� ~_LF -.2072 _4-__x.73 �608.fiG 10 3312.3005 12"Gate V4ve _ _ _� - 15 20�� .__ EA _ _ 2 , $2 06.75_~35 013.50 „11 333112.4107 12"X8"_Anchor Tee 331226-_4L _ EA _ 1 581734 �87.34 12 3005.0009 Trench Safety 330510 �EA- _ 2072 50.23 __ 1476,66 _ 13 3471.0001 Traffic Control W.J.Boaz Road _ _ 34 71 13 _ _ MO_ _1 X2.250-004 nn -X2,250.00 _ 14 _ 3312.0117 Coect to Ex 12'Water Ot ttej _ _. 3312 2S-µ _ w _EA' �? s%98.00 _• $795.00 15 9999.0001 Remove d.Re ace Cone Pvmt _- 00 00 00 _SF _ 42_0 315. 300.00 Offalte Wtr)�APa►achee y- --•.___-__._._.._ __ �_�, _ _____�r� _SUBTOTAL_ �_ _ _ $108,280.96 TO-T-AL,UNIT 1:WATER IMPROVEME S_ 1358.099.89 MY CIF FONT WORTH SO 42 43HIditWoW Lak:Via,V-11 Ph 4 Niliii,, STANDAPI)CONL7I4JCTWSPECa7CATION DOCUMENTS-DEVPLOMAWARDED PSQIECCS Luke Vim WSd PWw 4 PeaVa AVW 27014 004243 DAP-EMPROPO"t, PWIer4 SECTION 00 42 43 Developer Awarded Projecle-PROPOSAL FORM UNIT PRICE BID Bidder's Application prgntIia,InS2rmafiov B;dd Pmpmal Bidliat Unit of Bid itwa No llacripdon SP-0-6-section Na A4suure unit Rice Bid Valve QveMity SANITARY.UNIT 11: OV 1 3331.4115 8"Sewer �_— 3311 10,33 31 12,33 3120 LF 3234 $126.028.98 2 3331.4116 8"SewerPte,CSS BadctiN w 331110.33 31 12,33 3120 _ LF 60___48A0- ;2904.00 3 3331.3101 4'Sauter Service 333150 -EA .__._._ — ._.__.-�_._..__..__._.____.._....._.__......_.__._.._..�..._..____..--_....._...._. 82_„M,�884.04..w 911.28 4 33391101 4'Manhole 33 3910,33 3820 EA - _173 893.01 _ $88181.17 8.347_1.0001 Traf lo.Conhol 34-7-1 13 — MO _ ' __._._.__._._.. 1 _-_,6550.00 •--� SD.W 6 0330,0001Concrete EncaseSftWPP - 033004 ._______.__ _ LF 120 ._._. 36A2_ _ 461�0.40 7 3301.0002 Post-CCTV inspection — 33 01 31 _- _ _LF ' 3234 0.92 _ 975.28 X0.82~ $2.661.88 �9 r 3301.0101 Manhole Vacuum Testin _ Y 33 0130 _ EA -17 $100. 11,700.00 1700.00 1D 3339.1004'Extraa Depth Manhole(over 81_ _ _ 33 391033 39 20__ VF _ 16 __$186.62 2,6N.82 11- 3339A001~^`Manhole Liner _ _..._ 33 39 60 --�_w VF _ 16 ' . $187x. _ -X000.011 _12 9999.0001 Connect to Ex Mein 038000 EA - -_ _ 2 x_.80 11173.80 13 9999.0002 D Connection to SSMH __ _._ 0000 00 _ EA_ 2 _015.Q2 61,..630.00 b UNI -SJWrrARY SEWER INP S $272,882.61 MY OP Poe?aRAl77i 0047.3 WA%,voel Lde Vbb VAm&Vb 4ON" STANDARD CONSTRUMM SKMICAWON DOM 0413-DEVELOPER AWARWID M3JECrS la►vVWU Pied PbW4 Pmn Vwdm Apa 12014 0047 43 DAP-BID PROPML Pw 344 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Aoj"If=b&ntvtion Bidde:'t Pmpwal INMM_ Darenptk a Spaci&z6an Section No. I Rrn a� Q-6- Mice Hid v11tm UNIT III:MAIN,WE IMPROVEIAENT$ 1 _3341.0102 18"RCP,Class 111 _ 32 41 10 _ LF _ 79" 53.13 $4.197.27 2 3341.0205 24"RCP,Class 111 _ 334110 y _ LF y1003__,_ .57 572,888.01 3 3341.0208 2T RCP;Class III _.�.^._____�_. _� 344110 _�.._—. "LF _ 337 _. 378.44 . 6 434.28 •4~ 3341.0302 30"RCP,,Class III_ _-� 33 4110 _ LF_ 66_ _ ;91.49 80 566.38 5_ 3341_0349 36_RCP Clau.11l� 33-41-10......--.-_._...__.___ LF 6 --- 106:50 553250 6 3341.0409 84"RCP,Class 11!_ �` �� _� _- 3341 1 _ - V LF 629^..5227.33 _$114,2.990.57 7 _ 3341.0602 60'RCP,Class 111 _ _ �344110 10 � _y _LF -^111 290.73 36 2,271.03 8 -3349.0002 4'X4'Storm Junction _ 334910 _- _ EA 5 N $_5,_1_28.05~ 525.830.25 9+3349.0002��8905 Storm Junction Box � `R�M 334910 ,_..._._..___..__ EA _._4_ 7 629.48 _ 130 617.82 10_ 3349.6002 15'Curb Inlet v_ _ _ _ ___334920 -___ - EA _ 15 58.258;55 $93 878_25 11�3305.0109 Trench Safe _ 33 0510 M +LF 2729_ .51 $1.391.79 12 3349.41D9 SET,1 Pipe . ._. _ 334440 -LF _ 2 _ 1x,059.33�_ji2a118.66 13 _3137.01 02 Rocker Rap w _y_ 3137 00 vSY _30 —._,,�9Tu $2,760.00 14 9999.0001 Remove Ex JunoWn Box�vl� Inlaro� t _ w 00 00 00�� _ _ EA' 1 $975.00 $975.00 N —64-977151-911 MY OF MRT WORTH 004143 BIO Pggrt Lia VSA Rmb3R 4 WBitia ATAN 4W CONST MrW SPECe9CATM DOCUNMM-DBVGLOPER AWARDW PROJEM LM WWIdpdt p6w 4 Fe V"M AP H 1.2014 004243 DAP•RD PAMOSA7. hp 4 dJ SECTION 00 4243 Developer Awarded Pr*cds-PROPOSAL FORM UNIT PRICE BID Bidder's Application r,ojeet item bltbmatim Bidden Ftopmd Bidlist Dasa ippon Speci6astion Saaim Na Unit of Bid Unit price Bi l volae ItemNo. Meastmt Quantity Bid 3wnma UNIT 1: TER IMPROVEMENTS— 358 099,82.89 UNIT U:SANITARY SEWER IMPROVEMENTS $272 951 UNIT 111:DRAINAGE IMPROVEMENTS $497,151.91 UNIT IV:PAVING IMPROVEMENTS NO 810 UNIT V.STREET LIGHTING IMPROVEMENTS NO BID UNIT VI:STREET SIGN IMPROVEMENTS NO BID Total CoasttvcUoaBid $1,128,234.31 CoWxsdor dna to ew kb WORK tap FINAL ACCETAM wMft 48 edodw days WW r the date wbea tla CONMCT eoatmsaeat to rae as p vvMod M the Osaoral Caadlllsm W altlL END OF SECTION L.H.LACY COMPANY,LTD By:Bobby W.Gordon CRY OF APRT NORTH 004717 iiia Bepod l els Vbh ea&Fi I UdJ— STANDARDCONSTRUCTIONSFECU4CATIONDOCIS MMS-DEVELOPERAWARORDFROMM LAWYMRwAbPhi.A Farre Vwdwr April 2.rot n 004243 IMP-AID 14Ua4)S/, Nan 2 aro SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Deuription Specification Section No Unit of Brd Unit Price Bid Value Item hlo Memure Quantity JLNIT IV,PAVII IG IMPROVEMENTS 1 3211 0400 Hydrated Lime 32 11 29 TN 217 5146.76 $31,84692 2 3211 0501 8"Lime Treatment 321129 SY 14441 $4.01 $57,908.41 3 3213.0101 V'Conc Pvmt 321313 SY 13559 $37.73 $511,50107 4 3213 0501 Barrier Free Ramp,Type R-1 321320 EA 16 $1,660.00 $28,560.00 5 3213.0501 Barrier Free Ramp,Type M-2 321320 EA 2 $1,27100 $2,542.00 6 3305 0111 Valve Boa Adjustment 33 05 14 EA 25 $114.00 $2,95000 7 3305.0107 Manhole Adjustment Mirror 330514 EA 12 $270.00 $3,240.00 6 9999.0005 Dead End Barricade 000000 EA 2 $82200 51,644A0 9 9999.0006 2 Yr 100%Maintenance Bond 00 00 00 LS 1 $6,08500 $6,08500 10 9999 0007 Payment and Performance Bonds 000000 LS 1 $1,350.00 $1,350.00 AL UNI 5645,607.40 cr'Y OF FORT wORTti 00 42 43 Md P. I 1A.Vim Rush Ph 4 Wieg STAFLMRD CONS rRuc rxm 314TIFICATION DOCt1MPH19-Dli VFLOPIN AWARD1n)PROWC1 S Lma vim Rush Mira 4 Mum Varum Apil 2,2014 SECTION 00 42 43 Developer Awarded Prgeds-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Specification Section No Unit of Q&Miry Unit Price Bid V.I. Item No —' Measure rr vl: IROVENIENTS 1 Street Name Signs_ EA 9 $411.00 $3,699 00 2 Pavemerit Markings jSloo�Std•___ .__ •• LS 1 $1,351.00 $1,351.00 TOTAL UNIT VI:STREET SIGNIMPROVMENTSI $5,050.00 CRY CF FORT W0R 111 00 4147 Hid Pra�d take Vim R-*Ph 4 P.vi q STAMbM WNStRuc rloN siv,.cIFICATHN/1]ocuM W3•IN:Vf•.1.0PVR AWAR13M)PRO0iCTS L ku Vim fAsA Pb—4 F—V—i.Apo 1,1014 004243 IMP.1110PROPWAL A.v 4 d4 SECTION 00 42 43 Developer Awarded Prgech-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlial Unit of Bid Nan Description Specification Section No Measure Qusntity Unit Price Bid Value Bid Sumas I 1:WA NO BID UNIT It SANITARY SEWER IMPROVEMENTS NO BID UNIT III:DRAINAGE IMPROVEMENTS NO BID UNIT IV:PAVING IMPROVEMENTS $645,607.40 UNIT V:STREET LIGHTING IMPROVEMENTS NO BID UNIT VI:STREET SIGN IMPROVEMENTS S505000 ?old Camor"Wa Bid 56_0 667.40 Contractor ascan to maplete WORK For FINAL ACCEPTANCE within 40 cakmdnr days alter the date whey the CONTRACT emaeoem to ran as povided IN the Gerard GadWm. END OF SECTION PAVECON PUBLIC WORKS By: Brian-t VP CITY oi;wR'r WORT i1 004242 BidPq I�Via A..b Ph 4 M% S I'ANOARD CONS I RUC NON SPI_CIPICA'I ION 1X1CW-.WfS-iN:VI:LOPI'R A WARDE13 PR(]f im i LdW V W RrPhs 4 Form,—im Apl 2014 004243 DAP-SIDPROPOSAL Pw 2.r 3 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project item]nformaliou Bidder's Proposal Bldhat Description Specification Section No. Unit of Bid Unit]?riee Bid Value Item No. Mansura Quantity E I 1__'2605.3015 2 CONDT PVC SCH,.ao�_._•,__ 26 05 34______ _ _ LF 2281 8.89 X20,278.09 2 3441.3110 Install[1QMing Fixture ___�_.•_ 3441.20•__, EA._ � 17 __—X44.00 748.00 ;t4-41 20 EA 17 }1 886.00 .._�32,23�0 _4_ 3441.3301.Rev Ilium Foundallon TY 1_2 and 4 ___34 41 20_ _ EA_ _ 17 •$1054-00 17 918__._00 5_. 3441;1408 NO a Insulated_Elec Condr _ 34 4120 _T^�• LF 8843 _,_•. $0.88 56 021.84 __w_,•• Note;_Total Construction PdceIncludes PP&MBondl __..�.—_ —_ ,��- - --•--_--.—.,.....___. ..----�-- ------------ TL U NIT ViSTRE LIG HTIM $77,197.93 CTrY OF FORT WORTH 00 43 43 aid Pmpuel leko Vida Rmah Ph 4 Shom Wghu STANDARD CCMTRUC1 MR SPEC[FICATION DOI:Dh4@M-DRVRLCFER AWARDHD FROVEM Lb Via.R...hPh—4 Pam Va.im Apra 2,2014 0042 43 DAP-BID PROPOSAL Page 3 or 3 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Description Specification Section No. Unit of Bid Unit Price Bid Value Item No. Me.sure Quantity Bid Summary UNIT 1: WATER IMPROVEMENTS NO BID UNIT II:SANITARY SEWER IMPROVEMENTS _ NO BID UNIT III:DRAINAGE IMPROVEMENTS NO BID UNIT IV:PAVING IMPROVEMENTS NO BID UNIT V:STREET LIGHTING IMPROVEMENTS $77,197.93 UNIT VI:STREET SIGN IMPROVEMENTS NO BID Total Constriction Bid $77,197.93 Contractor agrees to complete WORK for FINAL ACCEPTANCE within 30 calendar days after the dote when the CONTRACT commenceg to nm as provided in the General Conditions. BY jchard W END OF SECTION TITLE: President DATE: 11/07/2018 CPTY OF PORT WORTFI 00 42 43 Bid P,ep=1 I.A.Vita Ranch Ph 4 S-1 Light, STANDARD CONSTRUCTION SPECIFICATION DOCUMRN2'S-DEVELOPER AWARDITD PRC TRC73 Latae Via4s R..h ph..4 Puan V—ian April 2,2014 ® C rA.46wd fn ' pr i�t �Wip,Bhfl d - 5 (� ihanbtnn o.. E" tsrawl�.Ql IMAN Coal.Trak N bailey 9mmil Rd W Baily 119 NII Rd W Y INUMN Rd W BAILEY BOSWELL RD. 3„1,4", M,7. -_rw�s f M iwarn�a 3dm1 f Is- � Y Taft of Nay K O x � SITEJEXISTIN � $� Q o W.J. BOAZ RD. _; Wd bou Rd a21 F 3 w3 $ $ s fit, _:Odhart Os r &liiiw*A*LA r3+i1r aN«rN m i�1e��. ifiti"" I_.__..._I�+MaQas.o. '�ao,d alaoac $ wow fipflertspn.�. di LOCATION MAP /� o°O • JAD �(111�► ................................. CHARLES � CPN 101461 �v �QJ�� 57357 MAPSCO #32 NOT TO SCALE VA���, •:' Q 0� F3;••G!STER G\�'� ONAI•�a FP-18-008 OWNER/DEVELOPER n �2/20�8 PP-14-005 BNM LAKE VISTA DEVELOPMENT, LP 0 9001 AIRPORT FREEWAY, SUITE 400 USE OF THIS ELECTRONIC SEAL/SIGNATURE NORTH RICHLAND HILLS, TX 76180 AUTHORIZED BY CHARLES F. STARK, P.E. D TEXAS REGISTRATION NO. 57357 Barron-Stark FUTURE IMPROVEMENTS PR0'1M Na' Bon Engineers LAKE VISTA RANCH , PHASE IV DATE 051518 6221 Southwest Boulevard,Suite 100 �f Fort worm, Texas 76132 CITY OF FORT WORTH,TARRANT COUNTY TEXAS LOCATION (0)8Regist.6100 Erigmee 617.231.6144 > Texas Registered Survey a Fir Flan F-10998 Texas Registered s�wey i=o-m F-10158800 MAP www.barronstark.com I' !1 EASEW pmt I I u7F1Exr --_ __ b 15119•XAATpf I LAKE%ISTA RANCH PROJECT N4 100174 1 1 c.ac,svr _______NATER PROJECT N.90M 0500470 100772 001593 FILE N.X-23901.N1-2405 _ SLOOP SST 1F W70 RATPR CONNECT ro E]0..'•11N0 NA70 NO COMMENTS �— It MH 8/23/18 i �.\ I I I I I I Ii Ir 7011FR i I I SCUD COURT I I I — — - - -- T - III g I > 1 I I , I i1 j �I IM I A I i C7 LAIGE VWA RANCH PN 1 I� I I III I PROJECT 110.90901 0900470 100772 001991 -FILE Ila X-23901.H1-2409 I 0 I I I I I I I I BOLLARD RW '- I \ i / I I I Uu _____-_________ I I I I I Ea mrW70 A7FR I ----------- ----- P P PP PP WABOAZ ROAD Ir WAIIIER I — IM J BOAS—ROAD CONNECEXISTING A Exs11Nc r1A7FR BOWMAN ROBERTS ROAD X-24 1r sumYAIL1 N OM7PRO ECT No 90901-0900470-,OOW-0017N GRAPHIC SCALE 1"=200' LEGEND 100 0 100 200 PSE of rF� PROPOSED 8' WATER W PROPOSED GATE VALVE •�•••••••••••••• •RK CHARLES F.%.§STARK PROPOSED FIRE HYDRANT 57357 EXISTING 8' WATER w OWNER/DEVELOPER • EXISTING GATE VALVE BNM LAKE VISTA DEVELOPMENT, LP SS�ONAL13 9001 AIRPORT FREEWAY, SUITE 400 15/20 EXISTING FIRE HYDRANT — NORTH RICHLAND HILLS, TX 76180 05/ Fp-16-008 ' SIGNATURE nurHORlzm eT CWLES FE OF THIS ELECTRONICirs ARK P.. DPP-14-005 SERATION Barron-Stark EXHIBIT 'A' 'g'j'ee15 WATER IMPROVEMENTS 101 91T.211.efOO IF}9+1M+91,. LAKE VISTA RANCH,PHASE IV SHEET T:d 9.,�xoerl`a�.,br7w F"io+a'�o I CITY OF FORT WORTH,TARRANT COUNTY,TEXAS A N NO COMMENTS GRAPHIC SCALE MN 8/23/18 1"=100' 50 0 50 100 '--- I I ' I I � SLOOP STREET I 1 r I�I I I 1 1 11 I CUR I � I 1 II - i • I I I I i � -- -- -- itIJBLA ED IIal W.J.BOAZ ROAD SE OF TFC LEGEND CHAR4ES..F;..STARK CITY PROJECT NO. XX po; 57357 �� PROPOSED 8' SEWER S "f`c/STER``'��' PROPOSED 4' MANHOLE OWNED/DEVELOPED BY: sS�ONAL BNM LAKE VISTA DEVELOPMENT,LP EXISTING 8' SEWER -- S 9001 AIRPORT FREEWAY,SURE 400 pS�Qat3 EXISTING 4' MANHOLE -0- NORTH RICHLAND HILLS,TX 76180 FP-17--ow03/ PP-14-005 wnl°Fox¢m 6r c° wune-c F. r� Barron-Stark RMISIUM NO,57M7 EXHIBIT - 'A-1' PFAW N& 999.699 Engineers SEVER IMPROVEMENTS WE 99 6221 Southwest Boulevard,Sul:e 100 SIM Fort Worth, Texas 76132 LAKE VISTA RANCH PHASE IV (0)617231.6100 (F)Bi],231 8144 Texas",,.ere'Engineering Firm F-10998 E X 1 Te...Registered S—V F-F-10158600 CITY OF FORT WORTH,TARRANT COUNTY,TEXAS www.bart ns[ark.com I sL0op_ I I --- _ ''LOOP S1EE7 I I I=_ I ' I I I I I I I I I I i ♦ � __ _.., I � I I I I I I I - -- I I / �— I I I ' I I - I I I , I I I -- — BOIlARD ROAD . I I � ILIJ I� I, I 1 — —� — - - -- -.l — I — I — PP PP PP PP W.,LBOAZ ROAD CPN 101461 GRAPHIC SCALE 1•=200' MAPSCO #32Q 100 0 100 200 Q��oop�4 FP-17-004 OF PP-14-005 ��.�P. •;�'4 �� LEGEND CHARLES.. .. .......STAp PROPOSED 6" CONCRETE F-57357 �,.:�`�� PAVING �/ONAL �o^� Q FS•.,/STE,. G�� 0000 0 PROPOSED 4" CONCRETE OWNER/DEVELOPER �18 SIDEWALK PAVING BNM LAKE VISTA DEVELOPMENT, LP 4001 AIRPORT FREEWAY, SURE 400 O NORTH RICHLAND HILLS, TX 76180 USE OF THIS ELECTRONIC SEAL/SIGNATURE AUTHORIZED BY CHARLES F. STARK, P.E. TEXAS REGISTRATION NO. 57357 Barron-Stark EXHIBIT 'B' PINXIM7 No. "m Engineers PAVEMENT IMPROVEMENTS °"'� 1518 6221 southwest aoulevard,sine,oo SHIMFo,wonh, T �s,3z LAKE VISTA RANCHPHASE IV (0)817 (F)8 ,.231.8100 (F)817231.8144 D Texas Registered Engineering FF-10996 CITY OF FORT WORTH TARRANT COUNTY,TEXAS J� Texas Registered Survey Firm F-10156600 > www.6arronstark.com NL DRIB r 1 , 1 GRAPHIC SCALE 1"=200' i — 1 � 100 0 100 200 INSfMl: 1 I -- 83 S7. I 1 I I lBTAIl• iI I I RP-RAF 2-16'p —__— �. __- 1 BI I I , I — L----- I SCUD COURT I jI I z -- IE CPN 101461 MAPSCO #32Q FP-17-009 PP-14-005 I I �\ I 2Y Rw am BX BOLLARD RO � 4L T i i i ,i oo��'`.�• •.gs�pp� J-=1 —.1 —II' 1 -1 - ....:......................:....V --- --— — - — I I I { U –rT-_—__—__— --- -- --- --1 c — _-_ _ _ SLOOP r m I I -'- i j 1 - + CSI - i I I L—__--- I SCUD COURT I I I I, I I I I GRAPHIC SCALE 1'=200' - I III ----- r Z I 100 0 100 200 — T I^ i lil I i I I -----T-- I CPN 101461 BARD ROAD MAPSCO #32Q i � -- --,-- I--- �-- -- --- -- -- - -- ----_-- I FP-16-008 I` I T _ PP-14-005 -_--__--- PP PP PP P W.dBOAZ ROAD LEGEND •CHARLES•.F:••STARK• ONCOR TRANSFORMER j "�•••�G ' 57357 CONDUIT a "Q�'��'p�G/STE��O•���� PROPOSED STREET LIGHT OWNER/DEVELOPER Op•••.•••L G S�ONA(POLE 18 EA) 6� (LUMINAIRE 21 EA) BNM LAKE VISTA DEVELOPMENT, LP 9001 AIRORT FRY, SUITE NORTH RP OLAND EEWLAS, TX 6180 ��j��/ USE OF THIS ELECTRONIC SEAL/SIGNATURE AUTHORIZED BY CHARLES F. STARK, P.E. 13 TEXAS REGISTRATION NO. 57357 " 9+126 Barron-Stark EXHIBITt SFr%l.C 1 "i1nmr% STREET LIGHT IMPROVEMENTS WE: $/'¢ sir Fon x+,YwW, Tam• 76132 LAKE VISTA RANCH,PHASE IV lu}aT �B+oo irFx29,B,Is (r .mH�pdir,r fiprrvrt FriF EB® �.�• � •���� CITY OF FORT WORTH,TARRANT COUNTY,TEXAS c SON 1-STREET 901 -1) _ I I I _ C J ' 1�3-1P I �nlnl I 1-STOP 90N 1) I _ � I ___ __ _7-STOP 901(R,-1) I '-1-S71EE�9� I I STEEi __—_ — 1-1113-1P I 1-57901(R1-1) ; 1-r13-11P 9_0_11_ --- SLOOP STRET __ 11-1113-11P NSTAIIs 1 _.147111wr 901,-M1},F_ I , I 1-STREET 901 — II i----- _. I - I j ,—s10P 901(R1-„�I j `M' I L — SCUD COURT - II -- - — — — I I S I ,f=j I -----T-- I I -- 1 j I REE L ,-STOP 11110111 0911 -, 1TEET ) I —rl PP T I I I RBTALL: I I t 1-RII3-1P- I I , BOLLARD ROAD Sm j I I LU I I - P pp PP PP W.,LBOAZ ROAD CPN 101461 FP-18-008 MAPSCO #32Q 4(9* PP-14-005 O P TF- I�� LEGEND GRAPHIC SCALE 1°=200' ap*;• '•9*�� STREET NAME SIGN 0 100 0 100 200 ............" •CHARLES F. STARK� STOP 15 �/1•�n'O . . 57357••��•.��°Q� M.P.H. `14�•nF`•QFG+�ST�E��•O'��`�O R,_, 913-TP OWNER/DEVELOPER Q�sS�p••••°'E��' (RI-1 (ie-.TR� NAL BNM LAKE VISTA DEVELOPMENT, LP nO,P PROPOSED STREET 9001 AIRPORT FREEWAY, SUITE 400 ` NAME BLADES (36) NORTH RICHLAND HILLS, TX 76180 USE OF THIS ELECTRONIC SEAL/SIGNATURE AUTHORIZED BY CHARLES F. STARK, P.E. DTEXAS REGISTRATION NO. 57357 Barron-Stark EXHIBIT 'C-1' MMM No. Engineers STREET SIGN IMPROVEMENTS DATE: 05/15/18 6221 Southwest Boulevard,Suite 100 SHET tFort worth. Texas 76132 LAKE VISTA RANCH,PHASE IV (0)817.231.8100 (F)817.231.8144 T.—Reg,=lend Ergineedeg Firm F-10906 CITY OF FORT WORTH,TAR-RANT COUNTY,TEXAS C-1 Texas Registered Survey Firm F-10158800 v—v barronstark.com