HomeMy WebLinkAboutContract 51715 Received Date: 12/28/18
Received Time:8:46 AM
Developer and Project Information Cover Sheet:
Developer Company Name: Rosedale Acquisition,LP
Address, State,Zip Code: 722 N.Main St.,Fort Worth, TX, 76164
Phone&Email. 817-654-1991,bcrowell(&hud inscompanies.com
Authorized Signatory,Title: Brian Crowell ,General Partner
Project Name: Rosedale Multifamily
Brief Description: Water, Sewer,Paving, Storm Drain
—7Project Location: SEC of Rosedale St. &Grainger St.
Plat Case Number: FS-18-035 Plat Name: Wray's Subdivision
Mapsco: Council District: 9
CFA Number: 2018-081 City Project Number: 101546
City of Fort Worth,Texas
Standard Community Facilities Agreement-Rosedale Multifamily r,-,X ri!,C L RECORD
CFA Official Release Date:02.20.2017
0TY SECRETARY
Page 1 of 11
LWORTH,TX
—
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. 51715
WHEREAS, Rosedale Acquisition, LP , ("Developer"), desires to make certain specific
improvements as described below and on the exhibits attached hereto("Improvements")related to
a project generally described as Rosedale Multifamily ("Project") within the City or the
extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS,any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memorialized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW,THEREFORE,for and in consideration of the covenants and conditions contained
herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated
into this Agreement as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Rosedale Multifamily OFFICIAL RECORD
CFA Official Release Date:02.20.2017
Page 2 of 11 CITY SECRETARY
FT. WORTH,TX
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by Developer
for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City-approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water(A) _0, Sewer(A-1) .O,Paving (B) K, Storm Drain(B-1) �, Street Lights & Signs
(C) M.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section Il,paragraph 7 of the Policy and the contracts shall be administered
in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its
contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed and
bonded to do work in public ways and/or prequalified to perform water/wastewater
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2) years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253, Texas Government Code.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Rosedale Multifamily
CFA Official Release Date:02.20.2017
Page 3 of 11
iii. To require the contractor(s) it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer-awarded
infrastructure construction contracts. The City shall be named as additional insured
on all insurance required by said documents and same will be evidenced on the
Certificate of Insurance (ACORD or other state-approved form) supplied by the
contractor's insurance provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available;to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces, to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Rosedale Multifamily
CFA Official Release Date:02.20.2017
Page 4 of 11
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans,specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer and required for the construction of the current and future
improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character,whether real or asserted,brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from,or in any way connected with,the construction of the infrastructure contemplated
herein,whether or not such injuries, death or damages are caused, in whole or in part,
by the alleged negligence of the City of Fort Worth, its officers, servants, or employees.
Further,Developer will require its contractors to indemnify, and hold harmless the City
for any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in a good
and workmanlike manner, free from defects, in conformance with the Policy, and in
accordance with all plans and specifications.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Rosedale Multifamily
CFA Official Release Date:02.20.2017
Page 5 of 11
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor,whether express or implied. Further, Developer agrees that all contracts with any
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent(2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent(4%) and material testing fees equal to two percent(2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing
the streetlights, inspection fees equal to four percent(4%) of the developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period,the developer may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two(2)years from the date of this Agreement(and any extension period)
the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
City of Fort Worth,Texas
Standard Community Facilities Agreement-Rosedale Multifamily
CFA Official Release Date:02.20.2017
Page 6 of 11
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government
Code,the City is prohibited from entering into a contract with a company for goods or services
unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms
"boycott Israel" and "company" shall have the meanings ascribed to those terms in Section
808.001 of the Texas Government Code. By signing this contract, Developer certifies that
Developer's signature provides written verification to the City that Developer: (1) does not
boycott Israel; and(2) will not boycott Israel during the term of the contract.
IMMIGRATION AND NATIONALITY ACT
R. Developer shall verify the identity and employment eligibility of its employees who perform
work under this Agreement, including completing the Employment Eligibility Verification
Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms
and supporting eligibility documentation for each employee who performs work under this
Agreement. Developer shall adhere to all Federal and State laws as well as establish
appropriate procedures and controls so that no services will be performed by any Developer
employee who is not legally eligible to perform such services. DEVELOPER SHALL
INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY
DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR
LICENSEES. City, upon written notice to Developer, shall have the right to immediately
terminate this Agreement for violations of this provision by Developer.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Rosedale Multifamily
CFA Official Release Date: 02.20.2017
Page 7 of 11
Cost Summary Sheet
Project Name: Rosedale Multifamily
CFA No.: 2018-081 CityProject No.: 101546
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
A. Water and Sewer Construction
1. Water Construction $ 109,186.00
2.Sewer Construction $ 39,685.00
Water and Sewer Construction Total $ 148,871.00
B. TPW Construction
1.Street $ 339,044.26
2.Storm Drain $ 31,210.00
3.Street Lights Installed by Developer $ 116,337.50
4. Signals $ -
TPW Construction Cost Total $ 486,591.76
Total Construction Cost(excluding the fees): $ 635,462.76
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 2,977.42
D. Water/Sewer Material Testing Fee(2%) $ 2,977.42
Sub-Total for Water Construction Fees $ 5,954.84
E. TPW Inspection Fee(4%) $ 14,810.17
F. TPW Material Testing(2%) $ 7,405.09
G. Street Light Inspsection Cost $ 4,653.50
H. Signals Inspection Cost $ -
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ 26,868.76
Total Construction Fees: $ 32,823.60
Choice
Financial Guarantee Options,choose one Amount ('ark one
Bond=100% $ 635,462.76
Completion Agreement=100%/Holds Plat $ 635,462.76
Cash Escrow Water/Sanitary Sewer—125% $ 186,088.75 x
Cash Escrow Paving/Storm Drain=125% $ 608,239.70 x
Letter of Credit=125%w/2yr expiration period $ 794,328.45
City of Fort Worth,Texas
Standard Community Facilities Agreement-Rosedale Multifamily
CFA Official Release Date:02.20.2017
Page 8 of 11
ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
Rosedale Acquisition,LP
T•�Gl,—
Jesus J.Chapa(Dec 27,2018)
Jesus J. Chapa
Assistant City Manager 11afirre
Date: Dec 27,2018 a anrT ro
DCwell(Dec� 20,2018)
Name: Brian Crowell
Recommended by: Title: General Partner
I K,�,, Date: Dec 20,2018
Evelyn Robe 5(Dec 27,2018)
Evelyn Roberts/Jennifer Ezernack
Project Assistant
Planning and Development Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
Approved as to Form &Legality: administration of this contract, including
ensuring all performance and reporting
,4 McCrAckeiv requirements.
Richard A McCracken(Dec 27,2018)
Richard A. McCracken 23v-`—_
Assistant City Attorney Jennifer Ezernack on the behalf of(Dec 27,2018)
M&C No. N/A Name: Janie Morales
Date: Title: Development Manager
Form 1295: N/A
O�.FOR ;
ATTEST: ®7J
U 2
Mary J.K Er(DV9,2018)
Mary J. ayser/Ronald Gonzales SAS
City Secretary/Assistant City Secretary
City of Fort Worth,Texas ---
Standard Community Facilities Agreement-Rosedale Multifamily OFFICiA. RECORD
CFA Official Release Date:02.20.2017
Page 9 of 11 CITY SECRETARY
FT. WORTH,TX
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
Attachment 1 -Changes to Standard Community Facilities Agreement
Location Map
Exhibit A:Water Improvements
® Exhibit A-1: Sewer Improvements
Water and Sewer Cost Estimates
Exhibit B: Paving Improvements
Paving Cost Estimate
® Exhibit B-1: Storm Drain Improvements
® Storm Drain Cost Estimate
® Exhibit C: Street Lights and Signs Improvements
® Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Rosedale Multifamily
CFA Official Release Date:02.20.2017
Page 10 of 11
ATTACHMENT"1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 101546
None.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Rosedale Multifamily
CFA Official Release Date:02.20.2017
Page 11 of 11
00 42 43
DAP-BIDPROPOSAL
Page 1 of 3
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
BidlistItem Specification Unit of Bid
No. Description Section No. I Measure Quantity Unit Price Bid Value
UNIT I:WATER IMPROVEMENTS
1 0241.1011 Remove 4"Water Line 0241 14 LF 48 $30.00 $1,440.00
2 0241.1012 Remove 6"Water Line 0241 14 LF 45 $30.00 $1,350.00
3 0241.1301 Remove 4"Water Valve 0241 14 EA 1 $1,000.00 $1,000.00
4 0241.1302 Remove 6"Water Valve 0241 14 EA 1 $1,000.00 $1,000.00
5 0241.1305 Remove 12"Water Valve 0241 14 EA 2 $1,000.00 $2,000.00
6 0241.1601 Salvage Water Sampling Station 0241 14 EA 1 $3,000.00 $3,000.00
7 10241.1602 Remove Concrete Water Vault 0241 14 EA 1 $3,000.00 $3,000.00
8 0241.1515 Salvage 3"Water Meter 0241 14 EA 1 $2,000.00 $2,000.00
9 3305.0003 8"Waterline Lowering 33 05 12 EA 1 $5,000.00 $5,000.00
10 3305.0109 Trench Safety 33 05 10 LF 772 $3.00 $2,316.00
11 3311.0001 Ductile Iron Fittings w/Restraint 3311 11 TON 0.2 $15,000.00 $3,000.00
12 3311.0161 6"PVC Water Pipe 3311 12 LF 46 $30.00 $1,380.00
13 3311.0261 8"PVC Water Pipe 3311 12 LF 633 $40.00 $25,320.00
14 13311.0461 12"PVC Water Pipe 3311 12 LF 15 $60.00 $900.00
15 3312.0002 Water Sampling Station 33 12 50 EA 1 $2,000.00 $2,000.00
16 3312.0117 Connection to Existing 4"-12"Water Main 33 12 25 EA 3 $3,000.00 $9,000.00
17 3312.2003 1"Water Service 33 12 10 EA 1 $2,000.00 $2,000.00
18 3312.2803 6"Water Meter and Vault 33 12 11 EA 1 $25 000.00 $25,000.00
19 3312.3002 6"Gate Valve 33 12 20 EA 2 $1,000.00 $2,000.00
20 3312.3003 8"Gate Valve 34 12 20 EA 4 $1 300.00 $5,200.00
21 19999.0000 Remove 3"Water Line 00 00 00 EA 376 $30.001 $11,280.00
TOTAL UNIT I:WATER IMPROVEMENTS $109,186.00
UNIT II:WASTEWATER IMPROVEMENTS
1 0241.2012 Remove 6"Sewer Line 0241 14 LF 23 $50.00 $1,150.00
2 0241.2013 Remove 8"Sewer Line 0241 14 LF 42 $50.00 $2,100.00
3 0241.2103 8"Sewer Abandonment Plug 0241 14 EA 1 $500.00 $500.00
4 0241.2201 Remove 4'Sewer Manhole 0241 14 EA 2 $2,500.00 $5,000.00
5 3301.0001 Pre-CCTV Inspection 33 01 31 LF 65 $5.00 $325.00
6 3301.0002 Post-CCTV Inspection 3301 31 LF 88 $5.00 $440.00
7 13301.0101 Manhole Vacuum Testing 3301 30 1 EA 3 $1,200.00 $3,600.00
8 3305.0107 Manhole Adjustment,Minor 33 05 14 EA 2 $1,000.00 $2,000.00
9 3305.0109 Trench Safety 33 05 10 LF 154 $5.00 $770.00
10 3305.0112 Concrete Collar 33 05 17 EA 4 $800.00 $3,200.00
11 3305.0113 Trench Water Stops 330515 EA 2 $1,100.00 $2,200.00
12 3331.3201 6"Sewer Service 3331 50 EA 1 $2,000.00 $2,000.00
13 3331.4202 10"Sewer Pipe,CSS Backfill 13311 10 1 LF 88 $50.00 $4,400.00
14 3339.1001 4'Manhole 133 39 10(20)1 EA 3 $4,000.00 $12,000.00
TOTAL UNIT II:WASTEWATER IMPROVEMENTS1 $39,685.00
UNIT III:DRAINAGE IMPROVEMENTS
1 3125.0101 SWPPP z 1 acre 31 25 00 LS 1 $0.00 $0.00
2 3301.0002 Post-CCTV Inspection 3301 31 LF 254 $5.00 $1,270.00
3 3305.0105 Inlet Adjustment 33 05 14 EA 1 $2,000.00 $2,000.00
4 3305.0109 Trench Safety 33 05 10 LF 254 $5.00 $1,270.00
5 3341.0202 21"RCP,Class IV 3441 10 LF 254 $105.00 $26,670.00
TOTAL UNIT III:DRAINAGE IMPROVEMENTS $31,210.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 m2_00 4243-Bid Proposal_DAP.As
00 42 4_
DAP-BID PROPOSAL
Pi_
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No Description Section No. I Measure Quantity Unit Price Bid Value
UNIT IV:PAVING IMPROVEMENTS
1 0241.0100 Remove Sidewalk 0241 13 SF 905 $1.90 $1,719.50
2 0241.0300 Remove ADA Ramp 0241 13 EA 4 $250.00 $1,000.00
3 0241.0401 Remove Concrete Drive 0241 13 SF 325 $1.89 $614.25
4 0241.0600 Remove Wall<4' 0241 13 LF 115 $1.80 $207.00
5 0241.1000 Remove Conc Pvmt 0241 15 SY 206 $1.90 $391.40
6 0241.1100 Remove Asphalt Pvmt 0241 15 SY 2,049 $2.751 $5,634.75
7 0241.1200 Remove Brick Pvmt 0241 15 SY 10 $16.50 $165.00
8 0241.1300 Remove Conc CurbBGutter 0241 15 LF 700 $2.25 $1,575.00
9 0241.1400 Remove Conc Valley Gutter 02 41 15 SY 56 $18.25 $1,022.00
10 0241.1507 3"Surface Milling 0241 15 SY 2 049 $17.72 $36,308.28
11 3201.0111 4'Wide Asphalt Pvmt Repair,Residential 3201 17 LF 661 $26.53 $17,536.33
12 3201.0112 5'Wide Asphalt Pvmt Repair,Residential 3201 17 LF 95 $35.70 $3,391.50
13 3201.0113 6'Wide Asphalt Pvmt Repair,Residential 3201 17 LF 231 $41.66 $9,623.46
14 3201.0115 8'Wide Asphalt Pvmt Repair,Residential 3201 17 LF 12 $47.12 $565.44
15 3212.0303 3"Asphalt Pvmt Type D 32 12 16 SY 2,049 $28.31 $58,007.19
16 3213.0101 6"Conc Pvmt 32 13 13 SY 928 $80.46 $74,666.88
17 3213.0103 8"Conc Pvmt 32 13 13 SY 188 $88.60 $16,656.80
18 3213.0301 4"Conc Sidewalk 32 13 20 SF 2,001 $7.58 $15,167.58
19 3213.0311 4"Conc Sidewalk,Adjacent to Curb 32 13 20 SF 6 580 $7.51 $49,415.80
20 3213.0401 6"Concrete Driveway 32 13 20 SF 983 $8.66 $8,512.78
21 3213.0503 Barrier Free Ramp,Type M-1 32 13 20 EA 3 $2 500.00 $7,500.00
22 3213.0506 Barrier Free Ramp,Type P-1 32 13 20 EA 4 $2 500.00 $10 000.00
23 3216.0101 6"Conc Curb and Gutter 32 16 13 LF 259 $38.48 $9,966.32
24 3217.0001 4"SLD Pvmt Marking HAS(W) 32 17 23 LF 613 $3.58 $2,194.54
25 3217.0002 4"SLD Pvmt Marking HAS(Y) 32 17 23 LF 260 $3.58 $930.80
26 3217.0301 12"SLD Pvmt Marking HAE(W) 32 17 23 LF 111 $3.58 $397.38
273217.0501 24"SLD Pvmt Marking HAE(W) 32 17 23 LF 31 $3.58 $110.98
28 3217.1002 Lane Legend Arrow 32 17 23 EA 1 $450.00 $450.00
29 3217.1004 Lane Legend Only 32 17 23 EA 1 $450.00 $450.00
30 9999.0000 7"Conc Valley Gutter,Residential 00 00 00 SY 58 $83.85 $4,863.30
TOTAL UNIT IV:PAVING IMPROVEMENTS $339,044.26
UNIT V:STREET LIGHTING IMPROVEMENTS
1 2605.3015 2"CONDT PVC SCH 80(T) 26 05 33 LF 1000 $10.50 $10,500.00
2 3305.0115 Vacuum Excavation 33 05 30 EA 40 $125.00 $5,000.00
3 3441.3037 Furnish/Install 10'-14'Washington Standard 3441 20 EA 18
Light Pole&Fixture LED $3,468.75 $62,437.50
4 3441.3303 Rdwy Ilium Foundation TY 7 34 41 20 EA 18 $1,250.00 $22,500.00
5 3441.1410 NO 10 Insulated Elec Condr 3441 10 LF 3,000 $1.00 $3,000.00
6 3441.1502 Ground Box Type B,w/Apron 3441 10 EA 2 $550.00 $1,100.00
7 3441.1771 Furnish/Install 120-240 Volt Single Phase Pedestal 3441 20 EA 2 $5500.00 $11,000.00
8 13441.4110 Remove and Reinstall Sign Panel and Post 34 41 30 EA 2 $400.00 $800.00
TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS $116,337.50
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 m2_00 42 43 Did Proposal_DAP.xIs
00 42 43
DAP-BID PROPOSAL
Pie 3 of3
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT.PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No. DescriptionSection No. Measure Quantity Unit Price Bid Value
Bid Summary
TOTAL UNIT I:WATER IMPROVEMENTS $109,186.00
TOTAL UNIT II:WASTEWATER IMPROVEMENTS $39,685.00
TOTAL UNIT III:DRAINAGE IMPROVEMENTS $31,210.00
TOTAL UNIT IV:PAVING IMPROVEMENTS $339,044.26
TOTAL UNIT V.STREET LIGHTING IMPROVEMENTS $116,337.50
Total Construction Bid $635,462.76
This bid is submitted by the entity named below:
BIDDER: BY:Doug Sore
Rampart Multifamily,LLC
800 Industrial Blvd Suite 100 !/
Grapevine,TX 76051 TITLE;Area `'��
DATE: f/ 8
Contractor agrees to complete WORK for F QAL ACCEPTANCE within 270 calendar days atter the date when the
CONTRACT commences to run as provided In the General Conditions.
END OF SECTION
CITY Of,PORT WORTH
STANDARD CONSTRUCTION SPEMCATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Pwm Veslon Septw*w 1,2015 reJ2_00 42 43—Bid Pmpowl DAP.a4
28
377
NI PA I AILROAD
Q
PROJECT
LOCATION
� I
'4.
I:
Y
g €
4
I �
35W
CPN 101546
MAPSCO NO. 77J
COUNCIL DISTRICT 9
ROSEDALE MULTIFAMILY
StanteL WRAY'S SUBDIVISION
12222 MerH@,Su@e 400 LOTS 1R&32-R, BLOCK 18-B LOCATION MAP
Delle.,Ta—75251
Tel.(972)991-0011 ROSEDALE ACQUISITION LP
TBPE#F-6324 TBPLS#F-1D194229 722 N.Main Street
Copyright®2018 Fort Worth,Texas 76164
DATE:August 2,2018 SCALE:AS SHOWN DRAWN BY:MMN CITY PROJECT NUMBER:101546 (SHEET 1 OF 6)
V:12222tectiw'222210161\dviherhibit\CFA%b,,bon_map.dw modified by—,bi on Aug 2,18 3:49 PM
no comments MH 8/29/18
WEST ROSEDALE STREET N
(VARIABLE WIDTH PUBLIC R.O.W.)
CAL➢1234 SO,TT(.PARCEL 77) ' CALLED 3,50 OF
73;
I S-A DF TEXAS �►
L WIL 14390,P^ 47°, 'sA 15379,7G,2„_, i
I pC C.P.R.
OOMECT M
I iI Iill
WD O LOT 32-R, Q .30 60
r IM UNE 9 WRAY'S SUBDIVISION OF
BLOCK 18-B OF I+ I
IUNE FIELD-WELCH ADDITION I N SCALE: 1" = 60'
61 VOL. 388-58, PG. 255,
I I~ ri".5r jIn
3 I 4
4�
+ b a 4
. . .... ........ I I
iSERME
I )
x wM am i
mew &
O
rU�y�m[�,77MW
601I'�
O W a as
LOT Z 3
v WRAY'S SUBDIVISION OF BLOCK 18—B
m I OF FIELDS-WELCH ADDITION I�
aI I CAB. A. SLD. 12587, I Q
P.R.T.C.T, d
z
CALLED 1.700 Z IN
ROSEDALE ACOUISl110N LP
O INST. N0.D216117387,
{ o+ O.P.R.T.GT. UJ
IO
I m
J
�z I I I
{
a r M k
m
j CONNECT
y„ � ,� CeT TD E%
J j 72' WAIER
I 4t� I
CZT MM
4+00dAp— A MM � o- — 6+00 OLEANDER STREET
^ - UBLIC R.0.W.)
1RACT t —5+00 OT' R k 22R, BLOCK D, i
CALLED
0.2437 ACRE WRA Y'S SUBDNS
ON
Nm Of amrrs ff
THE
unnvl9tt OF TEXAS SMOL FOR
Y usE ANDMGMaF UT$Wn4VASMM MEDICAL CUUM cA a. a, GLt7. 1459,
INET.IA 02/6"17360.O.P.RLQT P.R.T C TLOT I—R—I.BLOCK C�lt
. �—
M NAM BLABO1BJON OF FitDb-WELCH AT1D'M
LEGEND I �" 3 ( I ad'g.,T ."`
PROPOSED WATERLINE *NOTE:ALL PROPOSED WATER LINES
— W Y— EXISTING WASTEWATER LINE ARE 8"UNLESS OTHERWISE NOTED
ROSEDALE MULTIFAMILY
WRAY'S SUBDIVISION EXHIBIT A:
,2222 Mem 0r,SOW 4DC� LOTS 1R&32-R, BLOCK 18-B WATER
D,hae,T—s 75251
Tel.(972)Dgl-G 11 ROSEDALE ACQUISITION LP
TBPE M F-6324 TBPLS M F-10194229 722 N.Main Street IMPROVEMENTS
Copyright 0201e Fort Worth,Texas 76164
DATE:August 2,2018 SCALE:AS SHOWN DRAWN BY:MMN CITY PROJECT NUMBER:101546 (SHEET 2 OF 6)
V.=2\etllw=I0761%&~IM(,CFA\E4ilbk A-Weft,impm,emenb.&V motlMed by mnaM on Aug 2,18 4:25 PM
no comments MH 8/29/18
G c WEST ROSEDALE STREET---'.t
c 3 N
(VARIABLE WIDTH PUBLIC R.O.W.)
-sem
CA.L...,3,23?S0.r (PARCEL 77) CA_Ef 3.50x5 5.2.FT.(PARCEL 78) I
I 1S7A—,E OF TEXAS STATE Gi'*c)(AS
L •._.14590. 478. dCi.15379.PC.288. �
a0 �.£ O.R,R. .R.T.C,T m
Q ~ C- [V
�I M
?
I ( I a RUO LJ 32—R. 0 30 60
WRAY'S SUBDIVISION OF
1 i 0 BLOCK 18—B of I+ I SCALE: 1" = 60'
FIELD—WELCH ADDITION I iv
VOL. 388-58, PG, 258, f`
I
4
I I
I I
15-7
111 a I
u
ia �
I
LU
Lu
ry I U) I Lor 1 R.
v WRAY'S SUBDIVISION OF BLOCK 18—B
OF FIELDS—WELCH ADDITION I CSI R>
CAB. A. SLD. 12587. Z v
ZI I P.R.T.C.T. —
CALLED 1.700 ACRE
ROSEDALE ACDUI51710N LP �
INST. NO. D218117387,
i 4 I O.P.R.T.C.T. a I =
Imo ; I I °I — —
I
W { L
I � dfe
A
$U ~
CiCi
I
z CLEANOUT 4' MA rY1M1F1
6' P11C MMI � ❑❑ �
a° P11C MMI � O�ODM4I�EC�70
4' OU1 MMYI ( MMIlM1
4' MA MIMAdFI
- - — — — — - - - - - - TREET
a- LE-WDTN-PNBN6 AL.9.W.-}
o- O MM _
ASRHALT PAYEVEN7It, IZ MM
ruino24T,la Al _ WT IR a IM awm D. I
'.x rnE uhgrc>;9Y a'Fits ars.c"x,rcw WM"OUBVIVNION
nE v5E ANO.U.MT G ,BOInNYES'ETd1 9srcu CFN;F'R de.&ND. 1�7l,
1 INST.1iQ=5117W,0.P.R.T.CT. y Mrr_'r. —
I•) i S2 N� —
IAP I-R-I,SW=C-R
04 Y, P rX. -1YdCH ADM
LEGEND 3 I
GAS. B1'8"a.
PRT 4T.
PROPOSED WASTEWATER LINE �
WIN 21"- EXISTING WASTEWATER LINE I
ROSEDALE MULTIFAMILY
Stant@C WRAY'S SUBDIVISION EXHIBIT Al :
122V..t0r,SW1.400 LOTS 1R&32-R, BLOCK 18-B WASTEWATER
Dallas,Texas 76251
Te1.(972)991-0011 ROSEDALE ACQUISITION LP
TOPE«F-63A TBPLS•F-10141229 722 N.Main Street IMPROVEMENTS
Cpp)T1ght02016 Fort Worth,Texas 76164
DATE August 2,2018 SCALE:AS SHOWN DRAWN BY:MMN CITY PROJECT NUMBER:101546 (SHEET 3 OF 6)
V.=2WCUw\2 221076l Wtl AKeshiWLFA1EA,bk Ai-Waata w Imp�.thg mptlgstl 1y mn M m Aug 2,1B 5:13 PN
HEMPHILL STREET
(VARIABLE WIDTH PUBLIC R.O.W.)
to
�1! IV CURB Kra
0 20 40
3' SCALE: 1" = 40'
I i!
I �
WW s�
�: C�—
T
'
� 0 I " I
x> 40 �� I
rr
ro m mLOT 2R, BLOCK A LOT 1R, BLOCK A
080232— o
+8 m s 9WRAY 9 SUBDIVISION OF BLOCK 18 WRAY'9 SUBDIVISION OF BLOCK 18
5 o I FIELDS WELCH ADDITION FIELDS WELCH ADDITION
0, gc 0 INET. N0. D218040651,
O.P.R,T.C.T. D
1N57. N0. 213040657,
i I NO.
i (D -
j
+ ! I r X Y' PRIVATE
Be roc M RCP GRAINGER STREET
— W 3" — — BEPRNATE 21•RCP — — —
P
--�� — — — — FOR DE'I EPS
— — - —---
" ICLE D COVER
W/ST - _
7i� I F�NNNTENANCE ACCESS)
cozen ( I
1A-o
00 � o
�, ml moAo �) I pI LOT 1R,
z N Z z m WRAY'S SUBDIVISION Ole BLOCK
;+ z m>Z W- CF�e 1Un 18-B OF FIELDS-WELCH
v i m to > ` ( (CFS 14.300) ADDITION
U
my m m I ABOVE GROUND (BAS I"T�EEV�EI��J CAB, A, SLD. 12587,
-4 cEIEIITION .etFAC P.RJ.C.7.
w
It I a � � � � � � II
ROSEDALE MULTIFAMILY
Stance WRAY'S SUBDIVISION EXHIBIT B1 :
12222 Mem Dr,Suite 400 LOTS 1R&32-R,BLOCK 18-B STORM DRAIN
Dalley,Te—75251
Tel.;2)991-0011 ROSEDALE ACQUISITION LP
TBPE.F-6324 TBPLS N F-10191229 722 N.Main Street IMPROVEMENTS
C.WgM o 2018 Fort Worth,Texas 76164
DATE:August 3,2018 SCALE:AS SHOWN DRAWN BY:MMN CITY PROJECT NUMBER:101546 (SHEET 5 OF 6)
V:12222WW,e1222210781WJ heMIbWFAIE,hbk B7-Sk Dmi,9npor M.Mq,WW*dby,,wWm Aug3,187:59AAI
s WEST ROSEDALE STREET
®� (VARIABLE WD7H PUBLIC ROW.)
rl2r am
r . �
pTpi W. N
0 40 80 toarw®rna
N / t9tOMNWf C '1 I ■ O OF* ..
F
SCALE: 1 = 80 s 111 i I 1 ttl,rrl
I it "iii ' may
II I
e-A-n d er1i1 ( ii r OMM 1 liii ii ilii rA11Ylf
tem tai
• I ii TM 11-0 Ir e% It u'u NR
IIIII 'lllCl aar
Douro letioo I it(11i1 `IIIII ,,PAM=
,;)I { '1f°`y - e-•/M� 1� iiiii iiiii YAAWO
7 ywri ! tl j
lieit
u
i' 1`iit
l 1 leo or iee: 4 W "'� • I w z
�Meile>eMll LULX jR,
r
i g
Ig
I I 1 In �3
1IIt810 18-S S i 1' 1t it
» £ �
j ( W `F FMIZ.-WELCH ADDITION 11 1 ul
W
ll
it
I it
n
` I 1. � -i ,
N0.D } i ` '
'i 0.P.RT.C.T.
1 'iI
1 Ill' H
ilk r ane mee qac i;i
!'u
t»111„
IIIII tilt
111»» d
t AIO7Nt
lull lilt
I
itiiGii Ilii
alo1 lllt
y1q 1
IL
TuIIlilt
ll, Zio�eeea Mwll»l
z yc PAvmgar t+ e�oe s 'tl
19d Bele las IAdM En lith
I"8 It
MAFMM
iiiii itIffli it
_'� unu»w uuuuuununnunitl'm uuunut»uumu uu m
u uu
' rot uuuuunuuw
AVE T OLEAbLDER.STREET—
3 pW 4 NIDA!¢M 1/I�BRIT¢�= 1 E a Il It p
nA 11!IE MO IDfllf¢<- 1 1 11 IL
LEGEND
PUBLIC DRIVEWAY PAVEMENT
=.i Y,
Ij
(
PUBLIC CONCRETE VALLEY GUTTER
rJy.S�W
PURUP C014T1N 1 IS Y REINFMCFn CON-RETE PAVEMENT(CRCPI
PUBLIC SIDEWALK R FLATWORK
I
PUBLIC MILL AND HMAC OVERLAY(MOL) I I
® PERMANENT PAVEMENT TRENCH REPAIR
ADA RAMP --- -
I
ROSEDALE MULTIFAMILY
Stantec WRAY'S SUBDIVISION EXHIBIT B:
12222.., orSuMe400 LOTS 1R&32-R, BLOCK 18-B PAVING
Dallas,T-75251
T.L ign)991-0011 ROSEDALE ACQUISITION LP
TBPE.F-0324 TBPLS O F-10191229 722 N.Main Street IMPROVEMENTS
Copyright 02018 Fort Worth,Texas 76164
DATE:September 19,2018 SCALE:AS SHOWN DRAWN BY:MMN CITY PROJECT NUMBER:101546 (SHEET 4 OF 6)
V:U222WcU.22221076lkMMI bMGFAW,NbK B-PsA,g Impwe,wWb V moEMaO by r m 8"13,1811:09M
�~ N
WEST ROSEDALE STREET LpMOff"PA NDYD9T
(VARIABLE KIDTI-I PUBLIC R.O.W.)
CALLz`i1 3534 s0.FT.(PARCEL 77) CALLED 3.608 SO.FT.(PARCEL ld)
STATE OF TEXAS STATE OF TEXAS I
VCM-.14590.P 478, VOL 15379,PD.286, 0 30 60
.R,TC.T. p
IL
I
H4 D.P.R. M 40 SCALE: 1" = 60' .
II IIII LEGEND
a RWRArs SUBDIVISION OF PROPOSED SMr Mff
I BLOCK 16—B OF I I ——— PROPOSED SMn Mff COMDL rt
I FIELD—WELCH ADDITION
VOL. 866-56, PG. 256, PROPM SIOII k ME
. ......... ... !
I
C. I I I I I
° I Iw
z W 31 I W !g
LLu
u
,o ( ( WRArs SUBDIVISION OF BLOCK 18—B
U I OF F)ELDS—WELCH ADDITION I I >
W l m( CAB. A. SLD. 12587, I? U
! U' Q. P.R.7.C.7. Z m
Zol IzQ. —
�)
ROSEDALE ACQUISITION LP ED 1.700 ACR !' (Z) I�
I i I INSi 7
O.P.RT..C.T.
aI !
z I i
z aj ,
ME I
I
O�
—---� — — m WESTDLE STREET A-A rPAbEhtEN7 I �L
0C410 Q2433 ACRE
—
�T'7 � R k liR.ZOCIC 0.
BOARD OF REGOrM OF INE UNnAMSW OF TEXAS CU.R KA 1414
SYSXK FOR THE USE AND 80WRT OF UT PJLTIMT. I _
I SOUIHIYE.SIUM w:DICAL CENTER —
INST.N0.D216117366.".P T.a. I — —
La1' i'R-1, BLOCK C-R
ROSEDALE MULTIFAMILY
Sunte WRAY'S SUBDIVISION EXHIBIT Cl:
12222 Merit Dr,Sulte 400 LOTS 1R&32-R, BLOCK 18-B STREET LIGHTS AND
De11ee,Twee 75251
Te 1.(972)991-0011 ROSEDALE ACQUISITION LP SIGN IMPROVEMENTS
TBPE O F-6324 TBPLS O F-10191229 722 N.Main Street
COp^ht o 2916 Fort Worth,Texas 76164
DATE:September 13,2018 SCALE:AS SHOWN DRAWN BY:MMN CITY PROJECT NUMBER:101546 (SHEET 6 OF 6)
V:12222btlIwV??310761WIlMtl bIMFAIE hIbK C1-SVM Lipeb Mtl Siw k.v—.e%An..dAeE b,.r.w m SSP 1],1611:09 W