HomeMy WebLinkAboutContract 35147AMENDMENT NO. 1
TO CITY SECRETARY CONTRACT NO.�.���Z� O
STATE OF TEXAS §
�� � � L�
§ CIiY SECRETARY CONTRACT NO. �1 1
COUNTY OF TARRANT §
WHEREAS, the City of Fort Worth ("City") and Professional Service Industries, Inc.
("Laboratory") made and entered into City Secretary Contract No�_�� (the "Agreement")
authorized by City Council via M&C C-21196 on December 13, 2005; and
WHEREAS, the Agreement involves geotechnical and material testing services; and
WHEREAS, it has become necessary to execute ,�lmendment No. 1 to said Agreement to
correct a typographical/formatting error shown on Attachment "B" to the Agreement.
NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized
representatives, enter into the following agreement that amends the Contract:
1.
In order to rectify a typographical/formatting error, Attachment "B" of the Agreement is replaced
with Attachment "B" attached hereto and incorporated herein.
2.
All other provisions of the Agreement which are not expressly amended herein shall
remain in full force and effect.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANI�
�;`��J',,•!;`'`.� :,:��;;� ;��� r�
,,: ,� :,� -•1 r R" ]
�J�� ���,;�,,�z�;'}1?�
;:�, �. n,U
� � `:'s',:; ��: � !n', �i� �;�,
�ORIGtNAI
�a
d
1q
� \
EXECUTED on this the � day of � I , 2007, in Fort Worth,
Tarrant County, Texas.
ATTEST:
�
�
Marty Hend '
City Secretary
APPROVAL RECOMMENDED:
` , ,.� - - -- _ - �- �- =
i �/� � � ` �-�-4--�.-
Doug Rademaker, Director
Of Engineering
�d0 I�t�� ��.E��IIt�i)
CITY OF FORT
Marc A. Ott
Assistant City Manager
Approve to Form an�� lity:
�fny J��t'�fnf �j
Assist af Ci�i Attorney
LABORATORY:
Professional Service Industries, Inc.
By:
�
Name: O���vfi �1 � �L`�`-� � I�V�
Title:
���
��"����'- "'� 1:s �'�'. � �:�
:,*1:�! .��-'.k,! h
���I �'�" �'�t�„ 1 �o,; �;}�
J ,},;��_;�,.
-2- �, �,;�
�' �I ;i�e,� w;f "jf Iry ;i(^/
�i .i`JI.I� II���'� �u[G`4i
/
�4iT�►Clit+�lENT �
FEE SCHEDULE
For Construction Material Testing and Geotechnical Borings
Concrete
Compression Test Cylinders (Min. 4 per set), each
Air Content/Slump/Temperature/Next Day Cylinder Pick up, hour
Flexural Beams, each
*** Coring (4" DIA to 6" depth 4/trip)
2" Coring for depth isolarion to 6" each addirional inch
Thickness Measurement, each
Patching of Core Holes, each
Coring Technician Time, hour
Flexural Test of Beams, each
Compression Test Cylinders, each
Sawing and/or Capping Cores & Cylinders, each
Compression Test of Cores, each
Compression Test Specimen Hold
Mix Design Review, each
Mi�c Design Fortnulation w/Aggregate Tests Include Specific Gravity/Sieve
Analysis/CTnit WT-200, each
Additional Mix Besign Urilizing Above Mix Analysis, each
Mix Design Formulation Revision, each
Engineering Tech (rlICET) for Quality Asswance Monitoring of Onsite Work,
hour
Pre-pour Reinforcing Steel Placement Inspection, hour
Samnlins for In lab Test, hour
Minimum Vehicle Charge
Batching Mix Design in Preparation for Making Lab Confirmation G�linders
or Beams, hour
Batch Plant Observation Supporting Concrete Placement, hour
Concrete Flatness, Sq. Ft.
Certified Welding Inspector, hour
Field Gradarion Equipment, test
Slumn Test, each
*** Includes Cost of Technician Time Coring and Patching Core Holes
Page 1 of 5
$15.00
$35.00 (�'i� 3 hours)
$25.00
***$56.00 CM�4pertrip)
add inch $6.00
$40.00 (� 4 per trip)
$8.00
$6.00
$35.00
$25.00
$55.00
$100.00
$550.00
$200.00
$200.00
$45.00
$35.00
$40.00
N/C
$25.00
$35.00
$45.00
per sq. ft. $0.02
min. $500.00
$55.00
N/C
$15.00
�►ir!#CliMEINi �
FEE SCHEDULE
For Construction Material Testing and Geotechnical Borings
I.I�u/•.[i.'
++ Density Nuclear Method, hour
Core In place Density, each
Coring HMAC Technician Time,
Core Depth Measurement, core
Patching Core Holes, each
Min Vehicle Charge
4" DIA./6" Depth, core
Each Additional Inch, Inch
*** Rolling Pattern Nuclear Gaug
Nuclear Moisture Density Gauge,
Extraction and Gradarion, each
Lab Densiry, each
Stabilitv Test, each
hour
hour
Maximum Specific Gravity, each
Disposal Fee
Batch Plant Hot Bin Analysis, each
1Vtaterial Samnlin� For In Lab Tests, hour
++ $45.00
$32.00
$56.00 � (Min 4/trip)
$40.00
$6.00
*** $45.00
$80.00
$170.00
$40.00
$160.00
$75.00
N/C
$55.00
$40.00
* * * Includes Gauge Charge
++ First hour and half $135.00 any additional time after that is $45.00 per
hour. lincludes Technician Time, Trip and Gau�e Char�e).
Page 2 of 5
�►i�AC FO 6N E N�' �
FEE SCHEDULE
For Construction Material Testing and Geotechnical Borings
Page 3 of 5
Aii�►�!i 1� � t+l� �
FEE SCHEDULE
For Construction Material Testing and Geotechnical Borings
Geotechnical
Undisturbed Soil Sample, each $11.00 (per ft.)
Visual Classification, each $10.00
Classification ASTM D-2487, each $105.00
Sam le Extrusion, each N/A
Sam le Pre aration, each $10.00
Atterburg Limits RAW PI, each $45.00
Soil w/Addirive, each $50.00
Bar Lineal Shrinkage, each $16.00
Moisture Density Relationship (Proctor) $145.00
Standard (AST`M D-698), each
Moisture Density Relationship (Proctor) $175.00
Modified (ASTM D-1517), each
TI-3D 113E, each $180.00
Unit Weight, each $20.00
Unit Weight (Dry Rodded), each $20.00
-200 Sieve Analysis, each $30.00
Laboratory Moisture Content, each $8.00
Sieve Analysis (Fine Aggre ate), each $60.00
Sieve Analysis (Large Aggregate), each $60.00
Sieve Analysis (Finer than 200 Sieve), each $35.00
Lime or Cement Series Determination (5 points), each $255.00
Optimum Lime Content, each $200.00
H Series (6 points), each $210.00
S ecific Gravi , each $45.00
Absorprion, each $25.00
Los Angeles Abrasion (Large Aggregate), each $235.00
Los Angeles Abrasion (Small Aggregate), each $215.00
Texas Wet Ball Mill, each $175.00
Gradation (Lime or Cement Stabilized), each $30.00 �3 M� Tech Time &
Tri Included)
*** Limed Soil Depth Measurement, each ***$30.00 (3 Min Tech Time &
Trip Included)
++ In Place Moisture Density (Nuclear Method Technician), hour ++$45.00
Grain Size Anal sis (Mechanical and H drometer), each $150.00
Unconfined Com ression Test Includin Moisture, each $30.00
Unconfined Com ression Test Soil, each $27.00
Unconfined Com ression Test Rock, each $35.00
Confined Com ression Test (LTCJ), each $100.00
Triaxial Test Unconsoiidated Undrained, s eci $85.00
Triaxial Test Mulriple Sta e, stage $300.00
Tria�cial Consolidated Undrained w/Pore Pressure Measurement, s eci $650.00
Triaxial Consolidated Drained Multi le Stage, stage $650.00
Tri�ial Consolidated Drained Single Stage, stage $300.00
Triaxial Consolidated Drained Three Stage, sta e $780.00
Consolidated Test, each $350.00
Direct Shear Consolidated Drained Sand & Gravel, oint $200.00
Direct Shear Consolidated Drained Silt & Clay, point $350.00
Direct Shear Consolidated Undrained Sand & Gravel, point $175.00
Page 4 of 5
ATi�1CBiM��1i �
FEE SCHEDULE
For Construction Material Testing and Geotechnical Borings
Direct Shear Consolidated Undrained Silt & Clay, point $200.00
California Bearing Rado, each $250.00
THD Triaxial, each $800.00
Percent Swell, each $80.00
Permeability Test Falling Head, each $200.00
Permeability Test Triaxial, each $300.00
Permeabili Test Flex Wall, each $300.00
Permeability Test Fixed Wall, each $200.00
Permeability Test Clay Soils, each $290.00
Permeabili Test Granular Soils, each $250.00
Permeabili Test Pressure Head wBeck Pressure Saturation, each $350.00
Electrical Resistivity, THD Method, each $100.00
Truck Mounted Mobilization, mile and trip Mile -$3.25
Tri - $250.00
Buggy/Ave Mounted, mile and trip Mile -$5.00
Trip - $350.00
Per Diem Per Man, da $85.00
Intermittent Soil Sam ling w/Truck 5' Intervals 0-25 De th, foot $11.00
Intermittent Soil Sam ling w/Truck 5' Intervals 25-50' De th, foot $12.00
Intermittent Soil Sam ling w/Truck 5' Intervals 50-100' De th, foot $15.00
Continuous Soil Sam ling w/Truck 0-10' De th, foot $15.00
Intermittent Soil Sampling w/ATV 5' Intervals 0-25' De th, foot $12.00
Intermittent Soil Sampling w/ATV 5' Intervals 25-50' De th, foot $13.00
Intermittent Soil Sampling w/AT`V 5' Intervals 50-100' Depth, foot $15.00
Continuous Soil Sam ling w/ATV 0-10' Depth, foot $14.00
Continuous Soil Sam lin w/ATV 10-50' De th, foot $18.00
Auger Drilling Without Sam le, foot $8.00
Rock Coring w/NX Size, Core Barrel0-25' De th Carbide Bit, foot $18.00
Rock Coring w/NX Size, Core Barre125-50' De th Carbide Bit, foot $20.00
Rock Coring w/NX Size, Core Barre150-75' De th Carbide Bit, foot $21.00
Rock Coring w/NX Size, Core Barrel 75-100' De th Carbide Bit, foot $25.00
Rock Coring w/NX Size, Care Barre150-75' Depth Diamond Bit, foot $27.00
CME 5' Continuous Sam ler 0-50' De th, run $15.00 Per FT'
Stand By or Access Time, hour $120.00
Drilling w/Auger Rig, hour $150.00
Minimum Drill Fee $600.00
Post Injection Sub-grade Evaluation Per Boring Including Moisture and Free $500.00
Swell Determination
Minimum Post Injection Charge $900.00
Field Time En ineer, hour $100.00
* * * Includes Gauge Charge
++ First hour and half $135.00 any additional time after that is $45.00 per
hour, (includes Technician Time, Tri and Gauge Charge).
Page 5 of 5