Loading...
HomeMy WebLinkAboutContract 35166COMMUlVITY FACII,ITTES AGREEMENT THE STATE OF TEXAS § City Secretary COiJNTY OF TARRANT � Contract No. WI�REAS, Havco Realty, Ltd., hereinafter called "Developer", desires to make certain improvements to Lot 1�Block 1 Beckman Addition, an addition to the City of Fort Worth, Texas; and WI�REAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended, is hereby incorporated into this Community Facilities Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. Developer acknowledges that there shall be no reduction in the amount of financial security prior to project completion and acceptance by the City. E. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. r r •If' - . . �.., .t` 1 _. � i Beckman Addifion Lot 1 Block 1 � �� � �, J�,i � ;,; 2 � {`�; � .; `'; 1 v �:u i�`���^� �����i��^��tl i���� December 14, 2006 v L �:, �: f� � ��,;1.,1 �� `,T;��'1, p��lf S�I'S��n � i�,;(�,��i�i i i i� ✓�., J:� d..�i,a F. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. G. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such i�ziuries, �leath nr �lamages are causer�, in fvhole or in part, bv the alle�ed ne�ligence of the Citv of Fort Worth, its officers, servants, or emplovees. H. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. I. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). J. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). K. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. L. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to Beckman Addition Lot 1 Block 1 2 December 14, 2006 construct current and future improvements provided for in this agreement. M. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof: Water (A)None; Sewer (A-1.) None; Paving (B) None, Storm Drain (B-1) Attached; Street Lights and Signs (C) None. N. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B 1. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B 1. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $47.700.00. Beckman Addition Lot 1 Block 1 3 December 14, 2006 SUMMARY OF COST Beckman Addition Lot 1, Block 1 liem Developer City Cost Total Cost Cost A. Construction � ' 1. Streets $0.00 $ - $ 2. Storm Drainage $45,000.00 45,000.00 3. Street Lights $0.00 $ - 4. Street Name Signs $0.00 $ - B. Engineering Design � - C. Construction Engineering and Management by DOE $ � 4%) 1,800.00 1,800.00 D. Materials Testing by DOE $ � (2%) 900.00 900.00 $ � TOTALS 47,700.00 $ - 47,700.00 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. 4. Developer's column for Item D represents two percent (2%) of paving and storm drain costs for materials testing. � Beckman Addition Lot 1 Block 1 4 December 14, 2006 IN TESTIlVIONY WI�REOF, the City of Fort Worth has caused this instrument to be executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, ar ( id D ve op�r has executed this instrument in triplicate, at Fort Worth, Texas this the �da� o , 200� ! Approval Recommended: � �� ���;`����J�����, � -F-- — ATTEST: Marty Hendrix City Secretary to Form: Assistant ATTEST: Corporate Secretary Beckman Addirion Lot 1 Slock 1 December 14, 2006 "�"i-;�.�f ��� ' ,�i�!�� Transportation and Public Works Department ���� ,- r Robert Goode, P. E. Director City of � q . Marc Ott Assistant City Manager DEVELOPER � � ���� � i 1 tG� , b�', 5ene�.l pa,-4-ner, � % ' +�a �in C�-�er By: �; ,:--'i, L< � �%�-� ,�..�4�,- � �'oh r► Coc,�r h0.rrt � A�en�' (``��;�;� �� i� i .;; � .i; � �j' � 17 _.J .. , . . . 5 1:����t'� ;)'�1`,'!;?L��';�;';''� ;� ' � ? ::f, S';9 .1' , I I l�� .��:'�%'1,.���fli9 �SL��Q iJNIT II: STORM DRATN ITEM APPROX. DESCRIl'TION OF ITEMS WITH TJNIT TOTAL NO. QUANTITY BID PRICES WRITTEN lN WORDS PRICE AMOUNT (�'urnish and install, i.ncluding all appu.rtenant work, complete in place, the following iiems) 11. 100 LF 48" RCP (Class IV'), including all excavation required within existing earthen channel Three Hun.dred Twenty Dollars & No Cents per L.F. $ 3�0.04 $32,0OO.OQ 12. 1 EA 6:1 Concrete Sloping Headwall with Safety End Treatment Eight Thausand Dollars & No Cents per EA $ 8,000.00 $ 8,000.00 13. 1 EA. Remove e�risting 2-48" RCP Concrete Headwall & Apron, connect to existing 2- 48" RCP Five Thousand Dollars & No Cents per EA $ 5,000.00 $ 5,000.00 TOTAL AMOUNT BID STORM DRAIN � 45,000.00 B-4 Updated 05/16/2005 TOTAI. AMOUNT BID WATER TOTAL AM�UNT BID STORM DRA1N GRAND TOTAL AMOUNT SID : $ 42,398.40 $ 45,000.00 $ � $7,398.40 Updaied Q5/16/2005 PART B - PROPOSAL (Cont.) � After acceptan.ce of this Proposal, the undersigned will execute the formal cantract and . will deliver an approved Surety Bond and such other bonds as required by the Contract � Documents, for tb.e faithful performance of the Contract The atta.ched bid security, if reqtiired is to become the property of the Developer. The undersigned bidder certified that he has obtained at least one set of the General , Coniract Documents and General Specifications for V�ater Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and ' conditions of those General Documents and the specific Contract Documents and appurtenant plans. J ' ' The successful bidder shall be reqnired io perform the work in accord with the following publications, both of which are incorpo�rated herein and made a part hereof for all purposes: 1. The General Contract Documents and General Specifications for Waier Deparhnent Projects dated January 1, 1978, which may be purchased from the Water Department. ' 2. �I�e ��anda�d 5pecifications for Street and Storm l�rain Construction which may be purchased from the Department of Transportation �i Public Works. ' ' r ' ' The undersigned assures that its employees an.d applicants for employment and those of an.y Iabor organization, subcontractors, or employment agency in either fiunishing or referring employee applicants to the undersigned are not discriminated against as prohibited by tne tenms oi �i y;r��c� T1c. 72?� a.,� a�e�� b� r�ty Ordinance No. 7400. The Bidder agrees to begin construction within calendar days after issue of the work order, and to complete the contract within. working days after beginning construction as set forth in the written work order to be fumished by the Owner. :. � � � (Complete A or B below, as applicable:) A. The pri.ncipal place of business of our company is in the State of Nonresident bidders in the Siate of , our principal � place of business, are required to be percent lower than resident bidders by state law. A copy of the sta.tute is attached. � �, J ' � Non resident bidders in. the State of , our principal place of business, axe not required to underbid resident bidders. B. The principal place of busin.ess of our company or our parent compan.y or majority owner i.s in the State of Texas. I{we) acknowledge receipt of the following addenda to the plans a.nd specifications, all of the provisions and requirements of which have been taken into consideration on preparation of the foregoing bid: Addendum. No. I (Initials). � Addendum No. 2 (Initials). � i � I � ' J � � (Seal} Daie: Addendum No. 3 (Initials) Addendum. No. 4 (Tnitials) Respectfully submitted, -ow �� i ��Z�S . Address 3003 E Bellcnan Fort Worth� Texas 76111 Telephone: 817.232.2200 � B-7 � Updated 05/16/2005 LOCATION MAP LOCATION MAP LOT 1, BLOCK 1 BECKMAN ADDITION AUGUST 2006 SD Engin eering, In c. Site Development Engineering PO Box 1357, Abdo, Teuea 78008-1357 (817i 441-8 �0�� 441-6085 ___-� 0 m 0 ao� �<md � Sn= _ �o � Wm J � 5 8Eq(MAN AODITION LOT 3, BIOQC 1 VOWME 388-161. PAGE 90 _ _ — — _ — _ _ — — _ � � _ — _ _ � � r — _ _ _ � _ � _ — _ _ _ _ — _ _ _ _ I I I I I ( I � II � ^�� o��� � omg� � F�<Ci = � mz ap�< � a LOT 1, BLOqC i BEqC1AAN ADDI110N VOLUME 388-112, PAGE 67 5.418 ACRES 'J INOU5TRIAL T 20' FlRE LANE �---_--- r ' LOT 1, BLOCK 1 I W I 3ECKMAN ADDITIOf� ISI� VOLUME 388-112 � � PAGE 67 I�II 5.418 ACRES " I 'J' INDUSTRIAL I i I J � a 8 ����� 9M V� V���}�e � .����5� PROPOSED 2-48" RCP CULVERT / ' CYICTAII RISINGER ROAD EXIST. WATER UNE EXIST. FlRE HYORANT EXHIBIT B-1 STORM DRAIN LOT 1, BLOCK 1 BECKMAN ADDITION AUGUST 2006 d SD Engineering, Inc. Site Development Engineering Po Box 1357� Aledo, rauae 78008�-1357 (8fi) 441-6400 FAX (ei71441-6�5 www.ad-ergineerin�.00m