TO THE INTERLOCAL AGREEMENT BETWEEN THE CITY OF FORT WORTH
AND THE CITY OF SANSOM PARK FOR RECONSTRUCTION AND
MAINTENANCE OF BEVERLY HILLS DRIVE FROM JACKSBORO HIGHWAY
TO McCANDLESS AVENUE AND McCANDLESS AVENUE FROM BEVERLY
HILLS DRIVE TO 23RD STREET
This Agreement is entered into by and between the City of Sansom Park , acting
by and through Robert Armstrong, its duly authorized Mayor, hereinafter referred to as
Sansom Park, and the City of Fort Worth, acting by and through Marc Ott, its duly
authorized Assistant City Manager, hereinafter referred to as Fort Worth, both of Tarrant
County, State of Texas.
WHEREAS, Sansom Park and Fort Worth entered into Fort Worth City Contract
No. 34388, authorized by Fort Worth City Council on October 11, 2005 via M&C No. C-
21075 and executed by Sansom Park on December 13, 2006 (the "Agreement"); and
WHEREAS, the Agreement is an Interlocal Agreement for the Reconstruction
and Maintenance of Beverly Hills Drive From Jacksboro Highway to McCandless
Avenue and McCandless Avenue from Beverly Hills Drive to 23�d Street; and
WHEREAS, costs increased by $30,000 between the authorization and
execution dates of the Agreement; and
costs;
WHEREAS, Sansom Park and Fort Worth shall equally share the increased
NOW THEREFORE, Sansom Park and Fort Worth agree to amend the
Agreement as follows:
Section 2 of the Agreement shall be amended to be and read:
2. Costs. Fort Worth and Sansom Park reasonably believe that the total
cost of the necessary materials, survey, and engineering for the Project will not exceed
$90,000.00. The materials cost is estimated at $82,000.00. Fort Worth and Sansom
Park shall each pay fifty percent (50%) of the materials cost. The estimated cost of the
survey and engineering is $8,000.00. Fort Worth and Sansom Park shall each pay fifty
percent (50%) of the survey and engineering costs. Within thirty (30) days of the
execution of this Agreement, Sansom Park shall deposit with Fort Worth, $45,000.00 for
its share of the total estimated costs of the Project. Fort Worth will not issue County the
Notice to Proceed until Fort Worth receives the deposit from Sansom Park. If the actual
costs of the materials, survey, and engineering services exceed the estimated costs,
Fort Worth and Sansom Park shall each pay 50% of the actual costs. If the actual costs
of the materials, survey, and engineering services are less than the estimated costs, Fort
Worth shall refund Sansom Park its proportionate share of the savings.
Fort Worth & Sansom Park
Interlocal Amendment No. 1
January 30, 2007
Page 1 of 2
;_.;;?,c �!. t ,, 'nl„!'N ='. r 1-
a ��� f;'���Sv�J:�JJ
S .�.;1�' r.a,:��c�... 5 �I''i�"tT
� i�'t7 .!�1�51�"j y�; l�
l'��J� c �:iS':; u �>
� ��-, •;:,, ,�,� ���
�i ::;+',.���,�'�%lii'�' ���
? Y V� .�=:'�..aJ'J� ��:�`.3
2.
All other provisions of the Agreement not expressly amended herein shall remain in full
force and effect.
r� ,
EXECUTED this O� day of , 2007.
ATTEST:
( �(� �'�,���` -k� J� t' �t j,
I
Marty Hend��x, City Secreta
APPROVED AS TO FORM
AND LEGALITY:
s=;
ATTEST:
I
.
��� � �.. ���� � �
� • �
APPROVED AS TO FORM
AND LEGALITY:
Fort Worth & Sansom Park
Interlocal Amendment No. 1
January 30, 2007
Page 2 of 2
CITY OF FORT WORTH
i
. -
,�14 rc , As stant City Manager
_ �
CpF��L"8CL` .�U'��1dY'12i�'��.0�' ",,
�
Date —_--� _
CITY OF SANSOM PARK
�J �. I I // � iti`�!/ /
• � � � • • •
,� . .y
,..•�?] �,f;,;l ,;;�t"����if�j �
'�1 �'� 1 �.* , � : d'. � .,' e� �:'�
„
,:� " ,,," �:, ;frpj� f,?,,;�
� , , ��� iy �! '.t>, u �
'v y� , � ° �
r,
��1� d:�:;�:!1'U, 5��`':�
- ... ,._ .�
City of Fort Worth, Texas
Mayor and Council Communication
F-� �:�W�.:, �� .��:_ � .���.��.�::��..�fm��.�.��:�:���.���_,������..:�.�
COUNCIL ACTION: Approved on 3/6/2007
L�^�'iSAEl AT`�4tt��':��I_F.T_i'T�'�.-4LY�]�:•" �+ �Fu�r��ri' i^.�.1 �.F_.: 3�'lE. =�`=. u-,TY��.£n�:Et6A2� �� 3�;'� -5�+�^��i:= �-�i�a.=�
DATE: Tuesday, March 06, 2007
LOG NAME: 20BEV HILLS (2) REFERENCE NO.: *'�C-21987
SUBJECT:
Authorize Amendment No. 1 to an Interlocal Agreement with the City of Sansom Park and
Authorize Additional Funds Under an Interlocal Agreement with Tarrant County for Reconstruction of
Beverly Hills Drive from Jacksboro Highway to McCandless Avenue and McCandless Avenue from
Beverly Hills Drive to 23rd Street in the City of Fort Worth and the City of Sansom Park
� _���y �s.�.�� _.___ -� ,�_:.��,.:�,�.��.��s-�=.�.��
� ,�--�.,�� ��.��=:�s-g� �.�.�s �T��.=� . a_.� .:.�-, �.__.. :.��
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the City Manager to execute Amendment No.1 to the Interlocal Agreement with the City of
Sansom Park, wherein Sansom Park is responsible to deposit with the City of Fort Worth 50 percent of the
total cost of engineering, surveying materials and other incidentals for the reconstruction of Beverly Hills
Drive from Jacksboro Highway to McCandless Avenue and McCandless Avenue from Beverly Hills Drive to
23rd Street in the City of Fort Worth and the City of Sansom Park. Amendment No. 1 will increase the total
estimated cost by $30,000 for a total not to exceed $90,000 ($82,000 for materials, plus $8,000 for
engineering and surveying); and
2. Authorize additional funds to be paid under an authorized but not executed Interlocal Agreement with
Tarrant County for the reconstruction of Beverly Hills Drive from Jacksboro Highway to McCandless Avenue
and McCandless Avenue from Beverly Hills Drive to 23rd Street in the City of Fort Worth and the City of
Sansom Park to increase the City's participation by $30,000 for a total not to exceed $90,000.
DISCUSSION:
On October 11, 2005 (M&C C-21075), the Fort Worth City Council approved Interlocal Agreements with the
City of Sansom Park and Tarrant County. The estimated total project cost for materials, engineering and
surveying was $60,000. Due to delays by the City of Sansom Park in negotiating boundary adjustments
between Fort Worth and Sansom Park and other issues, the project was not implemented. Consequently,
the material prices have increased resulting in the need to amend these interlocal agreements.
Under the terms of the County agreement, Tarrant County will provide all necessary labor and equipment to
perform the work and Fort Worth will, at its sole option, deliver all the materials necessary for the
construction of the roads to Tarrant County, or pay for the material provided by Tarrant County. Also under
the County agreement, Fort Worth will provide the plan specifications and engineering drawings for the
project.
Under the agreement with Sansom Park, the two cities will equally share the cost of engineering, surveying,
materials, and other incidentals necessary to complete the project. Sansom Park is required to deposit its
half of the estimated project costs ($45,000) with Fort Worth before the work begins.
Additionally, the City of Fort Worth and the City of Sansom Park agree to take the necessary steps to
Logname: 20BEV HILLS (2) Page 1 of 2
close the road to through traffic for the duration of the project or as deemed necessary by Tarrant County.
This project is located in COUNCIL DISTRICT 2.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the
Contract Street Maintenance Fund.
TO Fund/AccountlCenters FROM Fund/Account/Centers
GS93 541200 020930355510 $30,000.00
Submitted for City Manager's Office bv:
Originatinq Department Head:
Additional Information Contact:
Marc Ott (8476)
Robert Goode (7804)
George Behmanesh (7914)
Logname: 20BEV HILLS (2) Page 2 of 2