Loading...
HomeMy WebLinkAboutContract 49776-AR2 CITY SECRETARY FORTWORTH® City of Fort Worth CONTRACT NO._ 7�.6',. a ""4 rConstruction Allowance Request Breakdown Construction CA# Date 12/3/2018 City Sec# ggc • q1`� KS Client Project FAC#(s) Project Name 2017-13 HIR Street Rehabilitation Description Contractorl Cutler Repaving, Inc. City Inspector Jarad Souders Funding TPW Select Day Type Allocation Account Totals Original Contract Amount $1,735,745.70 $1,735,745.70 Extras to Date Credits to Date Current Contract Amount $1,735,745.70 $1,735,745.70 Amount of Proposed Allocation $3,075.00 $3,075.00 Original Allowance Available for Allocation $94,546.00 $94,546.00 Allowance Funds Previously Allocated $20,679.70 $20,679.70 Remaining Funds Available for this Allocation $73,866.30 $73,866.30 JUSTIFICATION KU-MM ARY The City has requested 24"Solid Pavement Markings for Crosswalks installed on Ridgemar Boulevard. The bid schedule only has an item for 12'"Crosswalks.Yhis Constructioin Allowance adds the 24"Pavement Marking item. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.Contract Time will be adjusted on the basis of the time shown on this Construction Allowance Request by a later Change Order,if necessary. P,yid RECORD 4",'rl SECRETARY c��or�oR�woa�N �1-, WORTH,TX FORT WORTH. City of Fort Worth Construction Allowance Request Breakdown Construction FOA# 2 Date 12/3/2018 Client Project#(s) 7729 FAC#(s) Project Name 2017-13 HIR Street Rehabilitation Description Contractorl Cutler Repaving, Inc. City Inspector C ADDITIONS Dept/FAC y Unit Solid avemen Markings(Crosswalks) Change Order Additions Page 1 of 4 Sub' Change Order Additions Page 2 of 4 City Sec# F 100994 Jarad Souders Unit os o a Change Order Additions Page 3 of 4 TPW $3,075.00 Total Additions 3,075. 0 Change Order Additions Page 4 of 4 m 0 �t rn rn 0 0 a`> E, U 0 0 N C cn m m c `o 0 D n W C V LU3D C3 O U � N � LU O m 00 3 c4 W °J C O a t= O d w v U v o °; a LL c 0 3 z J o J O Q ovn U Q z O }, U V � _o N N m Z C p O @ U V � U U C _U m (� C m = U- N Cl) I— o U 4E 0 0 �k 4k m n. v U z .0 Q a> Q vcn c LL- o d o 0 U c d Oo r' U 0 0 C) 0 0 0 co c 0 0 N v-- O N N 4A l6 d C O N N 0 41 OA C l6 L U MIWBE Breakdown for this Construction Allowance Request MWBE Sub Type of Service Amount for this FOA N/A Total $0.00 Previous Construction Allowance Requests Co# DATE AMOUNT N/A Total $0.00 CFW Construction Allowance Request Approval CAAppr-03 Page 1 of 3 Routing Assigned To: Due Date: Assigned By: Due Time: Links 1 fortworthgov/Infrastructure Proiects/100994- HMAC 2017-13 HIR Street Rehab/Contractor/Change Orders/Constr Allow Reauest Breakdown #2 2017-13.xlsm Attachments(91 No Attachments have been added to this form. https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&Proces... 12/31/2018 CFW Construction Allowance Request Approval CAAppr-03 Page 2 of 3 FORT WORTH . City of Fort Worth Construction Allowance Request Approval (Construction Allowance Breakdown Available in Links) For Construction Allowance Submittal No.: [3 Construction Allowance Request Approval No.: ;CAAppr-03 Date Started: ,2018-12-03 Date Due: 2019-01-22 City Sec. No.: 49776 Project Name: HMAC 2017-13 HIR Street Rehab Project Numbers: 100994 DOE Numbers: Project3Removal and replacement of nonfunctional curbs and gutters, Description: sidewalks and driveways, followed by a HIR overlay of 1" HMAC. Project/Contract Compliance Kristian Sugrim City Inspector: Jarad Sounders Manager: Contractor: Cutler Repaving, Inc. COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW ;$ 3,075.00 ;;30100-0200431-5740010-100994-0 Total Cost: $ 3,075.00 Total Requested Days: 0 Approval Status: https://projectpoint.buzzsaw.com/ bz web/Forms/FomiPrint.aspx?SiteId=51500&Proces... 12/31/2018 CFW Construction Allowance Request Approval CAAppr-03 Page 3 of 3 Approved: Yes Comments: User: Lane Zarate Date: 2018-12-03 8:24 PM Approved: Yes Comments: User: Ricardo Matute Date: 2018-12-10 10:59 AM Approved: Yes Comments: User: Signing for TPW Director Role Approvals Date: 2018-12-10 1:19 PM Approved: Yes Comments: User: Doug Black EDRF Date: 2018-12-17 6:37 PM 0:• 0� , Attested by:, ► . :X Approved: Yes V'• •' Comments: _ User: Susan Alanis R ary J. Ser, City Secretary . Date: 2018-12-28 2:50 PM XP5, Action Required: OXFICIAL RECORD CITY SECRETARY ET WORTH,TX https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&Proces... 12/31/2018 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Kristian Su rig m / Name of Employee/Signature Project Manager Title ❑ This form is N/A as No City Funds are associated with this Contract Kristian Sugrim Printed Name Signature OFFICIAL RECORD CITY SECRETARY FT. WORTH,Tat