Loading...
HomeMy WebLinkAboutContract 34801-A6 (2)AMENDMENT No . 6 TO CITY SECRETARY CONTRACT `��,�(�� ���� WHEREAS, the City of Fort Worth (CITY) and Teague Nall and Perkins, Inc., (ENGINEER) made and entered into City Secretary Contract No. 34801, (the CONTRACT) which was authorized by M&C C-21918 on the 9th day of January, 2007 in the amount of $668,038.00; and WHEREP,S, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $19,000.00 which was administratively authorized by the City on the 19th day of June, 2007; and subsequently revised by Amendment #2 in the amount of $89,000.00 which was authorized by the City Council on the 18th day of March, 2008 (M&C C-22712); and subsequently revised by Amendment #3 in the amount of $190,400.00 which was authorized by the City Council on the 3rd day of February, 2009 (M&C C-23325); and subsequently revised by Amendment #4 in the amount of $50,000.00 which was administratively authorized by the City on the 20th day of December 2010; and subsequently revised by Amendment ##5 in the amount of $113,128.00 which was authorized by the City Council on the 6th day of December, 2011 (M&C C-25310); and WHEREP,S, the CONTRACT involves engineering services for the following project: Keller-Hicks Road from 750 feet west of Ridgeview Street to Park Vista Boulevard and North Beach Street from Golden Triangle to Keller-Hicks Road, Project Nos. 00653, 00791 and 01455; and WHEREAS, it has become necessary to execute Amendment No. 6 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: l. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated November 18, 2012, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $132,115.00. �--_ -__ ---_ �FFI�IA9, REC�R� cr� s�c������ , �'T, R�Ii��'��2 `� �, ----- - — - - Page -1- RECEIVED MAR � � ��i� 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1,261,681.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, belaw . �.�u.w►:�, . ATTE�T: Mary J . dCa r City Sec�" tary -�___�� ���" �07° 4 � �o $ ��� APPROVED : $ o �. '� ��, ��� @q�� t �� °°Qa000b°�, �� Fernando Costa aa�p,,��p►,1,.c,'�' Assistant City Manager APPROVAL RECOMMENDED: � _ l,,�J� Dougla W. Wiersig, P.E Director, Transportatio /Public Works Department ENGINEER Teague Nall and Perkins, Inc. '��� �„� i� /� �� Mark Berry, P.E. Principal APPRQVED Aw TO FORM AND LEGALITY: ,- �_ _;(�� � / Douglas W. Black Assistant City Attorney Page -2- M&C: � � Z v / L � � Date. ? ? /� �F�r�ia� R�co�� �ir�r s�c��rA�� �'. woRr�a, rx I November 18, 2012 Mr. Michael R. Weiss P.E. City of Fort Worth Transportution and Public Works Department 1000 Throckmorton Fort Worth, Texas 76102 �tn p teag�e nall & perkins ww.tnpinccom cnqmccn �w�oya�, j londscape arrhitocle Re: UNIT 1: Keller Hicks Road (750' west of Ridgeview thru Alta Vista Intersection) UNIT 2: Keller Hicks Road (Alta Vista to Park Vista Boulevard), Norih Beach Street (Golden Triangle Boulevard to Keller Hicks Road) Fee Proposal for Contract Amendment No. 6(Revised) Dear Mr. Weiss: Teague Nall and Perlcins, Inc. is submitting this tee Amendment to the above referenced contract based on additional services requested. The following is a brief description pnd cost for the additional services provided on this project: Addifiionul 3ePviees 40 �rovide Engineering associated with UNI� 2: IVorth Beach �treet (Golden Triangle Boulevard fo Keller Hicks Road) As requested, engineering services was provided up to and during the Condemnation hearing involved with the Drainage Easement and Construction Easement on Ihe Strand Property. Engineering Services involved a pre-coordination meeting, preparation of exhibits for the condemnation hearing, briefings with the City Attorney, and testifyiny pt the candemnation hearing. Also requested was the re-staking of the Drainage Easement, preparation of a floodplain exhibit for the Hillwood tract, pnd the preparation of the right-of-way acquisition exhibits for the triangle parcel near the proposed intersection of Altp Vista and North Beach Street. After Final plans were issued for North Beach Street and the project was under construction, the City of Fort Worth Water Department requested TNP to perform evaluations and design for interconnection of major trpnsmission mains near the intersection of North Beach and Keller Hicks. Numerous options and designs were pursued, including transferring a neighborhood in the Villpges of Woodland Springs to a higher pressure plan, which required additional survey along Park Vista. The originpl contract and previous nmendments anticipnted 30 ROW parcels. This amendment accounts for the preparation of 1 additional ROW pprcel pnd 1 water easement. Construction staking along Keller Hicks (Phase 2) for the road and utility improvements will be provided. The scope for construction staking includes staking the paving offsets twice and the utility (water, sanitary sewer, and drainage) offsets once during the course of construction. Additional construction staking or restaking will be considered additional services. Forl Worlh � I 100 Mecon Slrcel� Fon Worth, Texos 7610Z� 817.336.5773 ": Dallas � 17304 Proston Road, Sviro 1340� Dollos, Texas 75T52� 214.461.9867 Denlon+ 1517 Cmlre PI«e Drivc, Suite 320� Denton, Toxos 76�05+940.383.4177 ' Sharman� 200 Norih Travfs Slreet, Svito 500� 57iem�on, iexos 75090� 903.870.1089 Regtstcred by �ho Texos Board of Profcsslonol Engineors, Flm� No. F•T30 � Reglstcred by tho Toxa� Board of Profcsstonal S�rvoyors, Ftim No. 1001 16•00 Mr. Michael R. Weiss, PE, November 18, 2012, Page 2 of 2 Additional Engineering Services o Strand Property Condemnation Hearing pnd Exhibits o Re-staking Strand Drainage Easement o Hillwood Floodplain exhibit o Water System Improvements at Keller Hicks and North Beach Int. o Design approx. 2,460 LF of 12" Wpter Line extension from Kenny Drive to Pine Tree Circle. o Detailed design of Water System Pressure Reducing Valve (PRV) at Cacido Drive and Woodland Springs Drive. o Detniled design for Street Light Illumination along Keller Hicl<s (UNI7 2) o TDLR/TAS Accessibility review fee, filing fee, & inspection fee o Revise plans and quantities to account for portion of project constructed with North Beach St. o Revise contract documents for Keller Hicics (UNIT 2) based on updated information on Buzz-Saw as of January 2012. o Administrption fee (10%) on Sub consultants Additional Surveying Services o ROW parcel exhibits o Water Line Eosement exhibits o Survey at intersections along Park Vista and Woodland Springs $ 3,000 $ 500 $ 500 $ 32,000 $ 18,500 $ 5,000 $ 5,150 $ 1,000 $ 15,000 $ 6,000 $ 3,965 $ 2,000 $ 2,000 for Water improvements (3 locations) $ 8,000 o Wat�r line construction staking for Keller Hicks (UNIT 2) � 5,100 o Right of Way and Roadway construction staking for Keller Hicks (UNIT 2) 24 400 Total Contract Amendment No. 6(Revised): Summary of Contract Fee: Oriainal Contract Amount• $ 668 038 Amendment No. 1: $ 19,000 Amendment No. 2: $ 89,000 Amendment No. 3: $ 190,400 Amendment No. 4: $ 50,000 Amendment No. 5: $ 1 13,12g Amendment No. b(Revised)• $ 132,1 15 Revised Contract Amount $1,261,681 $132,115 Thanl< you for consideration of this contract amendment request. (f you {�ave any questions, please do not hesitate to call me. Sincerely, tnp feague nall & perkins � Scott A. Gibson, P.E. Sr. Project Manpger Copy: Mr. Tom Rutledge — TNP o:�proJoGsVpv06319Veu proposell_con�racl emend OB (rev).doc � Offiaal site of the City of Fort lVorth, T"exas 1' 1' • � � • e.�,m,�.ae�r e�. e�er.`�s�r�� COUNCIL ACTION:. Approved on 3/512013 DATE: 3/5/2013 CODE: C REFERENCE NO.: '`*G26127 TYPE: CONSENT LOG NAME: 20N BEACH AMEND 6 PUBLIC HEARING: NO SUBJECT: Authorize Execution of Amendment No. 6 to City Secretary Contract No. 34801, an Engineering Services Agreement in the Amount of $132,115.00 with Teague Nall and Perkins, Inc., for the Design of Keller-Hicks Road from Seven Hundred Fifty Feet West of Ridgeview Street to Park Vista Boulevard and North Beach Street from Golden Triangle Boulevard to Keller-Hicks Road, for a Total Contract in the Amount of $1,261,681.00 (COUNCIL DISTRICT 2) RECOMMENDATION: It is recommended that the City Council authorize the execution of Amendment No. 6 to City Secretary Contract No. 34801, an Engineering Services Agreement with Teague Nall and Perkins, Inc., in the amount of $132,115.00 for the design of Keller-Hicks Road from seven hundred fifty feet west of Ridgeview Street to Park Vista Boulevard and North Beach Street from Golden Triangle Boulevard to Keller-Hicks Road, thereby, establishing a total contract in the amount of $1,261,681.00. DISCUSSION: This contract Amendment No. 6 is necessary for the design of newly added water improvements, streetlights, associated right-of-way acquisition, and additional construction management services. This amendment will also provide for revision of the construction specifications and details to meet the recently updated City standards. Funds for this amendment will be provided from 2007 Certificates of Obligation, 2008 Capital Improvements Program, and Water Capital Projects. CONTRACT HISTORY: The progression of this Agreement and the associated amendments is as follows: PaQe I of 3 Amaunt Project Description — : M&C --- - -- � No. �Aproved Initial Contract $668,038.00 Design of Kellsr-Hicks Road and the C-21918 01/09/2007 West Half of North Beach Street _ .. -- -------- _..__ .----_ _-------- ------._�__----------------�-----___-- -------- Amendment $19,000.00 Construction Staking on Keller-Hicks N/A 06/19/2007 No. 1 Road -- -- _ - - -- _ _ _ _ _ . __. Amendment Hydraulic Analysis and LOMR at No. 2 $89,000.00 Keller-Hicks Road culvert and C-22712 ;Waterline Improvements Amendment $190,400.0� Additional Design for the East Half of ; C-23296 No. 3 North Beach Street Amendment $50,000.00 Hydraulic Study for Three Crossing N/A No. 4 Options for Big Bear Creek 03/18/2008 01 /27/2009 12/20/2010 _ ----- __ . - - - _ _ . _.. __ _ Amendment $113,128.00 '� Water, Sewer, Storm Drain and Paving j C-25310 ;12/06/2011 No. 5 ; Improvements for New Development ; Amendment ' �132,115.00 Water, Streetlights, ROW Document, � N/A N/A No. 6 and Construction Staking � Total $1,261,681.00 Teague Nall and Perkins, Inc., proposes to perform these professional services for a lump sum fee of $132,115.00. Staff considers this fee to be fair and reasonable for the scope of services to be performed. MWBE Office: Teague Nall and Perkins, Inc., is in compliance with the City's M/WBE Ordinance by committing to an additional eight percent MM/BE participation on this Amendment No. 6. The City's goal on this amendment is seven percent. This project is located in COUNCIL DISTRICT 2, MAPSCO 22J and 22N. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Street Improvements 2008 Fund, the 2007 Critical Capital Projects Fund, and the Water Capital Projects Fund. TO Fund/Account/Centers Submitted for Citv Manager's Office bv: Originating,Department Head; Additional Information Contact; FROM Fund/AccountlCenters P253 531200 602170079133 $71,610.00 C295 531200 202230079130 $54,505.00 C204 531200 202230145530 fi 000.00 Fernando Costa (6122) Douglas W. Wiersig (7801) Mike Weiss (8485) P�RA � �f'i