HomeMy WebLinkAboutContract 34801-A4�
STATE OF TEXAS b
COUNTY OF TARRANT S
AMENDMENT NUi�ER 4
CITY SECRETARY CONTRACT NO. � —��
WHEREAS, the City of Fort Worth (CITY) and Teague Nall and Perkins,
Inc., (ENGINEER) made and entered into City Secretary Contract No. 34801,
(the CONTRACT) which was authorized by the City Council by M&C C-21918 on
the 9th day of January, 2007; and subsequently revised by Amendment #1
which was authorized by the City on the 19th day of June, 2007; and
subsequently revised by Amendment #2 which was authorized by the City
Council on the 18th day of March, 2008 (M&C C-22712); and subsequently
revised by Amendment #3 which was authorized by the City Council on the
3rd day of February, 2009 (M&C C-23325);
WHEREAS, the Contract involves engineering services for the following
project:
Keller-Hicks Road from 750 feet west of Ridgeview Street to Park
Vista Boulevard and North Beach Street from Golden Triangle
Boulevard to Keller-Hicks Road;
WHEREAS, it has become necessary to execute Amendment #4 to said
Contract to include an increased scope of work and revised maximum fee;
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the Contract:
l.
Article I of the Contract is amended to include the additional
engineering services specified in the proposal letter dated November 18,
2010, copies of which are attached hereto and incorporated herein. The
cost to City for the additional design services to be performed by
Engineer total $50,000.00.
Article II of th
the maximum fee t
performed under the
the City for all
$1,016,438.00.
�
Contract is amended to provide for an increase in
be paid to Engineer for all work and services
Contract, as amended, so that the total fee paid by
work and services shall not exceed the sum of
Page -1-
-- ---�---_ -- --- = _
- �
�
^ ;��FFICf�� ���:� �[tD
a
�' �ITY S�CRETAR�'
�1!'o i�l4fd'��� �J'�S
,� ;
K�
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
EXECUTED on this the �k� day of � , 2010 in
Fort Worth, Tarrant County, Texas.
ATTEST:
C� �
Marty Hendri
'��,'C�4�,';� �`
City Secretary ��� ,��� �.s, �A
p UQpU/A�QqQ�
�. i�A /\ �n
APPROVAL RECOMT�NDED:
�
William A.'Verke � P.E. �`Q���
�
Director, Transportation/Public
TEAGUE NALL and PERKINS, INC.
ENGINEER
/
Mark Berry, P.E.
Principal
APPROVED AS TO FORM AND LEGALITY:
.�
ug Black
Assistant City Attorney
�
�
APPROVED:
����
Fernando Costa
Assistant City Manager
l�(� ��c� �€���!IJ�1t���..�,
____�z�,��_ �
ks Department
Page -2-
OFFICIAL RECORD
� —
' �I'Q'Y SECRETARY
`' �T. iNORTH, VX
�
�
�"i,,� TEAGUE NALL AND PERK/NS
Civil Engineering Surveying Landscape Architecture Planning
November 18, 2010
Mr. Michael R. Weiss P.E.
City of Fort Worth
Department of Engineering
1000 Throckmorton
Fort Worth, Texas 76102
Re: UNIT 1: Keller Hicks Road (750' westof Ridgeview thru Alta Vista Intersection)
UNIT 2: Keller Hicks Road (Alta V'sta to Park Vista Boulevard),
North Beach Street (Golden Triangle Boulevard to Keller Hicks Road)
ree Nroposa� for Gonfiract Amendment No. 4
Dear Mr. Weiss:
Teague Nall and Perkins, Inc. is submitting this fee Amendment to the abovereferenced contract
based on additional services requested. The following is a brief description and cost for the
additional services provided on this project:
Additional Services to provide right of way staking for UNIT 2: Keller Hicks Road (Alta
Vista to Park Vista Boule�vard); Engineering Services related to Big Bear Creek Crossing
options, FEMA map modification for UNIT 2:North Beach Street (Golden Triangle
Boulevard to Keller Hicks Road)
As requested, the right of way along Keller Hicks (Phase 2) was staked for the franchise utility
relocation phase of construction. The additional engineering services include the evaluation of
changes to the flood plain and hydraulic model based on the FEMA Map Modification effective
September 2009. In addition to the Map Modification issues, multiple crossing options were
evaluated and modeled to identify a solution that was in the City's best interest. As requested, the
engineer prepared multiple options to accommodate the Big Bear Creek crossing and provided
onwn�on cf pr��M►�!e ��^str.:�t��� � cast ��� eacn option.
■ Additional Surveying Services
o Right of Way staking along Keller Hicks (UNIT 2) $ 5,000
• Additional Engineering Services
o Coordination and evaluation of FEMA Map Modifications from Halff $ 10,000
o Preparation and coordination of Big Bear Creek crossing options 35 000
s— _=–= - _ �-_
Total Contract Amendment No.4: $50,0��--'---
� �FF�����. �'��;�RD
� �1�'� ��W:t��f�����f
f��'� ���',T�y `�'�
1100 Macon Street Fort Worth, Texas 76102 817.336.5773 phone 817.336.2813 fax
www. tnp-online. com
Mr. Michael R. Weiss, PE, November 18, 2010, Page 2 of 2
Summary of Contract Fee:
Oriqinal Contract Amount: $ 668,038
Amendment No. 1: $ 19,000
Amendment No. 2: $ 89,000
Amendment No. 3: $ 190,400
Amendment No. 4: $ 50,000
Revised Contract Amount $1,016,438
Thank you for consideration of this contract amendment request. If you have any questions, please
do not hesitate to call me.
Sincerely,
TEAGUE NALL AND PERKINS, INC.
�i�.� r.
Scott A. Gibson, P.E.
Copy: Mr. Tom Rutledge — TNP
o:\projects\ftw06319\fee proposal\_contract amend 04.doc
OFFICiia� �t���i'��►
CITY SEC�E7'ARY
t�u !���t'�'MI, �'�
Page 1 of 1
Tidwell, Allison
From: Black, Doug
Sent: Friday, December 17, 2010 10:29 AM
To: Tidwell, Allison
Subject: RE: Question About Amendment
Allison. Thanks for checking. By the city's code (Ch. 2, Art. I, Sec. 2.9(c)), contracts of $50,000.00 or less may be executed
by the city manager without council approval. Had this contract been for $50,000.01, it would have required an M&C.
Please let me know if there are other questions.
Thanks,
Doug
Douglas �r1�r. F3Iack
Assi,tant CitS� �ttorney
C;itv of Fort i�i'orth
i000 ThY°ockillor•ta�i
F'ort L-1'ortll; "[:K 76�02
f3r;� a9•�.;b1�, tel.
8� f.3y2.�3,;g fax
�n11�.�1�iC_�i(tt:: f01`ti1'Q1'��1�nT',fJI'f�T
From: Tidwell, Allison
Sent: Friday, December 17, 2010 9:50 AM
To: Black, Doug
Subject: Question About Amendment
Importance: High
Doug,
I received an amendment with Teague Nall & Perkins for the design of Keller-Hicks Road and North Beach
Street. The amendment is for $50,000.00, and it was my understanding that anything $50,000.00 and over
requires Mayor and Council approval. Before I processed this contract, I wanted to touch base with you to make
sure that we are following the proper procedure. Please advise. Thanks!
- r
li! Y !f: ,
.. i � � i.-... .
�� ii �i
Administrative/Records Technician
City Secretary's Office
Phone: {g17) 392-6090
Pax: (817) 392-6196
www. forfwo rthgov. org/cs ec
12/17/2010
� ��'FICIAL 6iECORD
� �ITY SECRETAR'Y
� ��, �����"H' ��