Loading...
HomeMy WebLinkAboutContract 35237-A2���p� �������-�-- 1 AMENDMENT No . 2 ������� ��� �'�� � �t'L TO CITY SECRETARY CONTRACT No. 35237 WHEREAS, the City of Fort Worth (CITY) and HALFF ASSOCIATES, Inc., (ENGINEER) made and entered into City Secretary Contract No. 35237, (the CONTRACT) which was authorized by M&C #C-21993 on the 6th day of March, 2007 in the amount of $ 63,650; and WHEREAS, the CONTRACT was subsequently revised by Amendment Number 1 in the amount of $213,605 which was authorized by M&C #C-24593 on November 16, 2010, and WHEREAS, the CONTRACT involves engineering services for the following project: Glen Garden Drainage Improvements, Project No. 00476; and WHEREA�, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated August 2, 2013, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $114,944. (See Attached Funding Breakdown Sheet, Page -3-) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $392,199. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth 9FFICIAL RECA6tD Professional Services Agreement Amendment Template rA�� 4l�,1�►��"'�'��`� PMO Official Release 8/1/2012 �° i7 a� Page 1 of 3 I LC"�'. ��R'�'�� '�`� rt- NOV 2 6 2013 EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth !N'KO �jL.�--+ Fernando Costa Assistant City Manager DATE: // S I? APP VAL RECOMMENDED: S> �J � Douglas . Wiersig. P.E. Director, Department of ransportation and Public Works APPROVED AS TO FORM AND LEGALITY: Douglas W. Black Assistant City Attorney ENGINEER Ha1ff Associates, Inc. Andrew Ickert Authorized Agent DAT E : �/�������3 M&C: C-26536 Date : �p _ 2�1'. ( 3 City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 2 of 3 �FFICIAL RECORD CI'iY SECRETi4R� �'�'� ��1��"�g �`X FUNDING BREAKDOWN SHEET City Secretary No. 35237 Amendment No. 2 Department Fund-Account-Center Amount Transportation and Public P227 531200 2082800476 30 $114,944.00 Works Total: $114,944.00 City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 3 of 3 ;�; HALFF August 2, 2013 Linda S. Young, P.E. Program Manager, Stormwater Capital Projects T/PW Stormwater Management Division City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102 Re: Glen Garden Siorm Sewer lmprovements (City Project No. 00476) Amendment No. 2 Dear Ms. Young, Thank you for the oppartunity to provide professional engineering services for the City of Fort Worth. This submittal is for Amendment No. 2 to the Glen Garden Storm Sewer Improvements Project (City Project No. 00476), which includes effort for evaluating potential detention options, channel improvements, and optimizing the downstream end of the proposed storm sewer improvements. In addition, the amendment includes additional survey and geotechnical analysis as well as Floodplain and Parks Conversion permitting as directed by the CITY. Halff Associates, Inc. was authorized by the City of Fort Worth in Apri) 2007 to conduct a detailed study of the drainage patterns in the vicinity of the Glen Garden Country Club. The final report, entitled Glen Garden Drainage Study, included a thorough examination of the existing system conditions and drainage patterns as well as analysis and recommendation of storm sewer and/or channel improvements aimed at removing or reducing flooding in the area. Based on the results presented in the study, The City of Fort Worth requested that Halff Associates Inc provide a proposal for design services, which was provided as part of Amendment No. 1. Amendment No. 1 was authorized by City Council on November 14, 2010. During the course of the improvements design, the terrain data was updated using survey and LiDAR data (2009) TNRIS. The updated modeling done as part of the Conceptual Design Phase (30%) revealed that there was still some structural flooding along the channel near Glen Garden Ave. After several discussions with the CITY, it was decided that the addition of a detention pond would reduce downstream flows sufficiently to provide flood relief to those homes. Halff provided detailed modeling analysis, conceptual layouts, and significant coordination for two (2) detention sites within the watershed. In addition, at the request of the CITY Halff intends to evaluate the efficacy of improvements to the channel near Glen Garden Avenue and design the improvements that result from that analysis. In support of the channel improvements, topographic survey and geotechnical investigation of the channel will be necessary. In addition to the supplementary analysis and design discussed above, the CITY has requested a Floodplain Development Permit and Parks Conversion Permit, which were not included in the original study contract or in Amendment No. 1. Finally, the CITY has requested "Additional Services" that may be used at it's discretion. These services include meetings with property owners or stakeholders, exhibit preparation, and other related items. HALFF ASSOCIATES,INC. 4000 FOSSII CREEK BLVD. TEL (877) 847-1422 WWW.HALFF.COt4 FORT WORTH, TX 76737-2720 FAX (817) 232-9784 ;�; HALFF Amendment No. 2 of the Gien Garden Storm Sewer Improvements project includes field reconnaissance, drainage calculations and modeling, and conceptual layout of two (2j potential detention ponds options within the Glen Garden watershed as well as analysis of channel improvement and modifications to the outfall to minimize downstream impacts and optimize the system. The amendment includes additional services including a City of Fort Worth Parks conversion permit, compliance with updated City of Fort Worth construction specification requirements, and the completion of a floodplain development permit. The potential detention pond locations are at Tadlock Park, near the intersection of Fairway Dr. and Eastline Dr., and on the Glen Garden Golf Course. The design phase for Amendment No. 2 will include plan submittals at 60, 90, and 100-percent completion and submittal of technical specifications and cost estimates at the 60, 90, and 100-percent milestones. The 30-percent (Conceptual) submittal has been completed and provided to the CITY and will not be provided as part ofi this Amendment. The scope will also include additional meetings and coordination with the CITY and the owners of the Glen Garden Country Club and floodplain permitting for the outfall of the Glen Garden system. If you have any questions or comments regarding this contract, please feel free to contact either myself or Russell Killen at (817) 847-1422 or email me at tbarr c halff.com. We look forward to continuing our work with you on this project. Sincerely, H FF ASSOCIATES, INC. Terry M. Barr, P.E., CFM Project Manager Cc: File Enclosures Professional Services Agreement Attachment 'A' — Scope of Services Attachment 'B' — Lump Sum Compensation (Including Level of Effort and Sample Invoice} Attachment `C' — Changes and Amendments to Standard Agreement Attachment'D' — Project Schedule Attachment `E' — Project Location Map Signed Letters of Intent (LOI) from M/WBE Subconsultants (2) c d � � N N E N � � c°'. z > �O � °co an i � w E � ° `1 N � o a � a� w W o � o o0C � yZ o� y t/� � � OC � � a> � � c � p �p a�oa m Y � c � N � � U � H m s � U C R d � � m o m m o r o a � rn m m� o N rn Oi N O N� y oJ N N Efl ��- Ef) V3 V3 � A� O y C C� � y E o R c� ro p E_ �°' >> m ro U � �' c �'o u �row u � � `��� �a � Ol O > > ] •a r cn cn w a w w c m A a p� m o� p � � � � ~ � � � = o 0 Z � FOR` WORTH DOE CONTRACT CAPITAL PROJECT 00476 BID NUMBER (Please check one) Minority/Women Business Enterprise Office LETTER OF INTENT TO PERFORM AS A SUBCONTRACTOR/SUBCONSULTANT FOR A CONTRACT ADMENDMENT/CHANGE ORDERS/ OR EXTRA WORK (TO INCLUDE EXTENSION OR RENEWAL OPTION) [NOTE: Pursuant to City of Fort Worth MIWBE Ordinance, M/WBE firms participating in the program must have current certification status with the City of Fort Worth prior to award of a contract where they are counted towards subcontracting participation. If the City of Fort Worth determines that the firm is not currently M1WBE certified for City of Fort Worth subcontracts that firm should immediately submit a completed and signed Certification A�davit to the North Texas Regional Certification Agency, 624 Six Flags Drive, Suite 100, Arlington, TX 76011.J 1. Name of Contract Glen Garden Drainaqe Improvement Proiect 2. Value of AmendmenUChange Order $ 114,944 Amendment/Change Order No. 2 3. Name of OfferorlPrime Contractor or Consultant Halff Associates InC. 4. The undersigned MWBE firm is prepared to perform the following described work and/or supply the material listed in connection with the above project (where applicable specify "supply" or "install" or both): Provide geotechnical services includinq three (3) borinqs and associated testinq Gorrondona & Associates, Inc. (Name of MIWBE Firm) Telfryn L. John, PE / Authorized Agent Circle one (OwnedAuthorized Agent of MIWBE firm) Type or Print Name 817-496-1424 (Phone Number) I HEREBY DECLARE AND AFFIRM that I, r CONSULT Circle one at the price of $ 10,538 September 3, 2013 (Date) (Signature of Owner or Authorized Agent of MIWBE firm) 817-496-1768 (Fax Number) it am the duly authorized representative of Halff Associates, IIIC, and that I have personally reviewed the material and Name of OfferodPrime facts set forth in this Letter of Intent to Perform. To the best of my knowledge, information and belief, the facts in this form are true, and no material facts have been omitted. Pursuant to the City of Fort Worth M/WBE Ordinance, any person [en6ty] who makes a false or fraudulent statement in connection with participation of a MIWBE in any City of Fort Worth contract may be referred for debarment procedures under the City of Fort Worth M/WBE Ordinance. I do solemnly swear or affirm that the signatures contained herein and the information provided by the offeror/prime are true and correct, and that uthorized o behalf of the offerodprime to make the a�davit. `l. � r i��! Halff Associates, Inc. Circle One (Owner uthorized Agen pe or Print Name (Name ot OfferorlPrime) Type or Print 08/28/2013 (Signa of Owner or Authorized Agent) (Date) �j817) 847-1422 (817) 232-9748 (Phone Number) (Fax Number) 01 / 14/09 FOPT WOF.TH DOE CONTRACT_ CAPITAL PROJECT 00476 BID NUMBER (Please check one) Minority/Women Business Enterprise Office LETTER OF INTENT TO PERFORM AS A SUBCONTRACTOR/SUBCONSULTANT FOR A CONTRACT ADMENDMENTICHANGE ORDERS/ OR EXTRA WORK (TO INCLUDE EXTENSION OR RENEWAL OPTION) [NOTE: Pursuant to City of Fort Worth M/WBE Ordinance, MIWBE firms participating in the program must have current certification status with the City of Fort Worth prior to award of a contract where they are counied towards subcontracting participation. If the City of Fort Worth determines that the firm is not currently MIWBE certified for City of Fort Worth subcontracts that firm should immediately submit a completed and signed Certification Affidavit to the North Texas Regional Cer6fication Agency, 624 Six Flags Drive, Suite 100, Arlington, TX 76011.] 1. Name of Contract Glen Garden Drainage Improvement Proiect 2. Value of AmendmenUChange Order $ 114,944 AmendmenUChange Order No. 2 3. Name of Offeror/Prime Contractor or Consultant Halff Associates, It1C. 4. The undersigned MWBE firm is prepared to perform the following described work andlor supply the material listed in connection with the above project (where applicable specify "supply" or "install" or both): Provide toqoqraqhic survev for approximatelv 800 LF of open channei and boundarv survey with metes and bounds descriptions for desiqnated properties at the price of $ 10,330 Gorrondona & Associates. Inc. (Name of MMfBE Firm) W. Truett Wilson Survey Director Circle one (Owner! u oozg gen o irm� Type or Print Name 817-496-1424 (Phone Number) AFFIDAVIT OF OFFERORIPRIME CONTRACTOR or CONSULTANT I HEREBY DECLARE AND AFFIRM that I, �. /� 1/�j�L(! J`1,j�IGJ Circle one August 30, 2013 (Date) � � L ���� ~__- (Sigoature of Owner or Authorized Agent of MIWBE firm) 817-496-1768 (Fax Number) am the duly authorized representative of Halff Associates, If1C, and that I have personally reviewed the material and Name of OfferodPrime facts set forth in this Letter of Intent to Perform. To the best of my knowledge, information and belief, the facts in this form are true, and no material facts have been omit(ed. Pursuant to the City of Fort Worth M/WBE Ordinance, any person (entity] who makes a false or fraudulent statement in connection with participation of a M/WBE in any City of Fort Worth contract may be referred for debarment procedures under the City of Fort Worth M/WBE Qrdinance. I do solemnly swear or affirm that the signatures contained herein and the information provided by the offeror(prime are true and correct, and at I authorize on behaif of the offeror/prime to make the affidavit. J� � i�t n Haiff Associates, Inc. Circle One (0 Authorized Agen Type or Print Name (Name of ONerorlPrime) Type or Print of Owner or Authorized Agent) (817) 847-1422 (Phone Number) 08/2812013 (Date) (817) 232-9748 (Fax Number) O l ! 14/09 iv1&C Review DATE: CODE: Page 1 of 2 _.._ � {: � .. _,.... ��)�T ��'���1�71 i � �. COUNCIL ACTION: Approved on 10/29/2013 REFERENCE ** 20SW GLEN 10/29/2013 NO : C-26536 NAME: GARDENS_DESIGN_AMENDMENT #2 C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Amendment No. 2 to City Secretary Contract No. 35237, an Engineering Agreement with Halff Associates, Inc., in the Amount of $114,944.00 for Additional Engineering Analysis and Design of the Glen Gardens Drainage Improvements Project, Thereby Increasing the Total Contract to the Amount of $392,199.00 (COUNCIL DISTRICT 8) RECOMMENDATION: It is recommended that the City Council authorize execution of Amendment No. 2 to City Secretary Contract No. 35237, an Engineering Agreement with HalffAssociates, Inc., in the amount of $114,944.00 for additional engineering analysis and design of the Glen Gardens Drainage Improvements Project, thereby increasing the total contract to the amount of $392,199.00. DISCUSSION: The Amendment recommended by this Mayor and Council Communication will provide additional engineering analysis and design for areas outside the original project limits. During design, it was determined that additional improvements along the channel near Glen Gardens Avenue are needed to reduce the risk of structure flooding. Preliminary analysis indicates that 16 homes and one commercial structure are at risk of flooding in the 100-year everit. There are three flood insurance policies within the watershed of the project area. Initial Contract Amendment No. 1 Amendment No. 2 Total Description Preliminary engineering and $ 63,650.00 analysis of drainage issues in the Glen Gardens Nei hborhood Design of new and relief storm $213,605.00 water pipes along various locations Additional engineering analysis $114,944.00 and design of channel, parks conversion and permitting, bid and construction hase services $392,199.00 G21933 C-24593 [�k1L�I:�f� � � 11/16/2010 Halff Associates, Inc., proposes to perform the Amendment services for a lump sum fee of $114,944.00. Staff considers the fee to be fair and reasonable for the scope of services proposed. Funding for this project is being provided from revenue bonds in the Stormwater Capital Projects Bond Fund. MWBE Office: Halff Associates, Inc., is in compliance with the City's M/WBE Ordinance by committing to an additional 18 percent M/WBE participation on this Amendment No. 2. The City's goal on this http://fortworthtexas. gov/council�acket/mc_review. asp?ID=19073 &counci ldate=l0/29/2013 11 /7/2013 ivI&C Review amendment is 18 percent. This project is located in COUNCIL DISTRICT 8, Mapsco 92A and 92E . FISCAL INFORMATION/CERTIFICATION: Page 2 of 2 The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Stormwater Capital Projects Bond Fund. TO Fund/Account/Centers Submitted for City Manager's Office by: Originating Department Head: Additional Information Contact: ATTACHMENTS 004i6 Glen Gardens C3rainaqe M��.pdf FROM Fund/Account/Centers P227 531200 208280047630 $114,944.00 Fernando Costa (6122) Douglas W. Wiersig (7801) Vibhuti Pandey (2424) http://fortworthtexas. gov/council�acket/mc_review.asp?ID=19073&councildate=l0/29/2013 11 /7/2013