Loading...
HomeMy WebLinkAboutContract 35232-A1AMENDMENT NO. 1 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. o -�� (M&C Not Required) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Multatech Engineering Inc., (Engineer) made and entered into City Secretary Contract No. 35232, (the Contract) which v�as authorized by the City Council by M&C C-22040 on the 3rd day of April; and WHEREAS, the Contract involves enqineerinq services for the follo�ving project: Water and Sanitary Se�er Replacement Contract 2004, WSM-M. WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the folloMing agreement which amends the Contract: 1, Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated July 27, 2010, a copy of which is attached hereto and incorporated herein . The cost to City for the additional dasign services to be performed by Engineer total $14,000.00.(Water: $10,324.54; Sewer: $3,675.46) 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $97,535.00. '� ��r��Y�a�, f{����Pi�' CITII SECREi'1��2�1 FT W�RTH, T� OS-30-10 NO2�59 IN 3. Al1 other provisions of the Contract �hich are not expressly amended herein shall rema.in in full force and effect. E3�:CUTED on this the ��� da Y Tarrant County, Texas. ATTEST: , Marty Hendrix City Secretary .-- __--- _ of � , 2010, in Fort Worth, .��,�'���tl� a,�'�"����` ��?c� ����4 on4����� U � �'� , ;�' ��� � � � ,- � � s� ��� n �, n � s � �o .��o �� 0 ��� � ���(]UG��, �� �� I�IO h��s� ����I����;G� -. ��tt��. �������' w.,. z.r�� -_ � � APPROVAL RECOHIl�lENDED : APPROVED : � � %�.G�� S. Frank Crumb, P E. irector, Fernando Costa � Water Department Assistant City Manager Multatech Engineering, Inc. ENGINEER By : � � � � l�L��i ; Name:Jack A. Otteson, P.E. Vice President 2821 W. 7�' St; Suite 400 Fort Worth TX 76107 APPROVED AS TO E�ORM AND �G'EGALITY : Assistant City At -2- �r,,W�r.�iF��. K�+�:C.�C�iL� , =��7� SECf�ETAR�' � �T W�R�H, T�C L_.� � ■MULTATECH ■ ARCHITECTS•ENGINEER5 2821 West 7th SIreeL Suite q00. Fort Worth. Texas 7G107-2219 Phone II17-II77-5571 • fax: 317-877-4245 • www.multatech.com July 27, 2010 Mr. Rakesh Chaubey, P.E. Project Manager City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102 Re: AMENDMENT No. 1 COFW Project 00399, Water and Sanitary Sewer Replacement Contract WSM-M Mr. Chaubey, MULTATECH Engineering was awarded the above referenced project on April 3, 2007. On June 22, 2007, MULTATECH submitted (30%) Conceptual Plans, (60%) Preliminary Plans on September 25, 2007, Temporary Right of Entry forms on October 30, 2007, street boring request on November 01, 2007 and Utility Clearance plans on January 17, 2008. Originally Bellaire Circle included the design of 1,000 linear feet of 16" and 8" water line. At the preliminary review stage the 16" water line was eliminated and the 8" water line was increased in size to a 12" water line. However at that point, the 16" and 8" water lines had already been preliminarily designed. The change in scope resulted in elimination of plan sheets, re-cutting, re- stationing and profiling of the 8" water line to reflect the new 12" water line stationing, profile and adjustment to the overall water layout sheet and table of contents. The additional work due to the change in line size resulted in a change in scope and increase in project cost to MULTATECH. In September 2007, at the 60% submittal, the City determined the project should be delayed due to funding issues and no further work was to be done. Between January 2008 and February 2010 monthly MWBE reports were submitted to the DBE Office. Also the City requested updated project status reports, cost estimates and a site visit to determine pavement conditions. In March 2010 the City requested the project resume and plans, specifications and probable estimate of cost be brought up to date and re-submitted for a second 60% review. The three year delay and resumption of the project has resulted in additional cost to MULTATECH. At the second 60% review it was decided to extend the proposed 8" water line in Terrell Avenue to the east crossing Union Pacific Railroad right-of-way and connecting to the existing 8" water line that was constructed in 1992-1993 (Ref. X-11314). This is a change in scope at additional cost to MULTATECH. Due to the delay and change in scope, MULTATECH is requesting amendment number 1 to our current contract to cover the additional expense and change in scope. � ■MULTATECH ■ ARCHITECTS•ENGINEERS 2821 West 7th StreeL Suite 400. Fort Worth. Texas 7G107-2219 Phane 817-£177-5571 • Fax: Si17-877-4245 � www.mu�tatech.com Presented below for your review is our estimate for Amendment Number 1. Amendment No. 1: Task 1.0 Project Management 2008-2010 (Additional Submittals - DBE Reports; Project Schedules; Project Updates; Cost Estimates, project review & coordination meetings) $ 1,190.00 Task 2.0: Modify plans, specs and estimates $ 2,230.00 Task 3.0: Design of 16" water line in Bellaire Circle $ 1,855.00 Task 4.1: Railroad Permitting Process $ 2,430.00 Task 4.2: Union Pacific Design Survey $ 2,655.00 Task 4.3 — 5.4: 8" water line design across UP RR $ 1,206.00 Task 5.0: 37 Right of Entry Exhibits $ 2,130.00 Reproduction $ 104.00 10% Sub Consultant Markup $ 200 00 Total Amendment No. 1 $14,000.00 Revised Contract Summary: Original Contract Amount $83,535.00 Amendment No. 1 Amount $14 000 00 Total Contract including Amendment No. 1 $97,535.00 MULTATECHs DBE participation for Amendment No. 1 is approximately $ 2,000.00 (9.3%) to A.N.A. Consultants for surveying services. All other terms and conditions of our current contract will remain the same. If additional information is required, please contact me at 817-289-1858 or by e-mail at rcontrerasCc�multatech.com i ��.,�� C,-,.��� Richard Contreras Project Manager MULTATECH Engineering Inc. � � � 3 .. � � � c 0 U G1 M � O � O pf Z cIS O �"� F aZ�Z � �ui� v c`, o Q Z �aowg N � Q �V � 'c ca � � C l0 � � f0 �