HomeMy WebLinkAboutContract 50812-CO1 CFW Change Order Approval COAppr-01 Page 2 of 3
CITY SECRETARY
GC�I�TRACTNO. �0$i oZ� 'LOl
FORT WORTH.- City of Fort Worth
Change Order Request Approval
(Change Order Breakdown Available in Links)
For Change Order Submittal No.: 1
Change Order No.: COAppr-01 Date Started: 2018-11-16
City Sec. No.: 50812 Date Due: 2019-01-05
Project Name: Randol Mill Road - IH820 to Precinct Line Rd
Project Numbers: 100278 DOE Numbers:
Project Randol Mill Rd at precinct Line Roundabout
Description:
Project/Contract
Compliance Wilma Smith City Inspector: James Ruiz
Manager:
Contractor: JLB Contracting
COUNCIL ACTION (If Required):
M&C Log Name: 20RANDOLMILLROADIMPROVEMENTSCOI
M&C Number:_C 2-g54-g" C-o1�`� M&C Date: 2018-11-06
COST AND DAYS SUMMARY:
Requested
Department: Cost($) Fund Account Center: Days:
TPW $ 211,061.71 34014-0200431-5740010-100278-0 30
Total Cost: $ 211,061.71 Total Requested Days: 30
Approval Status:
�\ OFFICIAL RECORD
A'A CITY SECRETARY
FT. WORTH,TX
https://projectpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?Siteld=51500&Proces... 12/31/2018
CFW Change Order Approval COAppr-01 Page 3 of 3
Approved: Yes
Comments:
User: Sam Davis
Date: 2018-11-26 6:56 AM
Approved: Yes
Comments:
User: Wilma Smith
Date: 2018-12-04 9:19 AM
Approved: Yes
Comments:
User: Lissette Acevedo
Date: 2018-12-04 2:00 PM
Approved: Yes
Comments:
User: Ricardo Matute
Date: 2018-12-04 4:25 PM
Approved: Yes
Comments:
User: Signing for TPW Director Role Approvals
Date: 2018-12-06 9:20 AM
Approved: Yes
Comments:
User: Doug Black
Date: 2018-12-18 10:12 PM
Atte b r� t `-� !?0
Approved: Yes y
Comments: _
User: Susan Alanis F
Date: 2018-12-28 2:49 PM J. 8I, Secretary
'-'k
Required:
1pdZ7,' OFFICIAL RECORD
CITY SECRETARY
FT. WORTH,TX
https://projectpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?SiteId=51500&Proces... 12/31/2018
CFW Change Order Approval COAppr-01 Page 1 of 3
Routinci
Assigned To: Due Date:
Assigned By: Due Time:
Links 2
fortworthgov/Infrastructure Proiects/100278 - Randol Mill Road - IH820 to Precinct Line Rd/Contractor/Chance
Orders/JLB/col - revised scooe.xism
fortworthgov/Infrastructure Proiects/100278 - Randol Mill Road - IH820 to Precinct Line Rd/Contractor/Chance
Orders/3LB/20 Randol Mill Road COI.i)df
Attachments(0)
No Attachments have been added to this form.
/od2-7?
https:Hprojectpoint.buzzsaw.com/ bz web/Forms/FonnPrint.aspx?SiteId=51500&Proces... 12/31/2018
M&C Review Page 1 of 3
Official site of the City of Fort Worth,Texas
CITY COUNCIL AGENDA FOR�YH
COUNCIL ACTION: Approved on 11/6/2018
REFERENCE ** 20RANDOL MILL ROAD
DATE: 11/6/2018 NO : C-28919 LOG NAME: IMPROVEMENTS CHANGE
ORDER 1
CODE: C TYPE: CONSENT PUBLIC NO
HEARING:
SUBJECT: Authorize Execution of Amendment No. 3 to City Secretary Contract No. 47997 with
Dunaway Associates, L.P. in the Amount of$27,000.00 for Randol Mill Road Part 2, and
Authorize Execution of Change Order No. 1 to City Secretary Contract No. 50812 with JLB
Contracting, LLC, in the Amount of$211,061.71 for Randol Mill Road Part 2 (COUNCIL
DISTRICT 5)
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the execution of Amendment No. 3, in an amount of$27,000.00,to the Engineering
Services Agreement with Dunaway Associates, L.P., City Secretary Contract No. 47997, for the
additional design of Randol Mill Road at Precinct Line Road to provide pedestrian and drainage
requirements for a revised contract amount of$527,673.00; and
2. Authorize the execution of Change Order No. 1 to City Secretary Contract No. 50812 with JLB
Contracting, LLC, in the amount of$211,061.71 for Street Improvements on Randol Mill Road at
Precinct Line Road, Phase 2, Intersection, thereby increasing the contract to an amount up to
$1,364,818.42.
i
DISCUSSION:
Dunaway Associates Professional Engineering Agreement. On June 28, 2016, City Council approved
Mayor and Council Communication (M&C C-27806) authorizing execution of an Engineering Services
Agreement in the amount of$293,763.00 with Dunaway Associates, City Secretary Contract No.
47997, to provide complete design plans for these improvements. On September 26, 2017, City
Council approved M&C C-28398 authorizing Amendment No. 1, in the amount of$166,910.00, for
additional professional engineering design work and construction management services. On August
7, 2018, City Council approved M&C C-28773 authorizing Amendment 2, in the amount of
$40,000.00 which provided for additional professional engineering services with scope changes
regarding modifications to landscaping and pedestrian access to reduce long term maintenance costs
and improve pedestrian safety.As the result of scope changes in Amendment 2, additional drainage
improvements were required. Dunaway Associates proposes to perform these additional professional
services in an amount not to exceed $27,000.00. Staff considers this fee to be fair and reasonable for
the scope of services to be provided.
$Amounts Project Description M&C No. Approved
Initial Contract $293,763.00 Design capacity C-27806 06/28/2016
improvements for Randol
Mill Rd
Amendment 1 $166,910.00 Dividing the project 2 C-28398 09/26/2017
phases and updating the
drainage report
Amendment 2 $40,000.00 Scope change for C-28773 08/07/2018
Pedestrian Improvements
http://apps.cfwnet.org/council_packet/mc review.asp?ID=26434&councildate=11/6/2018 11/16/2018
M&C Review Page 2 of 3
Amendment 3 $27,000.00 Design additional drainage Pending Pending
improvements
Total 1 $527,673.00 1 - - -
JLB Contracting Construction Contract. On May 1, 2018, Mayor and Council Communication (M&C
C-28649) the City Council authorized a contract with JLB Contracting, LLC, in the amount of
$1,153,756.71 for Street Improvements on Randol Mill Road at Precinct Line Road, Phase 2,
Roundabout Intersection, This Change Order No. 1, in the amount of$211,061.71, includes the
addition of sidewalks, curb ramps, crosswalks, signage and pavement striping as well as
modifications to drainage facilities to accommodate these improvements. These additional
improvements were added to provide pedestrian crossings at each approach of the intersection and
improved pedestrian movement around the intersections. JLB Contracting has delayed
commencement of the project until the final design modifications were completed and this change
order issued.
The project will begin construction in November 2018 and is expected to be completed in November
2019.
A portion of this project will use 2014 Bond Funds. Available resources within the General Fund will
be used to provide interim financing for these expenses until debt is issued. Once debt associated
with this project is sold, bond proceeds will reimburse the General Fund in accordance with the
statement expressing official intent to reimburse, that was adopted as part of the ordinance
canvassing the bond election (Ordinance no. 21241-05-2014) and subsequent actions taken by the
Mayor and City Council.
M/WBE OFFICE-JLB Contracting, LLC agrees to maintain its initial MBE commitment of 23% that it
made on the original contract and extend and maintain that same MBE commitment of 23%to this
first change order. Therefore JLB Contracting, LLC remains in compliance with the City's BDE
Ordinance and attests to its commitment by its signature on the Acceptance of Previous MBE
Commitment form executed by an authorized representative of its company.
The project is located in COUNCIL DISTRICT 5.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are available in the current capital budget as appropriated,
of the 2014 Bond Program Fund. Prior to an expenditure being incurred, the participating department
has the responsibility to validate the availability of funds,
TO
Fund Department Account Project Program Activity Budget Reference# Amount
ID ID Year Chartfield 2
FROM
Fund Department Account Project Program Activity Budget Reference# Amount
ID I ID I I Year Chartfield 2
Submitted for City Manager's Office by: Susan Alanis (8180)
Originating Department Head: Douglas Wiersig (7801)
Additional Information Contact: Wilma Smith (8785)
ATTACHMENTS
http://apps.cfwnet.org/council_packet/mc review.asp?ID=26434&councildate=11/6/2018 11/16/2018
M&C Review Page 3 of 3
Form 1295 Dunaway- Randol Mill Amend3.pdf
Form 1295 Randol Mill Roundabout .pdf
May Randol Mill.pdf
http://apps.cfwnet.org/council_packet/mc_review.asp?ID=26434&councildate=l 1/6/2018 11/16/2018
FORT WORTH. City of Fort Worth
Change Order Request Breakdown
ProjectNamel Randol Mill Road-Sanitary Sewer,Paving&Drainage Improvements(Part 2) City Sec# 1 50812
Client Project#(s)l 100279
ContractDrI JLB Contracting,LLC PM Wilma Smith Inspector)
Change Order Submittal# Date 911312018
Contract Time
Dept. TPW Totals CD
Original Contract Amount 1,153,756.71 1,153,756.71
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $1,153,756.71 $1,153,756.71
Amount of Proposed Change Order $211,022.99 30
Revised Contract Amount $1,364,779.701,364,779.70
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0,00
Additional Funding(if necessary) 1 $211,022,99 $211,022.99
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 16.29%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $1,442,195.89
_ _ ,IUBTIFICATION(RMON51FOR C GE ORDER
page- 67 ar
City of Fort Worth
Change Order Additions
Project Name Randol Mill Road-Sanitary Sewer,Paving&Drainage Improvements(Part 2) City Sec# 50812
Client Project# 100278
Contractor RE Contracting,LLC PM Wilma Smith Inspector��
Change Order Submittal# L✓J Date 9I13I2018
ADDITIONS
Unit Unit os o a
emove ence
Unclassified Excavation
arner Fir—ee-17amp,Type
Barrier Free Kamp, I ype -
m ankment by Plan P
one Sidewalk,Adjacent to Curb
312 b"Concrete Ddveway Replacement TPW
314 Baribed Wire Fence,Metal Posts
ate,Steel
Pedestrian Rail
Mountable Curb
Class V 7P-W- L
404 30"RCP,Class V TPW 43.00000000 LF $254.30
Concrete Channel
Drain Pipe,Solid
o i dation T000moo
TPW $257,892.69
ub Totalditions
Change Order Additions Page 1 of 1
Fot'�'43I�I City of Fort Worth
Change Order Deletions
Project Name Randol Mill Road-Sanitary Sewer,Paving&Drainage Improvements Part 2 City Sec# 50812
Client Project# 100278
Contractorl JLB Contracting,LLC PMJ Wilma Smith Inspector��
Change Order Submittal# L_J Date 9/13/2018
DELETIONS
ITEM— DESCRIPTIQN DEPT Qty Unit Unit os o a
Remove Asphalt Pvmt 7.
Concrete Curb and Gutter 5.
Splifter Island IntegralColored extureConcrete TPW 16.000000005.5
Metal eam Guard Fence•Furnish and install5.
oncrete Riprap
15084'SLD vmt ar ing vmt a ing vmt Marking HAS(Y) TPW- 124.00000000
Raised Pavement Marker Type - -
Furnish/Installum Sign roup Mount City t
Remove Sign Panel and Post
Remove and Reinstall Sign Panel and Post
509 18'DOT vmt Marking HAE(K TPW fW0000000 LF $7.00 $700.011
TPW 46,869.70
Sub ota a ebons 7
Change Order Deletions Page 1 of 1
Funding Breakdown Sheet
CSN: 50812
GPI/. /0 Llr.�7J?
Characters needed in each box:
5 7 7 6 6 4 8
Fund Department Account Proj # Activity Bdg Yr CF2 Ref Amount
34014 200431 5740010 100278 002380 9999 14040199 $211,061.71
$ 211,061.71
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Wilma Smith / I�U6U a�w�
Name of Employee/Signature
Project Manager
Title
❑ This form is N/A as No City Funds are associated with this Contract
Printed Name Signature
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH,TX