Loading...
HomeMy WebLinkAboutContract 44743-CO17 CITY SECRETARY CONTRACT NO.44743-CO17 O Texas Department of Transportation 2501 SW LOOP 820 1 FORT WORTH,TEXAS 76133-2300 1 (817)370-6500 1 WWW.TXDOT.GOV April 5, 2016 Precinct Line Road Project CSJ: 0902-48-539/0902-48-680/0902-48-793 Tarrant County Jesus J. Chapa Assistant City Manager City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102 Dear Mr. Chapa: The above captioned project has been issued Change Orders, which amends the construction work to satisfactorily complete the project.The amended work concerning this Change Orders is necessary to correct the PSE&E for omitting a required pay item. The contractor will be compensated for lowering the City of Fort Worth's water line and to avoid conflict with the proposed 48" storm drain. This work was originally identified in the plans.The costs of the Change Order are 3,778.08. Attached is Change Order No. #17 Package that includes: 1. Third Party Funding Notification sheets, City of Fort Worth to sign off on notification of Change Order approval (highlighted area) 2. Contractor's signature approving Change Order 3. Advance Funding Agreement, Article 12.D.: The Local Government is responsible for all non-federal or non-state or non-Tarrant County funding, including any project overruns, unless otherwise provided for in this agreement or through amendment of this agreement. Please mail the Third Party Funding Notification signed sheets to: Texas Department of Transportation Attn: Rose Rodriguez - Transportation Planning& Development 2501 S. W. Loop 820 Fort Worth, Texas 76133 OUR VALUES: People •Accountability• Trust• Honesty OUR MISSION: Through collaboration and leadership,we deliver a safe,reliable,and integrated transportation system that enables the movement of people and goods. An Equal Opportunity Employer Jesus J. Chapa 2 April 5, 2016 NOTE:The Third Party Funding Notification sheets serve as notice to the City of Fort Worth regarding the change orders and regardless of signature approval from the City of Fort Worth;the Change Orders will be processed by the State. If you should have any questions concerning this matter, please contact Rose Rodriguez at (817) 370-6997. j4 , 41 Pwe- Mohammad A AI Hweil, P.E. Advance Transportation Planning Director Fort Worth District Enclosures OUR VALUES: People •Accountability• Trust• Honesty OUR MISSION: Through collaboration and leadership,we deliver a safe,reliable,and integrated transportation system that enables the movement of people and goods. An Equal Opportunity Employer TEXAS DEPARTMENT OF TRANSPORTATION CONSTRUCTION CONTRACT CHANGE ORDER NUMBER: 17 Third Party Funding Notification Sheet This form is used when the subject change order Involves funding by a source other than TxDOT/U.S.DOT,and involves third parties who are providing funding under an Advance Funding Agreement or Donation Agreement. 1.Outside funding provided by: CCSJ: 0902-48-539 City of Fort Worth (Outside Entity's Legal Name) Project: BR 2006(132) 2.Type of outside funding agreement for this change: Highway: CS ® Existing F� Amended ❑ New County: Tarrant [Check one] District: Fort Worth 3, Indicate the type and amount of funding: Contract Fixed Price(Lump Sum) (Estimated Amount ) Number.08133013 ® Actual Cost (a) Contract Items(Bid Items): 3,778.08 Use as needed: I hereby acknowledge notification of the modifications (b) E&C•: (a)X 0 = 0.00 covered by this Change Order. enter W— (c) Indirect Cost**: (a+b)x 0 = 0.00 pate 'llo enter TOTAL 3,778.08By Typed/Printed Name �ej�s �• c. j�°"� Typed/Printed Title The percentage M for E&C(Engineering and Contingencies)charges varies from project to project depending on the contract amount of the project.Projects with a higher contract amount will have a lower rate of E&C charge. For a specific project,E&C rate I%)can be derived from the cost of"Engineering and Contingencies"in the"Estimated Cost"of the project. ••Use the statewide district rate as established by Finance Division each year. This line 3(c)is for Service Project only, unless otherwise specified in the Advance Funding Agreement. See Stand Alone Manual Notice 98-2 for instructions. Funding for this Change Order has been arranged: TxDOT Representative Date Typed/Printed Name: TXDOT Form 2146-AFA (Rev.07/131 Page 1 of 1 Texas Depertrrrent o/7fanspMtflon MEMO March 15, 2016 To: Mr.Tracy Cain, P.E. Director - Construction Division Through: Mr.Jay Tarwater Transportation Specialist - Construction Division From: Mr. Michael Bostic, P.E. ;Kp3 Director - Fort Worth District Construction Subject Change Order 17 Project: BR 2006(132) Control: 090248-539 Highway: CS County: Tarrant Enclosed is one copy of Change Order Number 17 on the above captioned project which has been approved by the Area Engineer.This is a SLOG project. Project plans were prepared by consultant. This change order is necessary to correct the PS&E for omitting a required pay item.The Contractor will be compensated for lowering the City of Fort Worth's water line and to avoid conflict with the proposed 48" storm drain.This work was originally identified in the plans. This change order will add Unique Item 9608-2010 "Installation of 8"DIP". The work was performed by Haydon Building Corporation and was inspected and field verified by TxDOT inspectors. These plans were provided by the City's Consultant.The cost breakdown has been reviewed by TxDOT and the City of Fort Worth and is considered to be fair and reasonable.The City of Fort Worth may be responsible for up to 100%of the change order costs.The final amount of participation will be determined following the completion and approval of the Statement of Cost. Attached is one copy of the Area Engineer's memo,supporting the added item(s). The cost in Control 090248-539 will increase by$3,778.08. OUR GOALS MAINTAIN A SAFE SYSTEM • ADDRESS CONGESTION • CONNECT TEXAS COMMUNITIES • BEST IN CLASS STATE AGENCY An Equal Opportunity Employer The equipment rates used in calculating the cost of this change order have been checked against the Blue Book Rates. Your review and further handling will be appreciated. If you should have any questions concerning this matter, please contact Mr.Greg Gorecki at(817)370- 6517. CAM Attachments CC: Mr. M.Tran, P.E. Area Engineer Mr.Tracy Cain,P.E. 2 March 15,2016 Texas Department of Transportation MEMO December 14, 2015 To: Michael Bostic, P.E. Director of Construction, FfW From: Minh Tran, P.E. Area Engineer, N AO Subjectt, Change Order#17 Project: BR 2006(132) CCSJ:0902-48-539 Highway: CS County:Tarrant GENERAL INFORMATION Contract Amount: $ 10,498,196.74 Previous Changes: $ 107,903.72 Proposed Changes: $ 3,778.08 TOTAL CHANGES: $ 10,609,878.54 Contractor: HAYDON BUILDING CORP. Plans were prepared by: Freese &Nichols,Aguirre & Fields Work on this change order is: Complete Third Party Participation:City of Fort Worth REVIEW INFORMATION Description of Contract: Bridge replacement .- Describe the reasons and recommendations being made for this Change Order: This change order is necessary to correct the PS&E for omitting a required pay item.The Contractor will be compensated for lowering the City of Fort Worth's water line and to avoid conflict with the proposed 48"storm drain.This work was originally identified in the plans. This change order will add Unique Item 9608-2010 "Installation of 8" DIP". The work was performed by Haydon Building Corporation and was inspected and field verified by TxDOT inspectors. These plans were provided by the City's Consultant.The cost breakdown has been reviewed by TxDOT and the City of Fort Worth and is considered to be fair and reasonable.The City of Fort Worth OUR GOALS MAINTAIN A SAFE SYSTEM • ADDRESS CONGESTION • CONNECT TEXAS COMMUNITIES • BEST IN CLASS STATE AGENCY An Equal Opportunfty Employer may be responsible for up to 100%of the change order costs.The final amount of participation will be determined following the completion and approval of the Statement of Cost. z NEW AND/OR REVISED PLAN SHEET(S): None s Added Items: o 96082011 UNIQUE CHANGE ORDER ITEM 11: Installation of 8" DIP (UOM:LF) s Added Days:Additional time not needed. If you should need additional information please contact Chuck Putnam at(817)399-4300. Michael Bostic,P.E. 2 December 14,2015 C \ k fes ) § n § m EL -0 < 3 & 7 ® 8 - = - CD � ) \ k \ ❑D❑❑ ¥ 2. » 7 / 0 } k2LLI ] : � % ` § \ f 2 $ k � 22 ( ) \ ) « ƒ\ k E `� $ 7 ) uj ) S } k f 2 ��pQ❑ o 2a § § \ 82 = 2 i .0 § ] @ § S g 2 a 6 } k Z 6 \ k E < � 2 u �Lca @ /0 E ) t w $ ] ) � § G g � 3 / ) � ° c ] k \ / / k u 434 - § a 2 $ � SR £ » o o , k / � / t u � § § Ak f LU z U � � e 2 § z i o k k SL 5 @ \ / 0 _ ■ � ( � _ Boz 2 \} 2 � 2 ° S 0 < u 0) § zeS < § 2q B a ] cu � ) k k \ � _ a.) \ ] & � 2 u = ° a c - q z LU G � E b � o @ E ) 0 d kj @ I 2 v _ § 2 < ■ 22 C 5 £ G § ( § e 2 \ G k 7 - � ° / & C E 2 G 00 z o o co E ° ° - p § k G � 8 § 3 2 £ § Gg . k § / § / k ) � mE ui (D - - - zC, c = _ - - _ § Ea u ƒ § � K / / R # � ° � k \ k \ J=a § § MN V: R moo = = - eeee # QTR ¥ k2 22 # 2 �/ f § § , § o § wmm � = _ nao § § ) § 7 mos z z ] � o 2 � � 2 Q o 0 \ 2 \ 7 § - ƒ § $ / % f < � § Lu $ E m /g » w § 2 @ ' o a: _ & . § « enc 2u Iz Bb t > e2 2 oou � o @ o < � � � § � $ � . § LilE � § @ � E2I- 2 � 2 [ § < § £ f ° 02 ? < E # mo _ c E § § 7 § o5 \ uIL L) § § § k / / / k § § ) < u u < 0. « 0 u u « � ■ ui a a o k ci \j }� � ] LU LU �k �§ k a § ES k k [ z S § uj ■ @ ¥ a § § IL g § § LL e f= kk � § p � fE � k� 'krk — k 2 = er f§ a_ Wcq 2 [ c to cm @ � ■ ��qi�w��� ' �cr| o $ Q /_ ( �f/\ m$ \ / � § �i§� ■ ' |6' ��� co wt ■ LULU -, C: I K ]) + R c c & ) § k § &■ uj § - « /k Q / k k k k co of 2 U o 0 O O Q a r y N Cil R 4 W C 2 Q N z rn a � w 4 O W (7 Z 6 z L) M: 8 g b , C + ul M c 0 m m z LU w W H U 0 0 � W O n z a ix z r O g ti O V W d 0 z o w V) d m LU e C QI C � y tt n v m ago to w e v a m o u CD o W o 4 O m a U m y w O ~ m Z w a r U � V u Com. Ca) z 0 v C3 m to a 0 Cd a z ch LID. eu c a 0 0 z a z v c 0 Q c� Z 0 m a a 0 s 0 c, LO N N J GnU 0 0 J W "' E U O q F- O a CL` z a 0 O U U. r Form 2146 Change Order Checklist (Rev 08110) �r Page 1 of 1 Change Order Number: 17 Contractor: Haydon Building Corp. CS1: 0902-48-539 Project: BR 2006(132) Highway: CS County: Tarrant Area Engineer: Minh Tran,P.E. CO Amount: $3,778.08 Is the change order for an Interim adjustment? [:]Yes ❑x No Is the change order 0 State oversight? ❑Federal oversight? 0 Participating? ❑ Non-Participating? If Federal oversight,Is the change order ❑x Major? ❑or Minor7 Is the Reason Code correct? x❑Yes ❑No is the proposed work within project limits? x❑Yes ❑No Does the change order affect the DBE commitment? []Yes x❑No Has time been addressed? ❑Yes 0 No Yes No NA Signatures ❑x ❑ ❑ Has the change order been signed by the Contractor? 0 ❑ Is change order signed by AE? ❑ ❑ ❑x Is DE signature Included?(If required) ❑ 0 is AED-00 signature required?(If so,see"Administrative Approval"below.) Yes No NA 3rd Party Funding ❑x ❑ Is 3rd parry funding Involved in this project? (If no, move to next section) ❑ 0 ❑ If yes, has the funding been requested and received? ❑x ❑ Does this change order Impact 3rd party funding? ❑ ❑x ❑ Will this Impact require a new or revised funding agreement? [) ❑ ❑x If an amendment or new agreement is required, has OGC•CSS reviewed the agreement? ❑ ❑ Has a Third Party Funding Notification Sheet(Form 2146-AFA)been sent and signed by the 3rd party? Yes No NA Permitting:Environmental,Historical,etc Q ❑ Is the work within the scope of the original environmental assessments and reviews? ❑ ❑x Does this change order impact pedestrian elements previously reviewed by TDLR or increase the cost of pedestrian elements to$50,000 or more?If yes,answer next question. ❑ ❑ 0 Has TDLR reviewed the Impact to pedestrian elements associated with this change order? ❑ 0 Does work performed in the change order affect any current environmental commitments? ❑ ❑ x❑ Have the necessary environmental clearances or permits been obtained to address the affect? ❑ 0 Does work performed in the change order increase the Impact to wetlands;waters of the U.S.; archeological,historical or social issues;endangered species;or any other regulated areas? ❑ ❑ 0 Have the necessary clearances or permits been obtained to address the increased Impact? ❑ ❑ 0 If the change order work causes the soil disturbance area to exceed the i acre and 5 acre thresholds,has a CSN or N01 been processed? Yes No NA Stockpiled Materials ❑ ❑ ❑x Are materials being received through this change order that will be placed In stock? ❑ ❑ ❑x If yes,have the materials been set up in MSMS? Yes No NA Area Office and District Approval 0 ❑ Does the AE's memo include an explanation/description of the change order work? ❑x ❑ ❑ Is price justification information Included?(per District procedures) ❑ ❑ 0 Are plan sheets attached?(per District procedures) ❑ ❑ Z If a time extension is being granted,has it been justified?(per District procedures) Yes No NA Administrative Approval ❑x ❑ Is a copy of the AE memo included in the transmittal to CST? ❑x ❑ Does the transmittal indicate who prepared the plans?(TxDOTor Consultant) ❑x ❑ ❑ If consultant prepared,is the consultant name provided? ❑x ❑ Is the status of the change order work indicated?(awaiting CO approval,active,complete) [) []x Does the transmittal indicate if environmental clearance for extra work has been addressed? ❑ ❑ Has the bank balance category for funding been identified? ❑ ❑ Is the transmittal memo from the District to CST attached and signed? ❑ ❑ Is all required documentation attached?(Ex:Plan Sheets,Form 2146,Price Justification,Force Account Backup Data) ❑ ❑ Has prior verbal approval of the change order work been given by Administration? Comments: FORTWORTH MEMORANDUM TO THE RECORD TO: CONTRACT FILE NO. 44743 DATE: January 3, 2019 FROM: Vania Soto, Administrative Assistant City Secretary's Office SUBJECT: REQUEST TO FILE MULTIPLE CHANGE ORDERS TO CITY SECRETARY CONTRACT NO. 44743 BACKGROUND On January 2, 2019,the City Secretary's Office received Change Order Nos. 38, 43 and 45-51 to City Secretary Contract No. 44743. During routine research before filing, it was discovered that previous change orders had never been filed with the City Secretary's Office. The Administrative Assistant requested originals of these documents from Transportation and Public Works for attesting and recording, but was informed that Change Order No. 1, 7, 29 and 33 did not have any documentation and were not received at the City Secretary's Office. Change Order No. 2, 3, 11, 21, 25, 30, 31, 37, 40 and 44 were not required by TXDOT to be signed by the City. All other Change Orders not mentioned have signatures and do not require a memo to record. Therefore, it was requested by Transportation/Public Works that a copy of the change orders or this memo be made the original in order to facilitate the processing of subsequent Change Orders. Correspondence related to the location of the original and the request for filing has been included in the contract file. AUTHORIZATION FOR CONTRACT NUMBER Per the direction of Mary Kayser, City Secretary, the City Secretary's Office has been requested to issue a contract number,and place in the City of Fort Worth's official contract files the Change Orders that were missing. This request has been approve City Secretary's Office