HomeMy WebLinkAboutContract 44743-CO26 CITY SECRETARY CONTRACT NO.44743-CO26 Texas Department of Transportation 2501 SW LOOP 820 1 FORT WORTH,TEXAS 76133-2300 1 (817)370-6500 1 WWW.Tx00T.GOV July 28, 2016 Precinct Line Road Project CSJ: 0902-48-539/0902-48-680/0902-48-793 Tarrant County Jesus J. Chapa Assistant City Manager City of Fort Worth 1000 Throckmorton Street Fort Worth,TX 76102 Dear Mr.Chapa: During construction of this project, it has become necessary to execute the Change Order #26 to settle a ROW utility conflict. The overhead utility presented a constructability issue and concern. The Contractor I' originally bid to install shafts using the standard methods of construction, based on utilities being cleared. The Contractor proposed a different means and methods for this item of work that requires specialized equipment.The cost of the change order is$28,355.05. The following documents are attached: 1. Third Party Funding Notification Sheet. 2. Change Order package. 3. The project's Advance Funding Agreement. We request that you sign the Third Party Funding Notification Sheets in the highlighted areas and return to: Texas Department of Transportation Attn: Rose Rodriguez— Transportation Planning&Development 2501 S.W. Loop 820 Fort Worth,Texas 76133 If you should have any questions concerning this matter, please contact Rose Rodriguez at (817)370-6997. SirF. or 4 Jor., P.E.Diportati PI ing& Development Foct Enclosures cc: Minh Tran, P.E., North Tarrant County Area Engineer OUR VALUES: People.Accountability a Trust a Honesty OUR MISSION: Through collaboration and leadership,we deliver a safe,reliable,and Integrated transportation system that enables the movement of people and goods. An Equal Opportunity Employer TEXAS DEPARTMENT OF TRANSPORTATION CONSTRUCTION CONTRACT CHANGE ORDER NUMBER: Third Party Funding Notification Sheet This form is used when the subject change order involves funding by a source other than TxDOT/U.S. DOT,and involves third parties who are providing funding under an Advance Funding Agreement or Donation Agreement. 1. Outside funding provided by: CCSJ: 0902-48-539 City of Fort Worth (Outside Entity's Legal Name) Project: BR 2006(132) 2.Type of outside funding agreement for this change: Highway: Precinct Line Existingnn Amended Flew County: Tarrant [Cuck one] District: Fort Worth 3. Indicate the type and amount of funding: Contract El Fixed Price(Lump Sum) (Estimated Amount ) Number. 08133013 ❑ Actual Cost J (a) Contract Items(Bid Items): $28,355.05 Use as needed. I hereby acknowledge notification of the modifications (b) E&C*: (a)x = $0.00 covered by this Change Order. enter% (c) Indirect Cost**: (a+ b)x = $0.00 enter% Date 8/3/16 TOTAL $28,355.05 By CITY OF FORT WORTH APPRQVAL RECOMMENDED: Typed/Printed Name Jesus J.Chapa Typed/Printed Title Assistant City Manager Doug Wily sig Directo , ranspotation/Public 4rks Department *The percentage(%)for E&C(Engineering and Contingencies)charges varies from project to project depending on the contract amount of the project.Projects with higher contract amount will have the lower rate of E&C charge. For a specific project, E&C rate(%)can be derived from the cost of"Engineering and Contingencies"in the"Estimated Cost"of the project. **Use the statewide district rate as established by Finance Division each year. This line 3(c)is for Service Project only, unless otherwise specified in the Advance Funding Agreement. See Stand Alone Manual Notice 98-2 for instructions. Funding for this Change Order has been arranged: TxDOT Representative Date Typed/Printed Name: TXDOT Form 2146-AFA(Rev.07/13)Page 1 of 1 APPROVED AS TO FORM AND LEGALITY Ao4 AI 4r- 401 Douglas W. Black Assistant City Attorney TCX�3 Atlpattment pf TFaftspotratfon MEMO July 22,2016 To: Mr.Tracy Cain, P.E. Director a Construction Division Through: Mr.Jay Tarwater Transportation Specialist--Construction Division Fm wt.* Mr.Michael Bostic,P.E. 00 Director- Fort Worth District Construction Subjw b Change Order 26 Project: 8R 2006(132) Control: 0902-48-539 Highway: CS County: Tarrant Enclosed is one copy of Change Order Number 26 on the above captioned project which has been approved by the Area Engineer.This is a NON-PARTICIPATING project. Project plans were prepared by consultant. This change order Is necessary to settle a ROW utility conflict. The overhead utility presented a constructability issue and safety concern,as stated in RFI##95.The Contractor originally bid to install these shafts using standard methods of construction,based on the utilities being cleared.The Contractor proposed a different means and methods for this item of work that requires specialized equipment. After review,TxDOT and the City agree that this proposed methodology and price are acceptable and in the best interest of the project. This worts will be performed by Wylie Drilling and Inspected by TxDOT. The City of Fort Worth will be responsible for 100%of the change order costs. This Change Order settles all compensation and costs associated with this utility conflict,as agreed by TxDOT and the Contractor.No additional compensation or time will be considered as a result of this Change Order. OUR VALUES: People•A=untabltity• rrust- Honesty OUR MISSION Through coilaborattn and leadership,we dettver a safe,raltable,and integrated transponatlon system shat enables the movement of people and goods• an fm,ni onnommry Emwovti Attached is one copy of the Area Engineer's memo,supporting the added item(s). The cost In Control 0902-48-539 will increase by$28,355.05. The equipment rates used in calculating the cost of this change order have been checked against the Blue Book Rates. Your review and further handling will be appreciated. If you should have any questions concerning this matter,please contact Mr.Greg Gorecki at(817)370- 5517. CAM Attachments CQ Mr.M.Tran,P.E. Area Engineer Mr.Tracy Cain,P.E. 2 July 22,2016 Taxas OepsrtmenP e!Trsnspartafton MEMO May 9, 2016 To: Michael Bostic, P.E. Director of Construction, FTN! From: Minh Tran, P.E. P Area Engineer, NTAO Subject: Change Order#26 Project:BR 2006(132) CCSJ:0902-48.539 Highway:CS County:Tarrant GENERAI,INFORMATION Contract Amount $ 10,498,196.74 Previous Changes: $ 394,342.06 Proposed Changes: $ 25,355.05 TOTAL CHANGES: $ 10,920,893.85 Contractor: HAYDON BUILDING CORP. Plans were prepared by:Freese&Nichols,Aguirre&Fields Work on this change order is:Pending Third Party Participation:City of Fort Worth REVIEW INFORAfj ATION Description of Contract:Bridge replacement > Describe the f@@sans and recommendations being made for this Change Order: This change order Is necessary to settle a ROW utility conflict. The overhead utility presented a constructabillty issue and safety concern,as stated in RFI#95.The Contractor originally bid to install these shafts using standard methods of construction,based on the utilities being cleared.The Contractor proposed a different means and methods for this item of work that requires specialized equipment. After review,TxDOT and the City agree that this proposed methodology and price are acceptable and In the best interest of the project. This work will be performed by Wylie Drilling and Inspected by TxDOT. OUR GOALS MAINTAIN A SAFE SYSTEM a ADDRESS CONGESTION a CONNECT TEXAS COMMUNITIES • REST IN CLASS STATE AGENCY An Equal Opportunity Employer The City of Fort Worth will be responsible for 100%of the change order costs. This Change Order settles all compensation and costs associated with this utility conflict,as agreed by TxDOT and the Contractor,No additional compensation or time will be considered as a result of this Change Order. d NEW AND/OR REVISED PIAN SHEETS: None > Added Items: 0 04162001 DRILL SHAFT(18 IN) 0 04162004 DRILL SHAFT(36 IN) > Added Days:NA If you should need additional information please contact Chuck Putnam at(817)3994303. Michael Bostic,RE May 9,2016 Form DO Change Order Checklist (Rev 00110) ZZ—_ a 1 ar 1 Change Order Number 26 Contractor. Haydon Building Corp. CS1: 0902-45.539 Project: BR 2006(132) Highway: CS County: Tarrant Area Engineer. MlnhTran,P.E. COAmount: $20,355.05 Is the change order for an Interim adjustment? ®Yes ®No Is the change order ®State oversight? ❑Federal oversight? x❑Participating? ®Non•Participadng7 If Federal oversight,Is the change order 0 Major? ❑or Minor? Is the Reason Code correct? Q Yes ®No Is the proposed work within project limits? ®Yes []NO Does the change order affect the DBE commitment? []Yes ®No Has time been addressed? [:]Yes ❑X No Yes No NA Signatures ❑X ❑ ❑ Has the change order been signed by the Contractor? x❑ ❑ Is change order signed by AE? ❑ ❑ ® Is DE signature included?(If required) ❑ ❑x Is AED•DO signature required?(If so,see"Administrative Approval`below.) Yes No NA 3rd Party Funding ® ❑ is 3rd party funding Involved in this project?(if no, move to next section) ❑ ❑x ❑ If yes, has the funding been requested and received? x❑ ❑ Does this change order Impact 3rd party funding? ❑ x❑ ❑ Will this impact require a new or revised funding agreement? ❑ ❑ ❑x If an amendment or new agreement Is required, has OGC-CSS reviewed the agreement? ❑ ❑x ❑ Hasa Third Party funding Notification Sheet(Form 2146•AFA)been sent and signed by the 3rd party? Yes No NA Permitting:Environmental,Historical,etc El ❑ is the work within the scope of the original environmental assessments and reviews? ® ❑x Does this change orderimpact pedestrian elements previously reviewed by TOLR or Increase the cost of pedestrian elements to$50,000 or more?If yes,answer next question. ❑ ❑ ® Has TDLR reviewed the Impact to pedestrian elements associated with this change order? ❑ x❑ Does work performed in the change order affect any current environmental commitments? ❑ ❑ x❑ Have the necessary environmental clearances or permits been obtained to address the affect? ❑ 0 Does work performed in the change order increase the impact to wetlands;waters of the U.54 archeological,historical or social issues;endangered species;or any other regulated areas? ❑ ❑ 0 Have the necessary clearances or permits been obtained to address the increased impact? ❑ ❑ 0 if the change order work causes the soli disturbance area to exceed the 1 acre and 5 acre thresholds,has a CSN or NOI been processed? Yes No NA Stockpiled Materials ❑ ❑ E] Are materials being received through this change order that will be placed In stock? ❑ ❑ x❑ If yes,have the materials been set up In MSMS? Yes No NA Area Office and District Approval ® ❑ Does the AE's memo Include an explanation/description of the change order work? ❑x [] ❑ Is price Justification Information included?(per District procedures) ❑ ❑ ❑x Are plan sheets attached?(per District procedures) ❑ ❑ x❑ If a time extension Is being granted,has it been justined?(per District procedures) Yes No NA Administrative Approval x Is a copy of the AE memo Included in the transmittal to CS17 x Does the transmittal indicate who prepared the plans?(fxDOTor Consultant) x ❑ If consultant prepared,is the consultant name provided? x Is the status of the change order work indlcated7(awaiting CO approval,active,complete) X Does the transmittal Indicate if environmental clearance for extra work has been addressed? Has the bank balance category for funding been identified? Is the transmittal memo from the District to CST attached and signed? Is all required documentation attached?(Ex:Plan Sheets,Form 2146,Price Justification,Force Account Backup Data) Has prior verbal approval of the change order work been given by Administration? Comments r4 y U CJ ei lL LL CS (s ❑❑❑❑ E Lom 'a N g C 4 g: 6 y Q m 9 N a 3g � z m -,W, a � u � ® a E U) v C LuNw 2 C w ®❑❑®❑ (nM M L s LH V)3C < ._ rd O Z N N m n v a o •g ti 4 a— m u CL o a o h LD U V Uui w� s to 5 22Q^Q LLI o tll N lu Q OI-- M2 O U Lb Q C a f- v W i O Y U m i x o E En m e m m U, cwi m m w w z z m a a :5u, w Q ¢ c�j 2 S 3 2 G Lail C to w u 04 S !S-• w w ClUI Q LU U V. S 4 U Q Q p Jx N t7 m Q CL w Q2 o c V ms U c O 4 m p m fl N Q m In m a �p m W m In y W d ¢ ID N U 6 !� en � � D s � w ,, 0 z 0 �' _ l� ` a g o <CL w Ha m E Q N n w m = L7 m Lr Y) m m v7 � z C3 d ® w c L LSI C, A V .�•' LO � O r[� 4 0 S ` G e C C m w LL! m p n to N an 6 m L7 m s m e. 4 L $ i � Pevmm $ z � lg s ma m 8c c m 0 � a m A _ w O ® C N t!1 N m $ N 2 N 4 ® 03 � t b A W y CL z LU 0 j 2 CD ED 0LU p,� a r0 � � Q a A 5c is o ? v je w o o m �t w i= w w g < � N ® m �� t� m'R O 2 � cai < 0- a a � � J ® ua ti ` wm 2 Y � � � � o LilQ S ® 9 S 2 p d N N w d 6 6 A A O Q A a D C � 6 a� 'S'w of w � �= O 0 C70 U = o O w A-e F 72 tl ' p t—o ~ O G a Z 9 O U w m w o n0.9 Oti A u a gE a ow- U. m aj 94 O p A c o. cn rC7 w.xNe CO � w e it es g � , s ag J ui Bim 0 8 uj w Ej� aye.. }a W Sdtl F y y Q d } f Cd( � w § � § § zo R3 & Ek 14 / • _ § § . . § » § ) � § + 2 ° to N LLI \ � \ k LLI 9 < � i E . _ ■ � � k B § k k k R m CL } § # § k in U3 E cz lu k 2 kk k } § g § § § § - � 0 0 at ea a n ev 0 vi m th z cc m cu U) 0 0 w z d C 7 O 4c a cl z 0 as a m `o 3 U3 U3 to � J a o � ci Q O J fA CU E ate. O O o QY o 3 U Is. r CERTIFICATE OF INTERESTED PARTIES FARM 1295 loll Complete Nos 1-4 and G It Thera are Intens ed genies OFFICE USE ONLY Compkie Not 1,2,3,5,mid 61f there are m htlerasted parties, CERTIFICATION OF FILING 1 Name of business entity Gflng form,and ilia city,stale end country of the business entity s place Certlficafe Nuntber: of buslncs& 20L6.51M06 Haydan Building Carp Irving,T7t United Slates pato Fifod: Name of government en ty or sista agency 1601 Is aµany lot a contract for wiqcfi Hie romtis 05105!2016 Using filed. Haydan t3u1109 Corp 1 51 bale Modgcd: q 3 Provide the Idemillcation numb or used by the govenmental entity or slate agency to track or Identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. 90248539 CAN 26 m Overhead Wilily Une Conflict-®rill Shafts 4 Nature of Interest Name of Interested Party City,Stetc,Country(plata of business) (chock applicable) Contraillng Irilerntedia 5 Clieekonly ifthere IsNOInterested Party. 6 AFFIOAViT I swear,oral0m;under penalty al perjury,that pre above discltrsura is true an9 correct. NOEMI TOVAR MARTINEZ NwmY Public,State or Ims P40\ my Comn+Isslon WhasFebruary 14,2017 5lpnatureati0it tlxedagent ofeantracnn0lim0nassetdlly AFFIX NOTARY STAMP I SEAL ABOVE l�� ,� Swom to and subsctibad botore mo,by the Bald LT.I-Q�! 1 MAK x r this the 6-' day of ! , 20�to cerdry wltkh,vAirmw my Iratrd an eal o sotfce - DEEICE Stgnatwe a naihw msfa dl PritAed name of atf ecr adrtiwslcring oath Title of omcer Adntinislering oath Farms provided by Bert Fifties Commission ww,v.elhimsude.tx.us Version V1.0.1021 FORTWORTH MEMORANDUM TO THE RECORD TO: CONTRACT FILE NO. 44743 DATE: January 3, 2019 FROM: Vania Soto, Administrative Assistant City Secretary's Office SUBJECT: REQUEST TO FILE MULTIPLE CHANGE ORDERS TO CITY SECRETARY CONTRACT NO. 44743 BACKGROUND On January 2, 2019,the City Secretary's Office received Change Order Nos. 38, 43 and 45-51 to City Secretary Contract No. 44743. During routine research before filing, it was discovered that previous change orders had never been filed with the City Secretary's Office. The Administrative Assistant requested originals of these documents from Transportation and Public Works for attesting and recording, but was informed that Change Order No. 1, 7, 29 and 33 did not have any documentation and were not received at the City Secretary's Office. Change Order No. 2, 3, 11, 21, 25, 30, 31, 37, 40 and 44 were not required by TXDOT to be signed by the City. All other Change Orders not mentioned have signatures and do not require a memo to record. Therefore, it was requested by Transportation/Public Works that a copy of the change orders or this memo be made the original in order to facilitate the processing of subsequent Change Orders. Correspondence related to the location of the original and the request for filing has been included in the contract file. AUTHORIZATION FOR CONTRACT NUMBER Per the direction of Mary Kayser, City Secretary, the City Secretary's Office has been requested to issue a contract number,and place in the City of Fort Worth's official contract files the Change Orders that were missing. This request has been approve City Secretary's Office