HomeMy WebLinkAboutContract 50225-CO2 CITY SECRETAR T
FORT WORTH. City of Fort Worth CONTRACT NO. . 0
Change Order Request Breakdown
ProjectNamel 2014 CIP Year 3 Contract 9 CitySec# 1 50225
Client Project#(s) 02696
Contractorl Ark Contracting Services,LLC PM Mary Hanna Inspectorl Thomas Miller
Change Order Submittal# Date 12113!2018
Dept. Water Sewer TPW Contract Time
Totals CD
Original Contract Amount $1,191,917.00 $357,161.00 $2,552,605.50 $4,101,683.50 365
Extras to Date $23,008.83 $23,008.83 15
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $1,191,917.00 $357,161.00 $2,575,614.33 $4,124,692.33 380
Go to ADD&DEL Tabs to Enter CO Backup $220,805.70 $0.00 $0.00 $220,805.70 60
Revised Contract Amount 1,412,722.70 $357,161,00 $2,575,614.33 $4,345,498.03 440
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00 $0.00 $0.00
Additional Funding(if necessary) $220,805.70 $220,805.70
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 5.94%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $5,127,104.38
Change Order No.2 will provide for the replacement of the severely deteriorated water main on Marigold Avenue(Smilax Avenue to Oakhurst Scenic Drive),provide for a
looped water system to Oakhurst Scenic Drive and the repaving of the roadway.Also,60 additional calendar days will be provided on the project.
C1�oFFOnjwO�jN OFFICIAL RECOM)
c� scC4�Nil
CITY SECRETARY
FT. WORTH,TX
City of Fort worth
Change Order Additions
Project Name 2014 CIP Year 3 Contract 9 City Sec# 50225
Client Project# 02696
Contractor Ark Contracting Services,LLC PM Mary Hanna Inspector Thomas Miller
Change Order Submittal# Date 12 13/2018
ADDITIONS
HEM L)LbCRI _DEP I Qty Unit UnitCost I o a
2 3311.02618"PVC Water Pipe Water 325.00 LF $105.00
7 3311.0001 Ductile Iron Water Fittings w/Restraint Water 0.05 TN $5,250.00
3312.0117 onnection to Existing "Water Main Water 1.00 EA $5,000.00
3312.2001 1"Water Service,Meter Reconnection Water 8.00 EA $200.00
2 312. 0 1"Water Service Water 8.00 EA $900.00
T6 3312.3002 6"Gate Valve Water 1.00 EA $1,000.00
17 3312.3 03 8"Gate Valve Water 1.00 EA $1,500.00
20 331 .0001 Fire Hydrant Water 2.00 EA $4,000.00
24 3TO-57TUTExpioratory Excavation of Existing Utilities Water 1.00 EA $2,500.00
5 3305.0109 Trench Safety Water 650.00 LF $1.00
1. 5"Wide Asph,Pvmt.Repair(Perm) Water 682.00 LF $85.00
46 3311.01616"PVC Water Pipe-Steep Slope on Marigold Avenue Water 32.00 LF $150.00
47 4 . 5 alvage Fire Hydrant Water 1.00 EA 1$200.00
48 0171.0001 Construction Staking-Marigold Avenue Water 1.00 LS $1,200.00
49 0171.001 Construction Survey(GPS Red LineSurvey)-Marigold Ave Water 1.00 LS $950.00
5 3471,0001 Traffic Control-Marigold Avenue Water 1.00 EA $850.00
51 3312.0302 2"Apsh.Pavement Ty D Water 2311.00 SY $11.50
52 3305.71F7 Manhole Adjustment,Minor Water 1.00 EA $800.00
53 3305. 12 Water Valve-Box Adjustment(with oncrete ollar) Water 2.00 EA $400.00
54 3311.02618"PVWater Line-Steep Slope on MarigoldAvenue Water 325.00 LF $135.00
55 Licensed Plumber to Check for Leak Water 1.00 EA $285.72
56 0241.1506 "Surface Milling Water 2311.00 SY $5.18
57 3201.0122 2'Wide Asph.Pvmt.Repair(Perm.)(Serv.Lines) Water 200.00 LF $40.00
___5F_Butt Joint ater 2.00 EA $345.00
Water $220,805.70
Sewer $0.00
TPW $0.00
Sub Total Additions 05.7
Change Order Additions Page 1 of 1
FOR_ r�TH City of Fort Worth
Change Order Deletions
Project Name 2014 CIP Year 3 Contract 9 CitySec# 50225
Client Project ft 02696
Contractor Ark Contracting Services,LLC PM Mary Hanna Inspector Thomas Miller
Change Order Submittal# F--2 Date 12/13/2018
DELETIONS
ITEM DESCRIPTION JFpl Qty Unit Unit Cost Total
Water $0.00
Sewer $0.00
TPW $0.00
Sub Total Deletions
Change Order Deletions Page 1 of 1
M/SBE Breakdown for this Change Order
M/SBE Sub Type of Service Amount for this CO
See attached MBE $220,805.70
Total $220,805.70
Previous Change Orders
CO# DATE AMOUNT
1 7/6/2018 $23,008.83
Total $23,008.83
�iii1111 �`II City of Fort Worth
ACCEPTANCE OF PREVIOUS MBE COMMITMENT FORM
(for use with CHANGE ORDERS or AMENDMENTS greater than$50,000)
To be Completed by City Project Manager
Change Order(for Construction Contract)
Project Name: City Project Number }
2014 CIP Yr 3 Contract 9 02696
City Project Manager
Contractor: Walter Norwood
Ark Contrcating Services, LLC City's MBE Project Goal: 10 % i
Original Amount of Contract: $4,101,683.50 Accepted MBE Commitment: 1 %
Total of Previous Change Orders: $23,008.83 Date of Last MBE Report:
Amount for this Change Order: $220,805.70 Change Order#: 2
Revised Amount of Contract: $4,345,498.03 Date:
Language to be inserted in the M&C for this Contract
Ark Contrcating Services, LLC agrees to maintain its initial MBE commitment of 11%that it made
on the original contract and extend and maintain that same MBE commitment of 1%to all prior i
change orders up to and inclusive of this Change Order No. 2. Therefore Ark Contrcating t
Services, LLC remains in compliance with the City's BIDE Ordinance and attests to its commitment
by its signature on the Acceptance of Previous MBE Commitment form executed by an authorized
representative of its company.
i
To be Completed by the Representative of the Contractor
Mike Plunk Project Manager
Printed Signature Title Authorized Signature/Date
Ark Contrcating Services,LLC j
Company Name Contact Name(if different)
420 South Dick Price Road mpiunk@arkcontractingservices.com
Address E-mail address k
Kennedale,Texas 76060 817-478-7400 817-478-7438
City/State/Zip Phone number Fax Number Q
1% as of 9/30/2018
MBE%Paid to Date Date f
City Project Manager has reviewed the work associated with this Change Order,
considers it the same or similar to work in the original Contract, and recommends that the
Contractor have the option to retain and confirm its existin MBE commitment.
Walter Norwood
City Project Manager t . City Project Manager Signature Date
J;iif?it/i;l�(bllij;/t:),5i'1Cf i1•%//:lf j^ ?fti�41i��.',Ij�IiliAJ1%5:�.��?li,Eithirr�,bjQ�C•_I,(!ild°'lirlAlrlll=�%ieil�(,N51
4
♦ ♦ { { • { {
B Com i �t f D# MB urrent% Level via Last Report Req
4 MIWBE Signatu e Date
CFW Change Order Approval COAppr-01 Page 2 of 3
FORT WORTH. city of Fort Worth
�.-...-- Change Order Request Approval
(Change Order Breakdown Available in Links)
For Change Order Submittal No.: 2
Change Order No.: COAppr-01 Date Started: 2018-12-13
City Sec. No.: 50225 Date Due: 2019-02-01
Project Name: 2014 CIP Year 3 - Contract 9
Project Numbers: 02696 DOE Numbers:
Project This is a combined project that includes water, sanitary sewer
Description: and paving' improvements on Bluebonnet Circle, Rouse St, Smilax
Ave and Kentucky Ave.
Project/Contract
Compliance Mary Hanna City Inspector: Thomas Miller
Manager:
Contractor: Ark Contracting Services, LLC
COUNCIL ACTION (If Required):
M&C Log Name: 602014CIPYR3CONTRACT9CO2-ARK
M&C Number: c-28975 M&C Date: 2018-12-11
COST AND DAYS SUMMARY:
Requested
Department: Cost($) Fund Account Center: Days:
Water Department $ 220,805.70 56002-06004300-5740010-c02696 60
Total Cost: $ 220,805.70 Total Requested Days: 60
Approval Status:
https://proj ectpoint.buzzsaw.com/_bz_web/Forms/FormPrint.aspx?SiteId=51500&ProcessId... 1/3/2019
CFW Change Order Approval COAppr-01 Page 3 of 3
Approved: Yes
Comments:
User: Mike Plunk
Date: 2018-12-13 11:04 AM
Approved: Yes
Comments:
User: Walter Norwood
Date: 2018-12-14 8:52 AM
Approved: Yes
Comments:
User: Mary Hanna
Date: 2018-12-14 9:48 AM
Approved: Yes
Comments:
User: John Kasavich
Date: 2018-12-14 5:12 PM
Approved: Yes
Comments:
User: Chris Harder
Date: 2018-12-20 5:14 PM
Approved: Yes
Comments: 0,
User: Doug Black
Date: 2018-12-21 4:36 PM
Atte by.
Approved: Yes
f'.
Comments:
User: Jay Chapa
Date: 2019-01-02 4:34 PM J. Ka ' ' ; ecre
Action Required: Please review and approve
M&C: C-as 15 la it f m
1295: a0,%- 41-j3o�} -.
OFFICIAL RECORD
0TY SECRETARY
FT WORTH,TX
https:Hprojectpoint.buzzsaw.com/ bz_web/Forms/FonnPrint.aspx?Siteld=51500&Processld,.. 1/3/2019
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Name 9f Employee/Signature
Sr.
Title
❑ This form is N/A as No City Funds are associated with this Contract
Printed Name Signature
OFFICIAL RECORD
CITY SECRETARY
FT WORTH,TX
City of Fort Worth, Texas
Mayor and Council Communication
DATE: Tuesday, December 11,2018 REFERENCE NO.: **C-28975
LOG NAME: 602014CIPYR3CONTRACT9CO2-ARK
SUBJECT:
Authorize Execution of Change Order No. 2 in the Amount of$220,805.70 and
the Addition of 60 days to City Secretary Contract No. 50225 with Ark
Contracting Services, LLC, for a Revised Contract Amount of$4,345,498.03
for 2014 CIP Year 3,Contract 9 and Adopt Appropriation Ordinance(COUNCIL
DISTRICTS 8 and 9)
RECOMMENDATION:
It is recommended that the City Council:
1. Adopt the attached appropriation ordinance increasing estimated
receipts and appropriations in the
Water and Sewer Capital Projects Fund in the amount of$220,806.00
from available funds; and
2. Authorize the execution of Change Order No. 2 to City Secretary
Contract No. 50225 with Ark
Contracting Services,LLC,in the amount of$220,805.70 and the
addition of 60 calendar days for
2014 CIP Year 3,Contract 9. (City Project No.CO2696)
DISCUSSION:
On January 23,2018 (M&C C-28543),the City Council authorized a contract
with Ark Contracting Services,LLC, in the amount of$4,101,683.50 for 2014
CIP Year 3,Contract 9. The contract was subsequently revised by Change
Order Number I in the amount of$23,008.83 authorized administratively on
July 18,2018.
Change Order No. 2 will provide for the replacement of the severely
deteriorated water main on Marigold Avenue(Smilax Avenue to Oakhurst
Scenic Drive),provide for a looped water system to Oakhurst Scenic Drive
and the repaving of the roadway.Also, 60 additional calendar days will be
provided on the project.
M/WBE OFFICE– Ark Contracting Services,LLC,agrees to maintain its
initial MBE commitment of 1 percent that it made on the original contract
and extend and maintain that same MBE commitment of 1 percent to all prior
change orders up to and inclusive of this Change Order No. 2. Therefore,
Ark Contracting Services,LLC remains in compliance with the City's BDE
Ordinance and attests to its commitment by its signature on the Acceptance
of Previous MBE Commitment form executed by an authorized representative of
its company.
This project is located in COUNCIL DISTRICTS 9 and 9.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that upon approval of the above
recommendation and adoption of the attached appropriation ordinance, funds
will be available in the current capital budget, as appropriated, of the
Water and Sewer Capital Projects Fund.The Fiscal Year 2019 Water Operating
Budget includes appropriations of$23,865,180.00 for the purpose of
providing Pay-As-You-Go Funding for Water Capital Projects. After this
transfer for Fiscal Year 2019,the balance will be$16,519,049.00.
Appropriations for 2014 CIP Year 3 Project as depicted below:
FUND Existing Additional Project
Appropriations Appropriations Total*
2014 Bond Program
Fund 34014 $2,512,085.00 $0.00 $2,512,085.00
2017A Water& Sewer $1,996,119.00 $0.00 $1,996,119.00
Bond Fund 56011
2008 Bond Program
Residuals Fund $625,000.00 $0.00 $625,000.00
39411
Street Improvements
CO' s Residuals $816,282.00 $0.00 $816,282.00
Fund 39412
Water Capital Fund $1,573,579.00 $0.00 $1,573,579.00
59601
Sewer Capital Fund $685,948.00 $0.00 $685,948.00
-Legacy 59607
Water& Sewer
Capital Projects $0.00 $220,806.00 $220,806.00
Fund 56002
Project Total $8,209,013.00 $220,806.00 $8,429,819.00
*Numbers rounded for presentation.
FUND IDENTIFIERS (FIDs):
iQ
Department Account Project Program Activity Budget Reference# Amount
Fund ID ID Year (Chartfield 2)
ERQM
Department Account Project Program Activity Budget Reference# Amount
Fund ID ID Year (Chartfield 2)
CERTIFICATIONS:
Submitted for City Manager's Office by: Jay Chapa (5804)
Originating Department Head: Chris Harder (5020)
Additional Information Contact: Walter Norwood (5026)
ATTACHMENTS
1. 302014CIPYR3CON T RACT9CO02-ARK-ARK MWBE.pdf (CFw Internal)
2. 602014CIPYEAR3CONTRACT9CO2-ARK Man.ndf (Public)
3. 602014CIPYR3CONTRACT9CO2-ARK_56002_A019.docx (Public)
4. 602014CIPYR3CONTRACT9CO2-ARK 1295 2018-417304 Redacted.12df (Public)
5. 602014CIPYR3CONTRACT9CO2-ARK FID Table(Danl.dOCx (CFw Intemal)
6. 602014CIPYR3CONTRACT9CO2-ARK SAM.pdf (CFw lntemal)