HomeMy WebLinkAboutContract 35205-A1STATE OF TEXAS COUNTY OF TARRANT : AMENDMENT NO. 1 CITY SECRETARY CONTRACT N0.35205-(�� (M&C Needed) WHEREAS, the City of Fort Worth (City) and HDR, Inc., (Engineer) made and entered into City Secretary Contract No. 35205, (the Contract) which was authorized by the City Council by M&C C-24013 on the 12th day of January 2009; and WHEREAS, the Contract following project: Meacham Airport Detention Pond, involves engineering services for the Project No.00619. WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I, of the Contract is amended to include the additional engineering services specified in a proposal letter dated February 10, 2009, copies of which are both attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $78,783.00. � Article II, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $102,583.00. 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. - - _ --- -- ,-�. y'"_ �����'�i�3� �s'E�Q��� ���"`l SE����+0.RY ��°: q�;€�� �'H, TX EXECUTED on this the �� day of �G.J�� . 2��(� , in Fort Worth, Tarrant County, Texas. ATTEST: Marty Hen ix ��.�..�.��?�� City Secretary ,o,� ��p�� �i � ��°Qoaoonop� S U 1� APPROVAL RECONII��NDED : � ��° °, C�a � �3 �o��.r�ct �uthoriz�ti��s�`_ --._ I I�c� �l� �at� � ° .�..' ° � �s ��n q� � �� o - -� � �° � William . Verk� t, P. E• �� °°000000 ���.� Director, Department of a� �'�•�� � sport , t-,Public Work����i.'�'a�' \ ,, _� Engineer By : —�.s u � � �c.H,.. �2.E _ � . + _ a � . �� « •_ . � ��� APPROVED AS T FORM AND LEGALITY: Assistant Ci y ttorney APPROVED: ��� �� Fernando Costa Assistant City Manager OF�i�l�L i�ECC��D CiTI( �����TARY �`�'. Y�����H, T� Page 1 of 2 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 1/12/2010 DATE: Tuesday, January 12, 2010 LOG NAME: 20AMEND1MEACHAMAIRPORTDETENTION REFERENCE NO.: **C-��p�� SUBJECT: Authorize Amendment No. 1 to City Secretary Contract No. 35205, an Engineering Agreement with F Inc., in the Amount of $78,783.00 for the Meacham Airport Detention Pond (COUNCIL DISTRICT: RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 1 to Secretary Contract No. 35205, an Engineering Agreement with HDR, Inc., in the amount of $78,783 revising the total contract cost to $102,583.00. DISCUSSION: The Storm Water Management Program was established to reduce flooding in Fort Worth, preserve streams, minimize water pollution and to operate the storm water system in a more effective manner fully comply with state and federal regulatory requirements. This will be accomplished by infrastruct� reconstruction and system maintenance, master planning, enhanced development review and incre� public education and outreach. On October 16, 2007, (Ordinance No. 17840-10-2007) the City Council authorized the issuance and of $25,000,000 in Storm Water (Drainage) Revenue Bonds, Series 2007, to fund a two-year Storm V Capital project program. The storm drain system in the Meacham Airport area is undersized and overtopped during rain even This overtopping causes the flooding of historic businesses south of NE 38th Street. A request for qualifications to provide drainage design was issued by the city in August of 2006 and design consultants submitted statements of qualifications, including HDR, Inc., HDR, Inc., was selec study the drainage in the subject area and provide subsequent design services for drainage improvements. On April 16, 2007, the City Manager executed administratively an engineering agreement with HDR, for the study of future storm drain improvements for the Meacham Airport Detention Pond (City Proje 00619). It was anticipated that the study project would be expanded to a design project. The study has been completed and the following proposed improvements have been recommended The Engineer determined, after the original drainage study, that further pre-design modeling is requi accurately account for overland flooding on the street surFace along the studied area of Washington Heights to account for both pressure flow and overland flow. This additional study will also determine the optimum horizontal and vertical alignment for the additic http:Uapps.cfwnet.arg/ecouncil/printmc.asp?id=12808&print=true&DocType=Print 3/3/2010 Page 2 of 2 storm drain line based on certain considerations such as utility conflicts, pavement reconstruction ar right-of-way factors. The work to be included will augment the storm water evaluations and analysis associated with the original contract. Amendment No. 1 will update the model to provide accurate flows and determine the preferred storn alignment. HDR, Inc., proposes to perform the additional study for a lump sum fee of $78,783.00. City staff considers the fee to be fair and reasonable for the scope of services proposed. HDR, Inc., is in compliance with the City's M/WBE Ordinance by committing to 37 percent M/WBE participation.The City's goal on the project is 37 percent. This project is located in COUNCIL DISTRICT 2, Mapsco 48T. FISCAL INFORMATION / CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated of the Storm Water Capital Projects 2007 Revenue Bond Fund. FUND CENTERS: TO Fund/Account/Centers CERTIFICATIONS: Submitted for City Manager's OfFice by: Originating Department Head: Additional Information Contact: FROM Fund/Account/Centers P229 531200 202280061916 49, P229 531200 202280061951 28. Fernando Costa (6122) William Verkest (7801) David Harbour (7952) ATTACHMENTS 1. 00619 MWBE Campliance Notice.pdf (CFW Internal) 2. BFT-_.139.pdf (CFW Internal) 3. FUNDS AVAILABLE.doc (CFW Internal) 4. M and C Ma.�_Meacham Air ap rt Detention Pond.pdf (Public) http://apps.cfwnet.org/ecouncil/printmc.asp?id=12808&print=true&DocType=Print 3/3/2010