Loading...
HomeMy WebLinkAboutContract 35054AMENDMENT N0.3 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. (No M&C Needed) COUNTY OF TARRANT $ WHEREAS, the City of Fort Worth (City) and Stream Water Group, Inc.,(Engineer) made and entered into City Secretary Contract No. 31252, (the Contract) which was authorized by the City Council by M&C G20438 on the 14�' day of December 2004 ; and subsequently revised by two previous amendments; and WHEREAS, the Contract involves engineering services far the following project: 2004 CIP Minor Drainage Projects; Contract F: Miscellaneous Culvert Improvements Drainage Project No. 00098 WHEREAS, it has become necessary to execute Amendment No. 3 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated February 28, 2007, a copy of which is attached hereto and incorporated herein. The cost to City far the additional design services to be performed by Engineer total �'195-�(l- � Article II of the Contract is amended to provide far an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $13f,909.��. 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the �day of , 007, in Fort Worth, Tarrant County, Texas. ATTEST: 1� Marty Hendrix City Secretary � ���--L= _?—=-�_- — _ a�t� ����� ��Ua � �, ___�— zt=----�������� �_--� �- APPROVAL RECOMMENDED: ��.� ,��'' `� , . �� � . ��_ . Director, Deparhnent of Engineering ENGINEER By: Name: Shamsul Arefin, P.E. President 6737 Brentwood Stair Rd; Suite 230 Fort Worth, TX 76112 APPROVED AS TO FORM AND LEGALITY: APPROVED: i� /� � /� Marc A. Assistant City Manager �1����v�:•'',l �`��'�� G ri -a- � - `�' a: v ��:�'� ;�'���„ :;; �'=�n, , �;.,� v u�;'.. ��: �`i ���l�. J: �� i�2� .�'<�r'��� �i�?�t. � ;���,_,,,-��.� � � STREAM WATER GROUP, INC, Consulting Engineers C��oap February 28, 2007 Roberto C. Sauceda Project Manager Department of Engineering City of Fort Worth 1000 Throckmorton Sh•eet Fort Worth, TX 76102 Phone: 817 392 2387 RE: Contract Amendment No. 3 2004 CIP Drainage Projects Contract F: Miscellaneous Culvert Improvements Drainage Project No. 00098 Stream Water Group Project No. 17016 Dear Mr. Sauceda: The following is a summary of additional work requested for Amendment No. 3 to the 2004 CIP Drainage Projects, per recent design meetings with City of Fort Worth officials. The proposed amendment includes additional design for Truman Storm Drain Extension and preparation of easement document. The total cost to perform the additional services included in Contract Amendment No. 3 is as follows: Additio�:al Basic Design Fee: $2695.00 Easente�tt Docir»tent Preparntio�t (1 ea) � 500.00 Total A��:end»ient No.3 $ 3,195.00 The current status of the contract between Stream Water Group, Inc and City of Fort Worth is as follows: Original Contract Amount = $ 71,162.00 Amendment No. 1 Amount = $ 40,790.00 Amendment No. 2 Amount = $ 21,762.00 Amendment No. 3 Amount = $ 3,195.00 Total Contract Amount including Amendment No. 3= $136,909.00 Please process Amendment No. 3, to the 2004 CIP Drainage Projects in the amount of $3,195.00. If you require any additional information or have any questions regarding this matter, please do not to hesitate to give me a call at 817-446-4171 or my cell phone 972-898-5685. We appreciate the opportunity to provide Engineering services far the City of Fort Worth. Sincerely, Stream Water G o�, Inc. Shamsul Are , P.E. President Copy: File Attachment A 6737 Rreiil�Fond Stair Rd 4 Suite 2'�0 fl Foit ��'orth, T� 761 1? e Phune: S 1 7.�=lb-�! ] lA'H%1b SYI'eillll\t'tIICC�YOII��.00111 , : :.: 'i:i„ t:7�1�Y.4� i r-4-4 bi7k'��+, ] � �; SCi.:.�l� `r���. J�..`:J�C.LJI�� ����G�1.� o �; Attachment A Additional Drainage Design Fee for the Truman Storm Drain Improvements City of Fort Worth Drainage Project No.: 00098 Hourly Rate $115 $105 $95 $70 $45 Pricipal Project Task Description QA/QC Manager Proj Eng CAD Clerical Total Fee Drainage Design 1 Project Management 1 1 $ 220 3 Conduct Site Visit 1 1 $ 200 4 Design Modification 14 9 $ 1,960 6 Quantity takeoff and Cost Estimate 2 $ 190 8 Review Meeting w/City 1 $ 105 Subtotal - Additional Design Fee $ 2,675 � �JG aOPll r� i',, n �' . ._�,,..r �1 �.� ,� .. �:; � ��'1::;,,1. } ���� ��� �,��� , ��>�� .� ��, J� l� '\� �'r '`r L V:���� ����% � � ::-1 Sa t1;J:'^I ��/ i 1� sfiy �•7 J�.. �;%t,. � f�' � ll �c'^•a i �.�W�.�i