HomeMy WebLinkAboutContract 35058COMNIUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
COUNTY OF TARR.ANT
0
�
City Secretary
Contract No.�`-k-�CJ
WHEREAS, D.R. Horton — Texas, Ltd., hereinafter called "Developer", desires
to make certain improvements to McPherson Ranch, Phase 2, an addition to the City of
Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
"7�� r� /�I I �. e �
That said Developer, acting herein by and through L ' er�i; its duly
authorized ���i�• ��C �, and the City, acting herein by and through Marc Ott, its duly
authorized Assistant City Manager, for and in consideration of the covenants and
conditions contained herein, do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
�
C.
0
E.
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copy
herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder.
The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor
of this Agreement.
Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy.
The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy.
The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the Policy.
��, f 11 ��.� �6-1 l� s l� ;;l ^, j�-
,I ,
� ,� �� �,, :� �n
� .��+��; ;;�:��-!�;.?�����L�
�.
CFA MCPHERSONRANCHPHASE 2 1 � ,J�}j ir;y�,� J,�=j ��C� ��n�t
f
F. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
G
H.
damages sustained by any persons (including death) or to any property,
resulting from ar in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers; agents or
employees, fvlaetlzer or not suclz i�ajuries, deatla or da�raa�es are caused,
i�a fvlaole or irz part, bv tlte alle.�ed taeQli�etzce of tlze Citv of Fort Wortla,
its officers, servants, or en:plovees.
Developer shall install or adjust all of the required utilities to serve the
development ar to construct the improvements required herein.
In the event that City participation exceeds $25,000, Developer agrees that
no street construction or storm drainage will begin prior to City Council
approval of this Community Facilities Agreement. (Article 104.100,
Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed
(Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications and
cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part hereoi
CFA MCPHERSON RANCH PHASE 2 2
Water (A) None; Sewer (A-1) None; Paving (B) attached; Storm Drain (B-
1) attached; Street Lights and Signs (C) attached.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, B 1,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $1,119,453.00.
Item Develo er Cit Cost Total Cost
A. Construction
1. Streets $ 872,000 $ - $ 872,000
2. Storm Draina e $ 191,385 $ - $ 191,385
3. Street Li hts $ 8,500 $ 25,500 $ 34,000
4. Street Name Si ns $ - $ 800 $ 800
B. Engineering Desi n $ - $ -
C. Construction Engineering
and Mana ement b DOE 2% $ 21,268 * $ -
TOTALS $ 1,093,153 $ 26,300 $ 1,119,453
Notes:
1. All Preliminary Plats filed after July 2000, will require sidewalks on all streets.
Sidewalk cost is included under street cost. The developer is responsible for
installation of sidewalk.
2. Developer's column for Item C represents two percent (2%) cost for construction
inspection fees and materials testing less 10% for contingency cost.
(*) Represents City participation for construction fees based on actual cost.
3. City not preparing plans and specifications.
4. Future Improvements — Developer to pay $8,000 for future improvements to
Timberland Boulevard at the time the adjacent property is improved in order to
facilitate construction of drainage channel.
CFA MCPHERSON RANCH PHASE 2 3
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, d said evelo er
has executed this instrument in triplicate, at Fort Worth, Texas this the ��ay of
, 200�?
Approval Recommended:
c - �_-
C:or.t ac��. Aut� xi��'tiona
--_���—_.—�-- .
Date
ATTEST:
�^ �
Y�
�ar�+� end��'x
City Secretary
/'
ATTEST:
Corporate Secretary
CFA MCPHERSON RANCH PHASE 2 4
Transportation and Public Worlcs
Department
���-,�,
Robert Goode, P. E.
Director
City Of Fort h
<°
,
i
B �'
arc Ott
Assistant City Manager
DEVELOPER
D. R. Horton – Texas, Ltd.
By;
Je�rf�er-H�e'ri "i7c�r� �ll�t►�
Title: �-�����,,� • �C G .
. , �� �j, , '' :; `, ���, �
'`J Y 1 7,\. I I! i � �✓
� J �'` ��. �:'? L:� L% �i L%
r, I ' I^'^'�1� [�Jt1 I� If
1�^ I � :I
�l��J`6 c;'��CiI�LU7L'i�.�
� �r�, ..�JG��'�i VL���
� —_ ..
No. 011454010
McPHERSON RANCH
PHASE II
JANUARY 8, 2003
PAVING
ITEM# DESCRIPTION QTY UNIT PRICE AMOUNT
1 29' B-B INTERNAL STREET PAVING 8,200 L.F. 96.00 787,200.00
2 1/2-27' B-B TIMBERLAND BOULEVAR 1,060 L.F. 80.00 84,800.00
TOTAL PAVING $872,000.00
Linear foot price includes excavation, subgrade preparation, lime, pavement, curbs and sidewalk
ASSESSMENT PAVING --� ��-����'�� `�� �c��l�-�Mt�i�-t ��
ITEM# DESCRIPTION QTY UNIT PRICE AMOUNT
1 1/2-27' B-B*- TIMBERLAND BOULEVAR 100 L.F. 80.00 8,000.00
TOTAL PAVING $8,000.00
Linear foot price includes excavation, subgrade preparation, lime, pavement, curbs and sidewalk
G:\J OB\011454\EST\McP E RSON I I C FA.XLS
Page 3
-� =—� -,� —�i
C.i t����JJ.� :� 1:�'�J ;:�.�.�u
.-. � , r i ��i!�i I;?i .,�..7
_ �'
r 1 r,, _; � ,
�., � � � .; _ _. _ _
,`V � ,.. , , �
r 1 /6/200�
No. 011454010
McPHERSON RANCH
PHASE II
JANUARY 8, 2003
STORM DRAIN SYSTEM
ITEM# DESCRIPTION QTY UNIT PRICE AMOUNT
1 6X3 RBC 211 L.F. 175.00 36,925.00
2 39" RCP 61 L.F. 74.00 4,514.00
3 33" RCP 41 L.F. 58.00 2,378.00
4 30" RCP 563 L.F. 52.00 29,276.00
5 27" RCP 629 L.F. 48.00 30,192.00
6 24" RCP 258 L.F. 44.00 11,352.00
7 TRENCH SAFETY 1,763 L.F. 1.00 1,763.00
8 STD 10' CURB INLET 6 EA. 2,200.00 13,200.00
9 4' SQUARE MANHOLE 4 EA. 2,500.00 10,000.00
10 5' SQUARE MANHOLE 1 EA. 3,300.00 3,300.00
11 8' SQUARE MANHOLE 2 EA. 4,500.00 9,000.00
12 BOX HEADWALLS 1 EA. 5,000.00 5,000.00
13 TYPE C 27" HEADWALL 1 EA. 2,400.00 2,400.00
14 TYPE C 24" HEADWALL 1 EA. 2,300.00 2,300.00
15 RIP RAP 851 S.Y. 35.00 29,785.00
TOTAL STORM DRAIN SYSTEM $191,385.00
Page 4
G:\JOB\011454\EST\McPERSON I ICFA.XLS 1 /6/2003
E. STREET LIGHTS:
1. STREET LIGHT COST ESTIMATE
INTERSECTIONS
MID-BLOCK RESIDENTIAL
CHANGE OF DIRECTION RESIDENTIAL
MID-BLOCK COLLECTOR
MID-BLOCK ARTERIAL PARKWAY
MID-BLOCK ARTERIAL MEDIAN
RELOCATE EXISTING LIGHT
QUANTITY UNIT COST
5 EA $ 2,000
6 EA $ 2,000
6 EA $ 2,000
0 EA $ 2,000
0 EA $ 2,200
0 EA $ 2,200
0 EA $ 1,500
Subtotal
City's Cost
Developer's Subtotal
10% Contingencies
Project Total
Adjacent Developer's Cost
Developer's Cost
2% Inspection Fee
Developer's Responsibility See PG
III-1, "Line 7"
MCPHERSON RANCH, PHASE II
February 12, 2003
Fort Worth, Texas
TOTAL COST
$10,000.00
$12,000.00
$12,000.00
$0,000.00
$0,000.00
$0,000.00
$34,000.00
$25,500.00
$0,000.00
$0,000.00
$34,000.00
$0,000.00
$0,000.00
$0,00.00
2. STREET LIGHTS WORK DESCRIPTION:
1. The Developer shall provide for the installation of streetlights at
the approximate locations shown in Exhibit "C", immediately after
final acceptance of the street construction, in accordance with
engineering plans and specifications approved by the Transportation
and Public Works Department.
2. Streetlights on residential and /or collector streets can be
installed using overhead or underground conductors with the approval
of the Director of Transportation and Public Works.
3. Streetlights on arterial streets shall be installed with underground
conduit and conductors.
4. The Developer shall provide for the installation of a 2-inch
schedule 40 PVC conduit at a depth not less than 30 inches and at
least 18-inch behind the curb, "clear from all other utilities".
5. The Developer shall provide for the installation of a 2-inch
schedule 40 PVC conduit between streetlights proposed for
installation and the power source to become operational.
6. A 3-inch schedule 80 PVC conduit is required when crossing streets
at a depth not less than 30 inches, unless indicated otherwise on
the plans concrete pull boxes shall be provided at the crossing
points.
7. Street light conduit and footings shall be installed by the
developer's contractor as part of and at the time of street
construction. The city will obtain electric service and complete the
street light construction in accordance with approved plans.
8. The developer or their contractor shall contact City's street light
division 48 hours prior to starting any installation of conduit
and/or streetlights at (817) 871-8100 to insure proper inspection of
work.
9.The procedure for installing conduit and footings will be with the
inspector on the job site or you can request a copy by calling 817-
871-6596.
MCPHERSON RANCH PHASE 22
February 12, 2003
�. � ;;' ,' '
,,�
;;�r� �J;��;�1�',l �������:;1�
, IS� ,:, r-,� } � rT
�VJ� I� ���`;'' ���i�':y�1�(
;s�, �:'v"�-� �;� �'�"t�
i
"STREETLIGHTS"
INTERSECTIONS
COTTAGEVILLE LN
COTTAGEVILLE LN
GRANTSVILLE DR
LILLYBROOK LN
EXCELSIOR LN
MID-BLOCK
SUMMERSVILLE LN_
COTTAGEVILLLE LN
CLARKSBURG TRL_
LILLYBROOK LN
GRANTSVILLE DR
& CLARKSBURG TRL
& LEWISBURG TRL_
& NEWBURG WAY
& EXCELSIOR LN_
& STREET A
CHANGE OF DIRECTIONS
SUi�II�lERSVILLE LN
GRANTSVILLE DR_
CLARKSBURG LN_
LILLYBROOK LN_
EXCELSIOR LN
MCPHERSON RANCH PHASE II
1
1
2
1
1
2
1
1
1
1
1
1
1
1
1
IV
STREET NAME SIGNS
1. The City will install the street name signs upon final approval
of the street construction. The street name signs will remain
the property of, and will be maintained by, the City.
2. The City will pay for the street name sign installations required
for this development to the extent of $100.00 per intersection.
This unit cost will be revised annually by the Department of
Transportation and Public Works to reflect prevailing costs of
materials and labor.
3. This development creates the following eight (8) intersections at
a cost to the City of $800.00:
Grantsville Drive and Newburg Way
Summersville Lane and Chatteroy Lane
Cottageville Lane and Clarksburg Trail
Cottageville Lane and Lewisburg Trail
Cottageville Lane and Timberland Boulevard
Lillybrook Lane and Excelsior Lane
Lillybrook Lane and Timberland Boulevard
Excelsior Lane and Unnamed Street
MCPHERSON RANCH
PHASE II
Fort Worth, Texas
IV-1
�
�
V
�
0 0
o �
� W
o Q
0
a
v
= P
N
N P
N
W a
� �
� �
m�� Z
°t5 � = r
W ZO W
U�3o
n0�
d
►
►
z
O
Q
U
O
J
��� ;�',? �� �L, j !-.� L �; 1'S V I;�; .;?',
1•911';h il�r.G�,���� (�ii J
� ;;. I� 1,
1\7�U LY �i�.7t:i�'i�L`J�'�:: �.y
.S I� �':.n. 7' �.;li � � � �
Or{� 'Ij;ll,Y�`I �����
JL� ..�:i U � �...
��� �
o�
��
Wa
x
a
rU
-/-�
c
Q
V
O
�
U
N
L(�
E
v
�
c
0
I
N
L
0
>
U
�
0
v
0
d
�
/
�
z
c�
0
0
0
M
II
� �
w
J
Q
U
N
�___:_�i1J..:.�1
` , __� ��� �� �
� � , ._ 3,4h'i � — ~ - - - '.. I
�� L -' � � ;� , '-- -- --�---I
-- � o � � � ---- �
____ _ ` � N � ______I
� p ry ' __
O
_ _ _ _ ` N �O �� I
. N La ` _-___ �_�__
'-- ---������ � , l ---�-- ----.-I
'------I—�\ � � _ -----� ------
L"' _
1
�- --�
�------ � -r
ti
---' I
` ----� ,�J,.�,
�q -_---� -���, �
----y --1JyO_�_'
m -3'I
�' t'------'
�-.---�) i-----�-�;)
�___-� -__---'�I
� _ ___ ___-___;I
�'__'_ _'____'�
3.4`5� �
�� ' _______
^ � ' _ � (
� �)
�
Z
W
C.�
L.LJ
J
�
O
m �
m O
. Lii
Oi
N �
a
.�
�o
�o
��
x
` U�J
m W F.~i
� O v/
� �
W W a
x
a
U
�
L�
J
a�
2 �
C� .
O
m �
I`-� \
Na
.�
�o
�o
��
C.�
Z
- �
> O
Q �
�
L.� O
F—J�
Z Q �
W2�
v�ima
N��
wmo
cNn r- o
QN�
�
y g o
� ��
w
o Q
a
� o
Z P
� �
N �
N
W o
` (� a
� o
�
� m��o
z
� � �� �
U
Q ��3�
V � ��
^o�
�
Y
J
Q
�
W
�
�
�
�
0
�
d.
'
I C
U
�
d
I �
U
L
I �
N
P
0
I--- N
U L
w a
� �
O
� U
� �
LL P
O
N o
� �
— o
� �
J �
i
c�
0
0
M
II
� �
W
J
a
U
N
—�/ � I � _ � , _ _
3NF'I HOISIH�7�[
■
�
�
O
C/)
— -�--� — —
� I
� [uv i a i� • I ¢� � ` ` ' -
'-- -p.l.���I ; ¢ _ � �� �
� � ; �a m
. � � r ; � � �
a ; S; � ^a � F ; �+ �� k - � �
� ��_�� �;. �� � � �e�,��;��
�.-� ��.,���.�� -- -� J , B o�
�— -�
� . � � ---- —
; �- � -�-- � - � ---- p _
^_ ; '� 1 -�-; �;q ;,q ,�, :p� ;� R � I \
--__-_ �� :.�_ - -�_ m ^ e n o � � �
---, ; o R � � ; � -- -I � o �..`
� �
---��- N � N JCO�H.7 --�- I ' P g N n�P`
--- �- 'a � N p --�---� �---�--I tr � � �` `
--- � - � Q � � -&f-- --- R-- e _ �� � �
►- _—�� � , —1 � — ---I _ ,_ �
'_-_=- ��_ ;_�-_ —-- � __==____0� e
� � . � ��
- � M
., - - - a� az�nna�va.t.a�
---- � � - � —
- `+- ry ` � , .-`�'-- � --- R - , , _ , � � _ p
0 N ` nf
W
.CVIa iulHlinala _ ` , � ' _ � � � � ; . . . . . . . . �
---�- "- � � -R -�� �J,��, �
--- $O n ; � �-- �--- � --- � ') "� �
---- � -- -- � 'I ;
� II -
� --�- � „ m p �.__ II —� ')
E--- e :/ �— II —�--
! II � ;I
" �' � �II - -
---
n N � �� Fl
'^ ^ � ��_-� __-� II __--� - ;) .
II _'�
� J "- - - - a4i, uarn�a � _
p_ _ _ ' '.I I � L�I
� � - �� � : : � IE� ; � z Z
// Il� • ;I w J
�
�
N{� o 0
41 �
o �
�
� o Q
o �
Z Q
� N
vi �
�
w o
�� s
� �
m�� Z
` ���v
wZo W
a ��;o
V 5���
�
W Z
J Q w
� J J
� J Z W J
W — J Q
� Z � W S �
O Q O J Z Q
tn U 0 z � 2
� d � � � �
O O O O O O
� � � � � �
W
z
J
Z
— �-
a c�
� w
0 7
O
� �
� 0._
O
H- �
(n O
N
H �
N �
X J
w
c
v�
v
0
4-
U
N
Lq
E
�
�
0
N
L
n
>
U
�
c
0
�
O
%
a
z
c�
0
0
0
M
��
� �
W
J
Q
U
�
C/)
2,^
V
J
W
w
�
�
�
• o �4I
I- S W I
� ���
- J H W
J N2
Q F- W2Q
w W I- F- Z
z � ��a � � v
W � cn — cn w
Ur tn WN N �
WJZ H O
W w J O C� F-- W �
J � ��— w w �
� Z (n W �
Z - J � F- �
- tn W a. F-- c/> O
N WO �
, I- F- . N
F-- cn ln . F-- E-
d N d (n -
� XOZ � X �
� W,..Q � W J
�
�
d
�
U
N
L
�
v
�
v
0
I
N
a
>
U
�
c
0
n
0
i
�
u
z
c�
0
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 8/17/2004
DATE: Tuesday, August 17, 2004
LOG NAME: 20STREET LIGHTS REFERENCE NO.: G-14460
SUBJECT:
Approval of City Participation for the Installation of Street Lights and Street Name Signs in Various
Locations �
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute Community Facilities
Agreements for the installation of street lights and street name signs with the following:
DEVELOPER
Hillwood Rld., L.P.
Classic Homes, Inc.
FHP Partners, L.P.
Sheffield, L.P.
KB Home
Arcadia Land Partners 19, Ltd.
D.R. Horton - Texas, Ltd.
J.L.K. Land Limited
One Sendera Ranch, L.P.
One Sendera Ranch, L.P.
Saglio Partnership, Ltd.
Centex Homes, a Nevada Corporation
Mike Sandlin Companies, Inc.
KB Home Lone Star L.P.
Texas Housing and Economic Resources
Glen Mills, Ltd.
Hillwood RLD., L.P.
Continental Homes of Texas, L.P.
Boat Club Residential, Ltd.
G&G Development
Beechwood Creeks, Ltd.
One Sendera Ranch, L.P.
PROJECT
Creekwood Addition, Phase 1
Emerald Park, Section 1
Fossil Hill Estates Addition, Phase 2
Heritage Addition, Phase 2E
Hidden Meadows, Phase 2
Marine Creek Ranch, Section 2
McPherson Ranch, Phase 2
Rolling Meadows Addition, Phase 1
Sendera Ranch, Phase 2, Section 1A
Sendera Ranch Phase 1, Section 2
Sycamore Pointe, Phase 2
The Quarry, Phase 1
Innisbrook Place, Phase 1
The Villages of Marine Creek
Jean Hills
Glen Mills, Section 3
Lasater, Phase 2, Section 3
Trinity at Heritage 1A
The Trails of Marine Creek
Vista Greens, Phase 2
Beechwood Creeks, Phase 1
Sendera Ranch Boulevard, Section 1
These Community Facilities Agreements are in compliance with the City's Policy for the Installation of
Community Facilities.
,`,�:,. .
'�;� �'�'! ,'�� 1!:'s L '�:.�'�;',J �''!.'
,;=�1 �`i ',7 "'i�;IS%� ,`1
���i�. l �,`:�_•:.; ,r��1�r�
Logname: 20STREET LIGHTS � Page 1 of 3
DISCUSSION:
On March 21, 12001 (M&C G-13181), the City Council approved "Amendment of Policy for the Installation
of Community Facilities Agreements and Approval of Ordinance Establishing Unit Prices for City
participation in Community Facilities Agreements and Street Design Criteria." These recommendations
included city participation of all wiring, street light fixtures, cost and the installation of standard street name
signs on public streets.
These projects were included in the list of the 83 projects submitted to the City prior to July 29, 2003, when
the City Council placed a moratorium on City participation in Community Facilities Agreements for street,
storm drainage, lights and signs facilities.
These CFA's are over $25,000 and therefore require City Council approval:
Project
Creekwood Addition, Phase 1
�meral Park, Section 1
Fossil Hill Estates, Phase 2
Heritage Addition, Phase 2E
Hidden Meadows, Phase 2
Marine Creek Ranch, Section 2
McPherson Ranch, Phase 2
Rolling Meadows, Phase 1
Sendera Ranch, Phase 2, Section 1A
Sendera Ranch, Phase 1, Section 2
Sycamore Pointe, Phase 2
The Quarry, Phase 1
Innisbrook Place, Phase 1
The Villages of Marine Creek
Jean Hills
Glen Mills, Section 3
Lasater, Phase 2, Section 3
Trinity at Heritage, 1A
The Trails of Marine Creek
Vista Greens, Phase 2
Beechwood Creek, Phase 1
Semdera Ranch Boulevard, Section 1
Total
Street Lights
$42,000.00
$54,000.00
$37,500.00
$42,000.00
$25,500.00
$46,500.00
$25,500.00
$55,900.00
$40,500.00
$33,000.00
$24,000.00
$37,500.00
$25,500.00
$31,500.00
$28,500.00
$26,000.00
$40,500.00
$28,500.00
$30,000.00
$27,000.00
$�7,500.00
$54,500.00
$793,400.00
Street Name Signs
$800.00
$1,700.00
$1,400.00
$1,300.00
$900.00
$1,300.00
$800.00
$1,200.00
$700.00
$900.00
$500.00
$1,200.00
$1,000.00
$1,100.00
$800.00
$900.00
$1,300.00
$500.00
$1,300.00
$1,100.00
$900.00
$500.00
$22,100.00
Totals
$42,800.00
$55,700.00
$38, 900.00
$43, 300.00
$26,400.00
$47,800.00
$26,300.00
$57,100.00
$41,200.00
$33,900.00
$24, 500.00
$38,700.00
$26,500.00
$32,600.00
$29,300.00
$26,900.00
$41,800.00
$�9,000.00
$31,300.00
$28,100.00
$38,400.00
$55,000.00
$815, 500.00
The total cost for City participation will be $815,500. Of this, $793,400 is for the installation of street lights
and $22,100 is for the installation of street name signs.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the
Street Improvements Fund.
TO Fund/Account/Centers FROM Fund/Account/Centers�
Logname: 20STREET LIGHTS Page 2 of 3
Submitted for City Manager's Office bv�
Originating Department Head•
Additional Information Contact:
C115 541200 020115136802
C115 541200 020115136801
Marc Ott (8476)
Robert Goode (7804)
Robert Goode (7804)
$22.100.00
$793.400.00
Logname: 20STREET LIGHTS Page 3 of 3