Loading...
HomeMy WebLinkAboutContract 35144AMENDIl11ENT P10. 1 TO CITY SECRETARY CONTR�4CT NO. �'�!J � STATE OF TEXAS § ,-- a... , t- § CITY SECRETARY CONTRACT NO. ` �/ COUNTY OF TARRANT § WHEREAS, the City of Fort Worth ("City") and Trinity Engineering Testing Corporation, DBA Kleinfelder ("Laborator�') made and enfered into City Secretary Contract N��.3� (the "AgreemenY') authorized by City Council via M&C C-21196 on December 13, 2005; and WHEREAS, the Agreement involves geotechnical and material testing services; and WHEREAS, it has become necessary to execute Amendment No. 1 to said Agreement to correct a typographical/formatting error shown on Attachment °B" to the Agreement. NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement that amends the Contract: 1. In order to rectify a typographical/formatting error, Attachment "B" of the Agreement is replaced with Attachment "B" attached hereto and incorporated herein. 2. All other provisions of the Agreement which are not expressly amended herein shall remain in full force and effect. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANI� � c. �, i r. n- iz; ��., ��, � �R1GINq�, —1— ,:''�'����-,I_-;t 'i;'�v�'Ja:id� � ;%'� 1 , :���:, , �� � ���;� <�l ��u� �s,� !�.��'4��r::� � ��, .� �:;�� ��U, ���:'', fG � EXECUTED on this the � day of , 2007, in Fort Worth, Tarrant Couniy, Texas. ATTEST: ;� . I Marty Hendri City Secretary APPROVAL RECOMMENDED: -- . _ - - - -- ��. _- � �l �.f_l -' , �Pn, �. . \ _ . Doug Rademake , Director Of Engineering IVU �i$cC It�QiJIR�D CtTY OF FORT WORTH: _ Marc A. Ott Assistant City Manager Approve to Form and Legality: Amy J. se 4ssistan City Attomey LABORATORY: Trinity Engineering Testing Corporation, DBA Kleinfelder By: � ���.C�(,�V�'� \.:�Gt� ��1�� Name: Michael M. Shiflett, P.E. Title: Principal ,:. �, ,� ,���?i�o�;;� �;:; ����;.,J:';, , �,`, .,, c — 2 — M , j ', � �' � i���'� �l,`( V��� �'_.�V�'. 1�.� �,.,; � .-, -,U , , ;�;;r, ,, c�yI i i �S°; r�� .� `i t•. U�fi � �G��. A�AC�$ {�N � �J7� � FEE SCHEDULE For Construction Material Testing and Geotechnical Borings Concrete Compression Test Cylinders (Min. 4 per set), each Air ContentlSlump/Temperature/Next Day Cylinder Pick up, hour Flexural Beams, each T** Coring (4" DIA to 6" depth 4/trip) 2" Coring for de th isolation to 6" each additional inch Thiclaiess Measurement, each Patching of Core Holes, each Coring Technician Time, hour Flexural Test of Beams, each Compression Test Cylinders, each Sawing and/ar Capping Cores & Cylinders, each Compression Test of Cores, each Compression Test Specimen Hold Mix Design Review, each Mix Design Formulation w/Aggregate Tests Include Specific Gravity/Sieve Analysis/Unit WT-200, each Addiiianal Mix Design Utilizing Above Mi�. ? nalysis, each Mix Design Formulation Revision, each Engineering Tech (I�TICET) for Qualiry Assurance Monitoring of Onsite Work, hour Pre- our Reinforcing Steel Placement Inspection, hour Samnlin� for In lab Test, hour Minimum Vehicle Charge Batching Mix Design in Preparation for Making Lab Confirmation Cylinders or Beams, hour Batch Plant Observation Supporting Concrete Placement, hour Concrete Flatness, Sq. Ft. Certified Welding Inspector, hour Field Gradation Equipment, test each *** Includes Cost of Technician Time Coring and Patching Core Holes Page 1 of 5 $15.00 $35.00 (Min 3 hours) $25.00 ***$56.00 �M�4pertrip) add inch $6.00 $40.00 (Mt� 4 per trip) $ 8.00 $6.00 $35.00 $25.00 $55.00 $100.00 $550.00 $200.00 $200.00 $45.00 $35.00 $40.00 N/C $25.00 $35.00 $45.00 per sq. ft. $0.02 min. $500.00 $55.00 N/C $15.00 �,.. ,-,. . -. �;,;� -� � �' ';'�. �,'�; J„� a� �, . ! ';J�,�,�'c,l;,- �� , �:�7 � ;: ���1�c�����o���l s' ,:� � 'J U �''� `�''�";''� .'t• � � ; �: �.�I'U, �(��^ �IJo :ia��;�1iU'Tfy U�'2b�sc = � - _ FEE SCHEDULE For Construction Material Tes�ing and Geotechnical Borings I�vIAC ++ Density Nuclear Method, hour Core In place Density, each Coring I�MAC Technician Time, Core Depth Measurement, core Patching Core Holes, each Min Vehicle Charge 4" DIA./6" Depth, core Each Additional Inch, Inch **T Rolling Pattem Nuclear Gau� Nuclear Moisture Density Gauge, Extraction and Gradation, each Lab Density, each Stability Test, each Maximum Specific Gravity, each hour hour Disposal Fee Batch Plant Hot Bin Analysis, each Material Sampling For In Lab Tests, hour ++ $45.00 $32.00 $56.00 � (Min 4/trip) $40.00 $6.00 *T* $45.00 $80.00 $170.00 $40.00 $160.00 $75.00 N/C $55.00 $40.00 *** Includes Gauge Charge ++ First hour and half $135.00 any additional time after that is $45.00 per hour. (includes Technician Time, Trip and Gauge Charge). Page 2 of 5 FEE SCHEDULE For Construction Material Testing and Geotechnical Borings r, � �-r�;;`n,�, � � „ 'I, � ��; �p, � � 1 ,.:���3'�.��GZ;� �(����,t�l'�.iJ � ,�'���,; ? S'�' cl 1���`�,' ��1 ,�, � ;���.;_;���� u, � Page 3 of 5 � ��, .. r,,l' 6�rJ � U���+, � � - _,. --- .� Qa`�ACFII�EN� � FEE SCHEDULE For Construction Material Testing and Geotechnical Borings Geotechnical Undisturbed Soil Sample, each Visual Classification, each Classification ASTM D-2487, each Sample Extrusion, each Sample Preparation, each Atterburg Limits RAW PI, each Soil w/Additive, eacb Bar Lineal Shrinkage, each Moisture Density Relarionship (Proctor) Standard (ASTM D-698), each Moisture Density Relationship (Proctor) Modified (ASTM D-1517), each THD 113E, each Unit Weight, each Unit Weight (Dry Rodded), each -200 Sieve Analysis, each Laboratory 1Vioisture Content, each Sieve Analysis (Fine Aggregate), each Sieve Analysis (Large Aggregate), each Sieve Analysis (Finer than 200 Sieve), each Lime or Cement Series Deternunation (5 points), each Optimum Lime Content, each pH Series (6 points), each Specific Gravity, each Absorption, each Los Angeles Abrasion (Large Aggregate), each Los Angeles Abrasion (Small Aggregate), each Texas Wet Ball Mill, each Gradation (Lime or Cement Stabilized), each *** Limed Soil Depth Measurement, each ++ In Place Moisture Density (Nuclear Method Grain Size Analysis (Mechanical and Hydrometer), each Unconfined Compression Test Including Moisture, each Unconfined Compression Test Soil, each Unconfined Compression Test Rock, each Confined Compression Test (LTU), each Triaxial Test Unconsolidated Undrained, speci Triaxial Test Multiple Stage, stage Triaacial Consolidated Undrained w/Pore Pressure Measu Tri�ial Consolidated Drained Multiple Stage, stage Tri�ial Consolidated Drained Single Stage, stage Tria�cial Consolidated Drained Three Stage, stage Consolidated Test, each Direct Shear Consolidated Drained Sand & Gravel, poin� Direct Shear Consolidated Drained Silt & Clay, point Direct Shear Consolidated Undrained Sand & Gravel, pc hour Page 4 of 5 $11.00 $10.00 $105.00 N/A $10.00 $45.00 $50.00 $16.00 $145.00 $175.00 $180.00 $20.00 $20.00 $30.00 $8.00 $60.00 $60.00 $35.00 $255.00 $200.00 $210.00 $45.00 $25.00 $235.00 $215.00 $175.00 $30.00 ***$30.00 ++$45.00 $150.00 $3 0.00 $27.00 $35.00 $100.00 $85.00 $650.00 $650.00 $300.00 $780.00 $350.00 $200.00 $350�00 $175;00 ft.) (3 Min Tech Tune & Trip Included) (3 Min Tech Time & , , ; � � � , �� ,.-- _. _ __: , , .,- . �st �'�5 ; � ��; _ , ��� __,...��.,._ J U�� .. �:�' :i ll �1 � ���� ��� °�..� A7�A��iME�� � FEE SCHEDULE For Construction Material Testing and Geotechnical Borings Direct Shear Consolidated Undrained SIlt & Clay, point California Bearing Rario, each THD Triaxial, each Percent Swell, each Permeability Test Falling Head, each Permeability Test Triaxial, each Permeability Test Flex Wall, each Permeability Test Fixed Wall, each Permeability Test Clay Soils, each Permeability Test Granular Soils, each Permeability Test Pressure Head wBeck Pressure Saturation, each Electrical Resistivity, THD Method, each Truck Mounted Mobilizarion, mile and trip Buggy/Ave Mounted, mile and trip Per Diem Per Man, day Intermittent Soil Sampling w/Truck @ 5' Intervals 0-25' Depth, foot Intermittent Soil Sampling w/Truck , 5' Intervals 25-50' Depth, foot Inter.nittent Soil Sampling vY/Truck @ 5' Intereals 50-100' Depth, feo± Continuous Soil Sampling w/Truck 0-10' Depth, foot Intermittent Soil Sampling w/ATV @ 5' Intervals 0-25' Depth, foot Intermittent Soil Sampling w/ATV @ 5' Intervals 25-50' Depth, foot Intermittent Soil Sampling w/ATV @ 5' Intervals 50-100' Depth, foot Continuous Soil Sampling w/ATV 0-10' Depth, foot Continuous Soil Sampling w/ATV 10-50' Depth, foot Auger Drilling Without Sample, foot Rock Coring w/NX Size, Core Barrel0-25' Depth Carbide Bit, foot Rock Coring w/NX Size, Core Barre125-50' Depth Carbide Bit, foot Rock Coring w/NX Size, Core Barrel 50-75' Depth Carbide Bit, foot Rock Coring w/NX Size, Core Barre175-100' Depth Carbide Bit, foot Rock Coring w/NX Size, Core Barre150-75' Depth Diamond Bit, foot CME 5' Continuous Sampler 0-50' Depth, run Stand By or Access Time, hour Drilling w/Auger Rig, hour Minimum Drill Fee Post Injecrion Sub-grade Evaluation Per Boring Including Moisture and Free Swell Determination Minimum Post Injection Charge Field Time Engineer, hour _ _ *** Includes Gauge Charge ++ First hour and half $135.00 any additional time after that is $45.00 per hour. (includes Technician Time, Trip and Gauge Charge). Page 5 of 5 $200.00 $250.00 $800.00 $80.00 $200.00 $300.00 $300.00 $200.00 $290.00 $250.00 $350.00 $100.00 Mile - $3.25 -ip - $250.00 Mile - $5.00 -ip - $350.00 $85.00 $11.00 $12.00 $15.00 $15.00 $12.00 $13.00 $15.00 $14.00 $18.00 $ 8.00 $18.00 $20.00 $21.00 $25.00 $27.00 $15.00 $120.00 $150.00 $600.00 $500.00 $900.00 $100.00 Per FT