HomeMy WebLinkAboutContract 35144AMENDIl11ENT P10. 1
TO CITY SECRETARY CONTR�4CT NO. �'�!J �
STATE OF TEXAS §
,-- a... ,
t-
§ CITY SECRETARY CONTRACT NO. ` �/
COUNTY OF TARRANT §
WHEREAS, the City of Fort Worth ("City") and Trinity Engineering Testing Corporation,
DBA Kleinfelder ("Laborator�') made and enfered into City Secretary Contract N��.3� (the
"AgreemenY') authorized by City Council via M&C C-21196 on December 13, 2005; and
WHEREAS, the Agreement involves geotechnical and material testing services; and
WHEREAS, it has become necessary to execute Amendment No. 1 to said Agreement to
correct a typographical/formatting error shown on Attachment °B" to the Agreement.
NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized
representatives, enter into the following agreement that amends the Contract:
1.
In order to rectify a typographical/formatting error, Attachment "B" of the Agreement is replaced
with Attachment "B" attached hereto and incorporated herein.
2.
All other provisions of the Agreement which are not expressly amended herein shall
remain in full force and effect.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANI�
� c. �, i r. n- iz; ��., ��,
� �R1GINq�,
—1— ,:''�'����-,I_-;t 'i;'�v�'Ja:id�
� ;%'� 1 , :���:, , �� � ���;�
<�l ��u� �s,� !�.��'4��r::�
� ��, .� �:;�� ��U, ���:'',
fG �
EXECUTED on this the � day of , 2007, in Fort Worth,
Tarrant Couniy, Texas.
ATTEST:
;� .
I
Marty Hendri
City Secretary
APPROVAL RECOMMENDED:
--
. _ - - - -- ��.
_- � �l �.f_l -' , �Pn,
�. . \ _ .
Doug Rademake , Director
Of Engineering
IVU �i$cC It�QiJIR�D
CtTY OF FORT WORTH:
_
Marc A. Ott
Assistant City Manager
Approve to Form and Legality:
Amy J. se
4ssistan City Attomey
LABORATORY:
Trinity Engineering Testing Corporation,
DBA Kleinfelder
By:
� ���.C�(,�V�'� \.:�Gt� ��1��
Name: Michael M. Shiflett, P.E.
Title: Principal
,:. �, ,� ,���?i�o�;;�
�;:; ����;.,J:';, , �,`, .,, c
— 2 — M , j ', � �' � i���'� �l,`(
V��� �'_.�V�'. 1�.�
�,.,; � .-, -,U ,
, ;�;;r, ,, c�yI i i �S°;
r�� .� `i t•. U�fi � �G��.
A�AC�$ {�N � �J7� �
FEE SCHEDULE
For Construction Material Testing and Geotechnical Borings
Concrete
Compression Test Cylinders (Min. 4 per set), each
Air ContentlSlump/Temperature/Next Day Cylinder Pick up, hour
Flexural Beams, each
T** Coring (4" DIA to 6" depth 4/trip)
2" Coring for de th isolation to 6" each additional inch
Thiclaiess Measurement, each
Patching of Core Holes, each
Coring Technician Time, hour
Flexural Test of Beams, each
Compression Test Cylinders, each
Sawing and/ar Capping Cores & Cylinders, each
Compression Test of Cores, each
Compression Test Specimen Hold
Mix Design Review, each
Mix Design Formulation w/Aggregate Tests Include Specific Gravity/Sieve
Analysis/Unit WT-200, each
Addiiianal Mix Design Utilizing Above Mi�. ? nalysis, each
Mix Design Formulation Revision, each
Engineering Tech (I�TICET) for Qualiry Assurance Monitoring of Onsite Work,
hour
Pre- our Reinforcing Steel Placement Inspection, hour
Samnlin� for In lab Test, hour
Minimum Vehicle Charge
Batching Mix Design in Preparation for Making Lab Confirmation Cylinders
or Beams, hour
Batch Plant Observation Supporting Concrete Placement, hour
Concrete Flatness, Sq. Ft.
Certified Welding Inspector, hour
Field Gradation Equipment, test
each
*** Includes Cost of Technician Time Coring and Patching Core Holes
Page 1 of 5
$15.00
$35.00 (Min 3 hours)
$25.00
***$56.00 �M�4pertrip)
add inch $6.00
$40.00 (Mt� 4 per trip)
$ 8.00
$6.00
$35.00
$25.00
$55.00
$100.00
$550.00
$200.00
$200.00
$45.00
$35.00
$40.00
N/C
$25.00
$35.00
$45.00
per sq. ft. $0.02
min. $500.00
$55.00
N/C
$15.00
�,.. ,-,. . -. �;,;� -� �
�' ';'�. �,'�; J„� a� �, .
! ';J�,�,�'c,l;,- �� ,
�:�7 � ;: ���1�c�����o���l
s' ,:� � 'J U �''� `�''�";''� .'t•
� � ; �: �.�I'U, �(��^
�IJo :ia��;�1iU'Tfy U�'2b�sc
= � - _
FEE SCHEDULE
For Construction Material Tes�ing and Geotechnical Borings
I�vIAC
++ Density Nuclear Method, hour
Core In place Density, each
Coring I�MAC Technician Time,
Core Depth Measurement, core
Patching Core Holes, each
Min Vehicle Charge
4" DIA./6" Depth, core
Each Additional Inch, Inch
**T Rolling Pattem Nuclear Gau�
Nuclear Moisture Density Gauge,
Extraction and Gradation, each
Lab Density, each
Stability Test, each
Maximum Specific Gravity, each
hour
hour
Disposal Fee
Batch Plant Hot Bin Analysis, each
Material Sampling For In Lab Tests, hour
++ $45.00
$32.00
$56.00 � (Min 4/trip)
$40.00
$6.00
*T* $45.00
$80.00
$170.00
$40.00
$160.00
$75.00
N/C
$55.00
$40.00
*** Includes Gauge Charge
++ First hour and half $135.00 any additional time after that is $45.00 per
hour. (includes Technician Time, Trip and Gauge Charge).
Page 2 of 5
FEE SCHEDULE
For Construction Material Testing and Geotechnical Borings
r, � �-r�;;`n,�, �
� „ 'I, � ��; �p, � � 1
,.:���3'�.��GZ;� �(����,t�l'�.iJ �
,�'���,; ? S'�' cl 1���`�,' ��1
,�, � ;���.;_;���� u, �
Page 3 of 5 � ��, .. r,,l' 6�rJ � U���+, �
� - _,. --- .�
Qa`�ACFII�EN� �
FEE SCHEDULE
For Construction Material Testing and Geotechnical Borings
Geotechnical
Undisturbed Soil Sample, each
Visual Classification, each
Classification ASTM D-2487, each
Sample Extrusion, each
Sample Preparation, each
Atterburg Limits RAW PI, each
Soil w/Additive, eacb
Bar Lineal Shrinkage, each
Moisture Density Relarionship (Proctor)
Standard (ASTM D-698), each
Moisture Density Relationship (Proctor)
Modified (ASTM D-1517), each
THD 113E, each
Unit Weight, each
Unit Weight (Dry Rodded), each
-200 Sieve Analysis, each
Laboratory 1Vioisture Content, each
Sieve Analysis (Fine Aggregate), each
Sieve Analysis (Large Aggregate), each
Sieve Analysis (Finer than 200 Sieve), each
Lime or Cement Series Deternunation (5 points), each
Optimum Lime Content, each
pH Series (6 points), each
Specific Gravity, each
Absorption, each
Los Angeles Abrasion (Large Aggregate), each
Los Angeles Abrasion (Small Aggregate), each
Texas Wet Ball Mill, each
Gradation (Lime or Cement Stabilized), each
*** Limed Soil Depth Measurement, each
++ In Place Moisture Density (Nuclear Method
Grain Size Analysis (Mechanical and Hydrometer), each
Unconfined Compression Test Including Moisture, each
Unconfined Compression Test Soil, each
Unconfined Compression Test Rock, each
Confined Compression Test (LTU), each
Triaxial Test Unconsolidated Undrained, speci
Triaxial Test Multiple Stage, stage
Triaacial Consolidated Undrained w/Pore Pressure Measu
Tri�ial Consolidated Drained Multiple Stage, stage
Tri�ial Consolidated Drained Single Stage, stage
Tria�cial Consolidated Drained Three Stage, stage
Consolidated Test, each
Direct Shear Consolidated Drained Sand & Gravel, poin�
Direct Shear Consolidated Drained Silt & Clay, point
Direct Shear Consolidated Undrained Sand & Gravel, pc
hour
Page 4 of 5
$11.00
$10.00
$105.00
N/A
$10.00
$45.00
$50.00
$16.00
$145.00
$175.00
$180.00
$20.00
$20.00
$30.00
$8.00
$60.00
$60.00
$35.00
$255.00
$200.00
$210.00
$45.00
$25.00
$235.00
$215.00
$175.00
$30.00
***$30.00
++$45.00
$150.00
$3 0.00
$27.00
$35.00
$100.00
$85.00
$650.00
$650.00
$300.00
$780.00
$350.00
$200.00
$350�00
$175;00
ft.)
(3 Min Tech Tune &
Trip Included)
(3 Min Tech Time &
, ,
; � � � , �� ,.-- _. _ __:
, , .,- .
�st �'�5 ; � ��; _ ,
��� __,...��.,._
J U�� .. �:�' :i ll �1 � ���� ��� °�..�
A7�A��iME�� �
FEE SCHEDULE
For Construction Material Testing and Geotechnical Borings
Direct Shear Consolidated Undrained SIlt & Clay, point
California Bearing Rario, each
THD Triaxial, each
Percent Swell, each
Permeability Test Falling Head, each
Permeability Test Triaxial, each
Permeability Test Flex Wall, each
Permeability Test Fixed Wall, each
Permeability Test Clay Soils, each
Permeability Test Granular Soils, each
Permeability Test Pressure Head wBeck Pressure Saturation, each
Electrical Resistivity, THD Method, each
Truck Mounted Mobilizarion, mile and trip
Buggy/Ave Mounted, mile and trip
Per Diem Per Man, day
Intermittent Soil Sampling w/Truck @ 5' Intervals 0-25' Depth, foot
Intermittent Soil Sampling w/Truck , 5' Intervals 25-50' Depth, foot
Inter.nittent Soil Sampling vY/Truck @ 5' Intereals 50-100' Depth, feo±
Continuous Soil Sampling w/Truck 0-10' Depth, foot
Intermittent Soil Sampling w/ATV @ 5' Intervals 0-25' Depth, foot
Intermittent Soil Sampling w/ATV @ 5' Intervals 25-50' Depth, foot
Intermittent Soil Sampling w/ATV @ 5' Intervals 50-100' Depth, foot
Continuous Soil Sampling w/ATV 0-10' Depth, foot
Continuous Soil Sampling w/ATV 10-50' Depth, foot
Auger Drilling Without Sample, foot
Rock Coring w/NX Size, Core Barrel0-25' Depth Carbide Bit, foot
Rock Coring w/NX Size, Core Barre125-50' Depth Carbide Bit, foot
Rock Coring w/NX Size, Core Barrel 50-75' Depth Carbide Bit, foot
Rock Coring w/NX Size, Core Barre175-100' Depth Carbide Bit, foot
Rock Coring w/NX Size, Core Barre150-75' Depth Diamond Bit, foot
CME 5' Continuous Sampler 0-50' Depth, run
Stand By or Access Time, hour
Drilling w/Auger Rig, hour
Minimum Drill Fee
Post Injecrion Sub-grade Evaluation Per Boring Including Moisture and Free
Swell Determination
Minimum Post Injection Charge
Field Time Engineer, hour _ _
*** Includes Gauge Charge
++ First hour and half $135.00 any additional time after that is $45.00 per
hour. (includes Technician Time, Trip and Gauge Charge).
Page 5 of 5
$200.00
$250.00
$800.00
$80.00
$200.00
$300.00
$300.00
$200.00
$290.00
$250.00
$350.00
$100.00
Mile - $3.25
-ip - $250.00
Mile - $5.00
-ip - $350.00
$85.00
$11.00
$12.00
$15.00
$15.00
$12.00
$13.00
$15.00
$14.00
$18.00
$ 8.00
$18.00
$20.00
$21.00
$25.00
$27.00
$15.00
$120.00
$150.00
$600.00
$500.00
$900.00
$100.00
Per FT