HomeMy WebLinkAboutContract 35366 (2)COMI��IiTNITY FACILITIES AGREEMENT
THE STATE OF TEXAS §
City Secretary
� = --
COLTNTY OF TARRANT � Contract No. �""� ��'��
WHEREAS, Eagle Mountain-Saginaw Independent School District, hereinafter
called "Developer", desires to make certain improvements to
Ea�le Mountain-Sa�inaw ISD Elementary School # 13 , an addition to the City of Fort
Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant, Denton, Parker, and Wise Counties, Te�as, hereinafter called
"City", to do certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through Steven G. Newcom, its duly
authorized Board President, and the City, acting herein by and through Marc A. Ott, its
duly authorized Assistant City Manager, for and in consideration of the covenants and
conditions contained herein, do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved and subsequently amended by the City
Council of the City of Fort Worth, is hereby incorporated into this
Community Facilities Agreement as if copied herein . verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section II, of the Policy.
Governmental Entity CFA TPW
Eagle Mtn Saginaw ISD
Marcl� 28, 2007
Page. 1 of 5
� ;;-�'��;.;J;';:� �s�'��'��,�
! v���f J��'l°����i�
� , �,.,�..��,J'
E I� Ij, :';:,� ;;��r � i� ���`�
� � r,� ,
D. The Developer shall award all contracts for the construction of
community facilities in accordance with Section II, paragraph 7 of the
Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in confarmance with paragraph 8, Section II, of the
Policy.
F. Developer shall install or adjust all of the required utilities to serve the
development ar to construct the improvements required herein.
G. Developer agrees that the City shall not be responsible for any
inadequacies in the preliminary plans, specifications and cost estimates
supplied by the Developer for this Agreement and hereby releases the
City from same.
H. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104.100, Ordinance 7234).
I. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to
construct current and future improvements provided for in this
agreement.
J. Developer agrees to construct proposed improvements as shown on the
eahibits attached hereto. The following exhibits are made a part
hereof: Water (A)None; Sewer (A-1) None; Paving (B)Attached
Storm Drain (B-1) Attached; Street Lights and Signs (C) Attached.
K. City is requiring the widening and/or straightening of the City road(s)
contemplated herein. .City shall not be responsible for aiiy costs that
may be incurred far the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developex(s) agree to install or to cause to have installed, the streets,
storm drainage, street lighting, street name sign and other community
y- , . ,.- a
° '�.>�'�'J`�.1�'� '�:���J r.�
Goverrunental Entity CFA TPW �p�; ,, �,�� r��,} �, �,�
Eagle Mm Sagina��� ISD '�, J U c �� �'�:: �';L IL�,� 1�
March 28, 2007 Zi� •`.;sr„^^';''iU y�I
Page2of5 tU� .�.J�:: u�, U��,.�
facilities improvements shown as "current improvements" on the attached
Exhibits B, B 1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Eahibits B, B1,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated at $585,409.60.
su_mmaRY o� - - - -- _
cosr
EAGLE MOUNTAlN SAG/NAW /SD ELEMENTARY NO
13
Item Developer City Cost Total Cost
Cost
A. Construction $ -
$
1. Streets $391,345.00 391,345.00
$
2. Storm Draina e $139,565.00 139,565.00
$
3. Street Li hts $22,400.00 22,400.00
$
4. Street Name Si ns $245.00 245.00
B. En ineerin Desi n $ -
C. Construction Engineering
and Management by DOE $ $
(4% 21,236.40 21,236.40
D. Materials Testing by DOE $ $
2% 10,618.20 10,618.20
$ $
TOTALS 585,409.60 $ - 585,409.60
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
Governmental Entity CFA TPW � �, 1'�:: i �:s v v�i'J
Eagle Mm Sagiva��� ISD ���1� �s' �;:�5 '��i.U�
March 28, 2007 �i� ;;';`�;�-�;`�U �';� �"
Page3 of5 ' '�"�'�f`� `'��;°
- -J,�_ __ _ ^
The developer is responsible for installation of sidewalk and a separate financial
guarantee is required in the form of a bond or check far the cost of the sidewalk.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
Governmental Entity CFA TPW
Eagle Mtn Saginaw ISD
March 28, 2007
Page 4 of 5
�'a'Y���Jf:� :��i����J�r�l;
'v���' ���1;���'':?%7 ;;.
�, -,�j �j9
: ���
�5�, '.'� ;i�:U� U,��1�:'; ;��
�� �,e.�,
� _r_=a � _
: `,�!�'��C� l?��,�e
IN TESTIMONY WHEREOF. the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said D�veloper
has executed this instrument in triplicate, at Fort Worth, Texas this the � day of �, 1�.4l��
, 200�.
CITY OF FORT WORTH
Marc A. Ott
Assistant City Manager
ATTEST:
y-� . .
Marty Hendrix
Citv Secretary
DEVELOPER
Eagle Mountain- Saginaw ISD
.��
Steven G. Newcom
President, Board of Trustees
ATTEST:
�
�% � . —�"�� . c�>= -�
Secretary, B ard of Trustees
Governmental Entity CFA TPW
Eagle Mtn Saginaw ISD
March 28, 2007
Page 5 of 5
'J R�����iE�
Approval Recommended:
i��ji
�
Robert Goode, P. E Director
Transportation and Public Works
Approved� to Form and Legality:
Amy J.�art�ey
Assistant City A
1lif� M�C ���,UdIt�I3
�,r����'�;)� �� ���� ��.
, �v���� ���;u?� ��i���
� �.,;�,-,
�. �� :.:�,:;. �, �, ,U ����`�
� �, � ,�a:�ln.�� �,_ ��.,
OPINION OF PROBABLE CONSTRUCT/ON COST
PROJECT: Paving Improvemenfs fo serve Eagle Mounfain-
Saginaw Elementary School No. 13
TNP JOB # VLK06295
ITEM DESCRIPTION QTY.
I PERMANENT PAVING IMPROVEMENTS
Unclassified Street Excavation
12" Reinforced Concrete
6" Reinforced Concrete
6" Lime Stabilized Sub rade
H drated Lime 36#/SY
6"HMAC 2"T eD&4"T e6
Concrete Street Header
6" Concrete Curb
4' Sidewalk
T e III Sidewalk Ram
Pavement Stri in & Si na e
H dromulch
Erosion Control
Traffic Control
PAVING SUBTOTAL
City of Fort Worth T/PW Inspection Fee (4%)
of Fort Worth T/PW Materials Testing Fee (2%)
OTHER
Street Liahts
TOTAL
5000
5770
340
8400
151
3240
120
1300
930
1
1
1
1
1
7
CY
SY
SY
SY
TON
SY
LF
LF
LF
EA
LS
LS
LS
LS
EA
DATE: 9/25/2007
COST I TOTAL
$3.50
$40.00
$22.00
$2.25
$105.00
$20.00
$12.00
$2.00
$14.00
$450.00
$10,000.00
$1, 500.00
$3,500.00
$3,500.00
�� �
$17, 500. 00
230,800.00
$7,480.00
$18,900.00
$15,855.00
$64,800.00
$1,440.00
$2,600.00
$13,020.00
$450.00
$10, 000.00
$1,500.00
$3,500.00
$3,500.00
391,345.00
$15,653.80
$7,826.90
400.00
225.70
� �'�`�'�� ��� �,�
� �� ,.
. �1�4�� ,` a�� �
��k`(�
� 1} �ii � �f �i�; � �❑Jii�l
'�:�i'�,)s S1 :'r,J�J
�� :a �-,�'01����: �
,r,q
�� � SI � ,�• 1
`�: . �� �) I` l�J v� lJ �', J�. IJ
��� .�s��Ji``.�fl� �SG`�e
OPINION OF PROBABLE CONSTRUCTION COST
PROJECT: Drainage Improvements to serve Eagle Mountain- DATE: 1/25/2007
Saginaw Elementary Schoo/ No. 13
TNP JOB # VLK06295
ITEM DESCRIPTION QTY. UNIT UNIT COST TOTAL
II DRAINAGE IMPROVEMENTS
21" RCP 15 LF $40.00 $600.00
24" RCP 270 LF $44.00 $11,880.00
42" RCP 200 LF $84.00 $16,800.00
54" RCP 420 LF $135.00 $56,700.00
60" RCP 160 LF $160.00 $25,600.00
5'x5' Dro Inlet 1 EA $5,500.00 $5,500.00
5' Storm Drain Manhole 1 EA $3,300,00 $3,300.00
6' Storm Drain Manhole 1 EA $4,100.00 $4,100.00
24" Headwall 1 EA $2,300.00 $2,300.00
60" Headwall 1 EA $3,900.00 $3,900.00
Rock Ri -Ra 580 SY $35.00 $20,300.00
Trench Safet 1,065 LF $1.00 $1,065.00
DRAINAGE SUBTOTAL $139,565.00
Cit of Fort Worth T/PW ins ection Fee 4% $5,582.60
Cit of Fort Worth T/PW Materials Testin Fee 2% $2,791.30
TOTAL $147,938.90
�r
�i��`'..'� ;?!S�� �U�I�S71�i�'I'•� ��
,�;U'l' ���.; � .�
�., �
� ���,�tr. ;
a'; ' �.�`t�(Ji�i ,nl � � I?,,�,
) i � u.
III STREETLIGHTS
I. STREETLIGHTS COST ESTIMATE:
INTERSECTIONS
MID-BLOCK RESIDENTIAL
CHANGE OF DIRECTION RESIDENTIAL
MID-BLOCK COLLECTOR
MID-BLOCK ARTERIAL
MID-BLOCK ARTERIAL MEDIAN
RELOCATE EXISTING LIGHT
DEVELOPERS COST: $22,400.00
QUANTITY UNIT COST
0 EA $ 2,600
0 EA $ 2,600
0 EA $ 2,600
0 EA $ 2,600
7 EA $ 3,200
0 EA $ 3,200
0 EA $ 1,650
Subtotal
City's Cost
Developer's Subtotal
4% Inspection fee
Project Total
Adjacent Developer's Cost
Developer's Cost
CFA CODE # 2007026
Eagle Mountain Saginaw ISD Elementary # 13
Fort Worth, Texas
PAGE 1 OF EXHIBIT "C"
TOTAL COST
$00,000.00
$00,000.00
$00,000.00
$00,000.00
$22,400.00
$00,000.00
$00,000.00
$22,400.00
$00,000.00
$22,400.00
�a.00
$00,000.00
$00.000.00
$22,400.00
March 14, 2007
. , � .,. . �,�� ; �
� ���JLT!i.�� ''�'vt'l'�{J
�� ��;�( � n �, �'r ii�'� ;�%
-:�}'tt'�� ����-!'��( �
-,,pLr �2�n
. ._5' :'�.::'r.;.� II i �
�l �o '7'�� r�✓ u; U IJII � I�:��� c,_�
II. STREETLIGHTS WORK DESCRIPTION:
1. The Developer shall provide for the installation of streetlights at the approximate locations
shown in exhibit "C", immediately after final acceptance of the street construction, in
accordance with engineering plans and specifications approved by the Transportation and
Public Works Department.
2. Streetlights on residential and/or collector streets can be installed using overhead or
underground conductors with the approval of the director of transportation and Public
Works.
3. The City of Fort Worth will install all the streetlights that use overhead or underground
conductors on residential, and collector streets. The developer agrees to pay the City of
Fort Worth the amount shown below prior to the City starting its design efforts, at the option
of the developer and at their expense they may purchase the poles, fixtures, and mast arms
from the City in order to assure compliance with city material standards
4. Street lights on arterial streets shall be installed with underground conductors
5. The developer agrees to dedicate all easements required for the installation and
maintenance of the street lights and to provide for the installation of any electrical
transformers required for the proper operations of the street light system
6. The estimated cost of this streetlight installation is detailed on page (1) of exhibit "C" and is
summarized below. The streetlights will remain the property of, and will be maintained by
the City of Fort Worth.
DEVELOPERS COST: $22,400.00
March 14, 2007
CFA CODE # 2007026
Eagle Mountain Saginaw ISD Elementary # 13
PAGE 2 OF EXHIBIT ��C„ ,� 1<<:-i � l �v���'�y ;
,; t�-- �,��.
',�JL�I''` ���.5�;;� ����,��`?'��
�� �:�, uU �r;�,,
���, ..�� .,�,��� W �i ��
� ���n
III. STREETLIGHTS LOCATIONS:
MID — BLOCK ARTERIAL:
Cromwell Marine Creek Rd & Future Rd 1
Cromwell Marine Creek Rd 3
Future Rd 3
CFA CODE # 2007026
Eagle Mountain Saginaw ISD Elementary # 13
PAGE 3 OF EXH/BIT "C"
� �� � � 1 � �-... r � o'�� . � � �
a� .�r�.��s�.�11(
FJ��1' .i�5n'���iIS r� �
� p bl �'V f. L'a �•
r�� T,rJin�l'. C1 n l�l �i4 ��
�f �i J�" ��:,�� 1�. � f U� �� �i.C. L1, i
iv
STREET NAME SIGNS
1. The City of Fort Worth will install the street name signs upon final
approval of the street construction. The street name signs will remain
the property of, and will be maintained by, the City of Fort Worth.
2. The Developer will pay for the street name sign installations required
for this development to the extent of $245.00 per intersection. This
unit cost will be revised annually by the Department of Transportation
and Public Works to reflect prevailing costs of materials and labor.
3. This development creates the following one (1) intersection at a cost to
the Developer of $245.00:
Cromwell Marine Creek Rd & Future Road
Eagle Mountain Saginaw ISD Elementary No. 13
CFA code: 2007026 March 14, 2007
_..a....._,.��.,.,�
�a�l;y ;l��;i�`,����dl��`,1
v IFc L, un! U.. �
i�`I��Yr;;��"1�ucj�j�j' S�(`�1'1
e �Cr J�� G'�,
� - -
... �. . � . ... . .
LOCA TION MAP
KT.� r
,
. . , =_ t � � . . .
,!���7'." ii5r'I�"IS �i} �1� �
t� V.(,��;;��(51i�u..,:l�l���� �;
,��o :�.�'���J`.U'f � ���G'�r —
JI.HLC
N __� TEAGUE IVALL AND PERK1111S
A tY00 M�con 8trest
DATE Fort Worfh, Texaa 7BJ02
/NC. Pnon.:(en)sse-e»s.Fax:(ai�)sse-2ais
JAN 2007 �V www.tnp-onllna.com
��������
.:���:�-<�,:�T.� ����F�
z
CITY OF FORT WORTH, TEXAS
ION FOR IMIPROVEMENTS TO SERV
LOCATION MAP
� �
� � 00 ,� ��
� �
� �I �
.. ��
� �.
�� �� �� � � „
�� `_� �� �� �_ �
HMAC TRANSl110N —� 27 PA
i , �Tx ...
i ��-�. {. . � � �_�
� ��-`�-,._� ! j,'u� GY��� i
I/' -T=� (��,/ �. @
� _�-- _'7�^ � � . a � .
� ;�_l,� � Q
� �� � 9�I�JJVTARY
�-_ _�
l i �
1 I � �� ���r�� ��
r � �- ,, ��- ' �; �
� �:� � �
q' � �=��. _ .��;_ - �
.4� �� ��1 ��:� ���- -� _
i � ��"�"� �.
'� i F�� —_ �� —y�� �_
i
i �' �-u���� ; � � � � �.
� : � {� - e-
�.,J \�� � �Y 4 ;•—�,� �`3 �y f � iZ.�t � 'y � 1
\ "�; y�,`� ' F �?�"t ti ) t�
.��y�, �',. i!'�� �.'.'- .'a7� .��y.. �,_/
� �� ,� ^�-� � �v � .----
�_ '- ���—�:_�-- ---
/NC yC
I ; ��'��i �'v;�;:l ::�vl.�: ,; i ,
�:
' ,f ,`i�,�,r, �s�,�, j�,F�
GRAPHIC SCALE ;��`� u '��`' ��'�'�`�J
° ?�, ,. ' ; ��:�1 �� �?^?.
; �'' � -
200 0 100 200 p _ _
SCALE
• A�� � TEAGUE , oNALL AND PERK/NS �
DATE Fort Worth, T�x�• 7Q10�
//VC. rno�.:fei�l��e•6n�.F.x:�e»lase•ra�a
JAN �I00% NWW.1110'0/IIIf11.00A
C TRANS/ 110N
c r�,aNsrnoN
CITY OF FORT WORTH, TEXAS
PAVING IMPROVEAIEN75 TO SERVE NI
E MOUNTAIN-SAqNAW ELE6IENTARY
EXHIBIT B
�
�
5'x5" DROP INLET
I
I 'O . I ' I
�
' . . . . . 'O • .
� , � � I � ,
�
I , �� " . I
. 'O , . I
�
�. I I �. I ,.. I� I ,.. .. I �.
� � � I
�. r. _. ... I �. �.
?__?.. ��! �:
� 42" \ � � _-.�,-.f....".F. �� 54 � RCP �
- — �-- _ ---- _
5' SDMH
� 6' SDMH
I
�
/NC.
�
�
? i • ' �"v
' �� ���. ��.C� `.�
� C:��d ��la�,'.�1 � } iSV�J
G:'�S � {�� r��:)i I'j'!' i j'1j r
GRAPHIC SCAL � ��'`'����� `'��:������(,� 2'�.� �q
,1 3
� I{� ':...��`!J:C:��JL� U�2%�,, t
200 0 100� 200 ` ---_— -
SCAIE
�• Aoo� __ _�_� TEAGUE � oNALL AND PERK/NS
DATE � Fort Worth, T�x�• 7Ef0?
.. � _ //�/C. PhOn�:(a/71J90-677J�F�x:(8/7)JJA•YB/1
JAN 2007 �� r�rr.fnp-onlln�.00e
24 � HEADWALL
W1 TH 45 SY OF
ROCK RlP-RAP
PROPOSED
PA IiEMENT
IMPROVEMENTS
60" HEADWALL
W1TH 535 SY Of
ROCK RlP-RAP
CITY OF FORT WORTH,
EXHIBIT B-1
�
,
'��'�`� L' ;''S; �;"�,�j �, rl�,,
.�,,�. _��1. i
���:v,'� � s�� � '�^g
t�.r �,J'1i L i(l, � ��21,�1,
I
i
SCALE
, � �°��� ^ __ � TEAGUE NALL AND PERK/NS
q -- �too M.00n srr..r '
OATE Fort Worth, T�x�i 7E101
/NC. Phon�:(B/71J9E-Q77J•F�x:(8 V1JJR-P9fJ
JAN 2007 ��� wr�r.fnp-onlln�.aoe
GRAPHIC SCALE
200 0 100 200
CIN OF FORT WORTN, TEXAS T
�HT1NG IAIPROVEMENTS TO SERVE NEW
A�OUNTAIN—SAqNAW ELEMENTARY N0. 13
EXHIBIT C
•
�:.
s+
,.-�e,-.- _.__�__-_. _ . . -_ u
�,'� ��1�:.,J;'-� L �;s'���:;r,D�
��- ,?,p/'. � r ,'1
��� � , ;�r J� ;; i�� �(i: G:��
' L� c,n
. � � °';�J'I� 1�� G i'I i � �
j .(� � „ �•:% t: � �: � �? S � .
� __ .... ,. __�.._�J