Loading...
HomeMy WebLinkAboutContract 35372AMENDMENT NO. 1 STATE OF TEXAS S CITY SECRETARY CONTRACT NO.-`R=% �_ (M&C Needed) - CQUNTY - OF- TARRANT - S - - -- - - - - - - - - - - _ - - - - WHEREAS, the City of Fort Worth (City) and Dannenbaum Engineering Corporation, (Engineer) made and entered into City Secretary Contract No. 31311 ,(the Contract) which was authorized by the City Council by M&C C-22115 on the 15t'' day of May 2007 and; subsequently revised by one previous amendment; and WHEREAS, the Ccr.tract involves engineering services for the following project: Engineering Design Services: Street Reconstruction, Water and Sewer Replacement on 2004 CIP Year 1 Drainage Project, Project No. 00085; DOE No. 4716 WHEREAS, it to said Contract maximum fee; has become necessary to execute Amendment No. 1 to include an increased scope of work and revised NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: F* Article I, of the Contract is amended to include the additional engineering services specified in a proposal letter dated October 16, 2006, copies of which are both attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $47,088.00. 2. Article II, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $149,008.95. ` � L � ��:�,' � �;�v��.:� �' ;,1 ,� �.,�,it����,� J1 ., vi�� �;;�1�,� ..�i;l ; i� Ili '�.,.`� � 1�,'� � `1�✓1� 1 l� �r ..r _.. __. _.. . .. _ __ s �ORIGINAL 3. All other grovisions of the Contract amended herein shall remain ir. full force � EXECUTED on this the ��." day c� in Fort Worth, Tarrant County, Texas. ATTE3T: �(� . I Marty Hendri City Secretary APP RECOM[�NDED: � A"`'"��� �� A. Douglas Rademaker, P.E. Director, Department of Engineering Dannenbaum EncTineering Corporation Engineer ,- � ,- , ,l �, gy; � ! �. ; -�- � �c i :.,, �` �. Name:Wavne G. Ahrens, P.E. Principal 6421 Camp Bowie Blvd Fort Worth, Texas 76116 , J �-. � APPROVE�" S TO FOR�I AND,%LEGALITY: / � �� � i Assistant C' y A� torney�.�� �• � /,� -�-:.._�, „�, � �,i , ,� � ,,, �. � �, � , i ;� ' � � ; , iti � : i� I'.; !�', � � r' � �.� .=�+. :�'�: J:�.� �:� >,� �,� sr�.; r�,� '� �J � ��i ;�;'� �v ,� r �� �,,,.1r J 5; �, tr ��:��o ! �''�r. �l"�' ' ! � �� �( �o .'�.7�: fL� �� rUa which are not expressly and effect. ' �,`��,�- - -� 2007, ., � . ��� � �� �:or���act- Ru�.�aoxzz���ki.o� � `5 ^, _�..__�,��. Ia�t--� r_�--:• i . ��= �f .� �Marc A. Ott Assistant City Manager DANNENBAUM ENGINEERING CORPORATION � �"� e� 6421 CAMP BOWIE BLVD., SUITE 400 FORT WORTH, TEXAS 76116-5421 (817) 763-8883 �,n� J1 � � �t<<i^nce October 16, 20�5 Mr. Joseph Bergeron, P.E. City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102-6311 RE: 2004 Capital Improvements Drainage Project Sriarhaven-Fieldcrest Drainage Improvements Supplemental Agreement No. 1 Mr. Bergeron: As we previously discussed, we evaluated the constructability issues for the above referenced project. As you know, the primary area of concem is where the storm drain departs Briarhaven Drive and runs between two houses (reference letter dated December 14, 2005). As an alternate, we began reviewing the feasibility of placing the proposed storm drain between the two houses immediately to the southwest of the alignment. At that time, we presented those findings to Steve Eubanks but the project was placed on hold pending the resolution of some funding issues. In addition to the issues surrounding the outfall location was the limits of the upstream reach of he proposed system. In the letter dated December 14, 2005, we proposed three (3) alternate systems. The TPW Department opted for Alternate No. 2 in that letter. That system extends beyond the limits of the original project. Based on recent direction by Steve, the TPW Department is ready to proceed with the project. The attached Supplemental Agreement No. 1 includes fees for both the re-route of the downstream portion of the project and the extension of the upstream reach. The numbers were calculated based on the standard negotiation techniques employed in Fort Worth and pertinent contract documents are attached. I am free to attend a meeting at your earliest convenience. If you have any questions in the meantime, please do not hesitate to call. Sincerely, Brian D. O'Neill, P.E. Project Manager G:\1210\4095-32�ADMIN\CONTRAC'I�SA#1\L.etter Bergeron 2006-10-16.doc ATTAC�IMENT "B" COMPENSATIrJN AND SCHEDULE 2004 CAPITAL IMPROVEMENTS DRAINAGE PROJECT B3tTARUAVEN-FIELDCREST DR�iINAGE IMPROVEM�NTS SUPPLEMENTAL AGREEMENT No. l PROJECT NO. 0008� I. Compensation: A. The Engineer shall be compensated a total lump sum fee of $ 47,088.00 as suminarized in E�ibit "B-3B". Payment of the total lump sum fee shall be considered full compensation for the services described in E�iibit "A" for all labor materials, supplies and equipment necessary to complete the proj ect. B. The Engineer shall be paid monthly as described in Exhibit "B-1", Section 1— Method of Payment. Each Invoice is to be verified as to its accuracy and compliance with the terms of this contract by an officer of the Engineer. II. Schedule: A. Phases 1 and 2 shall be completed 60 days after the "Notice to Proceed" letter is issued. The Scope of Services is outlined in Attachment "A", Exhibit "A". EXHIBIT "B-1" (SUPPLEMENTAL TO ATTACHMENT B) METHOD OF PAYMENT 2004 CAPITAL IMPROVElVIENTS DRAINAGE PROJECT BRIARHAVEN-FIELDCREST DR.AINAGE IMPROVEMENTS SU'PPLEMENTAL AGREEMENT No. l PROJECT NO. 00085 I. Method of Payment Partial payment shall be made to the Engineer monthly upon City's approval of an invoice from the Engineer outlining the estimated current percent complete of the total proj ect. The aggregate of such monthly partial fee payments shall not exceed the following: Until satisfactory completion of Exhibit "A", Conceptual Engineering plan submittal and approval by the City, a sum not to exceed 30 percent of the total lump sum fee. Until satisfactory completion of E�ibits "A", Preliminary Construction Plan submittal to City, a sum not to exceed 60 percent of the total lump sum fee, less previous payments. Until satisfactory completion of Exhibits "A", Final Construction plan submittal and approval by the city, a sum not to exceed 90 percent of the total lump sum fee, less previous payments. II. Progress Reports A. The Engineer shall submit to the designated representative of Director of Department of Engineering monthlyprogress reports covering all phases of design by the 15`� of every month in the format required by the City. B. If the Engineer deternzines in the course of making design drawings and specifications that the construction cost estimate of $ 681,000.00 (as estimated on Exhibit B-4) will be exceeded, whether by change in the scope of the project, increased costs or other conditions, the Engineer shall immediately report such fact to the City's Director of the Deparhnent of Engineering and, if so instructed by Director of the Engineering Department, shall suspend all work hereunder. EXHIBIT B-2 (SUPPLEMENT Tf1 ATTACHMEN'I' B) - - - - - - - _ HOLiRLY RATE SCHEDULE - - - 200� CAPITAL IMPROVEIVIENT5 DRAII�IAGE PROJECT BRIARHAVEN-FIELDCREST DRAINAGE IMPROETEMENTS SUPPLEMENTAL AGREEMENT No. l Project No. 00085 Emplovee Classification Rate/Hour Principal $258.00 Proj ect Manager/Planner $130.00 Senior Engineer/QA-QC $135.00 RPLS $93.00 Proj ect Engineer $104.00 Design Tech. $78.00 CADD Tech. $ 54.00 Clerical $ 48.00 2-Man Survey Crew $100.00 3-Man Survey Crew $120.00 4-Man Survey Crew $150.00 Reimbursables Cost + 10% Mileage $0.445 Per Mile Reproduction work will be at current commercial rates. Subcontractors will be paid for at actual invoice cost plus ten percent (10%). 4082 Exhibit B-2 EXHIBIT "B-3A" SUNIlVIARY OF TOTAL PROJECT FEES 2004 CAPITAL IMPROVEMENTS DRAINAGE PROJECT BRIA1t�IAVEN-FIELDCREST �R.AINAGE IMPROV�IVI�NT5 SUPPLEMENTAL AGREEMENT No. 1 PROJECT NO. 00085 Exhibit Exhibit Scope of Services Total Fee M/WBE % A Design Services $ 47,088.00 $ 2,814.00 6.0 Construction Assistance $ 0.00 $ 0.00 0.0 TOTAL $ 47,088.00 $ 2,814.00 6.0 % of Proposed M/WBE Sub-Consultants Services Fees Total Fee ANA Consultants, LLC Field Survey $ 1,950.00 4.2 Trevino Engineering Support Services Reproduction $ 864.00 1.8 TOTAL $ 2,814.00 6.0 Proposed Non-M1WBE Sub-Consultants _ None EXHIBIT `B-3B" FEE SUNIlVIARY 2004 CAPITAL IMPROVEMENTS URAINAGE PROJECT - - - -- BRIARHAVEN-FIEI,nCRFST DRAINAGE IMPROVEMENTS �UPPL�IVIENTAL AGREEMENT No. 1 PROJECT NO. 00085 ***STORM DRAINAGE*** OPINION OF PROBABLE CONSTRUCTION COSTS � 681,000.00 CURVE "A" 7.6% X 0.85 = 6.460% ENGINEERING DESIGN DESIGN SURVEY (600 LF @ $3.25/LF) (ANA) REPRODUCTION (TESS) TOTAL PAVING & STORM DRAINAGE FEE $ 43,993.00 $ 1,950.00 $ 864.00 $ 46,807.00 10% FOR SUB ($ 2,814.00) $ 281.00 TOTAL FEE $ 47 088.00 SUMMARY OF TOTAL FEE AND BREAKDOWN OF DESIGN FEE (LESS SURVEY FEE) A. SUNIMARY OF TOTAL FEE Service Description Water Sewer Paving/Drainage Total Engineering Services $ 0.00 $ 0.00 $ 45,138.00 $ 45,138.00 Surveying Services $ 0.00 $ 0.00 $ 1,950.00 $ 1,950.00 Total $ 0.00 $ 0.00 $ 47,088.00 $ 47,088.00 B. BREAKDOWN OF WATER SEWER AND PAVING FEES (LESS SURVEY FEES) Total Paving/Drainage Fee (less survey fee) Breakdown by Concept, Preliminary and Final Design 1. Concept (30%) _(Total Drainage Fee — Paving Survey Fee) x(0.3) _$ 13,541.00 2. Preliminary (60%) _(Total Drainage Fee—Paving Survey Fee)x(0.6) _$ 27,083.00 3. Final (10%) _(Total Drainage Fee — Paving Survey Fee) x(0.1) _$ 4,514.00 In order to ensure sufficient M/WBE participation in this project, we will be using ANA Consultants for surveying and Trevino and Associates for reprographics. This will result in an overall 21.5% portion of the contract that will be performed by approved M/WBE firms which will exceed the target goal of 17% on this project. EXHIBIT `B-3C" Supplemental Agreement No. 1 -- - - - - - - Project Ncr 00085 BREAI�OWN FOR REPROD�JCTION FEE AND ADDITIONAL SERVICES FEE FOR: REPRODUCTION FEE TOTAL = $ 864.00 6 Sets ofPlans (6 sets x$12/set) _$ 72.00 16 Sets of Plans (16 sets x$12/set) _$ 192.00 50 Sets of Plans (50 sets x$12/set) _$ 600.00 EXHIBIT "B-4" OPINION OF PROBABLE COST SUMMARY _ CONCRETE PAVIIvTG 2004 CAPITAL IMPROVEMENTS DRA,INAGE PROJECT BRIARHAVEN-FIELDCREST DRAINAGE IMPROVEMENTS Suppiemental Agreement No. 1 Project No. 00085 Drainage Improvements: Water $ 0.00 Sewer $ 0.00 Paving & Dra.inage $ 681,000.00 TOTAL $ 681,000.00 Dannenbaum Engineerinq Corporation SUPPLEMENTAL AGREEMENT No. 1 ENGINEER'S PRE-DESIGN OPINIQN OF CONSTRUCTION COST OUTFALL RE-ROUTE PROJECT NAME: 2004 Gapital Improvement Drainage Project Date: August 31, 2006 Briarhaven-Fieldcrest Drainage Improvements Project 00085 DEC Job No. 0040-9b Project Manager: Gopal Sahu, P.E. ITEM DESCRIPTION UNIT QUANTITY UNIT TOTAL �p, PRICE AMOUNT Paving Improvements: 1 UTILITY ADJUSTMENT LS 0$ 5,000.00 $ - 2 PROVIDE TRAFFIC CONTROL FOR HULEN LS 0 10,000.00 - 3 PROJECT DESIGNATION SIGNS EA 0 500.00 - 4 REMOVE EXISTING ASPHALT PAVEMENT SY 0 3.00 - 5 REMOVE EXISTING CONCRETE PAVEMENT SY 0 8.00 - 6 REMOVE EXIST. 7" CURB & 18" GUTTER LF 0 3.00 - 7 PROP. 21" CL.III R.C.P. LF 30 63.00 1,890.00 8 PROP. 24" CL.III R.C.P. LF 0 74.00 - 9 PROP. 30" CL. III R.C.P. LF 0 80.00 - 10 PROP. 36" CL. III R.C.P. LF 0 100.00 - 11 PROP. 42" CL. III R.C.P. LF 0 125.00 - 12 PROP. 48" CL. III R.C.P. LF 0 175.00 - 13 PROP. 60" CL. III R.C.P. LF 0 200.00 - 14 PROP. 6'X6' R.C.BOX SECTIONS LF 560 400.00 224,000.00 15 PROP. STD. 20' INLET EA 0 3,800.00 - 16 PROP. STD. 15' INLET EA 0 3,100.00 - 17 PROP. STD. 10' INLET EA 0 2,350.00 - 18 PROP. STD. 6' SQUARE MANHOLE EA 2 3,500.00 7,000.00 19 PROP. STD. 5' SQUARE MANHOLE EA 0 3,000.00 - 20 PROP. STD. 4' SQUARE MANHOLE EA 0 2,500.00 - 21 TRENCH SAFETY LF 0 2.00 - 22 TRENCH EXCAVATION & BACKFILL CY 7,200 12.00 86,400.00 23 REMOVE INLET EA 0 500.00 - 24 PROP. STRUCTURAL EXCAVATION CY 10 15.00 150.00 25 PROP. CONC. HEAD,WING,TOE, AND APRONS CY 10 400.00 4,000.00 26 HMAC PAVEMENT REPAIR SY 0 35.00 - 27 CONCRETE PAVEMENT REPAIR SY 0 50.00 - 28 6" THICK TOPSOIL, COMPLETE IN PLACE CY 380 14.00 5,320.00 29 PROP. 7" CURB & 18" GUTTER LF 30 20.00 600.00 30 ADJUST MANHOLE EA 0 350.00 - SUBTOTAL $ 329,360.00 Contingencies (10%) $ 32,936.00 TOTAL CONSTRUCTION COST $ 362,300.00 g:\1210\0040-95�P,dmin\Project\Conts_$\SA#1 Re-Design Estimate.xls Dannenbaum Engineering Corporation SUPPLEMENTAL AGREEMENT No. 1 ENGINEER'S PRELIMINARY OPINION OF CONSTRUCTION COST ALTERNATIVE SYSTEM PROJECT NAME: 2004 Capita! Improvement Drainage Project Date: August 31, 2006 - - - Briarhaven-Fieldcrest Drainage Improvements Project 00085 DEC Job No. 0040-95 Project Manager: Joseph Bergeron, P.E. ITEM DESCRIPTION UNIT QUANTITY UNIT TOTAL NO. PRICE AMOUNT Paving Improvements: 1 UTILITY ADJUSTMENT LS 1$ 5,000.00 $ 5,000.00 2 PROVIDE TRAFFIC CONTROL FOR HULEN LS 1 15,000.00 15,000.00 3 PROJECT DESIGNATION SIGNS EA 2 500.00 1,000.00' 4 REMOVE EXISTING ASPHALT PAVEMENT SY 5,210 3.00 15,630.00 5 REMOVE EXISTING CONCRETE PAVEMENT SY 1,100 8.00 8,800.00 6 REMOVE EXISTING 7" CURB & 18" GUTTER LF 555 3.00 1,665.00 7 PROP. 21" CL.III R.C.P. LF 400 63.00 25,200.00 8 PROP. 24" CL.III R.C.P. LF 480 74.00 35,520.00 9 PROP. 36" CL. III R.C.P. LF 235 100.00 23,500.00 10 PROP. 42" CL. III R.C.P. LF 880 125.00 110,000.00 11 PROP. 48" CL. III R.C.P. LF 175 175.00 30,625.00 12 PROP. 54" CL. III R.C.P. LF 990 190.00 188,100.00 13 PROP. 60" CL. III R.C.P. LF 290 200.00 58,000.00 14 PROP. 6'X6' R.C.BOX LF 540 400.00 216,000.00 15 PROP. STD. 20' INLET EA 19 3,800.00 72,200.00 16 PROP. STD. 10' INLET EA 16 2,350.00 37,600.00 17 PROP. STD. 8' SQUARE MANHOLE EA 1 4,500.00 4,500.00 18 PROP. STD. 6' SQUARE MANHOLE EA 2 3,500.00 7,000.00 19 PROP. STD. 5' SQUARE MANHOLE EA 2 3,000.00 6,000.00 20 PROP. STD. 4' SQUARE MANHOLE EA 5 2,500.00 12,500.00 21 TRENCH SAFETY LF 4,110 2.00 8,220.00 22 TRENCH EXCAVATION & BACKFILL CY 8,385 12.00 100,620.00 23 REMOVE EXISTING INLET EA 4 500.00 2,000.00 24 REMOVE EXISTING STRUCTURE EA 1 2,000.00 2,000.00 25 REMOVE 36" RCP LF 281 5.00 1,405.00 26 PROP. STRUCTURAL EXCAVATION CY 201 15.00 3,015.00 27 PROP. CONCRETE HEADWALL, WING,TOE, AND APRON CY 10 400.00 4,000.00 28 HMAC PAVEMENT REPAIR SY 5,210 35.00 182,350.00 29 CONCRETE PAVEMENT REPAIR SY 1,100 50.00 55,000.00 30 6" THICK TOPSOIL, COMPLETE IN PLACE CY 240 14.00 3,360.00 31 PROP. 7" CURB & 18" GUTTER LF 715 20.00 14,300.00 32 ADJUST MANHOLE EA 5 350.00 1,750.00 33 CONCRETE SIDEWALKS AND DRIVEWAYS SF 2,420 4.50 10,890.00 34 WHEEL CHAIR RAMPS EA 8 500.00 4,000.00 35 REMOVE EXIST. CONCRETE SF 2,420 1.00 2,420.00 36 SODDING SY 1,335 5.00 6,675.00 SUBTOTAL $ 1,275,845.00 Contingencies (10%) 127,584.50 Less: Original Contract Construction Cost (1,047,000.00) Plus: Outfall Re-Design Construction Cost 324,600.00 TOTAL CONSTRUCTION COST - Supplemental Agreement No. 1 $ 681.000.00 g:\1210\4095-32�Admin\Project\Conts_$WltAnalysis\SA#1 Alternate System Estimate.xls City of Fort Worth, Texas Mayor and Cour�cil C�mmunication COU�lCIL ACTION: Approved on 5/15/2007 DATE: Tuesday, May 15, 2007 LOG NAME: 30AMEND1 BRIAR85 REFERENCE NO.: **C-22115 SUBJECT: Authorize Amendment No. '� to Engineering Agreement with Dannenbaum En�ineering Corporation for 2004 Capital Improvements Drainage Project Briarhaven-Fieldcrest Drainage Improvements (Project No. 00085) ��:��.,���-�: �.,�. = - - - _ RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 1 to City Secretary Contract No. 31311 with Dannenbaum Engineering Corporation, in the amount of $47,088.00 to provide additional engineering services on the project, thereby increasing the contract by the amount to $149,008.95. DISCUSSION: The 2004 Capital Improvement Program (CIP) includes funds for 2004 Capital Improvements Drainage Project Briarhaven-Fieldcrest Drainage Improvements. On January 11, 2005, M&C (C-20483) the City Council authorized the City Manager to execute an engineering agreement to Dannenbaum Engineering Corporation. This Amendment Number 1 to the project consists of surveying and the preparation of plans and specifications for extension of the storm drainage system beyond the limits defined in the initial project scope. Dannenbaum Engineering Corporation proposes to perform the additional necessary surveying and design work for a lump sum fee of $47,088.00. City Staff considers this fee to be fair and reasonable for the scope of services proposed. In addition to the contract amount, $9,875.00 is required for project management by the Engineering Department. This project is located in COUNCIL DISTRICT 3, Mapsco 89F. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, in the Street Improvements Fund. Lo�name: 30AMENDIBRIAR85 Page 1 of 2 TO Fund/Account/Centers Submit�ed for City Manager's Office by: Originating De�artment Head: _ Additional Informatiorn-Contact: Logname: 30AMEND 1 BRIAR85 FROM Fund/Account/Centers 3)C20Q 531200 20328008533 $47,088.00 Marc Ott (8476) A. _Douglas Rademaker (6157) Joseph �ergeron (2384) Page 2 of 2