Loading...
HomeMy WebLinkAboutContract 35242AMENDMENT WO. 1 TO CITY SECRETARY CONTR�►CT NO. ��� 3� STATE OF TEXAS § r' § CITY SECRETARY CONTRACT NO.�_ � � COUNTY OF TARRANT § WHEREAS, the City of Fort Worth ("City") and Terracon Consultants, Inc. ("Laboratory") made and entered into City Secretary Contract No. �->�' ��� (the "AgreemenY') authorized by City Council via M&C C-21196 on December 13, 2005; and WHEREAS, the Agreement involves geotechnical and material testing services; and WHEREAS, it has become necessary to execute Amendment No. 1 to said Agreement to correct a typographical/formatting error shown on Attachment "B" to the Agreement. NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement that amends the Contract: 1. In order to rectify a typographical/formatting error, Attachment "B" of the Agreement is replaced with Attachment "B" attached hereto and incorporated herein. 2. All other provisions of the Agreement which are not express�y amended herein shall remain in full force and effect. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANI� ��"r�� i:i� '; '�; V'a��.:��-�� !.�V`iv'h�..' �� �' '" r!^' N, it"�i� y�,,7 �> > !1 �l� �?i 5 ��;: �i l� (!' ,v� ��� � �,-, �� )��� ,� �a .. :i,,,'+��i� �j ��`1(, . J -1- � ORIGtNAL v i /�} � i �� EXECUTED on this the ;;�V -f)'11 day of - , 2007, in Fort Worth, Tarrant County, Texas. ATTEST: CITY OF FORT WORTH: � Y` Marty Hend ' arc A. L City Secretary Assistant City Manager APPROVAL RECOMMENDED: oug Rademaker, Director Of Engineering as to Form and Legality: -_, � ,: �— �i �, �� / lLL��`-r��-f-[ Amy J. R�msey Assistant City Attorney -��..�_��.�_ i IV� ��� ��a����.�� Terracon Consultants, Inc. 2(,0l C���1 ���v� -�s,-F 1,.9arT1, , I�-x-a� �'i� I I v By: � �� Name: I�P �• �'�-F��, ��. Title: /��, n� �`?�- ( �._,- .�,_._ tl:`; r'''�� J.�;; `� �;� ���<�,,J,'n� i78 �' ; 4: j �.' IV ���1 � _2_ + � �I� � C� 'iC j� i�D,7 � , yjl i��;l � �)il� l ��.i:" L f�.: y �S� r ? 5� q� �u.7 i �, � �.•''V•" 7��"�I i JI.`�Y( �, �_��:J�1, �;,�.,� _ ._------- __.�.,._..� Concrete ATi�lC�BMEN`i' � FEE SCHEDULE For Construction Material Testing and Geotechnical Borings Test Cvlinders (Min. 4 per set), each Air ContendSlump/Temperature/Ne� Day Cylinder Pick up, hour Flexural Beams, each *** Coring (4" DIA to 6" depth 4/irip) 2" Coring for depth isolation to 6" each addirional inch Thickness Measurement, each Patching of Core Holes, each Coring Tecluucian Time, hour Flexural Test of Beams, each Compression Test Cylinders, each Sawing and/or Capping Cores & Cylinders, each Compression Test of Cores, each Compression Test Specimen Hold Mix Design Review, each Mix Design Formulation w/Aggregate Tests Include Specific Gravity/Sieve Analysis/CTnit WT-200, each Additional M� Besign Utilizing Above Mix Analysis, each Mix Design Formulation Revision, each Engineering Tech (I�IICET) for Quality Assurance Monitoring of Onsite Work, hour Pre-pour Reinforcing Steel Placement Inspection, hour Sampling for In lab Test, hour Minimum Vehicle Charge Batching Mix Design in Preparation for Making Lab Confirmarion Cylinders or Beams, hour Batch Plant Observation Supporting Concrete Placement, hour Concrete Flatness, Sq. Ft. Certified Welding Inspector, hour Field Gradation Equipment, test Slumn Test, each *** Includes Cost of Technician Time Coring and Patching Core Holes Page 1 of 5 $15.00 $35.00 iMin 3 hours) $25.00 ***$56.00 (�'��n 4 per trip) add inch $6.00 $40.00 (Mm 4 per trip) $8.00 $6.00 $35.00 $25.00 $55.00 $100.00 $550.00 $200.00 $200.00 $45.00 $35.00 $40.00 N/C $25.00 $35.00 $45.00 per sq. ft. $0.02 min. $500.00 $55.00 N/C $15.00 ��.:,`"�1�J'�,* �'�".: �:5 �J^"r ;;�``'li� '� �� ,,; i _�'F� . }� ��, i�::���y „l� /-����,� i�� i, a� U�� �� ���,����s�.;rlr � �S ''y'�'i',,.f;1j��' ��1�1,1� � r U� �'•.� ti.:u t'i� �,.J�P e e�i�'/SC F°I NI � I�i`� � FEE SCHEDULE For Construction Material Testing and Geotechnical Borings HMAC ++ Density Nuclear Method, hour Core In place Density, each Coring I�vIAC Technician Tim Core Depth Measurement, core Patching Core Holes, each Min Vehicle Charge 4" DIA./6" Depth, core Each Additional Inch, Inch T** Rolling Pattem Nuclear Ga Nuclear Moisture Density Gau€ E�raction and Gradarion, each Lab Densiiy, each Stabilitv Test, each hour hour Maximum Specific Gravity, each Disposal Fee Batch Plant Hot Bin Analysis, each Material Samplin� For In Lab Tests, hour ++ $45.00 $32.00 $56.0� � �Min 4/trip) $40.00 $6.00 TT* $45.00 $80.00 $170.00 $40.00 $160.00 $75.00 N/C $55.00 $40.00 * * * Includes Gauge Charge ++ First hour and half $135.00 any additional time after that is $45.00 per hour, fincludes Technician Time, Trip and Gauge Charge). Page 2 of 5 AiT�►C�INIENT � FEE SCHEDULE For Construction Material Testing and Geotechnical Borings Page 3 of 5 ����F�INi��� � FEE SCHEDULE For Construction Material Testing and Geotechnical Borings Geotechnical Undisturbed Soil Sample, each $11.00 (per ft.) Visua] Classification, each $10.00 Classification ASTM D-2487, each $105.00 Sam le Extrusion, each N/A Sam le Pre aration, each $10.00 Atterbur Limits RAW PI, each $45.00 Soil w/Additive, each $50.00 Bar Lineal Shrinkage, each $16.00 Moisture Density Relationship (Proctor) $145.00 Standard (ASTM D-698), each Moisture Density Relationship (Proctor) $175.00 Modified (ASTM D-1517), each THD 113E, each $180.00 Unit Weight, each $20.00 Unit Weight (Dry Rodded), each $20.00 -200 Sieve Analysis, each $30.00 Laboratory Moisture Content, each $8.00 Sieve Analysis (Fine Aggregate), each $60.00 Sieve Analysis (Large Aggre ate), each $60.00 Sieve Analysis (Finer than 200 Sieve), each $35.00 Lime or Cement Series Determination (5 oints), each $255.00 Optimum Lime Content, each $200.00 H Series (6 oints), each $210.00 S ecific Gravi , each $45.00 Absorption, each $25.00 Los Angeles Abrasion (Large Aggregate), each $235.00 Los Angeles Abrasion (Small Aggregate), each $215.00 Texas Wet Ball Mill, each $175.00 Gradation (Lime or Cement Stabilized), each $30.00 (3 Min Tech Time & Tri Included) * * * 3 Min Tech Time & *** Limed Soil Depth Measurement, each $30.00 ( Trip Included) ++ In Place Moisture Density (Nuclear Method Technician), hour ++$45.00 Grain Size Analysis (Mechanical and Hydrometer), each $150.00 Unconfined Com ression Test Including Moisture, each $30.00 Unconfined Com ression Test Soil, each $27.00 Unconfined Compression Test Rock, each $35.00 Confined Com ression Test (iJiJ), each $100.00 Triaxial Test Unconsolidated Undrained, s eci $85.00 Triaxial Test Multiple Stage, stage $300.00 Triaxial Consolidated Undrained w/Pore Pressure Measurement, s eci $650.00 Triaxial Consolidated Drained Multiple Stage, stage $650.00 Triaxial Consolidated Drained Single Stage, stage $300.00 Triaxial Consolidated Drained Three Stage, stage $780.00 Consolidated Test, each $350.00 _ ..___, _ _z --- - _- _ Direct Shear Consolidated Drained Sand & Gravel, oint $200.Oa ��' �" Direct Shear Consolidated Drained Silt & Clay, point $350.00� �' '- �" " Direct Shear Consolidated Undrained Sand & Gravel, point $175.OQ, '"� � - - ; � '�,' - `; r Page 4 of 5 ;� J�_ i; ,�iTAC I-i N1 E �B� � FEE SCHEDULE For Construction Material Testing and Geotechnical Borings Direct Shear Consolidated Undrained Silt & Clay, point $200.00 California Bearing Rario, each $250.00 THD Triaxial, each $800.00 Percent Swell, each $80.00 Permeability Test Falling Head, each $200.00 Permeability Test Triaxial, each $300.00 Permeability Test Flex Wall, each $300.00 Permeability Test Fixed Wall, each $200.00 Permeability Test Clay Soils, each $290.00 Permeability Test Granular Soils, each $250.00 Permeabili Test Pressure Head wBeck Pressure Saturation, each $350.00 Electrical Resistivity, T'HD Method, each $100.00 Truck Mounted Mobilization, mile and trip Mile -$3.25 Tri - $250.00 Buggy/Ave Mounted, mile and trip Mile -$5.00 Trip - $350.00 Per Diem Per Man, day $85.00 Intermittent Soil Sam ling w/Truck 5' Intervals 0-25' Depth, foot $11.00 Intermittent Soil Sam ling w/Truck 5' Intervals 25-50' De th, foot $12.00 Intermittent Soil Sampling vv/Truck 5' Intervals 50-100' Depth, foot $15.00 Continuous Soil Sam ling w/Truck 0-10' De th, foot $15A� Intermittent Soil Sam ling w/ATV 5' Intervals 0-25' De th, foot $12.00 Intermittent Soil Sam ling w/ATV 5' Intervals 25-50' De th, foot $13.00 Intermittent Soil Sampling w/ATV 5' Intervals 50-100' Depth, foot $15.00 Continuous Soil Sam ling w/ATV 0-10' Depth, foot $14.00 Continuous Soil Sampling w/ATV 10-50' De th, foot $18.00 Auger Drilling Without Sam le, foot $8.00 Rock Coring w/NX Size, Core Barrel 0-25' Depth Carbide Bit, foot $18.00 Rock Coring w/NX Size, Core Barre125-50' Depth Carbide Bit, foot $20.00 Rock Coring w/NX Size, Core Barre150-75' De th Carbide Bit, foot $21.00 Rock Coring w/NX Size, Core Barre175-100' De th Carbide Bit, foot $25.00 Rock Coring w/NX Size, Core Barrel 50-75' Depth Diamond Bit, foot $27.00 CME 5' Continuous Sam ler 0-50' De th, run $15.00 Per F�I' Stand By or Access Time, hour $120.00 Drilling w/Auger Rig, hour $150.00 Minimum Drill Fee $600.00 Post Injection Sub-grade Evaluation Per Boring Including Moisture and Free $500.00 Swell Determination Minimum Post Injection Charge $900.00 Field Time Engineer, hour $100.00 * * * Includes Gauge Charge ++ First hour and half $135.00 any additional time after that is $45.00 per hour, (includes Technician Time, Tri and Gauge Charge). Page 5 of 5