HomeMy WebLinkAboutContract 35242AMENDMENT WO. 1
TO CITY SECRETARY CONTR�►CT NO. ��� 3�
STATE OF TEXAS §
r'
§ CITY SECRETARY CONTRACT NO.�_ � �
COUNTY OF TARRANT §
WHEREAS, the City of Fort Worth ("City") and Terracon Consultants, Inc. ("Laboratory")
made and entered into City Secretary Contract No. �->�' ��� (the "AgreemenY') authorized by
City Council via M&C C-21196 on December 13, 2005; and
WHEREAS, the Agreement involves geotechnical and material testing services; and
WHEREAS, it has become necessary to execute Amendment No. 1 to said Agreement to
correct a typographical/formatting error shown on Attachment "B" to the Agreement.
NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized
representatives, enter into the following agreement that amends the Contract:
1.
In order to rectify a typographical/formatting error, Attachment "B" of the Agreement is replaced
with Attachment "B" attached hereto and incorporated herein.
2.
All other provisions of the Agreement which are not express�y amended herein shall
remain in full force and effect.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANI�
��"r�� i:i� '; '�;
V'a��.:��-�� !.�V`iv'h�..'
�� �' '" r!^' N, it"�i� y�,,7
�> > !1 �l� �?i 5 ��;: �i l� (!' ,v� ��� �
�,-, �� )���
,� �a .. :i,,,'+��i� �j ��`1(, .
J
-1- � ORIGtNAL
v
i /�} � i ��
EXECUTED on this the ;;�V -f)'11 day of - , 2007, in Fort Worth,
Tarrant County, Texas.
ATTEST:
CITY OF FORT WORTH:
� Y`
Marty Hend ' arc A. L
City Secretary Assistant City Manager
APPROVAL RECOMMENDED:
oug Rademaker, Director
Of Engineering
as to Form and Legality:
-_,
� ,:
�—
�i �, �� / lLL��`-r��-f-[
Amy J. R�msey
Assistant City Attorney
-��..�_��.�_ i
IV� ��� ��a����.�� Terracon Consultants, Inc.
2(,0l C���1 ���v�
-�s,-F 1,.9arT1, , I�-x-a� �'i� I I v
By: � ��
Name: I�P �• �'�-F��, ��.
Title: /��, n� �`?�- (
�._,- .�,_._
tl:`; r'''�� J.�;; `� �;� ���<�,,J,'n� i78
�' ; 4: j �.' IV ���1 �
_2_ + � �I� � C� 'iC j� i�D,7
� , yjl i��;l
� �)il� l ��.i:" L f�.:
y �S� r ? 5� q� �u.7
i �, � �.•''V•" 7��"�I i JI.`�Y(
�, �_��:J�1, �;,�.,�
_ ._------- __.�.,._..�
Concrete
ATi�lC�BMEN`i' �
FEE SCHEDULE
For Construction Material Testing and Geotechnical Borings
Test Cvlinders (Min. 4 per set), each
Air ContendSlump/Temperature/Ne� Day Cylinder Pick up, hour
Flexural Beams, each
*** Coring (4" DIA to 6" depth 4/irip)
2" Coring for depth isolation to 6" each addirional inch
Thickness Measurement, each
Patching of Core Holes, each
Coring Tecluucian Time, hour
Flexural Test of Beams, each
Compression Test Cylinders, each
Sawing and/or Capping Cores & Cylinders, each
Compression Test of Cores, each
Compression Test Specimen Hold
Mix Design Review, each
Mix Design Formulation w/Aggregate Tests Include Specific Gravity/Sieve
Analysis/CTnit WT-200, each
Additional M� Besign Utilizing Above Mix Analysis, each
Mix Design Formulation Revision, each
Engineering Tech (I�IICET) for Quality Assurance Monitoring of Onsite Work,
hour
Pre-pour Reinforcing Steel Placement Inspection, hour
Sampling for In lab Test, hour
Minimum Vehicle Charge
Batching Mix Design in Preparation for Making Lab Confirmarion Cylinders
or Beams, hour
Batch Plant Observation Supporting Concrete Placement, hour
Concrete Flatness, Sq. Ft.
Certified Welding Inspector, hour
Field Gradation Equipment, test
Slumn Test, each
*** Includes Cost of Technician Time Coring and Patching Core Holes
Page 1 of 5
$15.00
$35.00 iMin 3 hours)
$25.00
***$56.00 (�'��n 4 per trip)
add inch $6.00
$40.00 (Mm 4 per trip)
$8.00
$6.00
$35.00
$25.00
$55.00
$100.00
$550.00
$200.00
$200.00
$45.00
$35.00
$40.00
N/C
$25.00
$35.00
$45.00
per sq. ft. $0.02
min. $500.00
$55.00
N/C
$15.00
��.:,`"�1�J'�,* �'�".: �:5 �J^"r ;;�``'li�
'� �� ,,; i _�'F� . }� ��,
i�::���y „l� /-����,� i�� i, a�
U�� �� ���,����s�.;rlr
� �S ''y'�'i',,.f;1j��' ��1�1,1�
� r U� �'•.� ti.:u t'i� �,.J�P
e
e�i�'/SC F°I NI � I�i`� �
FEE SCHEDULE
For Construction Material Testing and Geotechnical Borings
HMAC
++ Density Nuclear Method, hour
Core In place Density, each
Coring I�vIAC Technician Tim
Core Depth Measurement, core
Patching Core Holes, each
Min Vehicle Charge
4" DIA./6" Depth, core
Each Additional Inch, Inch
T** Rolling Pattem Nuclear Ga
Nuclear Moisture Density Gau€
E�raction and Gradarion, each
Lab Densiiy, each
Stabilitv Test, each
hour
hour
Maximum Specific Gravity, each
Disposal Fee
Batch Plant Hot Bin Analysis, each
Material Samplin� For In Lab Tests, hour
++ $45.00
$32.00
$56.0� � �Min 4/trip)
$40.00
$6.00
TT* $45.00
$80.00
$170.00
$40.00
$160.00
$75.00
N/C
$55.00
$40.00
* * * Includes Gauge Charge
++ First hour and half $135.00 any additional time after that is $45.00 per
hour, fincludes Technician Time, Trip and Gauge Charge).
Page 2 of 5
AiT�►C�INIENT �
FEE SCHEDULE
For Construction Material Testing and Geotechnical Borings
Page 3 of 5
����F�INi��� �
FEE SCHEDULE
For Construction Material Testing and Geotechnical Borings
Geotechnical
Undisturbed Soil Sample, each $11.00 (per ft.)
Visua] Classification, each $10.00
Classification ASTM D-2487, each $105.00
Sam le Extrusion, each N/A
Sam le Pre aration, each $10.00
Atterbur Limits RAW PI, each $45.00
Soil w/Additive, each $50.00
Bar Lineal Shrinkage, each $16.00
Moisture Density Relationship (Proctor) $145.00
Standard (ASTM D-698), each
Moisture Density Relationship (Proctor) $175.00
Modified (ASTM D-1517), each
THD 113E, each $180.00
Unit Weight, each $20.00
Unit Weight (Dry Rodded), each $20.00
-200 Sieve Analysis, each $30.00
Laboratory Moisture Content, each $8.00
Sieve Analysis (Fine Aggregate), each $60.00
Sieve Analysis (Large Aggre ate), each $60.00
Sieve Analysis (Finer than 200 Sieve), each $35.00
Lime or Cement Series Determination (5 oints), each $255.00
Optimum Lime Content, each $200.00
H Series (6 oints), each $210.00
S ecific Gravi , each $45.00
Absorption, each $25.00
Los Angeles Abrasion (Large Aggregate), each $235.00
Los Angeles Abrasion (Small Aggregate), each $215.00
Texas Wet Ball Mill, each $175.00
Gradation (Lime or Cement Stabilized), each $30.00 (3 Min Tech Time &
Tri Included)
* * * 3 Min Tech Time &
*** Limed Soil Depth Measurement, each $30.00 (
Trip Included)
++ In Place Moisture Density (Nuclear Method Technician), hour ++$45.00
Grain Size Analysis (Mechanical and Hydrometer), each $150.00
Unconfined Com ression Test Including Moisture, each $30.00
Unconfined Com ression Test Soil, each $27.00
Unconfined Compression Test Rock, each $35.00
Confined Com ression Test (iJiJ), each $100.00
Triaxial Test Unconsolidated Undrained, s eci $85.00
Triaxial Test Multiple Stage, stage $300.00
Triaxial Consolidated Undrained w/Pore Pressure Measurement, s eci $650.00
Triaxial Consolidated Drained Multiple Stage, stage $650.00
Triaxial Consolidated Drained Single Stage, stage $300.00
Triaxial Consolidated Drained Three Stage, stage $780.00
Consolidated Test, each $350.00 _ ..___, _ _z --- - _- _
Direct Shear Consolidated Drained Sand & Gravel, oint $200.Oa ��' �"
Direct Shear Consolidated Drained Silt & Clay, point $350.00� �' '- �" "
Direct Shear Consolidated Undrained Sand & Gravel, point $175.OQ, '"�
� - - ; � '�,' - `; r
Page 4 of 5 ;� J�_
i;
,�iTAC I-i N1 E �B� �
FEE SCHEDULE
For Construction Material Testing and Geotechnical Borings
Direct Shear Consolidated Undrained Silt & Clay, point $200.00
California Bearing Rario, each $250.00
THD Triaxial, each $800.00
Percent Swell, each $80.00
Permeability Test Falling Head, each $200.00
Permeability Test Triaxial, each $300.00
Permeability Test Flex Wall, each $300.00
Permeability Test Fixed Wall, each $200.00
Permeability Test Clay Soils, each $290.00
Permeability Test Granular Soils, each $250.00
Permeabili Test Pressure Head wBeck Pressure Saturation, each $350.00
Electrical Resistivity, T'HD Method, each $100.00
Truck Mounted Mobilization, mile and trip Mile -$3.25
Tri - $250.00
Buggy/Ave Mounted, mile and trip Mile -$5.00
Trip - $350.00
Per Diem Per Man, day $85.00
Intermittent Soil Sam ling w/Truck 5' Intervals 0-25' Depth, foot $11.00
Intermittent Soil Sam ling w/Truck 5' Intervals 25-50' De th, foot $12.00
Intermittent Soil Sampling vv/Truck 5' Intervals 50-100' Depth, foot $15.00
Continuous Soil Sam ling w/Truck 0-10' De th, foot $15A�
Intermittent Soil Sam ling w/ATV 5' Intervals 0-25' De th, foot $12.00
Intermittent Soil Sam ling w/ATV 5' Intervals 25-50' De th, foot $13.00
Intermittent Soil Sampling w/ATV 5' Intervals 50-100' Depth, foot $15.00
Continuous Soil Sam ling w/ATV 0-10' Depth, foot $14.00
Continuous Soil Sampling w/ATV 10-50' De th, foot $18.00
Auger Drilling Without Sam le, foot $8.00
Rock Coring w/NX Size, Core Barrel 0-25' Depth Carbide Bit, foot $18.00
Rock Coring w/NX Size, Core Barre125-50' Depth Carbide Bit, foot $20.00
Rock Coring w/NX Size, Core Barre150-75' De th Carbide Bit, foot $21.00
Rock Coring w/NX Size, Core Barre175-100' De th Carbide Bit, foot $25.00
Rock Coring w/NX Size, Core Barrel 50-75' Depth Diamond Bit, foot $27.00
CME 5' Continuous Sam ler 0-50' De th, run $15.00 Per F�I'
Stand By or Access Time, hour $120.00
Drilling w/Auger Rig, hour $150.00
Minimum Drill Fee $600.00
Post Injection Sub-grade Evaluation Per Boring Including Moisture and Free $500.00
Swell Determination
Minimum Post Injection Charge $900.00
Field Time Engineer, hour $100.00
* * * Includes Gauge Charge
++ First hour and half $135.00 any additional time after that is $45.00 per
hour, (includes Technician Time, Tri and Gauge Charge).
Page 5 of 5