HomeMy WebLinkAboutContract 35243AMEIVDMEPIi NO. 1
TO CITY SECRETARY CONTIZACT NO. ��� 3�
STATE OF TEXAS §
§ CITY SECRETARY CONTRACT N(�. ��r\-�f �`�
COUNTY OF TARRANT § . �
�� �� ��
WHEREAS, the City of Fort Worth (°City") and Fugro Consultants ,
/� �%r �'<,<<: �j �ctc�� �«�` �.-��
�/ l �'. � c f c� 7'�"; : �f `{i !
�' �� , ,"Laboratory") made and entered into City Secretary Contract Na
" 7 � � ,
'�`�:' �(the "Agreement") authorized by City Council via M&C G21196 on December 13, 2005;
and
WHEREAS, the Agreement involves geotechnical and material testing services; and
WHEREAS, it has become necessary to execute Amendment No. 1 to said Agreement to
correct a typographical/formatting error shown on Attachment "B" to the Agreement.
NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized
representatives, enter into the following agreement that amends the Contract:
1.
In order to rectify a typographical/formatting error, Attachment "B" of the Agreement is replaced
with Attachment "B" attached hereto and incorporated herein.
2.
All other provisions of the Agreement which are not expressly amended herein shall
remain in full force and effect.
(REMAINDER OF PAGE INTENTIONALLY LEFT BIANI�
�.i�iJ�, J.;�'l � v'�_; :�
jv �'��' ;;i(�/,-���j��!!1 1����ti
,!., � �( �r � � r� ,_l � �;,.� (; ��
n •i-�.i•S'li"; ��ir'Rn
;�, ��;:'u �(}; ici �'Il' t �� i�:.
-1- ,� ORIGINAL
�EXECUTED on this the %J � day of , 2007, in Fort Worth,
Tarrant County, Texas.
ATTEST:
Marty Hendri
City Secretary
APPROVAL RECOMMENDED:
�P�������
Doug Rademaker, Director
Of Engineering
�d0 1��� ��:��1���i� ;
CITY OF FORT WO
�
Marc A. Ott
Assistant City Manager
to Form and I�gality:
��,
Amy J,�ms�y
Assist�nt City Attorney
LABORATORY: �j✓G - � ll ��
�
Fugro Consultan��l ,�
-
By: v� —
Name: ' �
Title: ��'���
� /, ' � .
� �� �, �.� o; l� � �,�, i �;
— 2 — �� r, J ,. � 1�,: � �,;,e �.�, �,.. �:: �,�, t
<:_J�� � `�'`>n,Sn�` �r`i
i C> � lr :. � t'u P� c: v��'! �i'a
'- •' ,aLr �
� '��: r�`"';��i�t6���� �I��l��
AT�ACHNl�EVT �
FEE SCHEDULE
For Construction Material Testing and Geotechnical Borings
Concrete
Compression Test Cylinders (Min. 4 per set), each $15.00
Air Content/Slump/Temperature/Next Day Cylinder Pick u, hour $35.00 (n'Iin 3 nours)
Flexural Beams, each $25.00
*** Coring (4" DIA to 6" depth 4/h-ip) ***$56.00 (n'I�n 4 per trip)
per add inch $6.00
2" Coring for de th isolation to 6" each additional inch $40.00 (M� 4 per trip)
Thiclaiess Measurement, each $8.00
Patching of Core Holes, each $6.00
Coring Technician Time, hour $35.00
Flexural Test of Beams, each $25.00
Compression Test Cylinders, each
Sawin aud/or. Capping Cores & Cylinders, each $55.00
Com ression Test of Cores, each
Compression Test Specimen Hold
Mix Desi Review, each $100.00
Mix Design Formulation w/Aggregate Tests Include Specific Gravity/Sieve $550.00
Analysis/CJnit WT-200, each
Additional M'vc Besign Utilizing Above Mix Analysis, each $200.00
Mix Design Formulation Revision, each $200.00
Engineering Tech (NICET) for Qualiry Assurance Monitoring of Onsite Work, $45.00
hour
Pre- our Reinforcing Steel Placement Inspection, hour $35.00
Sam ling for In lab Test, hour $40.00
E ui ment Charge N/C
Minimum Vehicle Charge $25.00
Batching Mix Design in Preparation for Making Lab Confirmation Cylinders $35.00
or Beams, hour
Batch Plant Observation Supporting Concrete Placement, hour $45.00
Concrete Flatness, Sq. Ft. per sq. ft. $0.02
min. $500.00
Certified Welding Ins ector, hour $55.00
Field Gradarion E ui ment, test N/C
Slump Test, each $15.00
*** Includes Cost of Technician Time Coring and Patching Care Holes
Page 1 of 5
�.�, �ji ,j ,1 � r' ,c_, .�, -
u �,.�ll i� 1G�:S 1� ���.:�Lt11���%1
t '";. � 1
rtii ��� �rI[/',�����r`1i",,��°f
� .., J � tl � 5 V !; !� ��.�iti �: � L
. ?�"r�'i! Iiit'� � �U �n(�n
1�: t;��`r�,V dll� �14>�S,
Ai�A� FI 1� � �1 f �
FEE SCHEDULE
For Construction Material Testing and Geotechnical �orings
Geotechnical
Undisturbed Soil Sample, each $11.00 (per ft.)
Visual Classification, each $10.00
Classification AST'M D-2487, each $105.00
Sample Extrusion, each N/A
Sam le Pre aration, each $10.00
Atterburg Limits RAW PI, each $45.00
Soil w/Additive, each $50.00
Bar Lineal Shrinkage, each $16.00
Moisture Density Relarionship (Proctor) $145.00
Standard (ASTM D-698), each
Moisture Density Relationship (Proctor) $175.00
Modified (ASTM D-1517), each
T�ID 113E, each $180.00
Unit Weight, each $20.00
Unit Weight (Dry Rodded), each $20.00
-200 Sieve Analysis, each $30.00
Laboratory Moisture Co�tent, each $g•Q�
Sieve Analysis (Fine Aggregate), each $60.00
Sieve Analysis (Large Aggregate), each $60.00
Sieve Analysis (Finer than 200 Sieve), each $35.00
Lime or Cement Series Determivarion (5 points), each $255.00
Optimum Lime Content, each $200.00
H Series (6 points), each $210.00
S ecific Gravity, each $45.00
Absorption, each $25.00
Los Angeles Abrasion (Large Aggregate), each $235.00
Los Angeles Abrasion (Sma11 Aggregate), each $215.00
Texas Wet Ball Mill, each $175.00
Gradation (Lime or Cement Stabilized), each $30.00 (3 Min Tech Time &
Tri Included)
*** Limed Soil Depth Measurement, each ***$30.00 (3 Min'rech Time &
Trip Included)
++ In Place Moisture Density (Nuclear Method Technician), hour ++$45.00
Grain Size Analysis (Mechanical and H drometer), each $150.00
Unconfined Com ression Test Including Moisture, each $30.00
Unconfined Compression Test Soil, each $27.00
Unconfined Compression Test Rock, each $35.00
Confined Com ression Test (UU), each $100.00
Tria�cial Test Unconsolidated Undrained, s eci $85.00
Triaxial Test Mulriple Stage, stage $300.00
Triaxial Consolidated Undrained w/Pore Pressure Measurement, s eci $650.00
Triaxial Consolidated Drained Multiple Stage, stage $650.00
Triaxial Consolidated Drained Single Stage, stage $300.00
Triaxial Consolidated Drained Three Stage, stage $780.00
Consolidated Test, each $350.00
Direct Sheaz Consolidated Drained Sand & Gravel, oint $200.00
Direct Shear Consolidated Drained Silt & Clay, point $350.00
Direct Shear Consolidated Undrained Sand & Gravel, point $175.00
Page 4 of 5
ATTA�HMEIVT �
FEE SCHEDULE
For Construction Material Testing and Geotechnical Borings
Direct Shear Consolidated Undra.ined Silt & Clay, point $200.00
California Bearing Ratio, each $250.00
THD Tria�cial, each $800.00
Percent Swell, each $80.00
Permeability Test Falling Head, each $200.00
Permeability Test Triaxial, each $300.00
Permeabili Test Flex Wall, each $300.00
Permeability Test Fixed Wall, each $200.00
Permeability Test Clay Soils, each $290.00
Permeabili Test Granular Soils, each $250.00
Permeability Test Pressure Head wBeck Pressure Saturation, each $350.00
Electrical Resistivity, THD Method, each $100.00
Truck Mounted Mobilizarion, mile and trip Mile -$3.25
Trip - $250.00
Buggy/Ave Mounted, mile and trip Mile -$5.00
Tri - $350.00
Per Diem Per Man, da $85.00
Intermittent Soil Sampling w/Truck 5' Intervals 0-25' De th, foot $11.00
Intermittent Soil Sam ling w/Truck 5' Intervals 25-50' De th, foot $12.00
Intermittent Soil Sampling va/Truck 5' Intereals SQ-100' Depth, foot $15.00
Continuous Soil Sam ling w/Truck 0-10' De th, foot $15.00
Intermittent Soil Sampling w/ATV 5' Intervals 0-25' Depth, foot $12.00
Intermittent Soil Sam ling w/ATV 5' Intervals 25-50' Depth, foot $13.00
Intermittent Soil Sampling w/ATV 5' Intervals 50-100' Depth, foot $15.00
Continuous Soil Sam ling w/ATV 0-10' Depth, foot $14.00
Continuous Soil Sampling w/ATV 10-50' Depth, foot $18.00
Auger Drilling Without Sam le, foot $8.00
Rock Coring w/NX Size, Core Barrel 0-25' Depth Carbide Bit, foot $18.00
Rock Coring w/NX Size, Core Barre125-50' Depth Carbide Bit, foot $20.00
Rock Coring w/NX Size, Core Barre150-75' Depth Carbide Bit, foot $21.00
Rock Corin w/NX Size, Core Barre175-100' De th Carbide Bit, foot $25.00
Rock Coring w/NX Size, Core Barre150-75' Depth Diamond Bit, foot $27.00
CME 5' Continuous Sam ler 0-50' De th, run $15.00 Per �'r
Stand By or Access Time, hour $120.00
Drilling w/Auger Rig, hour $150.00
Minimum Drill Fee $600.00
Post Injection Sub-grade Evaluation Per Boring Including Moisture and Free $500.00
Swell Determination
Minimum Post Injecrion Charge $900.00
Field Time Engineer, hour $100.00
* * * Includes Gauge Charge
++ First hour and half $135.00 any additional time after that is $45.00 per
hour, (includes Technician Time, Tri and Gauge Charge).
Page 5 of 5