AMENDMENi NO. 1
TO CITY SECRETARY CONTRACT NO. �-'� (-� �
STATE OF TEXAS §
�
§ CIiY SECRETARY CONTI�ACT NO. �"��� _
COUNTY OF TARRANf §
WHEREAS, the City of Fort Worth ("City") and CMJ Engineering, �nc. ("Laboratory")
made and entered into City Secretary Contract No. �'� �� 7(the "Agreement") authorized by
City Council via M&C G21196 on December 13, 2005; and
WHEREAS, the Agreement involves geotechnical and material testing services; and
WHEREAS, it has become necessary to execute Amendment No. 1 to said Agreement to
corr�ct a typographical/formatting error shown on Attachment "B" to the Agreement.
NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized
representatives, enter into the following agreement that amends the Contract:
1.
In order to rectify a typographical/formatting error, Attachment "B" of th� Agreement is replaced
with Attachment "B" attached hereto and incorporated herein.
2.
All other provisions of the Agreement which are not expressly amended herein shall
remain in full force and effect.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANf�
-1-
_ _ �.
�.�� , _ .,�' �
� � i ':� '� � ;'� �
��rr�,-i. � ,> _
^'i�s'rt �(}i[�"���;ij�':'.I�i�! �
;i J�i � L� `,J,S �C:1 :`�. G ��l':� J; �
��� .; �:.«U �-,��,,� �
rJ� ..;�,�:.!J,�� :.�,:,
� ORIG�HAL
, , �.l �"l
� � �-, � �
EXECUTED on fihis the �� -� day of �� C�� � , 2007, in Fort Worth,
Tarrant County, Texas.
ATTEST:
CITY OF FORT WORTH:
��1(/�\` • f.� '' � �
' ` ` f j.a_..�. -- -- -
Marty Hendri Marc Ott
City Secretary Assistant City Manager
APPROVAL RECOMMENDED:
��
�Doug Rademaker, Director
Of Engineering
Approved � to Form and Legality:
��5�.; ��.��i'�J�����' �1
�� -- - LABORATORY:
CMJ Engineering, Inc.
V/
By:
� �
Name: ��zl- �--� �
Title: V c � �'� 7 �iirU�fl°�c�Z
�y1 � , -
�,��- �,>.
—2— ��; � J; , :� ':s:�', ���.i;
� i�'I!I++� \?,�a,,''15ir:,;'r'��i
� �J J 0 � �;' �.7 �:i '1: �� b,1�. �;
��� i ll i�'�i Ui �,�no �
�f 3 .v�'`:�f�.��J�'7 �L�(:,,i+
.... �..�.«i
AiiACt°�lMEIVT �
�EE SCHEDULE
For Construction Material Testing and Geotechnical Borings
Concrete
Compression Test Cylinders (Min. 4 per set), each $15.00
Air ContentlSlump/Temperature/Ne� Day Cylinder Pick up, hour $35.00 (Min 3 hours)
Flexural Beams, each $25.00
T** Coring (4" DIA to 6" depth 41h-ip) ***$56.00 (n'Iin 4 pertrip)
er add inch $6.00
2" Coring for depth isolarion to 6" each addirional inch $40.00 (Min 4 per irip)
T`hiclaiess Measurement, each $8.00
Patching of Core Holes, each $6.00
Coring Technician Time, hour $35.00
Flexural Test of Beams, each $25.00
Com ression Test Cylinders, each
Sawing and/or Capping Cares & Cylinders, each $55.00
Compression Test of Cores, each
Compression Test Specimen Hold
Mi7t Design Review, each $100.00
Mix Design Formulation w/Aggregate Tests Include Specific Gravity/Sieve . $550.00
AnalysislLTnit VJT-200, each
Addiiional 1VIix Besign Utilizing Abave Mi� Analysis, each $200.00
Mi�c Design Formulation Revision, each $200.00
Engineering Tech (I�IICET) for Quality Assurance Monitoring of Onsite Work, $45.00
hour
Pre- our Reinforcing Steel Placement Inspection, hour $35.00
Sampling for In lab Test, hour $40.00
E uipment Charge N/C
Minimum Vehicle Charge $25.00
Batching Mi�c Design in Preparation for Making Lab Confirmation Cylinders $35.00
or Beams, hour
Batch Plant Observation Supporting Concrete Placement, hour $45.00
Concrete Flatness, Sq. Ft. per sq. ft. $0.02
min. $500.00
Certified Welding Ins ector, hour $55.00
Fie1d Gradation E ui ment, test - N/C
Slum Test, each $15.00
*** Includes Cost of Technician Time Coring and Patching Core Holes
Page 1 of 5
�4�i'A� kl l�f � �i i �
FEE SCHEDULE
For Cons�ruction Mat�rial Testing and Geotechnical Borings
Geotechnical
Undisturbed Soil Sample, each $11.00 (per ft.)
Visual Classification, each $10.00
Classification ASTM D-2487, each $105.00
Sample Extrusion, each N/A
Sam le Pre aration, each $10.00
Atterburg Limits RAW PI, each $45.00
Soil w/Additive, each $50.00
Bar Lineal Shrinkage, each $16.00
Moisture Density Relationship (Proctor) $145.00
Standard (ASTM D-698), each
Moisture Density Relationship (Proctor) $175.00
Modified (ASTM D-1517), each �
TIID 113E, each $180.00
Unit Weight, each $20.00
Unit Wei ht (Dry Rodded), each $20.00
-200 Sieve Analysis, each $30.00
Laboratar� Moisture Conteut, each ��•�`�
Sieve Analysis (Fine Aggregate), each $60.00
Sieve Analysis (Large Aggregate), each $60.00
Sieve Analysis (Finer than 200 Sieve), each $35.00
Lime or Cement Series Determ.ination (5 points), each $255.00
Optimum Lime Content, each $200.00
H Series (6 points), each $21�.00
S ecific Graviry, each $45.00
Absorprion, each $25.00
Los Angeles Abrasion (Large Aggregate), each $235.00
Los Angeles Abrasion (Small Aggregate), each $215.00
Texas Wet Ball Mill, each $175.00
Gradation (Lime or Cement Stabilized), each $30.00 (3 Min Tech 'rime &
Tri Included)
*** Limed Soil Depth Measurement, each ***$30.00 (3 Min Tech Time &
Trip Included)
++ In Place Moisture Density (Nuclear Method Technician), hour ++$45.00
Grain Size Analysis (Mechanical and Hydrometer), each $150.00
Unconfined Com ression Test Including Moisture, each $30.00
Unconfined Compression Test Soil, each $27.00
Unconfined Compression Test Rock, each $35.00
Confined Compression Test (iJiJ), each $100.00
Tri�ial Test Unconsolidated Undrained, s eci $85.00
Triaxial Test Multiple Stage, stage $300.00
Triaxial Consolidated Undrained w/Pore Pressure Measurement, speci $650.00
Triaxial Consolidated Drained Multiple Stage, stage $650.00
Tri�ial Consolidated Drained Single Stage, stage $300.00
Tri�ial Consolidated Drained Three Stage, stage $780.00
Consolidated Test, each $350.00
Direct Shear Consolidated Drained Sand & Gravel, oint $200.00
Direct Shear Consolidated Drained 5ilt & Clay, point $350.00
Direct Shear Consolidated Undrained Sand & Gravel, point $175.00
Page 4 of 5
ATTA�Ii Nt Ef� i' �
FEE SCNEDULE
For Construction Material Tes�ing and Geotechnical Borings
Direct Shear Consolidated Undrained Silt & Clay, point $200.00
Califomia Bearing Ratio, each $250.00
THD Triaxial, each $800.00
Percent Swell, each $�0.00
Permeability Test Falling Head, each $200.00
Permeability Test Triaxial, each $300.00
Permeability Test Flex Wall, each $300.00
Permeability Test Fi�ed Wall, each $200.00
Permeabiliry Test Clay Soils, each $290.Q0
Permeability Test Granular Soils, each $250.00
Permeabili Test Pressure Head wBeck Pressure Saturation, each $350.00
Electrical Resisrivity, THD Method, each $100.00
Truck Mounted Mobilization, mile and h-ip Mile -$3.25
Trip - $250.00
Buggy/Ave Mounted, mile and trip Mile -$5.00
Trip - $350.00
Per Diem Per Man, day $55.00
Intermittent Soil Sam ling w/Truck 5' Intervals 0-25' Depth, foot $11.00
Intermittent Soil Sam ling w/Truck 5' Intervals 25-50' Depth, foot $12.00
Intermittent Soil Sampling va/Trnck 5' Intervals 50-100' Depttz, faot $15.Q0
Continuous Soil Sam iing w/Truck 0-10' Depth, foot $15.00
Intermittent Soil Sampling w/ATV 5' Intervals 0-25' I�epth, foot $12.00
Intermittent Soil Sam ling w/ATV 5' Intervals 25-50' Depth, foot $13.00
Intermittent Soil Sampling w/ATV 5' Intervals 50-100' Depth, foot $15.00
Continuous Soil Sampling w/ATV 0-10' Deptl�, foot $14.00
Continuous Soil Sampling w/ATV 10-50' De th, foot $18.00
Auger Drilling Without Sam le, foot $�.00
Rock Coring w/NX Size, Core Barrel0-25' Depth Carbide Bit, foot $18.00
Rock Coring w/NX Size, Core Barrel 25-50' De th Carbide Bit, foot $20.00
Rock Coring w/NX Size, Core Barre150-75' Depth Carbide Bit, foot $21.00
Rock Coring w/NX Size, Core Barre175-100' De th Carbide Bit, foot $25.00
Rock Coring w/NX Size, Core Barrel 50-75' Depth Diamond Bit, foot $27.00
CME 5' Continuous Sam ler 0-50' Depth, n�n $15.00 Per F7'
Stand By or Access Time, hour $120.00
Drilling w/Auger Rig, hour $150.00
Minimum Drill Fee $600.00
Post Injection Sub-grade Evaluation Per Boring Including Moisture and Free $500.00
Swell Determ_ination
Mirvmum Post Injection Chazge $900.00
Field Time Engineer, hour $100.00
T * * Includes Gauge Charge
++ First hour and half $135.00 any additional time after that is $45.00 per
hour, (includes Technician Time, Tri and Gauge Charge).
Page 5 of 5