Loading...
HomeMy WebLinkAboutContract 35293AMENDMENT TO ENGINEERING CONTRACT STATE OF TEXAS § CITY SECRETARY COUNTY OF TARRANT § Contract No.sJ��� WHEREAS, the City of Fort Worth (City) and _Halff Associates, Inc._ (Engineer) made and entered into City Secretary Contract No. 33121 (the "Contract") on the _23 _ day of _Januarv_, 2006 ; and WHEREAS, the Contract involves engineering services for the following project: Henderson Street Storm Drain Watershed Planning Study (Phase 2, City Proj. No. 00078_ WHEREAS, it has become necessary to amend said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I, Section 1 of the Contract is amended to include the additional engineering services specified in a proposal letter dated February 12, 2007 , a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer is _$195,000_. 2. Article III of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of 481 640 . 3. Engineer acknowledges its commitment to obtain an additional 5_ % M/WBE participation for this amendment. The Engineer's commitment for the Contract remains unchanged. 4. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. � � =__=--_-- _ - �. 2, ,,, , ,�;N.;. ^ '� V ���'i :�. � �o\ S ir i �>J,`-:��. �:.��U� 0, /', r 'v��C� ����R��'1R� ��� ��.��,����:�w9 ���,�o � ORIG�Nq � EXECUTED on this the � day of Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: � �� Robert D. Goode, P.E. Director, Transportation and Public Works Department APPROVE �1����TO FOR��T LEGALI��, � > !� ���f � ;-����_ Assistant ATTEST: , 2007, in CITY OF FORT WORTH By: Marc A. Ott Assistant City Manager ATTEST: ���-- � � . ��� �� Marty A. drix City Secretary ENGINEER ` By: � " (XoL�.i� } . ,ontr�cL Au�thoxiza�io� � �. :�ate � �, - r I� I ij � i�; ; r`(. ^.,,� ��j"1. '�r��f�v�G,:� �S��u 1�J 'v��'l� ���G°?� !'�G?� ��o^� i::+� J� ��J �' U lS Ltl o � 4:;1i ;'. %1 ; ATTACHMENT A Henderson Watershed Planninq Studv Phase 3 Work Proqram Finalize GIS Data Collection & Mapping of Storm Drain System This task will complete data collection for existing storm drain system assets within the Henderson Watershed. Following the data collection task, the will be incorporated into the GIS database developed in Phase 2. Database structure developed for the modeling in Phase 2 will be revised and updated to include other features needed for general planning and operations. Included in the task of finalizing GIS data collection and mapping of the storm drain system is the following: 1. Research available plans, records, maps, etc. of available data from City and evaluation of source. 2. Survey and GIS data collection for remainder of storm drain system within the Henderson Watershed. 3. Revisions to and population of GIS database using collected data; 4. Mapping of existing storm drain system in GIS with data attributes as defined in the revised GIS database structure. 5. Provide analysis of data and efficiency in data collection for various storm drain system assets. 6. Document data capture approach, standards, and methods. 7. Review and recommend revisions to existing data provided in current watershed planning studies, as needed to combine into singe database. 8. Develop standard study approach, reflecting needs of study area and refine storm drain assessment data collection procedures; refine standard scope of watershed planning studies based on findings and experience with the first round of studies, including flexibility to allow for size and types of facilities involved in specific projects. Henderson Storm Water Model Conversion The current Phase 2 contract storm drain system model was developed using the EPA-SWMM5 computer model program. The effort under this task will be to convert the SWMM5 model into the Wallingford Software InfoWorksCS model. This task will be used to evaluate and make recommendations regarding the use and capabilities of this software. Included is the consideration of study type and watershed needs; prepare a summary report on issues involved with "work- arounds" and "tricks" in the models; provide recommendations and assist in the coordination of software and modeling techniques; evaluation of other software programs based on comparisons with current SWMM5 models; software input and output data management and assistance. Continuation of Watershed Planning Study Program Assistance This task is a continuation of the "Task VI. D. Other Services", as described in the Phase 2 contract, "Attachment C". The tasks outlined below will be required to successfully combine data collected in each of the current watershed planning studies by guiding the format and development of the GIS database population procedures. Included in the task of watershed planning study program assistance is the following: 1. Assist with the review of field data collection methods and procedures; coordination between GIS data collection and data implementation; assist in a data review from pilot study of field data collection for storm water assets; pilot study data management, modeling and data maintenance; pilot study data collection standards, data capture manual development and guidance; assist with the mapping of data collected in pilot study and other studies, as needed, to be incorporated into the storm water GIS database; assist with the development of storm water mapping standards and templates. 2. Coordination of training opportunities for watershed study consultants. 3. City-wide storm water GIS database management development assistance; assist with the incorporation of existing watershed planning studies data into the storm water GIS database; review and recommend revisions to existing data as needed to combine into a comprehensive database. 4. Assist in the development of the GIS-based storm water system geometric network model; conveyance system mapping rules and maintenance assistance for incorporation of new development and field data collection of existing infrastructure. 5. Assist with coordination between Storm Water and other City departments. SWMM5 Preprocessor Programming To integrate the use of the EPA SWMM5 complex storm water modeling program and the development of GIS data desired by the City, a utility program is required for use in ArcMap 9.x. This utility program file (.DLL), by Halff Associates, Inc., will be provided to the City. Software support and further revisions, updates, or modifications will not be included in this amendment. In addition to the preprocessor, a standard storm water geodatabase will be included to standardize the data format for models developed by the watershed planning studies. ,�• /'� ,. n,rNn� '�:'r�l'�,,lt.`'!'� �t'����',�a''� �, �� ar�'��� ; r�. 'v��C� '���1�����i� , �:;�',;'�n;; ; i � i ,, ��� '���:� io ��.�,.e Preprocessor Utility for SWMM5 in ArcMap 9.x 9�� � • i � • ,�,�. e .�� i'r,�� - � e9■ �:�.'-.:..�..";:f�;:� . . Click an the Title button to enter the filename and title afthe inpu#file. J Fh E6t t5ew Go Took {Y�dow !k� JQI�-JI � 1�--� i�l='_:�=I JLocation N�WV0123000s�23837�SW1 � Sh^�sheet F,C�i- E',F�� ❑ ...............7�i[le.............. ❑ Cv�duif. I ❑ Oriiii:es 1 � OWfIL'�S � ❑ Pum�es � ❑ 1fle�r�� I ❑ S�beaEcl�mer�is I ❑ Opiior�s I ❑ �iL�s�rt —I � laanm�try I ❑ J�anctions I ❑ Uivirlers I � LI1Jti`d��� I ❑ Starag� , ❑ Fi£�in r�c�es � ❑ Trae�secis I � Is�terr�c� c=ilas � Creai� Input — Cancel �ii� Geodatabase Design ,..�.T. f,:��,,� — €��s;t�����R? f'�-�;;�Y�I�I� � J� J AJ � J ConIWslRe' , ._ G iJ S�n,h, . . o u swrmis �,t � N I.,ve . _ �USWNM_Database OL'arts PrsondGeoda[abaseFeatveOass �� 6-��Halff_5hapefies OPoe�ts PusonaGeoda[abaseFeMtiedass �-eCFW_SVlIAMWBvI OSVVeY_Loca[rorts PerSondGeadatabauFeatveda55 - Q�� OSVIhBA_Gaqes PdswwlGeodatayyseFeatva0asz - �.. QL'nes �51aniMGeotdetwork PasmalGeadatabaseGew wicNe... - O� O swr+aa_ceaxaYa,k_n.,�r;�x Pa� c ax� Fenn.e a�s �,, - Q SweY Locatior�s O SYlIM1_ti�es Pasonal Geadatabaze FeaNe tlazs � -Q SN1N�� Gages O SV4MM_Poids Pusan J Geoda[a6ase FeMve Oass - -� SNThM-Geq4e[y'�rk '� SN'hMA SthcM[M�e�'R5 Pnsonal Geody(ayasa FeaMe tlazs —[] SN'bM1 GeohlMak_JincGcns QSVdI+J�I_Trx�sec[s PersonalGeodNa6aseFeMveOass �; -['.] SWhm lNes �.; [] SVN�Yd_Pdnts ..: •� SWM1� SuMa[dvreNs - Q SYMdA_Traiuetts ;—� Da[abase_Log -.. � Herderson_Basns -:—� HerdP.f5Ca1 PNcds �—SE] Hrnde.rson_SWIM1 F}�] 23839 OO-�] 23699 �v 23856 �-[1 23883 G}-� 23991 ��I) Lwq &mdi i� 23153 [] 24�Os -�] ARCGISimrary -� ea�� ceoaxabn:e -� �nw c.me5��: (� �s_a,oub��*�s L� �o,�afow � ;o� �«_,�„m,..,�oe..�.�.. � J i � ' � � - � . � - • � • i �' • � ' � - : � � Horne � Council Agenda � h1&C [ Employ�e Dircctory j AGToday � Emplopee Cfassifeds � ARS � IT Oaline � L�epartments � Site Map �. . _ .._ _ _ . ... .. _ . _ __ _ _. _. _ _ . _ _.a_ ..�- :_�� -_ �_> _ _ -- - COUNCIL ACTION: Approved on 4/24/2007 DATE: 4/24/2007 REFERENCE NO.: **C-22078 LOG NAME: 20SWM HENDERSON CODE: C TYPE: CONSENT PUBLIC HEARING: NO SUBJECT: Authorize Amendment No. 1 to the Engineering Agreement with Haiff Associates, Inc., for the Henderson Street Storm Drain Watershed Planning Study, Phase 3(City Project No. 00078) (Contract No. 33121) (M&C C21239) RECOMMENDATION: It is recommended that the City Council: Authorize the City Manager to execute Amendment No. 1, City Secretary Contract No. 33121, to an engineering agreement with Halff Associates, Inc., in the amount of $195,000 for the Henderson Street Storm Drain Watershed Planning Study, Phase 3 for a total contract price of $481,460.00. DISCUSSION: The 2004 Capital Improvement Program (CIP) included $1,300,000.00 for Watershed Planning Studies. These studies are designed to provide a detailed assessment of the condition and capacity of several older storm drain systems and to develop an improvement plan for each. Halff Associates, Inc., has completed Phase 1 of this study for the Henderson Street Storm Drain Watershed, which consisted of background work for a grant application and development of a detailed scope for the Phase 2 study; and Phase 2, which included detailed mapping and inspection of the major trunk lines within this storm drain system, hydraulic modeling, and development of a detailed improvement plan to be implemented as additional funding became available. Phases 1 and 2 were paid for through 2004 CIP funding. Storm Water Utility funds will be used to implement Phase 3 of the study. The scope of work consists of additional data collection and mapping of the storm drain system, updating computer models and continuing assistance as the lead consultant in the City-wide watershed planning study program. Halff Associates, Inc, proposes to perForm this scope for a lump sum fee of $195,000. City staff considers this fee to be fair and reasonable for the scope of services proposed. Halff Associates, Inc., is in compliance with the City's M/WBE Ordinance by committing to 5 percent M/WBE participation. This project is located in COUNCIL DISTRICTS 8 and 9. http://www.cfwnet.org/council�acket/mc review.asp?ID=7486&councildate=4/24/2007 4/25/2007 M&C Request Review FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that, funds are available in the current operating budget, as appropriated, of the Storm Water Utility Fund. TO Fund/AccountlCenters Submitted for City Manager's Office bk Originating Department Head: Additional Information Contact: FROM Fund/Account/Centers PE69 531200 0209203 $195,000.00 Marc Ott (8476) Robert Goode (7804) Joseph Komisarz (2662) ATTACHMENTS ° r���]'� , I:_� I, 'jf',�'�„"� 1�:'�'f � . ' -,• I�N�I � �if �����?P. ������L?I`�,�i1�ij . .� �J � � � � "-, �?,`7,:;J! . i�;, . �;,,., I., Page 2 of 2 http://www.cfwnet.org/council�acket/mc_review.asp?ID=7486&councildate=4/24/2007 4/25/2007 ��� H al ff A ' ... ssoclates February 13, 2007 AVO 23837 Mr. Steve Eubanks, P.E. City of Fort Worth Transportation and Public Works 1000 Throckmorton Fort Worth, TX 76102 4000 FOSSIL CREEK BOULEVARD FORT WORTH, TEXAS 76137-2797 (817)847-1422 FAX (817) 232-9784 Re: Contract Amendment for Henderson Watershed Planning Study (Phase 2) Mr. Eubanks: In response to your request, Halff Associates is pleased to present this Amendment for Additional Services for the above referenced project. This amendment includes the following additional services and proposed budget for third and final phase of study: Finalize GIS Data Collection of Storm Drain System $115,000 Henderson Storm Water Model Conversion $ 30,000 Continuation of Watershed Planning Study Program Assistance $ 30,000 SWMM5 Preprocessor Programming $ 20 000 TOTAL PROPOSED AMENDMENT $195,000 Attached is the standard Amendment to Engineering Contract form and the Scope (Attachment A) to be considered under this amendment. Thank you for the opportunity to assist the City with this important project. If you have any questions, comments or need additional information please feel free to call myself or Russell Killen at (817) 847-1422. Sincerely, HALFF ASSOCIATES, INC. c�i'�%c�G,a,�( Cr�-,J � � Michael Crenshaw, P.E., CFM FORT WORTH • DALLAS • HOUSTON • McALLEN • AUSTIN • FRISCO • SAN ANTONIO TRANSPORTATION • WATER RESOURCES • LAND DEVELOPMENT • MUNICIPAL • ENVIRONMENTAL • STRUCTURAL MECHANICAL • ELECTRICAL • SURVEYING • GEOGRAPHIC INFORMATION SYSTEMS ARCHITECTURE • LANDSCAPEARCHITECTURE • PLANNING