HomeMy WebLinkAboutContract 35298Gi i Y ���R���RY\���
',C�NTI�'AC;T f��� . _�_T.._�_
CITY OF FORT WORTH, TEXAS
DEPARTMENT OF ENGINEERING
STATE OF TEXAS §
KNOWN ALL BY TI�SE PRESENTS:
COUNTY OF TARRANT §
THIS AGREEMENT, entered into the �l ' day of, �i L, 2007 , by and
between the CITY OF FORT WORTH, a municipal corporation of ant and Johnson
Counties, Texas, acting herein by and through Marc Ott, its duly authorized Assistant
City Manager, hereinafter called the "City", and Trinity Engineering Testing
Corporation, DBA Kleinfelder, Engineer.
WITNESSETH
That for and in consideration of mutual covenants and agreements herein contained, the
parties hereto mutually agree as follows:
ARTICLE I
SERVICES
Section 1. Engineer hereby agrees to perform as a per job independent contractor
such professional services as may be requested by the City during the term of this
agreement. These professional services shall be performed in connection with
geotechnical investigation for bridge foundations, drainage structures, retaining walls,
levees, dams, roads, landfills, utilities and other civil works as may be required during the
life of this contract and include laboratory analysis, field work, and reports. These
services shall also include material testing, of Construction and vertical structure,
Environmental study as needed.
Section 2. In addition to the professional engineering services to be performed under
Section 1 above, Engineer shall render the following professional services:
1. Attend such conferences with City officials as may be deternuned
necessary to ensure the drilling, testing, and analysis will proceed in an
economical and orderly manner.
2. Advise the City on special aspects of each project as may be requested by
the City.
3. Furnish all necessary personnel, drilling equipment, laboratory testing
equipment, and materials necessary to perform all testing and other work required
and contemplated under this contract and at such time and in such man��r so as- -� --_ �
not to delay the geotechnical investigation by the City. Engineer s�a�l a�.so '!,5�_,;.i!� t�D)
n, o
� ' �ci��' �i'1��
,
,
� ORIG � �, _.��:.���.�,�� � ����;;, �
IN�#� ;
fi�rnish all necessary barricades, signs and other warning devices and their
appu.rtenances so as to comply with all applicable local, state and federal laws,
rules and regulations.
ARTICLE II
CIT�"� OBLIGA�'IONS AND COMPEIoTSATION
Section 1. All testing or other work to be performed under this contract will be
specified in writing by the Department of Engineering City of Fort Worth. City shall not
pay for any testing or other work performed by Engi_neer or its subcontractors that has not
been ordered in writing. It is specifically agreed that Engineer shall not be compensated
for any alleged additional work resulting from oral orders of any person:
City shall make available to Engi_neer in the performance of the coniract, a11 existing
plans, maps, field notes, statistics, computations, and other data in its possession relative
to the sites designated for investigation. City assumes no responsibility for the accuracy
of such data. furnished to Engineer by the City, its agents, contractors, or subconiractors.
Section 2. City agrees to pay Engineer for testing services on a unit price per authorized
test basis. The unit price to be paid for each authorized service shall not exceed the unit
price amount set out in the schedule of Fees and Services, attached hereto, marked
"Atta.chment A", and incorporated herein for a11 purposes incident to this contract. In no
event shall the total contract price paid by the City for a11 services performed hereunder
exceed the sum of Two Hundred Twenty Five Thousand Dollars ($225,000.00).
The method of payment shall be as follows: Payment for services rendered shall be due
upon completion of the particular services so ordered and receipt by City of Engineer's
invoice for payment of same.
Acceptance by Engineer of said payment shall operate as and shall release the City from
all claims or liabilities under this contract for anything related to, done, or furnished in
connection with the services for which payment is made, including any act or omission of
the City in connection with such services.
AIZTICLE III
TERM
This agreement shall be for a term of thirty-six (36) months, beguming upon contract
execution date.
ARTICLE N
INDEPEI�DENT CONTRACTOR
Engineer sha11 operate hereunder as an independent contractor, and not as an ofFicer,
agent, servant, or employee of the City. Engineer sha11 have exclusive control of and the
exclusive right to control the details of the work to be performed hereunder and all
GEOTECI-INICAL SERVICES
ANNUAL CONTRACT
Page 2 of 8
persons performing same, and shall be solely responsible for the acts and omissions of its
officers, agents, employees, contractors and subcontractors. The doctrine of respondent
superior shall not apply as between City and Engineer, its officers, agents, employees,
contractors, and subcontractors, and nothing herein shall be construed as creating a
partnership or joint venture between City and Engineer.
ARTICLE V
PROFESSIONAL COMPETENCE AND INDEMNIFICATION
Section 1. To the best of its professional ability, all work performed by Engineer shal]
comply in all aspects with all applicable local, state and federal laws and with all
applicable rules and regulations promulgated by the local, state and national boards,
bureaus and agencies. Approval by the City sha11 not constitute or be deemed to be a
release of the responsibility and liability of Engineer or its officers, agents, employees,
contractors and subcontractors for the accuracy and competency of its drilling, testing,
and reporting, and other engineering services performed hereunder.
Section 2. In this connection, Engineer sha11 indemnify, hold harmless and defend the
City and all of its officers, agents, servants and employees from and against any and all
claims or suits for property damage or loss and/or personal injury, including death, to any
and all persons of whatsoever kind or character, including but not limited to employees of
Engineer, employees of subcontractors, and all other persons performing work incident to
this contract which may rise out of or be connected with directly or indirectly;
a. The negligent, defective or deficient execution, performance, attempted
performance or non-performance of this contract by Engineer.
b. Any act, omission, defect, deficiency or negligence of Engineer in drilling
and testing, reporting, recommendations or any other engineering services
provided under this contract;
c. Any neglect in the safeguarding of the work by Engineer or its
subcontractors;
d. Failure by Engineer or its subcontractors to properly execute the work;
e. Defective work or materials; and/or
f. Striking, cutting, impaling or tearing any cables, utility lines, pipes and
other matter located beneath the surface due to the negligence or wrongful acts of
Engineer.
Engineer shall likewise indemnify, and hold harmless, City for any and all injury or
damage to City property arising out of, or in connection with, any and all acts or
omissions of Engineer, its officers, agents, employees or subcontractors.
GEOTECFINICAL SERVICES
ANNUAL CONTRACT
Page 3 of 8
�� �� i �'i:� ) ��;1 l- .��''�5 e> �: ;! ;' fi)%
r� ',�,� "'i�. �1 I i� ipj��'
I�I ;117 '� �� i I �l I��, �
�:✓ Y Y � .i i] �v,'l�. � �. 1 •'�
vr� r;l,noI�,
l �� :';`���%��: U l��j f�G�.:
ARTICLE VI
INSUR ANCE
Section 1. Engineer shall not commence work under this contract until it has
obtained all insurance required under this Article and the City has approved such
insurance, nor shall Engineer a11ow a.ny subcontractor to commence work on its
subcontract until all similar insurance of the subcontractor has been so obtain.ed and
approval given by the City; provided, however, Consultant may elect to add any
subconsultant as an additional insured under its liability policies.
Commercial General Liabiliiy
$5,000,000 each occurrence
$5,000,000 aggregate
Automobile Liability '
$1,000,000 each accident (or reasonably equivalent limits of
coverage if written on a split limits basis). Coverage shall
be on any vehicle used in the course of the PROJECT.
Worker's Compensation
Coverage A: statutory limits
Coverage B: $100,000 each accident
$500,000 disease - policy limit
$100,000 disease - each employee
Professional Liability
$1,000,000 each claim/annual aggregate
Section 2. Additional Insurance Requirements
a. Except for employer's liability insurance coverage under Engineer's worker's
compensation insurance policy and professional liability insurance, the City,
its o�cers, employees and servants shall be endorsed as an additional insured
on Engineer's insurance policies.
b. Certificates of insurance shall be delivered to the Department of Engineering's
contract administrator, 1000 Throckmorton Street, Fort Worth, TX 76102, prior
to commencement of work.
c. Any failure on part of the Ciiy to request required insurance documentation
shall not constitute a waiver of the insurance requirements specified herein.
d. Each insurance policy shall be endorsed to provide the City a minimum thirty
days notice of cancellation, non-renewal, and/or material change in policy terms
or coverage. A ten da.ys notice shall be acceptable in the event of non-payment
of premium.
GEOTECi3NICALSERVICES
ANNUAL CONTRACT
Page 4 of 8
e. Insurers must be authorized to do business in the State of Texas and have a
current A.M. Best rating of A: VII or equivalent measure of financial strength
and solvency.
f. Deductible limits, or self-funded retention li_mits, on each policy must not
exceed $10,000.00 per occurrence unless otherwise approved by the City.
g. Other than worker's compensation insurance, in lieu of iraditional insurance,
City may consider alternative coverage or risk treatment measures through
insurance pools or risk retention groups. The City must approve in writing any
alternative coverage.
h. Workers' compensation insurance policy(s) covering employees employed on
the project shall be endorsed with a waiver of subrogation providing rights of
recovery in favor of the City.
i. City shall not be responsible for the direct payment of insurance premi»m
costs for Engineer's insurance.
j. Engineer's insurance policies shall each be endorsed to provide that such
insurance is primary protection and any self-funded or commercial coverage
mainta.ined by City shall not be called upon to contribute to loss recovery.
k. In the course of the contract, Engineer shali report, in a timely manner, to
City's officially designated contract adnunistrator any known loss occurrence
which could give rise to a liability claun or lawsuit or which could result in a
property loss.
1. Engineer's liabiliiy sha11 not be limited to the specified amounts of insurance
required herein.
m. Upon the request of City, Engineer shall provide complete copies of all
i_nsurance policies required by these contract documents.
ARTICLE VII
T12ANSFER OR ASSIGl�MENT
City and Engineer each bind themselves, and their respective successor and assigns, to
this agreement. Engineer, its successors and assigns, shall not assign, sublet or transfer
any interest in this agreement without prior written consent of the City.
ARTICLE VIII
TERMINATION OF CONTRACT
GEOTECiiNICAL SERVICES
ANNUAL CONTftACT
Page 5 of 8
� `�.:i����l�;'�:�.�� jr.C'J��J�:U
a � �� ',; ?r,�:�i),� ;�;, ��r��y �
V � � � � � '1� L �L' -1•� � �
. �
' �� � �U ��
`. :� '` ': :�t'� ��,s�
a
Section 1. City may terminate this contract at any time, for any cause, by notice in
writing to Engineer. Upon receipt of such notice, Engineer sha11 immediately discontinue
all services and work hereunder and the placin.g of all orders or the entering into contracts
� for supplies, assistance, facilities, and materials, in connection with the performance of
this contract and sha11 proceed to cancel promptly a11 existing contracts insofar as they are
chargeable to this contract.
Section 2. If City chooses to terminate this contract under Article VIII, Section 1, upon
receipt of notice of termination, Engineer shall discontinue services rendered up to the
date of such termination based upon calculations in Article II, Section 2 and the attached
incorporated Schedule of Fees and Services (E�ibit "A").
Section 3. All reports, whether partial or complete, prepared under this contract,
including the original drawings, whether furnished by the City, its officers, agents,
employees, consultants, engineers, or contractors, or prepared by Engineer, shall be or
become the property of the City, and shall be fiunished to the City prior to or at the time
such services are completed, or upon ternunation or expiration of this agreement.
ARTICLE IX
IBIGHT TO AUDIT
(a) Engineer agrees that the City shall, until the expiration of three (3) years after final
payment under this contract, have access to and the right to examine a.ny directly
pertineni books, documents, papers and records of Engineer involving transactions
relating to this contract. Engineer agrees that the City shall have access during
normal working hours to all necessary facilities and shall be provided adequa.te and
appropriate workspace in order to conduct audits in compliance with ihe provisions of
this section. City shall give Engineer reasonable advance notice of intended audits.
(b) Engineer further agrees to include in all its subcontracts hereunder, a provision to the
effect that the subcontracting consultant agrees that the City shall, until the expiration
of three (3) years after final payment under the subcontract, have access to and the
right to examiue any direcily pertinent books, documents, papers and records of such
subconsultant, involving transactions to the subcontract, and further, that City shall
have access during normal working hours to all subconsultant facilities, and shall be
provided adequate and appropriate work space in order to conduct audits in
compliance with the provisions of this article. City sha11 give Engineer and a.ny
subconsultant reasonable advance notice of intended audit.
(c) Engineer and subconsultants agree to photocopy such documents as may be requested
by the City. The City agrees to reimburse Engineer for the cost of copies at the rate
published in the Texas Administrative Code in effect as of the time copying is
performed.
GEOTECHNICAL SERVICES
ANNTJAL CONT'RACT
Page 6 of 8
ARTICLE X
MINORITY AND WOMAN BISLINESS ENTERPRISE
(MIWBE) PARTICIPA�'ION
In accordance with City Ordinance No. 15530, the City has goals for the participation of
minority business enterprises and woman business enterprises ("M/WBE") in City
contracts. Engineer acknowledges the M/WBE goal established for this contract and its
commitment ta meet that goa1. Any misrepresentation of facts (other than a negligent
misrepresentation) and/or the commission of fraud by the Engineer may result in the
termination of this agreement and debarment from participating in City contracts for a
period of time of not less than three (3) years.
ARTICLE XI
OBSERVE AND COMPLY
Engineer shall at all times observe and comply with all federal and State laws and
regulations and with all City ordinances and regulations which in any way affect this
agreement and the work hereunder, and sha11 observe and comply with a11 orders, laws
ordinances and regulations which may e�st or may be enacted later by governing bodies
having jurisdiction or authority for such enactment. No plea of misunderstanding or
ignorance thereof shall be considered. Engineer agrees to defend, indemnify and hold
harmless City and a11 of its officers, agents and employees from and against all claims or
liability arising out of the violation of any such order, law, ordinance, or regulation, whether
it be by itself or its employees.
ARTICLE XII
VENUE
Should any action, whether real or assert�d, at law or in equity, arise out of or under this
Contract, venue for said action shall be exclusively in Tarrant County, Texas.
IN WITNESS THEREOF, the parties hereto have made and executed this agreement in
multiple originals the day and year first above written, in Fort Worth, Tarrant County,
Texas.
ARTICLE XIII
NO THIRD PARTY BENEFICIARIES
This Agreement shall inure only to the benefit of the parties hereto and third persons not
privy hereto shall not, in any form or manner, be cansidered a third party beneficiary of
this Agreement. Each party hereto shall be solely responsible for the fulfillment of i#s
own contracts or commitments.
GEOTECfINICAL SERVICES
ANNUALCONTRACT
Page 7 of 8
,,
� , � i,��. i , � ' '�!,�
- + � 5 v J '�..,
^'��',+�1( v'�',�'I�`,u �1,�Y1� i���'%
�� � . � : �
����� r„''�'1`;'���'t � ����� , �
ATTEST:
BY: I � �
Marty Hend
City Secretary
APPROVAL RECOMMENDED:
Doug Rademaker, Director
Department of Engineering
APPROVED AS TO FORM AND
T L'!`_ A T TTV �.
GEOTECHNICAL SERVICES
pNN[JAL CONTRACT
Page 8 of 8
_;
CITY OF FOR ORTH
�-
SY:
Mar Ott '��
Assistant City Manager
Trinity Engineering Testing
Corporation, DBA Kleinfelder.
B �������� ��.���
Y�
�'� (- ���`�
Contract Authorization
�^ ��J^�
Date
%�;'� = t ; N: ;},`.�
:� f�f J L�.I;� �l. 1'� V l� ,,.ti:�
, �
��� 1' 5,�� \ I[;,�Cy i� 11 �1�, I�C 7
�JJ u t•,'S�a �IL..i• �
,1n,-,, 7J �q,
i�'rq i;lj' �: I �rI� �(
' o ..`:%�d�jt� U�.GLa
ti
.-.__��...-_��._,�.��_ ._>.-.._ .Y
EX!-IIBIi A
FEE SCHEDULE
For Construction Nlaterial Testing and Geotechnical Borings
Concrete
Compression Test Cylinders (Min. 4 per set), each $15.00
Air ContendSlump/Temperature/Ne�ct Day Cylinder Pick up, hour $35.00 �M�n 3 hours)
Flexural Beams, each $25.00
*** Coring (4" DIA to 6" depth 4/trip) ***$56A0 (M�n4pertrip)
per add inch $6.00
2" Coring for depth isolation to 6" each additional inch $40.00 �M� 4 per trip)
Thiclrness Measurement, each $8.00
Patching of Core Holes, each $6.00
Coring Technician Time, hour $35.00
Flexural Test of Beams, each ' $25.00
Compression Test Cylinders, each
Sawing and/or Ca ping Cores & Cyiinders, each $55.00
Compression Test of Cores, each
Compression Test Specimen Hold
Nli�c Design Review, each $100.00
Mix Design Formulation w/Aggregate Tests Include Specif'ic Gravity/Sieve $550.00
Analysis/LTnit WT-200, each
Additional Mix Design Utilizing Above Mix Analysis, each $200.00
Mix Design Formulation Revision, each $200.00
Engineering Tech (I�]ICET) for Quality Assurance Monitoring of Onsite Work, $45.00
hour
Pre-pour Reinforcing Steel Placement Inspecrion, hour $35.00
Sampling for In lab Test, hour $40.00
Equipment Charge N/C
Minimum Vehicle Charge $25.00
Batching Mix Design in Preparation for Making Lab Confirmation Cylinders $35.00
or Beams, hour
Batch Plant Observation Supporting Concrete Placement, hour $45.00
Concrete Flatness, Sq. Ft. per sq. ft. $0.02
min. $500.00
Certified Welding Ins ector, hour $55.00
Field Gradation Equi ment, test N/C
Slump Test, each $15.00
*** Includes Cost of Technician Tune Coring and Patching Core Holes
Page 1 of 5
E)C9iIBIT �►
FEE SCHEDULE
For Construction Material Testing and Geotechnical Borings
F�v1AC
++ Density Nuclear Method, hour ++ $45.00
Core In place Density, each $32.00
Coring HMAC Technician Time, hour
Core Depth Measurement, core
Patching Core Holes, each $56.00 (Min 4/trip)
Min VehicIe Charge
4" DIA./6" De th, core $40.00
Each Additional Inch, Inch $6.00
*** Rolling Pattern Nuclear Gauge, hour *** $45.00
Nuclear Moisture Density Gauge, day $8Q.00
Extraction and Gradarion, each $170.00
Lab Density, each $40.00
Stability Test, each $160.00
Maxi.mum Specific Gravity, each $75.00
Disposal Fee N/C
Batch Plant Hot Bin Analysis, each $55.00
Material Sampling For In Lab Tests, hour $40.00
*** Includes Gauge Charge
++ First hour and half $135.00 any additional time after that is $45.00 per
hour, (includes Teclusician Time, Tri and Gauge Charge).
+' f' L' I^ E r .II^'J."�1.,':�I.
'v'' � f J \J J �, :.� �^\' � �`' `.::i� .,; I' i� �
y � ^�. i iip
. '> 7 � ��� � � .� `'.J �`: L � Id�l } �y�
��jI�I '��'ii �'..(�,n,lf (I'j ��\�
�'Ja �.'�%l:��lnl�� 4'�.�G,�
Page 2 of 5 . _ . � ��..--_-- -�- - _„ . _ �
EXF�lIBIT 4►
FEE SCHEDULE
For Construction Material Testing and Geotechnicai Borings
Page 3 of 5
EXHI�IT /�a
FEE SCHEDULE
For Construction Material Testing and Geotechnical Borings
Geotechnical
Undisturbed Soil Sample, each
Visual Classification, each
Classification ASTM D-2487, each
Sample Exlrusion, each
Sample Preparation, each
Atterburg Limits RAW PI, each
Soil w/Additive, each
Bar Lineal Slu�iukage, each
Moisture Density Relationship (Proctor)
Standard (ASTM D-698), each
Moisture Density Relationship (Proctor)
Modified (ASTM D-1517), each
THD 113E, each
Unit Weight, each
Unit Weight (Dry Rodded), each
-200 Sieve Analysis, each
Laboratory Moisture Content, each
Sieve Analysis (Fine Aggregate), each
Sieve Analysis (Large Aggregate), each
Sieve Analysis (Finer than 200 Sieve), each
Lime or Cement Series Determination (5 point:
Optimum Lime Content, each
pH Series (6 points), each
�ecific Gravity, each
Absorption, each
Los Angeles Abrasion (Large Aggregate), each
Los Angeles Abrasion (Small Aggregate), each
Texas Wet Ball Mill, each
Gradation (Lime or Cement Stabilized), each
*** Limed Soil Depth Measurement, each
++ In Place Moisture Densitv (Nuclear Method
Grain Size Analysis (Mechanical and Hydromete�
Unconfined Compression Test Including Moistur�
Unconfined Compression Test Soil, each
Unconfiued Compression Test Rock, each
Confined Compression Test (iJLJ), eacb
Triaxial Test Unconsolidated Undrained, speci
Trialcial Test Multiple Stage, stage
Triaxial Consolidated Undrained w/Pore Pressure
Triaxial Consolidated Drained Multiple Stage, sta
Triaxial Consolidated Drained Single Stage, stage
Triaxial Consolidated Drained Three Stage, stage
Consolidated Test, each
Direct Shear Consolidated Drained Sand & Grave
Direct Shear Consolidated Drained Silt & Clay, pc
Direct Shear Consolidated Undrained Sand & Gra
each
each
each
int
hour
Page 4 of 5
$11.00
$10.00
$105.00
N/A
$10.00
$45.00
$50.00
$16.00
$145.00
$175.00
$180.00
$20.00
$20.00
$30.00
$8.00
$60.00
$60.00
$35.00
$255.00
$200.00
$210.00
$45.00
$25.D0
$235.00
$215.00
$175.00
$30.00 (3 Min
***$30.00 � (3 Min Tech Time &
++$45.00
$150.00
$30.00
$27.00
$3 5.00
$100.00
$85.00
$300.00
$650.00
$650.00
$300.00
$780.00
$350.00
$200.00
$350.00
$175.00
EXFfI�IT f�
FEE SCHEDULE
For Construction Material Testing and Geotechnical Borings
Direct Shear Consolidated Undrained Silt & Clay, point $200.00
California Bearing Ratio, each $250.00
TI-ID Triaacial, each $800.00
Percent Swell, each $80.00
PermeabiIity Test Falling Head, each $200.00
Permeability Test Tri�ial, each $300.00
Permeability Test Flex Wall, each $300.00
Permeability Test Fixed Wall, each $200.00
Permeability Test Cla Soils, each $290.00
Permeability Test Granular Soils, each $250.00
Permeability Test Pressure Head wBeck Pressure Saturation, each $350.00
Electrical Resistivity, THD Method, each $100.00
Truck Mounted Mobilization, mile and trip Mile -$3.25
Trip - $250.00
Buggy/Ave Mounted, mile and trip Mile -$5.00
Trip - $350.00
Per Diem Per Man, day $85.00
Intemuttent Soil Sampling w/Truck 5' Intervals 0-25' Depth, foot $11.00
Intermittent Soil Sampling w/Truck 5' Intervals 25-SO' Depth, foot $12.00
Intermittent Soil Sampling w/Truck 5' Intervals 50-100' Depth, foot $I5.00
Continuous Soil Sam ling w/Truck 0-10' De th, foot $15.00
Intermittent Soil Sam ling w/ATV 5' Intervals 0-25' De th, foot $12.00
Intermittent Soil Sampling w/ATV 5' Intervals 25-50' Depth, foot �$13.00
Internuttent Soil Sampling w/ATV 5' Intervals 50-100' Depth, foot $15.00
Continuous Soil Sam ling w/ATV 0-10' De th, foot $14.00
Continuous Soil Sam ling w/ATV 10-50' Depth, foot $18.00
Auger Drilling Without Sample, foot $8.00
Rock Coring w/NX Size, Core Barrel0-25' Depth Carbide Bit, foot $18.00
Rock Coring w/NX Size, Core Barre125-50' De th Carbide Bit, foot $20.00
Rock Coring w/NX Size, Core Barrel 50-75' Depth Carbide Bit, foot $21.00
Rock Coring w/NX Size, Core Barrel 75-100' Depth Carbide Bit, foot $25.00
Rock Coring w/NX Size, Core Barre150-75' Depth Diamond Bit, foot $27.00
CME 5' Continuous Sampler 0-50' De th, run $15.00 Per FT
Stand By or Access Time, hour $120.00
Drilling w/Auger Rig, hour $150.00
Minunum Drill Fee $600.00
Post Injection Sub-grade Evaluation Per Boring Including Moisture and Free $500.00
Swell Determination
Minunum Post In'ection Charge $900.00
Field Time Engineer, hour $100.00
*** Includes Gauge Charge
++ First hour and half $135.00 any additional time after that is $45.00 per
hour, (includes Technician Time, Trip and Gauge Charge).
Page 5 of 5
�
�ify Of ��f't �I/�rf'l1, Te�fas
Ma or and C�uncil Communscation
v
� _ __ _ n ___ _ _ .�.�r� _ __ _ _ __ _
COUNCIL ACTION: Approved on 3/20/2007
DATE: Tuesday, March 20, 2007
LOG NAME: 30AGREEMENTS REFERENCE NO.: **G-15637
SUBJECT:
Authorize Execution of Agreements with Trinity Engineering Testing Corp. d/b/a Kleinfelder,
Professional Service Industries, Inc., Mas-tek Engineering & Associates, Inc., (MTE), and Globe
Engineering, Inc., for Geotechnical, Construction Material and Environmental Testing for Various
Construction Projects
�.�_ - _ „��..�-�.�,,��., _ �.-��_-��:,-,-_=����:��� .�,� - -- - - -
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute agreements with Trinity
Engineering Testing Corp. d/b/a Kleinfelder, Professional Service Industriecs, Inc., Mas-tek Engineering &
Associates, Inc., (MTE), and Globe Engineering, Inc., for geotechnical, construction material and
environmental testing for various construction projects for a period of 36 months with an aggregate fee not
to exceed $225,000.00 for each agreement.
DISCUSSION:
Since 1982, the City has periodically negotiated contracts with firms to perform geotechnical, construction
material and environmental testing services for various City projects. These requirements contracts provide
the City with additional capacity as needed and allows for rapid response to departmental needs with
already established unit prices. Funding is provided from each individual project.
The City's previous contract with MACTEC Engineering will expire on September 26, 2007. Staff recently
solicited unpriced proposals from sixteen firms. A total of 16 proposals were received.
Each firm's proposal was evaluated based upon pre-established selection criteria, which included, but was
not limited to, qualification of personnel, experience and performance on previous City contracts, and
availability of testing equipment.
An inter-departmental committee selected Trinity Engineering Testing Corp. d/b/a Kleinfelder, Professional
Service Industries, Inc., Mas-Tek Engineering & Associates, Inc. and Globe Engineering, Inc., to provide
geotechnical, construction material, and environmental testing services for various construction projects.
All City departments requiring geotechnical and/or construction materials testing services will be able to
utilize the services of the recommended firms. Each contract will terminate 36 months after execution or
upon expenditure of $225,000, whichever occurs first.
A sub-consultant and M/WBE goal was not established for these contracts because subcontracting
opportunities are negligible.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budgets, as appropriated, of the
..., . �r�rrr ,rr�.7TC�
Page 1 of 2
�
various Capital Improvements Program Funds
TO FundlAccountJCenters
Submitted for Citv Manager's Office bv:
Originating Department Head:
Additional Information Contact:
FROM Fund/AccountJCenters
Marc A. Ott (8467)
A. Douglas Rademaker (6157)
Pedro Hernandez (871-7920)
P��P 7 nf 7