Loading...
HomeMy WebLinkAboutContract 35798AMENDMENT NO. 2 STATE OF TEXAS § CITY SECRETARY CONTRACT NO.� � I—I,� (M&C Needed) COUNTY OF TAR.RANT § WHEREAS, the City of Fort Worth (City) Stream Water Group, Inc., (Engineer) made and entered into City Secretary Conh-act No. 34090, (the Contract) which was authorized by the City Council by M&C C-21721 on the 26`�' day of September 2006; and WHEREAS, the Contract involves engineering services for the following project: Engineering Design Services: Street reconstruction, Water and Sanitary Sewer Replacement on Selene St (Decatur Rd to Weber St), N.E. 37th St (Grover St to Den Rd], Hardy St (Elaine PI to Mineola Ave), and Decatur Ave (Terminal Rd to Elaine PI). 2004 CIP Neighborhood Street Projects Year 4& 5, Contract 41, Project No. 00441 WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated February 7, 2007, copies of which are both attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $35,531.61. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $214,679.61. _ _ i_ . - , c i � `'_,_� —'r. d�':..1�5 :!,S��J'�� � 3. --J`�i' 1!�;';rij�j�,'� ,-,^�u r� .:;i:;;'�;, � , . ... �.•�J1 �1�� �12u1�o All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED on this the day of 007, in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: � b A.Douglas Rademaker, P.E. Director, Department of Engineering Stream Water Group, Inc. Engineer �`.�.� = ,:�-��. By: Name: Shamsul Arefin, P.E. President 6737 Brentwood Stair Rd, Suite 230 Fort Worth, TX 76112 �ALITY: APPROVED , Marc :-O t Assistant City Manager ATTEST: }� �� � ,. � .-� � �� Marty Hendrix, ity Secretary .-�_^ ��J�JIJ ;'.C�I1 "Ci: i1fi�14x'J 4bi'�10� .._._- _ - ^ .`� �_-..��_�-�-- ua,�c ,-,�-,; =�1 :' or��.r�, `;.��Y1� ;,�.,1� ';�;�1 ���,;.L� ,�:����- ar �, �; .. :' : `.' 'J's�i:; ����� �� :,,:�� � Y�', C'����:i�1:�J�0 �� ��� � � G�p Mr. Gopal Sahu, P.E. Project Manager Department of Engineering 1000 Throckmorton St.; Fort Worth TX 76102 Phone: (817) 392-7949 February 7, 2007 RE: Contract Amendment No. 2 Engineering Design Services: Street reconstruction, Water and Sanitary Sewer Replacement on Selene St (Decatur Rd to Weber St), N.E. 37th St (Grover St to Den Rd), Hardy St (Elaine Pl to Mineola Ave), and Decatur Ave (Terminal Rd to Elaine Pl). 2004 CIP Neighborhood Street Projects Year 4& 5, Contract 41, Project No. 00441 Dear Mr. Sahu: The following is a summary of additional work requested for Amendment No. 2 to the above referenced project, per recent design meetings with City of Fort Worth officials. Replace existing 2-60" culvert with 3-10'X9' box culvert as recom�nended by the previous drainage study and improve the draireage systef» ►vithin Decatur Rd. project limit as shown in Exhibit A. The Engineer's Opinion of Probable Construction Cost for the above Drainage Improvements =$475,621.00 (see Table 1) 1. Basic Engineering Fee based on 8.5% of construction (T.S.P.E. Curve %) ($475,621) X(T.S.P.E. Curve 8.5% X 0.85) _$34,363.61 Additional Services Printing & Reproduction Subtotal (12 sheets per plan ) $1,168 (4 sets preliminary, 16 sets utility clearance, 5 sets fmal and 50 set bid documents) Total Additional Services $35,531.61 Amendment No. 2 TOTAL LUMP SUM $35,531.61. The current status of the contract between Stream Water Group, Inc and City of Fort Worth for the Street Reconstruction, Water and Sewer Replacement, 2004 CIP Contract Year 4& 5, Contract 41 is as follows: Original Contract Amount = $ 164,947.00 Amendment No. 1 Amount = $ 14,201.00 Amendment No. 2 Amount = $ 35 531 61 Total Contract Amount including Amendments = $ 214,679.61 Please process Amendment No. 2, to the Street Reconstruction, Water and Sewer Replacement, 2004 CIP Contract Year 4& 5, Contract 41 in the amount of $35,531.61. If you require any additional information or have any questions regarding this matter, please give me a call at 817-446- 4171. We appreciate the opportunity to provide Engineering design services for the City of Fort Worth. Sincerely, Stream Wate roup, Inc. �,_---_` m� Shamsul A e m, P.E. President Copy: File, Dena Johnson, P.E. (City of Fort Worth) 6737 Brenlwood Stair Rd • Suite 230 • For� Worth. T?: 7611? • Phone: 817.44G.4171 . Fax: 817.446.4335 �a����w. stream���atergroup.coiu N �+ C d i O C. d � lC C .� � 0 ..� H � � U Z O F- U � T N IL � ,�^ � v! `� Z !' ' O U W J m Q m � a � O Z O � Z o a N O NN � w w Z (9 Z W co M O � O 2 V G1 �O a` r � V � r c O U �ri � � � � t� � � �° a O V �� _ o U c�v F � V Ll.I Z "W'> o O a 0 0 0 � o 0 0 0 0�n o 0 0 0 o r� o 0 0 0 o ch co .- J O o o � o 11) O lf) O h O O o O O�i' O l!� O ln l!� 00 M N Q N O f� O.- O N O O O N O O O� 11') N O N� N f� M N(O � N N M � N N�t O M�� O N M N �A (� � f� �- � N M� O U � � ln M'ct � M N � � � �M �� (A 69 Ef3 Efl EA EA 69 EA 64 EA 69 69 EA 69 Efl FA 69 EA EA E9 E�J EA Efl EA o�� U7 0 ln �� O� O O� O O O O o f� lI) lf� �� � � N f� O I� �- (O �-- M O O � ln � Cp ln I� (O ,.Z, O '�' t- � C� N � �� r 64 EA Efi 64 Hi ffl Efl FfJ Efl Ef? FA 69 64 d9 Efl 69 Ef3 Efl 69 H� 69 J 7 O Q O O O M O O ln O � O � O O N H O 00 N �� M M f� O CO 00 �� N N N O r� ln 11� V � N � � � f� M M r � � N � � O - - T � IIJIJIJIUIUIUIUIJIJIJIJIwI�IWIwIUIJlwl�l�l� g U H o � N o � � N Z -� c � j � 0�� �� � X rn a ��� Q� o o ii � a� � U � � � � a @ � a � � U U�_� x � a � U�� a� a� a w o � a� a� � rn V � c�v U U c c cYi � a_°i � c � c � O O O cp U t0 �«�c�oUU� � � � c `o.n � a� 0 0 0 0 0 0��@ �� �� c� j �' U c� — v�i v�i �� v�i v�i cca ���� U �0 00 � c � a 2 2-3p o a an°n.n.aaa� E� Eo�'m mgg co— � � a N �n �n v� rn �n a� `o 0 o x � s 0 � ��� �� m � � � � 0 � ' (n (n (n o �- (n cn = � � � n' � � v � a � � ln `� � Q " � c�o � � � �dad � N � � a� o c�o c�o c�o � c�o c�o � U U U j��, m co � 2 a� ��� w���'� cA � U U d— c� V�.Y a> a> a� N a� a> in --- 0 �� � � m c-p c� c� 0 0 0 0 0 0�' �� N�- o o��� 3 o c c o � N M � U � �- � 4. .: � "a U (0 O � � �.' �' �' � � � U U U � (q H � � U 2 'ct (fl io � W II�INIMI'�I�nlcol�l°olrnl�l�-I�I�I.-I�I_�I�I00I�IcVIcV J Q 2 6 �C`/ -� 5 17 11 .,�� 8 13 8 R 25R �/`C � 14R 21 24 A�h� �� �R 50' 18 10 � 23 � 15R 20 12 22 6R,�1% 19R 9 50' 21 1 Q. 1g � 13 v 8 14 20 � gOXC1LVERTS3 �� 20R } 18 4 �� � � h� 16 ,`J s�� � 21 R a 17 21 '9��.q 17 �V� 20 19 � 6R 2 0 M�/�/�. �� • 18 2 16 5 19 �R 17 3 18 1 15 11 16 � 17 2 sl 12 16 3 �' 15 4 14 13 �j� 13 4 �ro . 14 A � 5 �09� 13 � �� ��sO�s 15 2� � 9 � 6 12 2�� G �,� ��1! ,8 , „ � 6 1R 17 16 ho P Fo 19 2R 5 3 4 � 15 g 10 ���� 18 4 14 17 16 2� � 3 5 6 12 15 18R � 11 2A N 17 � 8 21R 27R 9 19R 16 �� 22R 3 6 28 ,6Re 15 2 9 14B 20R 23 26R 14A 13 12 11 � � 10 Q 24 25 U 30 16RA H 60' 2 -rro��i�in� r�n 6 0� 8 9 a 50' 2 3 Q 50 5 LEGEND 20 19 18 17 16 15 14 13 12 PROP. SD 23 22 21 20 19 18 17 PROP.INLET � PROP. PVMT. 3 4 5 6 7 8 9 10 11 � 2 3 4 5 g � g EXHIBITA (COUNCIL DISTRICT 2) 2004 CIP NEIGHBORHOOD STREET PROJECTS YEAR 4& 5, CITY PROJECT NO. 00441 STREET RECONSTRUCTION, WATER AND SANITARY SEWER REPLACEMENT LIMITS: CONTRACT 41 DECATUR AVE. ( TERMINAL RD. TO ELAINE PL. ) 12-INLETS � 3-10'x9' BOX CULVERTS PROP. 24" STORM SEWER - PROP. 36" STROM SEWER PROP. 42" STORM SEWER �STREAM WATER GROUP, �N�. FORT WORTH ENGINEERS � PLANNERS � SURVEYORS SEWER 8 WATER �` 6737 &r�wod SHrld.,SW� T30 Mqp; 2048��g MAPSCO 48V SCALE : 1" = 200' �p�y Fon W«M, il( 76II4 �^'Y' Mw�»: e�r.ue.nn City of Fort Worth, Texas Mayor and Council Communication E- __,_..,_�. < - . w ..A-� . . .....- . ..._ ..r..ri'_W._...� - - _ - .._..._. -- �_.._.._._.-�_.». ___._=_.._W .�._...__.�__.�i COUNCIL ACTION: Approved on 9/4/2007 ,� � ��----�.�._��� --- . �:�_��..�.,.���..�„ _ �_�__......._�,_���._._�.� ___�.___::� ._.�._� � -� — �.�::_._. _.._ �.__. _.___ _ �_w ��F.m.:..�._..� �_�_ �:__... �. � . ._.___� .�.ya _. �__�__�_.�.�_ _ _ DATE: Tuesday, September 04, 2007 LOG NAME: 30AMEND2DECATUR REFERENCE NO.: **C-22358 SUBJECT: Authorize Amendment No. 2 to City Secretary Contract No. 34090 with Stream Water Group, Inc., for Additional Engineering Services Related to Drainage Improvements on Decatur Avenue (Project No. 00441) c�-���._...s.....xeq�..�:.._.�.£,��-�d�,a.�:, r_..-.a - .; . ..�:._��Y-,m..:..._..:— . .. .___. .. . ��:....,:a�_�.,.._.ye��.:.�:.v_d.. � . ... ,... . .. �_.,dv, ,. .. _. RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 2 to City Secretary Contract No. 34090 with Stream Water Group, Inc., for additional engineering services related to drainage improvements on Decatur Avenue in the amount of $ 35,531.61, thereby increasing the total contract amount to $214,679.61. � - DISCUSSION: On September 26, 2006, (M&C C-21721) the City Council authorized the City Manager to execute an engineering agreement with Stream Water Group, Inc., for pavement reconstruction and water and sanitary sewer main replacements on NE 37TH Street, Decatur, Hardy Street and Selene Street for a fee not to exceed $164,947.00. This contract was administratively revised by one amendment. . Amendment No. 1 was approved for $14,201.00 for geotechnical studies and reports. Amendment No. 2 provides for design of box culverts on Decatur Avenue to improve the existing drainage system within the limits of Decatur Avenue. These services were not incfuded in the original scope of services. City staff considers the proposed fee of $35,531.61 to be fair and reasonable for the scope of additional services to be performed. This project is located in COUNCIL DISTRICT 2. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Street Improvements Fund. Logname: 30AMEND2DECATUR Page 1 of 2 TO Fund/AccountlCenters FROM Fund/Account/Centers C200 531200 202400044133 $35,531.61 Submitted for City Manager's Office bv: Marc A. Ott (8476) Originating Department Head: A. Douglas Rademaker (6157) Additional Information Contact: Gopal Sahu (7949) Logname: 30AMEND2DECATUR Page 2 of 2