WHEREAS, the Contract involves engineering services for the
following project:
Sanitary Sewer Rehabilitation Contract LXXIV (74).
WHEREAS, it has become necessary to execute Amendment No. 1 to
said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following
agreement which amends the Contra�t:
1.
Article I, of the Contract is amended to include the addition-
al engineering services specified in a proposal letter dated August
7, 2007, copies of which are both attached hereto and incorporated
herein. The cost to the City for the additional services to be
performed by Engineer is $8,300.00.
�
Article II, of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $211,005.00.
� �t�1�.,.6;:t �aS���% 1�D �
e
�;� ��'�� ���; �?G��� .
4 ';rGr��l' �1 tt C�� �
�; Ifi
Y�o b�:�l'J��! cY'J��9 �L✓�� '
� ORIGINAL
3.
All other provisions of the Contract which are not expressly
amended herein shall remain in full force and effect.
EXECUTED on this
Worth, Tarrant County,
the ��t uay of , 2007, in Fort
Texas.
ATTEST:
,� .
Marty Hendri
City Secretary
APPROVA�COr�1ENDED :
�� r � -� l��
A. Douglas Rademaker, P.E.
Director, Department of
Engineering
TEAGUE NALL AND PERK NS, INC.
Engineer .
BY:
Name: Ty Hilton, P.E., Vice President
1100 Macon Street
Fort Worth, TX 76102
��
SI�dC� ��C�I�L���T�It��
PI� VE •
,
,
Marc A. Ott
Assistant City Manager
z_ _,���a� .,.. g
�� `r!`i��c`�� �S�I�V�?��)� i
, �� -
';���1' ����� ���``,': �
r�, `.7�'����1��, ���3e �
�� TEAGUE NALL AND PERK/NS
Civil Engineering : Surveying ' Landscape Architecture Pianning
August 7, 2007 ,
Mr. Abe Calderon, P.E.
City of Fort Worth
Department of Engineering
1000 Throckmorton
Fort Worth, Texas 76102
Re: Sanitary Sewer Rehabilitation Contract 74
Amendment No. 1
TNP No. FTW 05313
Dear Mr. Calderon:
Teague Nall and Perkins, Inc. is submitting this fee Amendment to the above referenced contract
based on additional services requested. The additional services involve separating line M-163 from
the balance of the sewer line projects such that it can be constructed as an individual project. In
addition, the line will be relocated from its current configuration on the west side of Horne Street to
the east side. The following is a brief description and cost for the additional services provided on
this project:
Additional Field Services
Based on our meeting with you and David Cooper in June 2007, we recommend a limited
sub-surface utility investigation to locate the storm sewer main line and the 12-inch water
line in Camp Bowie. After a careful review of our survey data and record drawings obtained
from the City, we have discovered numerous utility crossings along the proposed re-
alignment of M-163. Although most of these crossing should be above the proposed sewer
re-alignment, the storm sewer main and the 12-inch water line are two utilities that are of
concern. Record drawings and field survey are inconclusive regarding the depth and
alignment of these two lines.
Therefore, we propose to perForm limited survey field work and sub-surFace investigation to
establish the horizontal and, more importantly, the vertical location of these two lines.
■ Survey/Sub-SurFace Utility Investigation 4 000
SUBTOTAL $ 4,000
1100 Macon Street Fort Worth, Texas 76102 817.336.5773 phone 817.336.2813 fax
www. tnp-online. com
Mr. Abe Calderon, PE, August 7, 2007, Page 2 of 2
Additional Engineering Services
The re-alignment of M-163 is based on a proposed development by Pate Engineers and
requires a change in the established alignment we have developed for M-163. This change
also requires preparation of a separate set of bid documents along with additional meetings
and coordination time. The following is a summary of additional engineering services.
■ Basic Engineering Services (30% Re-Design for M-163) $ 3,750
■ Special Coordination Meetings with Developer/City $ 400
■ Additional Printing Costs associated with bidding M-163 $ 150
SUBTOTAL 4 300
Total Contract Amendment No. 1: $ 8,300
Summary of Contract Fee:
Original ContractAmount: $ 202,705
Amendment No. 1: $ 8,300
Revised Contract Amount $ 211,005
Thank you for consideration of this contract amendment request. If you have any questions, please
do not hesitate to call me.
Sincerely,
TEAGUE
RKINS, INC.
ment: M-163 Exhibit and Cost Projection
Copy: Mr. Ty Hilton, PE - TNP
\\corpdsl\projects\Idt\ftw05313\docs\contracl\_contracl amend 01.doc
- - �
� � � �''' o ���
.. I 1 . :��i l '}'.S�u'�r �
=�,7,�' ;�,� �, � �-�}7
',';��, � �:;��5���
;�, •,-,,��, �
'; �; ,; r, o i Vi C;,
, . .., . ;'�( �i Ini il �r' : �
,
�
f91-1Y 55 .B � — —
_ �
I � �i� � I I
i.� � I i i
�� i I
,b a3��,a�a PRA? 8• � B� �� U � � 1— -
�
0
_ � _ _ � _ f9l- _ 6 SS_�__ _------
SS .8 L-2J00
CONC. - COflC.
��Y ALLEY
BRRRIER WAL � I
.1.2' HIGH CONCRETE RETAININC WALL � � I
i3 'I
I I�� m� I r
I y I I� �
� I �` I
I I Va � I � i
� y � m I I
i i i k i
I I�� � I � '
- I �
i i� y � �
3
� .'� I - �
I �;&,�I � � '
y 3 �
.
i '�•<.i ' '
i '� i'� � 1 oE„�
--1�-- -- --�,` �� �c�
�
os, �
cor�c. oarvEwnv E d �2� I
i ���� � I ^'•
� i� �� �'
/ ;�
as,e�/ � �`�O�__ g
// ' '___"'_'
� Y daa .ei '
_ — — — — — —M.9_ _ — — � — —/� ��Q.�� �
LOCKE AVE /i� /Y I`` E~ I �
� � T � � � � � �
I
�
i
(ASPHALT PANNG) ���/ I' + � Q p / �
%/// � I
/ / � /
y � � ti�
� � �'� i � b s'��e���
`/, � � �1 �`1! N�tl
�nvs3a�s '�r�� I Q � � en
--- -- �y I �� .�►����
_� 6/ / � � /
��( 4j I
/ �pF,`�W �V'9 � /
/ C�C _ _ / \
,- � y I ',�
� � '�% i
. �' � .
/ - � ,� I o , ,
/ Jr ,�y v O
i � / � 'I I o �S ���`� V
i i' ,�i y
/ �'i / �� p,��tl `�
i� / / � i G��Q`c��,P �\�\
'y �y0 �
- / 'i b � I
/ / J B��e� �Gl �
i � �a�?�'P`-s � I '
� � �
� � 0 R��
o ��`°
� � � ,4
��`� NGl
��1 ���° y 1 �,. �° �� `"
J! �l���Nol /
G�epQl�Op�.tpP j� I / �
P �
�
I /
� W �l
— � I p0.\�•�P
��G.
�- I G
\
O �y� �
pfNP� i �..ti5� w •\B.
GRAPHIC SCALE ��` j� �' W �" s;� �
I "
zo o io 20 �o ���� I �IS � I
i ��
�I `_ �
� oH
x<
SCALE TEAGUE NALL AND PERK/NS CITY OF FORT WORTH, �xas
�q �� ` SANITARY S-�EpWER IMPROVEAIEN75
N A /��� 1f00 Mecon 3trset � CONIRACT 74
DATE Fort Woith, Texee 78102 y—ip3pLAN
//�/G', Phone:(8f7199B-6773�Fax:(917)338-2813
JUN 2007 w.w.w.tnv-onl/n�.com
SHEET
1
TEAGUE NALL AND PERKINS PAGE 9 OF 21
CONSULTING ENGINEERS
OP/NION OF PROBABLE CONSTRUCTION COST
CONTRACT 74 SANITARY SEWER IMPROVEMENTS
CONCEPTUAL (30%) SUBMITTAL
TNP# FTW05313
Main M-163
OWNER: CITY OF FORT WORTH
DATE: MARCH 21, 2007
ITEM UNIT
NO. DESCRIPTION OF ITEMS QUANTITY UNIT COST TOTAL
1 Pre-Construction Clean and N Ins ection 704 LF $3.00 $2,112.00
2 Remove Existin Sanita Sewer Manhole 1 EA $500.00 $500.00
3 Sa Correction 35 LF $40.00 $1,400.00
4 Ex lorato Excavation D-Hole 1 EA $500.00 $500.00
5 8" IPS DR-17 HDPE Pi e Burst Method 704 LF $73.00 $51,392.00
6 8" SDR-35 PVC O en Trench Method, 0'-6' Dee 178 LF $38.00 $6,764.00
7 8" SDR-26 PVC O en Trench Method, 0'-6' Dee 20 LF $45.00 $900.00
8 Trench Safet S stem >5' De th 51 LF $1.00 $51.00
9 Sanita Sewer Service Ta Pi e Burst 5 EA $450.00 $2,250.00
10 4" Sanita Sewer Service Line 32 LF $85.00 $2,720.00
11 4" Two-Wa Service Clean-out 5 EA $200.00 $1,000.00
12 4' Diameter Concrete Sanita Sewer Manhole 1 EA $2,500.00 $2,500.00
13 Water Ti ht Insert 1 EA $75.00 $75.00
14 Concrete Pavement Re air 6 LF $70.00 $420.00
15 Concrete Drivewa Re air 8 LF $65.00 $520.00
16 HMAC Pavement Re air 308 LF $50.00 $15,400.00
17 Traffic Detector Loo Re air 400 LF $6.50 $2,600.00
18 Vacuum Test New Sanita Sewer Manhole 1 EA $175.00 $175.00
19 Post-Construction N Ins ection 915 LF $1.00 $915.00
Sub-Total Cost $92,194
Contingency (10%) $8,806
Total Construction Cost $101,000