Loading...
HomeMy WebLinkAboutContract 35815STATE OF TEXAS S COUNTY OF TARRANT S AMENDMENT NO. 1 CITY SECRETARY CONTRACT NO.L�L.L�tiJ (M&C Not Required) WHEREAS, the City of Fort Worth (City) and Teague Nall and Perkins, Inc., (Engineer) made and entered into City Secretary Contract No. �3830, (the Contract) which was authorized by the City Council by M&C C-21582 on the 25th day of July, 2006 and; WHEREAS, the Contract involves engineering services for the following project: Sanitary Sewer Rehabilitation Contract LXXIV (74). WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contra�t: 1. Article I, of the Contract is amended to include the addition- al engineering services specified in a proposal letter dated August 7, 2007, copies of which are both attached hereto and incorporated herein. The cost to the City for the additional services to be performed by Engineer is $8,300.00. � Article II, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $211,005.00. � �t�1�.,.6;:t �aS���% 1�D � e �;� ��'�� ���; �?G��� . 4 ';rGr��l' �1 tt C�� � �; Ifi Y�o b�:�l'J��! cY'J��9 �L✓�� ' � ORIGINAL 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this Worth, Tarrant County, the ��t uay of , 2007, in Fort Texas. ATTEST: ,� . Marty Hendri City Secretary APPROVA�COr�1ENDED : �� r � -� l�� A. Douglas Rademaker, P.E. Director, Department of Engineering TEAGUE NALL AND PERK NS, INC. Engineer . BY: Name: Ty Hilton, P.E., Vice President 1100 Macon Street Fort Worth, TX 76102 �� SI�dC� ��C�I�L���T�It�� PI� VE • , , Marc A. Ott Assistant City Manager z_ _,���a� .,.. g �� `r!`i��c`�� �S�I�V�?��)� i , �� - ';���1' ����� ���``,': � r�, `.7�'����1��, ���3e � �� TEAGUE NALL AND PERK/NS Civil Engineering : Surveying ' Landscape Architecture Pianning August 7, 2007 , Mr. Abe Calderon, P.E. City of Fort Worth Department of Engineering 1000 Throckmorton Fort Worth, Texas 76102 Re: Sanitary Sewer Rehabilitation Contract 74 Amendment No. 1 TNP No. FTW 05313 Dear Mr. Calderon: Teague Nall and Perkins, Inc. is submitting this fee Amendment to the above referenced contract based on additional services requested. The additional services involve separating line M-163 from the balance of the sewer line projects such that it can be constructed as an individual project. In addition, the line will be relocated from its current configuration on the west side of Horne Street to the east side. The following is a brief description and cost for the additional services provided on this project: Additional Field Services Based on our meeting with you and David Cooper in June 2007, we recommend a limited sub-surface utility investigation to locate the storm sewer main line and the 12-inch water line in Camp Bowie. After a careful review of our survey data and record drawings obtained from the City, we have discovered numerous utility crossings along the proposed re- alignment of M-163. Although most of these crossing should be above the proposed sewer re-alignment, the storm sewer main and the 12-inch water line are two utilities that are of concern. Record drawings and field survey are inconclusive regarding the depth and alignment of these two lines. Therefore, we propose to perForm limited survey field work and sub-surFace investigation to establish the horizontal and, more importantly, the vertical location of these two lines. ■ Survey/Sub-SurFace Utility Investigation 4 000 SUBTOTAL $ 4,000 1100 Macon Street Fort Worth, Texas 76102 817.336.5773 phone 817.336.2813 fax www. tnp-online. com Mr. Abe Calderon, PE, August 7, 2007, Page 2 of 2 Additional Engineering Services The re-alignment of M-163 is based on a proposed development by Pate Engineers and requires a change in the established alignment we have developed for M-163. This change also requires preparation of a separate set of bid documents along with additional meetings and coordination time. The following is a summary of additional engineering services. ■ Basic Engineering Services (30% Re-Design for M-163) $ 3,750 ■ Special Coordination Meetings with Developer/City $ 400 ■ Additional Printing Costs associated with bidding M-163 $ 150 SUBTOTAL 4 300 Total Contract Amendment No. 1: $ 8,300 Summary of Contract Fee: Original ContractAmount: $ 202,705 Amendment No. 1: $ 8,300 Revised Contract Amount $ 211,005 Thank you for consideration of this contract amendment request. If you have any questions, please do not hesitate to call me. Sincerely, TEAGUE RKINS, INC. ment: M-163 Exhibit and Cost Projection Copy: Mr. Ty Hilton, PE - TNP \\corpdsl\projects\Idt\ftw05313\docs\contracl\_contracl amend 01.doc - - � � � � �''' o ��� .. I 1 . :��i l '}'.S�u'�r � =�,7,�' ;�,� �, � �-�}7 ',';��, � �:;��5��� ;�, •,-,,��, � '; �; ,; r, o i Vi C;, , . .., . ;'�( �i Ini il �r' : � , � f91-1Y 55 .B � — — _ � I � �i� � I I i.� � I i i �� i I ,b a3��,a�a PRA? 8• � B� �� U � � 1— - � 0 _ � _ _ � _ f9l- _ 6 SS_�__ _------ SS .8 L-2J00 CONC. - COflC. ��Y ALLEY BRRRIER WAL � I .1.2' HIGH CONCRETE RETAININC WALL � � I i3 'I I I�� m� I r I y I I� � � I �` I I I Va � I � i � y � m I I i i i k i I I�� � I � ' - I � i i� y � � 3 � .'� I - � I �;&,�I � � ' y 3 � . i '�•<.i ' ' i '� i'� � 1 oE„� --1�-- -- --�,` �� �c� � os, � cor�c. oarvEwnv E d �2� I i ���� � I ^'• � i� �� �' / ;� as,e�/ � �`�O�__ g // ' '___"'_' � Y daa .ei ' _ — — — — — —M.9_ _ — — � — —/� ��Q.�� � LOCKE AVE /i� /Y I`` E~ I � � � T � � � � � � I � i (ASPHALT PANNG) ���/ I' + � Q p / � %/// � I / / � / y � � ti� � � �'� i � b s'��e��� `/, � � �1 �`1! N�tl �nvs3a�s '�r�� I Q � � en --- -- �y I �� .�►���� _� 6/ / � � / ��( 4j I / �pF,`�W �V'9 � / / C�C _ _ / \ ,- � y I ',� � � '�% i . �' � . / - � ,� I o , , / Jr ,�y v O i � / � 'I I o �S ���`� V i i' ,�i y / �'i / �� p,��tl `� i� / / � i G��Q`c��,P �\�\ 'y �y0 � - / 'i b � I / / J B��e� �Gl � i � �a�?�'P`-s � I ' � � � � � 0 R�� o ��`° � � � ,4 ��`� NGl ��1 ���° y 1 �,. �° �� `" J! �l���Nol / G�epQl�Op�.tpP j� I / � P � � I / � W �l — � I p0.\�•�P ��G. �- I G \ O �y� � pfNP� i �..ti5� w •\B. GRAPHIC SCALE ��` j� �' W �" s;� � I " zo o io 20 �o ���� I �IS � I i �� �I `_ � � oH x< SCALE TEAGUE NALL AND PERK/NS CITY OF FORT WORTH, �xas �q �� ` SANITARY S-�EpWER IMPROVEAIEN75 N A /��� 1f00 Mecon 3trset � CONIRACT 74 DATE Fort Woith, Texee 78102 y—ip3pLAN //�/G', Phone:(8f7199B-6773�Fax:(917)338-2813 JUN 2007 w.w.w.tnv-onl/n�.com SHEET 1 TEAGUE NALL AND PERKINS PAGE 9 OF 21 CONSULTING ENGINEERS OP/NION OF PROBABLE CONSTRUCTION COST CONTRACT 74 SANITARY SEWER IMPROVEMENTS CONCEPTUAL (30%) SUBMITTAL TNP# FTW05313 Main M-163 OWNER: CITY OF FORT WORTH DATE: MARCH 21, 2007 ITEM UNIT NO. DESCRIPTION OF ITEMS QUANTITY UNIT COST TOTAL 1 Pre-Construction Clean and N Ins ection 704 LF $3.00 $2,112.00 2 Remove Existin Sanita Sewer Manhole 1 EA $500.00 $500.00 3 Sa Correction 35 LF $40.00 $1,400.00 4 Ex lorato Excavation D-Hole 1 EA $500.00 $500.00 5 8" IPS DR-17 HDPE Pi e Burst Method 704 LF $73.00 $51,392.00 6 8" SDR-35 PVC O en Trench Method, 0'-6' Dee 178 LF $38.00 $6,764.00 7 8" SDR-26 PVC O en Trench Method, 0'-6' Dee 20 LF $45.00 $900.00 8 Trench Safet S stem >5' De th 51 LF $1.00 $51.00 9 Sanita Sewer Service Ta Pi e Burst 5 EA $450.00 $2,250.00 10 4" Sanita Sewer Service Line 32 LF $85.00 $2,720.00 11 4" Two-Wa Service Clean-out 5 EA $200.00 $1,000.00 12 4' Diameter Concrete Sanita Sewer Manhole 1 EA $2,500.00 $2,500.00 13 Water Ti ht Insert 1 EA $75.00 $75.00 14 Concrete Pavement Re air 6 LF $70.00 $420.00 15 Concrete Drivewa Re air 8 LF $65.00 $520.00 16 HMAC Pavement Re air 308 LF $50.00 $15,400.00 17 Traffic Detector Loo Re air 400 LF $6.50 $2,600.00 18 Vacuum Test New Sanita Sewer Manhole 1 EA $175.00 $175.00 19 Post-Construction N Ins ection 915 LF $1.00 $915.00 Sub-Total Cost $92,194 Contingency (10%) $8,806 Total Construction Cost $101,000