Loading...
HomeMy WebLinkAboutContract 34445-A2 AMENDMENT NUMBER 2 STATE OF TEXAS $ CITY SECRETARY CONTRACT NO. COUNTY OF TARRANT $ WHEREAS, the City of Fort Worth (CITY) and Freese & Nichols, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 34445, (the CONTRACT) which was authorized by the City Council by M&C C-21884 on the 12th day of December, 2006; and subsequently revised by Amendment Number 1 which was authorized by the City Council on the 9th day of October, 2007 (M&C C-22439) ; WHEREAS, the Contract involves engineering services for the following project: Precinct Line Road from Hurst Boulevard to Concho Trail (Project No. 00147) ; WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in the proposal letter dated December 23, 2009, copies of which are attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $53,210 .00 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $892, 876 . 00 CITE' SECRETM. FT WORT! Page -1- 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED on this the �- day of 20#0 in Fort Worth, Tarrant County, Texas . ATTEST: APPROVED: �j �&� a� Ll Marty Hend xdaa��RAna Fernando Costa City Secretary ��OO°000n°oo044,; � Assistant City Manager pgn( ° p0 Y� p4,0�c a414 9 APPROVAL RECOMMENDED: $ co °ow q� o_ G°MXAS fl0000000 a Contr?ct Authorizatiou 4�� `_',Date William erkes . . Director, Tra sportation/Public Works Department FREESE and NICHOLS, INC. ENGINEER L.Jo Dewar, P.E. , S.E. Principal APPROVED AS TO FORM LEGALITY: Amy Ramsey Assistant City Attorney OFFICIAL RECORD CITY SECRETARY Page -2- FT. Wp# TH, TX Freese N1 c h o ls, Inc. Engineers Environmental Scientists Architects Planners 4055 International Plaza,Suite 200 Fort Worth,Texas 76109 817 735-7300 817 735-7491 fax www.freese.com December 23, 2009 Michael Weiss, P.E. City of Fort Worth Transportation and Public Works Department 1000 Throckmorton Street Fort Worth, Texas 76102 Re: City Secretary Contract No. 34445, M&C No. C-21884: Precinct Line Road: Proposal to provide engineering design for the relocation of a 12" waterline, archeological survey, and additional surveying services. Dear Mr. Weiss: This letter is written in response to your request for Freese and Nichols, Inc. (FNI) to prepare a combined contract amendment for additional engineering services for the design of a 12" waterline relocation, archeological survey, and additional surveying services. The purpose of the waterline relocation is to relocate the waterline to the east of the proposed TxDOT Bridge widening to maintain accessibility for line maintenance following the bridge construction. The existing 12" waterline is located approximately 15' east of the existing bridge, which would be located in the center of the proposed bridge and would be in conflict with the proposed bridge drilled shafts. Refer to the attached location map for the limits of the 12" waterline relocation. The existing 12" waterline connects to a 33" concrete cylinder main that is located on the north side of Trinity Boulevard. The City Water Department has stated that they will only allow a connection to the 33" main between the months of October and March. In addition, the City Water Department has requested that the entire 1,600 linear feet of existing 12" waterline between Trinity Boulevard and the concrete plant be relocated in conjunction with the roadway construction, due to the height of the embankment that is planned within this area. FNI will sub-consultant with AR Consultants to complete the following scope. This scope was not included in our original proposal due to TxDOT historically has performed the archeological survey services. However, with the funding cutbacks, TxDOT is no longer performing those services. An archeological survey is required as part of the TxDOT Categorical Exclusion and the USACE preconstruction notice. The additional surveying services includes additional permanent slope easements, temporary construction easements and right-of-way documents. Mr. Michael Weiss,P.E. December 23,2009 Page 2 of 4 Project Scope— 12" Waterline Relocation Task No. 1 —Data Collection FNI will collect as built plans of the existing waterline facilities and shop drawings of the existing 33" concrete cylinder pipe. The proposed waterline relocation is located within the limits of the survey for Precinct Line Road, so no additional survey is included in this proposal. Task No. 2— Construction documents FNI will prepare plans and specifications for construction. The plans will include the following sheets: general notes, plan and profile sheets, and construction detail sheets. FNI will prepare specifications in accordance with the City of Fort Worth requirements. Task No. 3—Proiect Meetings FNI will attend up to four (4) project meetings, these include the two previously attended concept plan meetings and two additional plan review meetings. Task No. 4— Construction Phase Services FNI will review construction submittals and attend up to two (2) construction site visits or progress meetings during the construction of the waterline relocation improvements. Project Scope—Archeological Survey The proposed investigations will consist of an intensive archeological survey of approximately 2,500 feet of South Precinct Line Road in the Cities of Hurst and Fort Worth, Tarrant County, Texas prior to widening within existing and proposed right-of-way (ROW). The project would also include the realignment of approximately 1,800 feet of Walker Branch immediately west of the roadway for drainage improvement. The project area extends from IH 10 to Concho Trail, with the proposed realignment channel located immediately west of the roadway between Walker Branch and Calloway Branch. Tasks In order to conduct the intensive pedestrian archaeological survey, AR Consultants, Inc. intends to perform the following tasks. 1. Coordinate with the Texas Department of Transportation, the Fort Worth District of the Corps of Engineers, and the Texas Historical Commission to confirm that an archaeological survey is warranted and the level of survey needed. Once this is done we will secure an Antiquities Permit for the investigation. Mr.Michael Weiss, P.E. December 23, 2009 Page 2 of 4 2. AR Consultants proposes to compile an inventory of historic and prehistoric archaeological sites and architectural structures that are or were present within this study area. The first step in the process will be the compilation of historic maps and records which provide graphic representations of the entire area. In addition, we will compile records about archaeological sites that have been recorded in the area. This will supplement the information contained in earlier reports and in more recent survey reports. 3. We will conduct an intensive pedestrian archaeological survey of the entire site between the railroad and Trinity Boulevard, which we estimate covers approximately five acres. Shovel testing will be done on a judgmental basis, as recommended by the Council of Texas Archeologists (2002), and we expect to excavate a minimum of ten shovel tests. Shovel tests will be excavated to various depths depending upon their location. The sandy loam matrix will be broken into small pieces and inspected carefully and screened through '/4-inch hardwire screening. We expects to extend the shovel test depths to 1.75 in with the use of a 4" diameter racket auger. The pit walls will be visually inspected for cultural materials. Notes on the terrain, soils, vegetation and other relevant information will be notated as well as photographs taken. We proposes to excavate four or five backhoe trenches in the study area in order to explore for deeply buried archaeological site deposits, and to determine the extent of the old creek channel and the potential for finding cultural materials on unmapped high spots along the empty drainage channel. These trenches will be immediately recorded and then will be backfilled after the profiles have been drawn and photographed. 4. A draft report, following the guidelines recommended by the Council of Texas Archeologists (ND) and accepted by the Texas Historical Commission (THC), will be submitted to TxDOT and then the Archeology Division of the THC and to FNI for review. Lastly, a final report will be prepared after review by the agencies above. Copies including an unbound copy and an archival quality CD will also be submitted to the City of Fort Worth, THC and TxDOT. Proiect Scope—Additional Surveyin Services The additional surveying services include preparation of two (2) additional permanent slope easements, three (3) additional temporary construction easements, and five (5) additional right- of-way documents. Mr.Michael Weiss,P.E. December 23, 2009 Page 2 of 4 Compensation FNI proposes to provide the above mentioned basic services for a lump sum fee of $53,210.00. (See attached project fee summary exhibit) If you have any questions concerning this proposal, please do not hesitate to call me at 817-735- 7359. Thank you for this opportunity. Freese and Nichols, Inc. Chris Bosco, P.E. Project Manager [FTW06238]TAContractWmendmentsWmend#2 Project Fee Summary DESIGN OF THE PRECINCT LINE ROAD WATERLINE RELOCATION PROJECT Consulting Firm Prime Responsibility Total Fee M/WBE Fee Percent Freese and Nichols Basic Waterline Services $ 20,440.00 Construction Phase Services $ 3,070.00 Project Meetings $ 2,760.00 Expenses $ 1,520.00 Printing& Reproduction Subtotal $ 980.00 Total Waterline Design Services $ 28,770.00 $0.00 0% Freese and Nichols FNI Markup on Subconsultants $ 2,230.00 Non-M/WBE Sub-consultants AR Consultants, Inc. Archaeological Survey $9,490.00 M/WBE Sub-consultants Gorrondona and Associates Additional ROW/Easement Documents $12,720.00 $12,720.00 Prosect Description Scope of Services Total Fee M/WBE Fee Percent Current Contract Precinct Line Road Design $839,666.00 $ 284,460.00 33.9% Additional Waterline Relocation,Archaeological Services Survey, ROW Surveying $ 53,210.00 $12,720.00 23.9% Project Total Precinct Line Road $892,876.00 $297,180.00 33.3% We are using Gorrondona.Associates for Surveying and Aguirre& Fields for Traffic Control and Construction Phasing and Blanton and Assoc. is providing 404 permitting services on the Precinct Line Road project with TPW.With the additional services for waterline design, Archaeology, and Surveying the project MWBE percentage will change from 33.9%to 33.3% of the contract that will be performed by approved M/WBE firms,which exceeds our original goal of 28.0%for the Project. M&C K, iew Page 1 of 2 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDAORTI COUNCIL ACTION: Approved on 4/6/2010 DATE: 4/6/2010 REFERENCE ,,C-24149 LOG NAME: 20PRECINCTLINE AMEND2 NO.. CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Amendment No. 2 in the Amount of$53,210.00 to City Secretary Contract No. 34445, an Engineering Services Agreement with Freese & Nichols, Inc., for the Design of Precinct Line Road from Hurst Boulevard (State Highway 10)to Concho Trail (COUNCIL DISTRICTS 4 and 5) RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 2 in the amount of$53,210.00 to City Secretary Contract No. 34445, an Engineering Services Agreement with Freese & Nichols, Inc., for the design of Precinct Line Road from Hurst Boulevard (State Highway 10)to Concho Trail, thereby establishing a total contract cost of$892,876.00. DISCUSSION: This contract amendment is needed for the following additional design services: Relocation of the existing 12 inch waterline east of the proposed Texas Department of Transportation (TxDOT) bridge construction over Walkers Branch; Completion of archeological survey required by Texas Department of Transportation (TxDOT) as a part of the environmental review. Additional surveying services for right-of-way, permanent slope and temporary construction easements. The City's 2004 CIP included $635,000.00 and the Special Assessments Fund included $444,000.00 for the design and construction of this four-lane divided roadway 1,000 feet north and south of Trinity Boulevard. Subsequently, the 2006 Tarrant County Bond Program included $2,729,000.00 and Federal transportation funding was approved for$800,000.00 to extend the project limits to SH-10 on the north and Concho Trail on the south. On December 12, 2006, (M&C C-21884)the City Council authorized the City Manager to execute an Engineering Services Agreement with Freese & Nichols, Inc., in the amount of$263,346.00 for the schematic design of Precinct Line Road from Hurst Boulevard to Trammel Davis Road. On October 9, 2007, (M&C C-22439)the City Council authorized the City Manager to execute Amendment No. 1 to City Secretary Contract No. 34445, an Engineering Services Agreement with Freese & Nichols, Inc., in the amount of$576,320.00 for the final design of Precinct Line Road from Hurst Boulevard to Concho Trail, thereby establishing a total contract cost of$839,666.00. During the schematic design phase, it was determined that the southern project limit needed to be shortened from Trammel Davis Road to Concho Trail because of additional expenses required for right-of-way acquisition and roadway construction. The Water Department is providing funding for Amendment No. 2 in the amount of$28,770.00 for the relocation of the existing 12 inch waterline. Freese& Nichols, Inc., proposes to complete Amendment No. 2 for a lump sum fee of $53,210.00. City Staff considers this fee to be fair and reasonable for the scope of services to be performed. Freese & Nichols, Inc., is in compliance with the City's M/WBE Ordinance by committing to 24 percent M/WBE participation on this amendment. The City's goal on this amendment is 24 percent. http://apps.cfwnet.org/counciLpacket/mc—review.asp?ID=l 3194&councildate=4/6/201 0 4/8/2010 M&C R&iew Page 2 of 2 This•project is located in COUNCIL DISTRICTS 4 and 5, MAPSCO 52Z, 66D and 67A. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies funds are available in the current capital budgets, as appropriated, of the Water Capital Projects Fund and Street Improvements Fund. TO Fund/Account/Centers FROM Fund/Account/Centers C200 531200 204230014730 $24,440.00 P253 531200 604170014730 $28,770.00 Submitted for City Manager's Office by: Fernando Costa (6122) Originating Department Head: William Verkest(7801) Additional Information Contact: Michael Weiss (8485) ATTACHMENTS 20PRECINCTAMEND2 MAP pdf.pdf http://apps.cfwnet.org/council_packet/mc review.asp?ID=13194&councildate=4/6/2010 4/8/2010 MAYOR AND COUNCIL COMMUNICATION MAP 20PRECINCT_AMEND2 .i FOV t r' '.i:w W ,A &96sw'� PIPEURE w.P yy"F.2 (:.�i.16 fin+ if r,g• •�� _{r L 4 A _�1 � • io 1J A �SF+,. F y -:i�' �'.X 3i.x�..� �.� ,.K� '""`l ✓.;, i':. 1,g�`4 .�� t�C�. ,�y �, � i' �� ,R;•- �.,a. �` p+�, S ,�'R -4r.. � :,r• r n epi 4• IL aWALKER '? z,000 o z,000 Fi :, : � BRAN,CTMH ' ` DOE#6090 DETAIL OF PROJECT LOCATION