Loading...
HomeMy WebLinkAboutContract 51472-CO1 3 A 5 5 7 T WO RT H City of Fort Worth CITY SECRETARY ti k ' Change Order Request CONTRACTNO. 51470-GO s GE-*]$eject Na Emergency Response-Trinity River Streambank Erosion Affecting two 90-inch Sanitary Sewer Lines City Sec No.: 51472 FSE �9 �p� 1`�oject No.( : Emerency Reinforcement and Repair of existing sheet pile wall DOE N0. NSA City Proj.No.: N/A ORZ wOR Cm Kescri or); Emergency Reinforcement and Repair of existing sheet pile cutoff walls and piping installation for emergency bypass pumping 8 Lctor:I Willian J.Schultz,Inc.dba Circle C Construction Co. Change Order# Date: 1/8/2019 Ity Project Mgr. John Kasavich City Inspector: I David Johnson Phone Number:1 817-392-8480 771 Phone Number: 817-392-8455 Dept. Sewer Unit 1 Sewer Unit 2 Sewer Unit 3 Totals Contract Time (Calender days) Original Contract Amount $500,000.00 $500,000.00 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $500,000.00 $500,000.00 =mount Proposed Change Order $700,000.00 $700,000.00 Revised Contract Amount $1,200,000.00 $1,200,000.00 Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding(if necessary) $700,000.00 $700,000.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 140.00% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) 1$625,000.00 This Change Order authorized by the attached memorandum of January 2, 2019 which supplement the October 17, 2018 emergency memorandum-resulting in City Secretary Contract No.51472 with Circle C Construction Company for emergency services to reinforce and repair the existing sheet pile cutoff walls to prevent further failure of the Trinity River slope bank to allow a specialty contractor(Humphrey and Morton authorized under the original October 17,2018 emergency memorandum)to construct r permanent river bank stabilization and to install piping for emergency bypass pumping. ® t H The change order will provide additional sheet piling and grading improvements that are needed in order to secure an exposed river bank wall surface that ours Ilapse on wor(�,vewr construction of Q ... ... O the permanent repairs. Attested by . L U. = O M J. K Secretary It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order, Date Willian J.Sdmlt,-Inc.dba Circle C Construction Co. Teri Skelly Date Dat Date M&C Number NIA M&C Date Approved F(7►RT WC>n-FH City of Fort Worth —�"`' vChange Order Additions Project Name Emergency Response-Trinity River Streambank Erosion Affecting two 90-inch Sanitary Sewer City Sec No.: 51472 Project No.(s): Emerency Reinforcement and Repair of existing sheet pile wall = DOE No. N/A City Proj. No.: N/A Project Emergency Reinforcement and Repair of existing sheet pile cutoff walls and piping installation for emergency bypass Description pumping Contractor Willian J. Schultz, Inc.dba Circle C Construction Co. Change Order:= Date: 1/8/2019 City Project Mgr. John Kasavich City Inspector David Johnson ADDITIONS ITEM DESCRIPTIZZI DEPT Qty Unit Unit Cost Tse 2 Additional sheet piling and grading improvements Sewer Unit 1 1.00 LS $700,000.00 $700,000.00 Sewer Unit 1 $700,000.00 Sewer Unit 2 Sewer Unit 3 Page 2 of 4 Additions Sub Total J$700,000.00 Fort`r Woaxm City of Fort Worth Change Order Deletions Project Name Emergency Response-Trinity River Streambank Erosion Affecting two 90-inch Sanitary Sewer Lines City Sec No.: 51472 Project No.(s): 011 V1 DOE No. N/A City Proj. No.: NIA Project Description Emergency Reinforcement and Repair of existing sheet pile cutoff walls and piping installation for emergency bypass pumping Contractor Willian J.Schultz,Inc.dba circle c construction co. Change Order: 0 Date 1/8/2019 City Project Mgr. John Kasavich City Inspector: David Johnson DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total Sewer Unit 1 Sewer Unit 2 Sewer Unit 3 Page 3 of 4 Deletions Sub Total MMBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total Page 4 of 4 Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Signature Name of Employee Title OFFICIAL RECORD CITY SECRETARY FT WORTH,TX FORTWORTH MEMORANDUM Date: January 2, 2019 From: Chris Harder, P.E.,Water Director Via: Doug Black, Sr.Assistant City Attorney Cynthia Garcia, Purchasing Manager To: Jesus Chapa,Assistant City Manager RE: SUPPLEMENT TO 10-17-2018 MEMORANDUM AND CITY SECRETARY CONTRACT NO. 61472 RE TRINITY RIVER STREAMBANK EROSION AFFECTING TWO 90" SANITARY SEWER LINES EMERGENCY REPAIRS This memorandum is to supplement the October 17, 2018 emergency memorandum- resulting in City Secretary Contract No. 51472 with Circle C Construction Company ("Circle C ") for emergency services to reinforce and repair the existing sheet pile cutoff walls to prevent further failure of the Trinity River slope bank to allow a specialty contractor (Humphrey and Morton) to construct permanent river bank stabilization and to install piping for emergency bypass pumping. The initial estimated overall amount of the emergency work was $1,510,000 and of that, the amount of reinforcing the sheet piling was$200,000. It has been determined that additional sheet piling and grading improvements are needed in order to secure an exposed river bank wall surface that could collapse on work crews during construction of the permanent repairs. It is anticipated that the additional work may cost up to $700,000.00. A change order will be processed to the existing contract with Circle C and actual costs will be reconciled at the end of the project. APPROVED FOR EMERGENCY PROCUREMENT: Recommended: C is r ,Water Department Approved as to from and Legality: Doug[ .Black. S ssistant City Attorney Approve: Cynt 'a-Garcia,Purcha Manager Approve: Jesus J.Chapa, ssis nt City Manager