Loading...
HomeMy WebLinkAboutContract 51012-AR2 FORT WOOTH. City of Fort Worth CITY SECRETARY CONTRACT N0. �I O l a -f�12 a _ Construction Allowance Request Breakdown Construction CA# 0 Date 12/12/2018 City Sec# 1 51012 Client Project#(s)l 101333 FAC#(s) Project Name HMAC(20184)HIR Street Rehabilitation Description Contractorl Cutler Repaving, Inc. City Inspector Jarad Souders Funding TPW Select Day Type Allocation Account Totals Original Contract Amount $1,865,363.60 $1,865,363.60 Extras to Date Credits to Date Current Contract Amount $1,865,363.60 $1,865,363.60 Amount of Proposed Allocation $6,540.00 $6,540.00 Original Allowance Available for Allocation $102,443.00 $102,443.00 Allowance Funds Previously Allocated $48,750.00 $48,750.00 Remaining Funds Available for this Allocation $53,693.00 $53,693.00 JUSTIFICATION SUMMARY The original bid sheet for this project had an Item for unclassified excavation,but did not have a corresponding item for Flex Base.This Construction Allowance adds the item for Flex Base. X234 56 ,,� F� -C04 ti 51 It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.Contract Time will be adjusted on the basis of the time shown on this Construction Allowance Request by a later Change Order,if necessary. OFFICIAL RECO CITY SECRETARY FT. WORTH,TX FORT WORTH. City of Fort Worth �'�`"��✓ Construction Allowance Request Breakdown Construction FOA# 2 Date 12/12/2018 Client Project#(s)l 101333 FAC#(s) Project Name HMAC(2018-4)HIR Street Rehabilitation Description Contractorl Cutler Repaving, Inc. City Inspector C ADDITIONS Dept/FAC y Unit Flex Base TPVV Change Order Additions Page 1 of 4 F—TuT Change Order Additions Page 2 of 4 City Sec# 51012 Jarad Souders Unit os o a Change Order Additions Page 3 of 4 TPW $6,540.00 Total Additions 5 00 Change Order Additions Page 4 of 4 -0 0 N O L N Q) � O O O �# CO U Cl) C U � C O fl w C V a 3 a p LU o � ❑ LU 0 N m ML � W ao }+ O (p a) Lnd �L N L O v v O v Q L LL = v v— M D a 0 3 - o _ _0 Q opo U Q z c _ _D t O o U U V) _ Z O D U N v U = C C (Q O 0- g N of x �Q wr U 0 V N a> c o5 O *k *k m .Q Q cD Q v N c o LL- 0 a� a� OLL- a o U � N O U 0 0 0 0 0 � o 0 Lj N O N N UA !d d C O v v v 0 N on C ca t U M/WBE Breakdown for this Construction Allowance Request MWBE Sub Type of Service Amount for this FOA N/A Total $0.00 Previous Construction Allowance Requests CO# DATE AMOUNT N/A Total $0.00 CFW Construction Allowance Request Approval CAAppr-02 Page 1 of 3 Routing Assigned To: Due Date: Assigned By: Due Time: Links 1 fortworthgov/Infrastructure Proiects/101333 - HMAC 2018-04 HIR Street Rehab/Contractor/Change Orders/Constr Allow Request Breakdown #2 2018-4.xism Attachments t01 No Attachments have been added to this form. https://projectpoint.buzzsaw.com/ bz web/Forms/FonnPrint.aspx?SiteId=51500&ProcessI... 1/16/2019 CFW Construction Allowance Request Approval CAAppr-02 Page 2 of 3 FORTWORTH-) city of Fort Worth Construction Allowance Request Approval (Construction Allowance Breakdown Available in Links) For Construction Allowance Submittal No.: 2 Construction Allowance Request Approval No.: CAAppr-02 Date Started: 2018-12-14 Date Due: ,2019-02-02 City Sec. No.: 51012 Project Name: 101333 - HMAC 2018-04 HIR Street Rehab Project Numbers: t01333 DOE Numbers: Project Removal and replacement of nonfunctional curb and gutter, Description: ';driveways and sidewalks, followed by a HIR overlay of 1" HMAC. Project/Contract Compliance Kristian Sugrim City Inspector. Jarad Sounders Manager: Contractor: Cutler Repaving, Inc. COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW $ 6,540.00 30100-0200431-5740010-101333-0 Total Cost: $ 6,540.00 Total Requested Days: 0 Approval Status: https://projectpoint.buzzsaw.com/ bz web/Forms/FonnPrint.aspx?Siteld=51500&ProcessI... 1/16/2019 CFW Construction Allowance Request Approval CAAppr-02 Page 3 of 3 Approved: Yes Comments: User: Lane Zarate Date: 2019-01-03 12:32 PM Approved: Yes Comments: User: Ricardo Matute Date: 2019-01-03 2:06 PM Approved: Yes Comments: User: Signing for TPW Director Role Approvals Date: 2019-01-03 4:02 PM Approved: Yes Comments: User: Doug Black Date: 2019-01-11 9:13 PM j A F4Rr Attested by: Al; Approved: Yes Comments: 70 User: Susan Alanis M Date: 2019-01-16 12:49 PM J° S , t� S@CxCtSTy �F AS Action Required: k "0FRICIAL RECORD :FIT, TY SECRETARY WORTH,TX https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessI... 1/16/2019 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Kristian Sugrim / Kj-L "�•-- Name of Employee/Signature Project Manager Title E This form is N/A as No City Funds are associated with this Contract Kristian SuRrim / Printed Name Signature OFFICIAL RECURD CITY SECRETARY FT. WORTH,TX