Loading...
HomeMy WebLinkAboutContract 50603-A2 City Secretary Contract No. 50(o03-Ra SECOND AMENDMENT TO CITY SECRETARY CONTRACT NO. 50603 WHEREAS, the City of Fort Worth (hereafter "City") and HVAC Service Pro (hereafter "Contractor")made and entered into City Secretary Contract No. 50603 (hereafter"Contract"); and WHEREAS,the Contract provides funding to Contractor pursuant to a grant received by City from the United States Department of Housing and Urban Development ("HUD") through the Community Development Block Grant Program ("CDBG"), Program No. B-16-MC-48-0010, Catalog of Federal Domestic Assistance No. 14-218; and WHEREAS,the City and Contractor amended the Contract by City Secretary Contract No. 50603- A1 dated June 19, 2018 to include program guidelines and requirements associated with the City's Home Crisis Repair Program; and WHEREAS, it is the mutual desire of City and Contractor to revise Attachment "C," Bid Price Worksheet, of the Contract to add pricing information for materials not listed on the original Bid Price Worksheet,and to update pricing information for selected items; and WHEREAS, it is the mutual desire of City and Contractor to amend the Contract to complete the Program and meet the Contract objectives. NOW,THEREFORE,City and Contractor hereby agree to amend the Contract as follows: I. "Attachment C—Bid Price Worksheet"attached to the Contract is hereby replaced,in its entirety with, "Attachment C — Bid Price Worksheet —Revised 12/2018," which is attached hereto as Exhibit «A„ II. This amendment is effective as of the Effective Date of the Contract III. All terms and conditions of the Contract not amended herein remain unaffected and in full force and effect,are binding on the Parties and are hereby ratified by the Parties. Capitalized terms not defined herein shall have the meanings assigned to them in the Contract. ,q [SIGNATURES APPEAR ON FOLLOWING PAGE] C14 R� 62p�9 _.WM r JPN� wo��H J'FINCYAL RECORD k Orry SECRETARY Amendment No.2 to CSC No. 50603 FT. WORT101W HVAC Service Pro City Secretary Contract No. 50603-A2 ACCEPTED AND AGREED: HVAC SERVICE PRO CITY OF FORT WORTH y: By:-5i 1�L -- Albert Va ez/Owner Fernando Costa,Assistant City Manager ATTEST: APPROVE AS TO FORM AND � ,0RT LEGALITY: By: � `� :� .By: -'Zr f4,L.� C Secret ? 'k Matt Murray, Assistant City Attorney M&C: P-121 0 ?,a Date Approved: March 6, 20A ......• 1295 Certification No. 2017-29 8 £ APPROVAL COMI DED: BY: Name: Aubrey Thagard Title: Neighborhood Services Director CONRACT COMPLIANCE MANAGER: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Barbara Asbury Compliance and Planning Man LOFFICPAILRECORD Amendment No. 2 to CSC No. 50603 Page HVAC Service Pro City Secretary Contract No. 50603-A2 Exhibit A "Attachment C — Bid Price Worksheet — Revised 12/2018" Amendment No. 2 to CSC No. 50603 Page 3 HVAC Service Pro City Secretary Contract No. 50603-A2 Exhibit A "Attachment C — Bid Price Worksheet — Revised 12/2018" Amendment No. 2 to CSC No. 50603 Page 3 HVAC Service Pro Attachment C—Bid Price Worksheet—Revised 12/2018 Revised Attachment C-December 18' RFP 17-0500,Home Repairs erMj Carpentry Services and related work not specified or mention under the Bid contract:Nore:Rate shall include trip i charge,trawl time,mileage,transportation cost and parking fees.The labor rah shall start upon arrival at client Carpentry rate per hour HR la 65 home or worksite.'ContrectorIsresponsible for securing permit Fiberglass tub&wall kit ea 460 500 960 Vanity base w/sink ea 130 150 280 Faucet set ea 1 50 100 150 Drywall 1/2"green board sf 2 21 4 Drywall 1/2"board sf 2 21 4 Tape and Bed only if 1 1 2 3/4"subfloor remove/replace sf 2 2.5 4.5 Floor joist insulation sf 0.5 0.85 1.35 Attic insulation blown in sf 0.48 0.6 1.08 Attic insulation batt sf 0.48 0.89 1.37 Door Adjustment Each 20 60 80 Install pre-hung interior door 30" ea 1 200 150 350 Install pre-hung interior door 32" ea 200 150 350 Install pre-hung interior door 36" ea 200 150 350 Install new exterior door pre-hung 32"wood ea 220 200 420 Install new exterior door pre-hung 36"wood ea 240 200 440 Install new exterior door pre-hung 32"metal ea 300 200 500 Install new exterior door pre-hung 36"metal ea 380 200 580 Remove and replace interior doorjamb ea 1 25 50 75 Remove and replace exterior doorjamb ea 1 60 50 110 Replace threshold ea 1 35 80 115 Remove and replace kitchen wall cabinets If 7 13 20 Remove and replace kitchen base cabinets If 7 13 20 Remove and replace countertop If 15 15 30 Remove and replace bathroom vanity base w/sink 24" ea 130 150 280 Remove and replace bathroom vanity base w/sink 30" ea 170 150 320 Replace shelving If 5 5 10 Remove and replace baseboard up to 4" If 1 4 3.61 7.6 Remove and replace baseboard 6" If 1 5 3.6 8.6 Paint baseboard If 0.5 0.5 1 Gas line steel per drop each 175 200 375 Install handicap grab bar 36" ea 35 15 50 Replace bathroom wall tile sf 5 3 8 Install flooring vinyl sheet sf 2.5 2.4 4.9 Install flooring tile sf 3 4 7 Repair wood flooring sf 1 1.5 1.5 3 Install new carpet and pad sy 2 2 4 Lead Containment mini per room ea 80 75 155 Lead Containment fee interior ea 400 375 775 Lead Containment fee exterior ea 80 75 155 Final Clean per room ea 30 70 100 Final Clean per window ea 5 5 10 Remove and replace vinyl windows per U.I. ui 1 2 2 4 Remove and replace matching wood windows ui 1 7.5 2 9.5 Remove and install window sill interior ea 8 15 23 Remove and install window sill exterior ea 10 15 25 Replace door trim ea 10 20 30 Remove and replace wood siding If 4 3 7 Remove and replace cementitious siding ea 10 20 30 Install vinyl siding If 4 3 7 Replace wood trim up to 3x4 If 1 1 2 Remove deteriorated flooring on porch sf 11 2 3 Repair vinyl soffit if 5 3 8 Repair wood soffit sf 5 3 8 a)4"x 4"treated wooden porch posts ea 25 35 60 b)4"x 6"treated wooden porch posts ea 35 35 70 Lumber 1x4 LF 4 4 8 Lumber 1x6 LF 1 4 41 8 Lumber 1x8 LF 4 4 8 Lumber2x4 LF 4 4 8 Lumber 1x6 LF 4 4 8 Lumber 5.8 LF 5 4 9 Lumber 2x10 LF 5 4 9 Attachment C: Bid Price Worksheet- Home Repair RFP 17-0500 Attachment C—Bid Price Worksheet—Revised 12/2018 Remove and replace burglar bars ea 10 20 30 Remove and replace miniblinds ea 15 10 25 Replace all exterior window trim per if if 1 1 2 Remove and install wooden screen door ea 50 100 150 Vendor Mark Up% -== 20 =q�TI_a er W"T z.o a.. Wet scrape prime and paint siding sf 3 3 6 Wetscrape prime and paint interior components sf 3 3 6 Abate friction points on window unit If 3 31 6 Abate friction points on door and jamb If 3 3 6 Remove abate wood window,re-install per ui 4 5 9 Enclose ceiling with Hardiboard per sf 3 3 6 Lead Containment mini per room ea 80 75 155 Lead Containment fee interior ea 400 375 775 Lead Containment fee exterior ea 80 75 155 Final Clean per room ea 30 70 100 Final Clean per window ea 5 5 10 Soil Removal and replacement per 3"depth sy 100 50 150 HEPA Vac paint chips exterior per sf 1 2 3 Moving and covering furniture per man per hour hr 40 40 POD rental per week wk 150 100 250 Packing and storing household in POD hr 75 325 400 Lead Safe Work Practices Each 125 125 250 Vendor Mark Up% % = 20 Attachment C: Bid Price Worksheet- Home Repair RFP 17-0500 Attachment C—Bid Price Worksheet—Revised 12/2018 Revised Attachment C-December 18' RFP 17-0500,Home Repairs V. .- -:'.HVAC installed to Code. - Material I labor I Total Complete Install of,gar fired,wall mounad heater Including new us line wall ma.rand them t tet t cit and Alternative Heating Units t gig. 6,000 BTU Unvented Wali Furnace W/ODS ea 310 125 43$Un—rd Wall F.—with Ogyen Depletion SW—Sim:6AW BTU(min.)EER W.V.80%(AFUE)or high., 8,000 BTU Unvented Wall Furnace W/ODS ea 345 12$ 470 Unvented Wall Furmce with OMen DepkzbnSystem,Sim:SAM BTU(,I,.)EER Rating:80%(AFUE)or high., 10,000 BTU Unvented Wall Furnace W/ODS ea 375 12S SO(Unwnled Wall Furnace with Oman OepleUan system,She:10,000 BTU(,In,)EER Rating:80%(AFUE)or hlhe, 35,000 vented wall furnace with tstat each 900 950 185(Vented Wall Fumacewlth wall maunxd11—II01m:35,000 BTU(.].)EER Rating:W%(AFUEIor high- 50,O00 vented wall furnace with tstat each 950 950 190(ventedwml Furmawith waft—nadh.—,%: Sm:50,00D BTU fedn.)UR R.thg:et VPA)w hyh.r 50,000 double vented wall furnace with tstat each 1000 1000 2000 Vented wall Furnas with wall rnmmed Unrnanat,Sm:S%G0D BTU(.In.)EER Raflrg:WX(AFUE)whigher PAP A ImaAaton ms[shall imlude all ahor,naterial and supplies aquired a install new unit in aaardance m manuh¢urer(s)requlramenq remowl of $ existing unit and pmperly d6iau-Il Ir—rd—with EFA mph d n lmalktion shall abs Ndude mndmmer Power d.—tt/whlp,llgWd line Central Air Conditioner Unit(Outside Only) dga,,section line dryer,rel gear and mncete slab ands twain month supplyof nitws'Contracmr b responeble f--mg perm) 1,5 Ton,Seer Rating 15 W/Matching Coil ea 1480 1500 298OCentral Alr Condiflona,Unhand Matdi.,Ewpantiw Cot Sim:LSTom,SEER Rating15Me.- 1.5Ton,SeerRating 16W/Matching Coil ea 1480 1500 2980 Central ter CundRiha,Unit Md MaKhing Ewp—tJwt Colt 51ze:LS Tom,SEER Ragnr.15 Ma—um 2 Ton,Seer Rating IS W/Matching Coil ea 1535 1500 3035 Central Air Condrdmar Unit And Matching Ewpo,etiw CoA,Sim:2 Tom,SEER ReUrsg:15 Mlnin,- 2Ton,5eerRating 16W/Matching Coil ea 1535 1S00 3035 Central Air Condal,ner Unit And Matchhg Ewporadw Coo,Size:2Tons,SEER R,Ung:16 Mink,- 2.5 Ton,Seer Rating 15 W/Matching Coll ea 1660 1500 3160 Cental Air Conditioner Ung And Matching EwpwaUwCot Size.25 Tons,SEER Rating:5 Mmknum 2,5 Ton,Seer Rating 16 W/Matching Coll ea 1660 1$00 3160 Central AirCondift—Unit And Matching Ewpwattwe Cog,Size:2.5 Tom,SEER Rating:I6 Mhhem 3 Ton,Seer Rating 15 W/Matching Coil ea 1745 1500 3245 centminirconmtbher Unh And Matd Ing EwpomUw CPA.Sze:3Tons,SEER Rating:15 Minimum 3 Ton,Seer Rating 16 W/Matching Coil ea 1745 1500 324$Centmi Air Conditioner Unit Md Mari Ewpoa,dw,Coil,Sia:3 Tom,SEER Rating:16 Minimum 3,S Ton,Seer Rating 15 W/Matching Coll ea 1 17501 1500 32SOCentral AirConditio—Unit And Matchhg Ewporathe Call,Sze:3.5 Tom,SEER Rating:15 Minimum 3.5 Ton,Seer Rating 16 W/Matching Coil ea 1750 1$00 3250 Cental Air Condhi—Unit And Matching Ewparathe Coll,She:3.5 TOm,5EER R.Ury l6 Minknon 4 Ton,Seer Rating 15 W/Matching Coil ea 1875 1500 3375 centalar Cnndld....unit And MatrhingEwWOecogsl:e:ntom,SEMR UW.15 Mhkmmn 4 Ton,Seer Rating 16 W/Matching Coil ea 1875 1500 3375 Central Air Undkoner Unit And Matching Ewpwadw Coit She:4 Tons,SEER Raflrg:16 Mhknvm 5 Ton,Seer Rating 15 W/Matching Coil ea 2065 1550 3615 Central arCondHbner Unit And Matrhing EwpwatW Col{Six:5 Toru,SEER Rating:15 Mini- 5 Ton,Seer Rating 16 W/Matching Coil ea 2065 1550 3615 Centralar Condidaner Unit And Matching EwpmUw Col{SIze:STons,SEERRaUng:16 Minimum Urnpka huall–EAiderayar higher mnllguration types:UI-Mw.Q—fi and Horhmttal.central Heat/Fum call hsa9w11om shall be mite wmpfank a merhanral""n" aquired.1—IL rlon mst shall kande all labor,maarhl and supplies required x install new unit In amordarae with manula¢urw requirements,remawl of uisWg unRand properly duposaf 1n acmrdana with EPA reguatbn.InwaBation shdlaha hdude, mmtrt ve carr.ex with auWde rod ask azd Re in raw snWlfa hl alirw aL air dfwke H• .tech madiliotbn andseMa Adl new and ulstlna duds olenum+rd return.Unit sh.11 be pmperN vented,hwlated and/w sealed In acmrdawe to Add electrical outlet or kill switch eac 100 150 2SO lea rod.requkemwds(Indeain,h%h low cant,). Add electrical outlet or kill switch eac 100 150 2S036AM BTU(minimum),EER 0.ehg:80%Annual Fuel U64-ion Efdnz,zor higherCwRmtbn TypaY Up-fiow,On—Row, and Ho rtzi Add electrical outlet or kill switch ea0 100 150 25042p00 BTU(minimum),EER Rating:30%Annual Fuel Utilladon EfRdnz,r or We—Conligwatbn Types:Upfiw,Down-fbw and Horizontal Add electrical outlet or kill switch eaC 100 150 2SO 50,000 RM(mhimum),EERRIAM:W%Annual Fud UUGation EfBclengor high,,[mnguration Types Upflow,Down-fl and lbNonul Add electrical outlet or kill switch eac 100 150 2SO 0.=Bm(mhimum),EERRO,:W%Mnual Fuel Utikatim EffiNengarhlgAerUnflguatbnTypes:Up4b,I flit and HatmnW Add electrical outlet or kill switch each 100 150 250 70AM BTU(minimum),EER RaIIng:W%An...I Fuel Utilization EFBckmor higher Configuratbn Types:Upibw,Do.,.I—and Hwimnal Add electrical outlet or kill switch each 100 150 25075,=ITIU(m1rhhnvm),EER Rwing:SC%Annual Fuel UUN,W,ERkienq p,higher Co.11Wation Type:UPRow,D—fiw and Horizontal 100,000 BTU Central Furnace 80%EER ea 1360 900 22601(10,000 BM(min]mum),EER RaWg:90%Annual Fuel Utilization Enkkayw higher OzzOpntim Typo:UWfIow,Dr flzaa and Horizontal Gas line steel per drop each 175 200 375 36AWBM(mhimum),EERRating:90%Mnual Fuel Utinatiw EfflckrngorhigherC fk,ratb Types:Up4l_O -nwand Harimnal 42,000 BTU Central Furnace 90%EER ea 1310 1000 2310 42/100 BTU(mfnfmum).EER Redr.90%Annual Fuel Utlfladon ElRclercyorhgharCmggurrtbn Type:Upflaw,Own-Fbwamd Ho I—W $0,000 BTU Central Furnace 90%EER ea 1 134$ 1000 2345 WAMBM(minimum),EER Rating:90%Annual Fuel Utilization Effickrcyor higher Cmnghmtbn Types:Upflw,Da fl—nd Ho,lan-I 60,000 BTU Central Furnace 90%EER ea 1400 1000 2400 WAW BTU(mWmum),EER Retina:90%Annual Fuel tlLUan Effhdengor hlghrConFVutbnTypes:Upfiw,Down-flw and Harimnal 7$,000 BTU Central Furnace 90%EER ea 1450 1000 24SQ 75,O00 BTU(minhnum),EER RztIrW9D%Annual Fuel Utilization ERkleng or higher[onft—ln Types:UpROw,Cv—R.wand Horizontal 100,000 BTU Central Furnace 90%EER ea 161Q 1000 26101W.WOBM(minimum),EERR,Ung:90%AnnwIFud Wlk¢bn Etude, rHgher C-fgwr lte.Typ.Up-Ibw,D—t—w .d rbm I Insall.W.azar shall Ndudeall labor,material,and supplies Nuked to-11 new,complex systems(with naw ale handlerand mItdli.g mil)in ac na—with manufac —mquiremremenb, ]ofu9#hg unit and projwdbposal h zuordana with EPA miputbn.lnsallaslon Shen ImWe eve 7 dry pragramrnable thrmosta[,new plastk or mncete slab,dhmmect ben,mballenuus mppv line and mmectiau,(raw fNe-wtre br 1 h the new Pmgrwnmabkt-wat),m,Wmonth supplyof fillers,nitrogen ask TKVIF rz,Rn—carer 0 receamyaW miaell-azeur repain Heat Pumps Complete Up Flow/Horizontal Contactor k mpon9ble for semring permit.The ayaam mud be road AHRI.145SEER 1.5 Ton Seer Rating 16 Matched System ea 2610 2000 4610 Comple.Spam-Hut Pump With Ele¢dc All Handler,She:1.5 Ton,SEER Rating:16 2 Ton Seer Rating 16 Matched System ea 2920 2000 49ZOCanplea System Heat Pump with Elastic Air Handler,Size:2 Tons,SEER R...,:16 2.5 Ton Seer Rating 16 Matched System Be 3010 2000 5010 Complete Sptem Heat Pump With Eie¢ricAlr Handler,Sia:25 Tons,SEER Radng:16 3 Ton Seer Rating 16 Matched System ea 3210 2000 S216 Cwtipl..System-Haat Pump With Elactrk Air Handier,Size:3Tcn.SEERRathg:16 3.5 Ton Seer Rating 16 Matched System ea 3430 2000 5430 Complete,Sy¢em-Hart Pump with Ele¢rlcar Handler,Size:3.5 Tom,SEER Rating:16 4 Ton Seer Rating 16 Matched System ea 3700 2000 5700 Compka System-Hart PmnP With Ele¢flc Al,Handler,Sim:4 Tone,SEER Rating:16 4.5 Ton Seer Rating 16 Matched System ea 3700 2000 5700 Complex Bram-Heat Pump With Elemic ter Handler,vee:4.S To.%SEER R.zn 16 5 Ton Seer Rating 16 Matched System ea 1 39901 20001 5990 Complete Srtem-Hut Pump With Electric Air Handler,She:5 Tan;SEER R,Vng:16 Thum units are mast mmmoNyfaund apartment unit,.When mbmlttingyou,bid proposal mnsldervokrme and the ebthg prke In the original bid t Pdm M.Inmlhuw sort shall indude d1 labor,matwkl,and wpplks aquired m imtall new mmpkte systems(wait new ah h.rdler and matching call)in amodarm with manufacturer requkements, m reowl of ubting unit and pmzmana perdh,ouI In rdwith EPA ragd ol—Iruallultz, Ieve ptaRk ormwreteslab,dismnne¢boa,meld month mpPNdfiRea mhall—copper Items and mnraitlomfar Bogen task TzvwW, Heat Pumps Complete Ceiling Mount neeatoo—Hneassaryand miscellaneous repain Contactor b respomibla brsemdng Ctypermit.The sptem ra-b rated by A.H.R.I 1.5 Ton Seer Rating 13 Matched System ea 2376 1750 4126 ComPl¢e srtem Heat Pump With Calling Mourn tls do ter Handler,Sim:IS Tons,SEER WW 13 2 Ton Seer Rating 13 Matched System ea 2400 1750 4150 Complex System-Hut Pump With Calling Mount Ek¢dc ter Handler,Six:2 Tom,SEER RztJW.13 2.5 Ton Seer Rating 13 Matched System ea 2570 1750 4320 Complete Sys—Het Pump With Calling Fount ElectricAl,Handler,She:2.S Tons,SEER R,Ung:13 3 Ton Seer Rating 13 Matched System ea 2695 1750 4445 Camplem Sptem-Hut Pump With Ceilhg Mnunttkdri,ar Handlmr,SIm:3Tom,SEER Rating:0 Preventive Maintenance And Tune Ups Be W Air Condition System ea 10 79 By Air Conditioning Spam(mogng)-PMand Tunsup5erdm,Ndude all lehor,demkab maarbl and suppge required to perform the sarvke. Heat/Fumace System Be SO 79 89 Heat/Fumaa-PM and Tune-up Services,indude all kbor,materul and supPRas requketl to pedam the services. Condenser Coil Cleaning Service ea 10 79 89 Cord—,C1CkaNm servke(-Iv)in indude all labs,chemlals,m,mriahandwpplles ntgWad to pad—the—,,los Evaporator/Cooling Coll Cleaning Service ea 10 89 99 Evaporarw/CaolingekaNrgseake4lonN)amdaee an iabw,chs.,rleis,matal>raand,Ppdkrrequhedapedwmthe:er,nte,. 7 Day Programmable Thermostat(Only) ea 105 65 1707-Day Programmable Th.—m1(.nIy)imall.d Replace supply plenum ea 125 125 250 Duct repair and replacement 6-8" ea 7575 150perrun or 20 Duct repair and replacement 10-12" ea 1 ,01 0 75 185 per,unof2a Duct repair and replacement 14-16" 1ea1 1651 75 240 Per mnof2o New Copper line set lea 1 2001 100 300 new Rwn,ondwuorxewpwato,vnikhlghand6w M, Attachment C:Bid Price Worksheet-Home Repair RFP 17-0500 Attachment C—Bid Price Worksheet—Revised 12/2018 Line set cover metal ea 1001 100 200 Line set cover UV material ea 1001 100 200 Freon Line Insulation ea 101 15 25 add sediment trap(drip leg) ea 301 50 80 seal return area with fiberboard and mastic ea 10 55 65 HVAC clean and tune ea 10 79 89 Additional R-410 freon per pound Ib 15 10 25 Additional R-22 freon per pound Ib 45 10 55 Lead Containment fee Interior ea 75 75 150 Install attic shield atflue penetrations Be 15 20 35 Duct Blaster test ea - 150 150 Specify labor Rrte for HVACSen m and rekted work not,WINd or menton under the Bid mntncL Hot.:Rab ahallinrfude trip urge,travel itime,mlkage,tramportatlon wat,parking aM toll Hes.The labor nb shall sort upon arrival rt tlient home orvnrlulte.'Contra.tor b regomOtk HVACTech Hourly Rate hr 75 75 for—ring N mR Vendor Mark Up% % 20 Attachment C:Bid Price Worksheet-Home Repair RFP 17-0500 Attachment C—Bid Price Worksheet—Revised 12/2018 Revised Attachment C-December 18' RFP 17-0500,Home Repairs y-+� R , s Winless or lnber.rl fged,all materials shallbamower,PVC oR PEX.All Items shall operere withoutleakage,raise, 1111 vibratlan pr hammering All penetration of building component shall be neat,sleeved,&fire stopped No solder ntalning lead shall be used In any pipe or(tourer.Damage to strudursl members from drilling or notching shall be tFlUF a a j repaired to thea=pu,m fthe owner and the City. l!!! JExavate to 36",lMa art"PEXpipeandrefllltmn�hfarwaterservice,layllnewxhout)oinbhommaterhubtomain Water Service PEX l" If 25 25 50 shpt off vane msme strpet,.contractor to apply and pay for all permlb.0,,Ml disturbed yard areas. Water supply 3/4"+1/2"per drop ea 100 125 225 PEX manifold ea 175 1501 325 Water safety shut-off float switch ea 1 100 751 175 Remove bathroom wall UVH,cap line,magazine rack ea 1 50 125 175 Move gas line to accommodate equipment Install ea 125 175 300 Bonding and grounding gas and water lines If 10 25 35 Cap Al gas lines prior m filling the distribution system wkh 5-8 lbs.of compressed air.MatrRain pressure for at Inst Gas Pressure Test ea 50 300 350 30 minutes,tooter leaks In the system. Ground wire If 10 25 35Runground wire Per Code when banding a„,,PE)(waterlines toaround ShutoffValves gas ea 10 30 40 Shutoff Valves water ea 10 30 40 Shut Off Valve Exterior ea 175 125 300 Faucet shut offvalves ea 10 25 35 chromed bress,but-Diff vane an exwagrteresuppiy ane. Install Valve Box ea 75 100 175 2”PVC DWV If 15 35 50 3"PVC DWV If 15 351 50 Install a 4"PJC sewer Zine from,uudure and mnned to the public sanitary sower system.Ianall daanauts as required .Re-grade yard in work area,saw grass seed and spread straw toreestsblish lawn.rnntradortoapplyard 4"PVC DWV If 15 35 50pay for11 permiband road repairs. Replace dual kitchen sink drain lines under cabinet ea 75 125 200 Replace single drain line kitchen or bath under cabinet ea 50 50 100 Replace/install washer bibs and drain box ea 175 175 350 asmmplar.unit Hi-Lo venting in combustion closet each 30 30 60 3 Pleae Fiberglass Tub Wall xit-TW,md Finish Remove old kit and dispose and replace with new to loud code Tub wall kit 3 piece Installed ea 1972 900 2872 requlrem.nb,aaplks..I tc Install Handicap shower stall ea 3123 1000 4123 Removal of bathtub ea 15 165 180 Replace new bathtub ea 300 250 550 Replace Faucet and Shower Diverter ea 225 225 450 Install new tub shoe drain and aver flow to existing tub ea 150 150 300 Install handicap shower head and hose ea 150 150 300 add sediment trap(drip leg) ea 30 50 80 Remove and replace same toilet new wax ring ea 75 75 150 Gas line steel per drop each 175 200 375H.ng3/4'main.ndln'rixture gas supply llnesofsdrdule40blahrteelpdpewith mallnblelmn—selfltdnp. Gas line meter to house If 35 35 70 Replacement of exterior hose bib,anti-frost ea 85 85 170 Install a glass fined,high recovery,Insulated,gas water heater with a 6ryear rarely(eledricwater heater when ) � war n ('Is applicable).Use A.0.smeharapproved agpal.)rtstallatlon asatshatlfrtektde new dtwbts areal vara nips,rodard, now ns fin.'ddo lee new TAP lines.new roof flue/lads stack—clots.on end Dine Insulation.Unit must meet • drymdendmurtberalsed18'fromednadon(whnapplioble).Therm lof exWngmWh,,mrardpoper stKT-_tti dispasalshall be lnaccordanm to EPA regulation.-comractor b ress—lble for securing perms." 30 gallon gas water heater each 850 750 1600 40 gallon gas water heater each 850 7501 1600 50 gallon gas water heater each 950 750 1700 30 gallon electric water heater each 1 850 750 1600 40 gallon electric water heater each 850 750 1600 50 gallon electric water heater each 950 750 1700 Install gas shut off valve ea 40 60 100 Install drain pan on exisiting unit ea 75 325 400 Rod and clean drain lines clean out to main all 300 300 Rod and dean drainlinesatallfixturasttsd,arlinesfarflsturestomainstreetsee.r. Rod and clean drain lines Interior ea 300 300 Toilet 1.6gallonflush ea 250 200 455 Complete install including new supply line,war ring Toilet HC 1.6 gallon flush ea 300 250 550 Complete Install indudlng new supply line,wax ring Replace bathroom faucet ea 100 125 225 Two handle bathroom faucet w pop-up assembiyand drain.Finish:Chrome. Replace kitchen faucet ea 100 125 225Ktchen-Two handle kla eh hutatFinish:Chrame: Construct sealed combustion closet ea 75 75 150 seaidosetwithnubberweatheretrip,latchingdoar,sealdoorvenb Isolate service/house linew/box and valve for estimate ea 125 275 4001solatemdeterminelfleaklsinyard,emkelineoranhauseside,indudeslaca.ingline,11lvsandbax Lead Containment fee interior ea 75 75 150 teadssfeworkpradimsperHUDand EPA Boring under sidewalk if 75 75 150 Boring under driveway If 75 75 150 Master Plumber Hourly hr 125 Plumber apprentice Hourly Rate hr 25 Vendor Mark Up% % ,, 20% Attachment C:Bid Price Worksheet-Home Repair RFP 17-0500 Attachment C—Bid Price Worksheet—Revised 12/2018 Revised Attachment C-December 18' RFP 17-0500,Home Repairs o i 100 amp breaker panel each 850 850 1700 150 amp breaker panel each 950 950 1900 200 amp breaker panel each 1100 1000 2100 Install ceilingfan and light kit ea 125 125 250 Add electrical outlet water heater closet ea 90 90 180 Install 220 circuit for condensor exterior ea 150 250 400 GFCI installation ea 751 75 150 Carbon Monoxide alarm w/10 year battery ea 60 60 120 Battery-Operated carbon Monoxide Detector,Bard:First Alert or equal w/10 year batery Carbon Monoxide alarm hard wired ea 90 90 180 Smoke alarm w/10 year battery ea 50 50 100 Battery Operated Dual Senior ionization&Photoelectric Smoke Det,dor,Brend:Flat Men or equal w/SO year beery Smoke alarm hard wired ea 120 125 245 Wired Dual SensorIonizatIon&PhotoelectdcSmokeDetector,Brand:FlatAertorequal Lead Containment fee interior ea 75 75 150 Lead Containment fee exterior ea1 75 75 150 Master Electrician Hourly Rate hr 125 125 Apprentice Hourly Rate hr 65 65 Vendor Mark Up% 96 20 Gas line steel per drop leach 1 1751 200 375 Attachment C:Bid Price Worksheet-Home Repair RFP 17-0500 Attachment C—Bid Price Worksheet—Revised 12/2018 Revised Attachment C-December 18' RFP 17-0500,Home Repairs I ib r,Tear off one layer and replace roof complete.All roof work performed for this bid shall be warrantedfore period of one year following payment.This warranty coven problems such as leaks,loose shingles and=rmUng,replacing s J.} or repairing other damage and/or problems that may result from the faulty roof work.standard roof work shall be bid to Include Iratallatlon of new 1.111 —Urea tab'ar'archllectural shingles',S,a felt paper,code approved venting,new drip edge,new vent pipe boots,starter shingles for eves and rakes,ridge and gable cap shingles, ;meq_ j and code approved Work includes proper disposal of scrap and waste.Bid shall assume lessthan 8/12 pitch roof. Roofing per square includes tear off of one layer SQ 120 150 270 Tear Off Additional Layers SQ 20 40 60 Tear off each additional roonng layer(beyond one layer) Decking Replacement sf 1 2 1 3 2x4 Fascia replacement If 5 3 8 Remove and replace deteriorated facia board sf 5 3 8 Replace all damaged and deteriorated soffit material sf 5 3 8 Remove and replace deteriorated gable vents ea 200 100 300 Replace deteriorated decking with 1/2"OSB plywood sf 2 1 3 m1n.32af Replace deteriorated decking with 3/4"OSB plywood sf 3 1 4 min.32rf Patch shingle roof(up to 10 shingles) ea 100 100 200 Patch built up roof to match existing up to 100SF ea 200 150 350 Remove and replace gutters If 4 5 9 Provide temporary mastic patch on existing roof ea 20 20 40 Steep slope charge >8/12 ea 20 40 60 Tree trimming from roof ea 50 100 150 Lead Containment fee interior ea 5751 150 Lead Containment fee exterior ea 75 751 150 Vendor Mark Up% % 20 Attachment C: Bid Price Worksheet-Home Repair RFP 17-0500 Attachment C-Bid Price Worksheet-Revised 1212018 Revised Attachment C-December 18' RFP 17-0500,Home Repairs Weatherization - `"'� fi'-'•-"'"-"'Contactor b responsible for securing permit(when appAcable).Insblhtion of bbwMn a[Uc fiberglass Insulation IncWdes[he bllawlry basic 740001ky attic preparation:Blockingaro,nd chimney,accesq,)and heat sources.Block wes/wffmtoa prevent Insulation from blocking smith vents, helpingto maveasmallamoun[of cllentbeloigings.Flag electrkaljunctron boxes,recessligh[shiNds,ventilation batfies,and other critical a nn,avrgs. R-19 sf 0.36 0.6 0.96 -- - -•��� --��-���� R-30 sf 0.42 0.6 1,02' R-38 sf 0.48 0.6 1.08 y o ;!•g Install withpaper coward the Interior ofthe house pushed in between the studs with all the paper touching the studs and sheeuock(m airgaps) R-30 sf 0.7 0.8 1.5 fasten In place on the outside of if,studs with TYVEKwmp puffed tight and resumed in place so the it will notcume loose. 31R-13 sf 0.7 0.81 1.5 - - - - _ R-13 sf 0.7 0,8 1.5 R-7(per inch)Inside Attic sf 1.5 0.75 2.25R-7 Per Inch Application for holds thetnlc,rem-1 old Insulation and prep for the new spray onappric.dr. R-7(per inch)For Pier and Beam sf 1.5 0.75 2.25R-7Perinch Appllotbn forplerand beam founlation,prepsudaeesfmr newsprryonapplicatbr. Spray Foam Can 30 SO20 Contra ctorIsunfoo ble for securing Minh(when applicable).Insulation of blo-in fiberglass wall Insulatlon Includes allnecessary R-13 sf 0.3 0.65 0.95 separationmon-landmirtachmem ofddbg,pivongorfllingdrll holes,gbl-thru brlcYfJl holes Mth brick mortar,etc. _stir a• 0 1 R-19 sf 0.5 0.65 1.15R-19 Floor fiberglass Includes metal sup"nmdspipewrap,and Girl.vapor harder with seamsthat owdW12'and ll'up the foundation wall R-19 sf 0.5 1.61 2.1R-19 Application:Paper backed Insulation adhered to belly paper and secured under beams uto Insubteall plumbingat these,,time. Mobile Home Belly Repair SOFT 2 2 4 30" sf 3 2 5 Remove the old skirting and install the new skirting making sure that it Is straight,connected logethert-ti,so R win notseparah ) ; '• Remweoldwnu(gappllcable).Newvantshallbelnm,lledlnacwrdanc,WiththemanufactwYtmbuctions,Mmied Mthapproprlate A pJCP3�'15 '' y sealent.Venb,hall be Installed!no lumerto preventtheentrance ofrem,imecuand mdema Aluminum Gravity Vent 80sq.1n.free net venting ea 75 75...A��^1ISO Turbine roof vent ea 80 25 105 Re-screen exisiting Gable Vents with metal screen ea SS 151 30 Vents(up to 14+'x24") ea 30 151 45 Vents(18"X24") ea 30 15 45 Gable Vents(24"x24") ea 30 15 45 soffit vents single story ea 15 10 25 mid desinte lorchme soffit vents two story ea 15 20 35 Includes Interior chute Gas line steel per drop each 175 200 375 Instal Insulated ventmn du-k-for bath,kitchen or lagndyareav,ms ""•' c'-----�"'�' ""` 4 -"-7'- Ductsngngard Repair SeMcer.Perform neceneryductseallrigbefore Insulation Is lnsmled.Vapor barrier must be placed to theoutside Mtls l no exposed imitation Insulation should ravel all exposed supplyand return,duces with no signlfiontareas of bare duct left uMmulated. all t yy i !8 r,..-. - ._ Imulatlon shoWd be attached MN Stick ups,(wine,or plastic straps. Seal duct with mastic ea 17.5 20 37.5 Seal plenum with mesh tape and mastic ea 30 30 GO Seal return with Duct Board and Mastic ea 30 20 50 P Replace Register ea 22 10 321n<lude ag 6stgr,materHl,suppB,s,a+d equ'ipmemminslen newaapnew,,cunard blade,Mthchmrer damper register Replace Return Grill ea 65 15 801nclode an labor,material,supplies,and egmp,em. Replace Duet each 60 75 135 include an labor,materlatsuppges,and equipment to seat and Install new R-Bvalu,or better duct not, Relocate Return Air ea 150 125 275 Includeall labor,material,supplies,and equipment seal and Install new Rb value or better return duct: Duet Wrap If 1.95 2.951 4.9nbergle"seal Mth mastic Register Boots Each 30 101 40 Registers Each 20 10 30 la oft -'I k - 11, - Create an attk access-new,where none previously eslsted(Install In closet where possible)Install palmed woad trim for a finished appearance New Attic Access ea 1 50 85 135 cortsmacros.3/4'plywood painted panel;to lndudelrsuladon barrkr,eye hooks,weather-sbippirgand R-30orgneaterfoam Insulation: +nv,where rone pm)ougy existed(Install mut of the way ern)Install paloted rood Vim bra finished appearance K'plywood panel,2 higes, New Hinged Knee Wall Door ea 25 75 1001 barrel bolt,weather-stripping and R-30 or greater foam Insulation [stall crawlspace access-new,where none tabled previously W treated plywood,214 treated lumber for ftaming,2 einc bartel bob,Werther New Crawlspace Access ea 50 85 135 stripping,R-19cefourl-lallmn. Attie Access Panel Only 3/4"Plywood ea 25 25 50 Install n,wameaeresspaM.io+uy%Inch plywood primed wwle wgh lHOufQadez foam mswatbn Improve sviningatticmr aWspueaccess panel by addingweather-Stripping and R-30 orgreaterfoam Insolation,stops,eye hooksand Improve Existing Attic Access ea 40 40 80 omathershlpping. Attic Access Box for Pull Down Stairs ea 250 225 47$Drop down ladder.To boh+de all labor,material,supplies anti equip,,,. Vendla ing In zhall be of the ceiling mount,ENERGY STAR rated type,MN no less than(see below)CFM and+o more than(see below)some as 'j x5 I ceriiRedbythe Home Ventilating In itute(HVI).The--hall be mGMencbsed,four pole condenser types engloseed to run continuously. 3e t Power ratlngshall be 120v/6011t.Duct dametershall be no was than issue below).Fanshall be ULand CUL fisted for tub/shower enclosure when s {. used With GFCI branch circuit Wring.All fans mart be instilled in accerda+oe to local code requirements. per 55ti++ g. BraM:Panuonic Whit sero or Will l- actual."contractor hreWcm1bw for secudng permit(u I,.applicable) Ventilation Exhaust Fan 50cfm ea 120 70 190 so6M,sonsso3.Ds !he:4',GrIIWWth:lr Ventilation Exhaust Fan 80cfm ea 120 70 19080CFM,smnes:0.4,0getSI-4',6rIMMdn (ERV)should profiles,mlmmum venHatfon rate of 35 airchanges per hmur.To include all hardware IrdudnB,motel box,Mring,electrical work,insulated duct work,u,lkirg aid sealing.fan must be veined W oulsde of home out of the view of the right ofway.Ag lam mist be ERV to include electrical wiring each 695 200 8951mtaned macm+dmeeto local lad,rewfremenn ""- v""o•'--'"' "'-"""- "-` �--.. ii-it"'° t"`"`-"�Contractor Is responsible for securingpermit(when applicable)Remove existing vmt hood(If applicable)and Install new kitchen mounted vert a hood,toebe2WeeedfsnndoverheadllghtNutm,,appmedeW,Lwinckideouet Wall Mdngnulkbgand seallry.Al ein hoods mustLR&ftg-o - i' Onbelnsalld and ined lnccordancetolmcal coderequbecrumm Vent Hood 30" ea 190 200 390 1 Vent Hood 32" ea 190 200 390 Vent Hood 36" ea 190 200 390 Vent Hood 42" ea 1901 2001 390;•- Attachment C:Bid Price Worksheet-Home Repair RFP 17-0500 Attachment C—Bid Price Worksheet—Revised 12/2018 o.. _..__ ._.. a_.. .. .. it4eyf:FlT )^ Sor2G�eleeni__, ;7�Aa`erJal,ip'y6o _,�MaTT Allservxessnanbacompletedmatmrmecemlocalcoderequhemena'epntracmrbresppmmleforsecpdn¢permbs Energy Star Rated,U-value Of 0.30 or less,Shall oomph with ANSIA/AAMA standards Remove edssing window lmtall new replacement window Vinyl Window Low-EU-Value Of.30 Or Less ui 210 140 350 to Flt opening.incldeail hardware and screen.Caulk window—nd framing Energy5tar Rated,Uwalue of 0.30 or less,Shall Complyvdth ANSIA/AAMA standards Remove nissing window Install new replacement window Vlnyl Window Casement Low-EU-Value Of.30 Or Less ul 355 140 395 complebatofit opafihy.Include all hardware and savers CwAkwkKkm around framing: Replace Single Strength Glass ui 18 12 30 Remmeagglass remnants andsaape putty.Imfall newgfenanddotandghcewith gfazMgcompound. Replace Double Strength Glass ui 20 14 34 DoubleStrength Glass.Removeallglass remnants and scrap,putty.lratall newdassanddptandgfaze with glazing compound. Replace Tempered Glass ui 18 121 30Tempared Glass Replacement Remove a 11 glass remnants andscrape putty.Install naw glass and dot and late kh gfating compound. Replace Window Pulley Seals ea 15 30 25 Replace Window Sash Locks ea 15 5 201 Window Glazing If 3 2 5 1 New Window Sill ea 25 15 40; New Window Stool ea 25 15 40 PVC coated Pabricwoven,aluminum frame,W%sun dockage.To Include all materlafs,bracket,and hardware mquhed to ImulL Screen Colors: Solar Screens PVC Coated Fabric Woven 90% scift 3.5 1.25 4.75 Black,Bnmw Grey,Stucco,and Beige. Tear off the area thatis to be refused down to the decking.All roof work performed for this bid shall be warranted for a period of MV years following payment.The mm my covers problems such as leak%Bose shingles and mracting,replacing or repakingthe(repair ed)area only. Standard roofwork shag be bld to include lnstallatlon ofnew 30 year Three OW or—froectural shmgfaV,158 frit pipet,code approved can venting,new drip edge,new vent pipe boob,sta—hiNinfor eves and rakes,ridge and gable cap shingles,and code approved Work includes Minor roof repair ea 200 150 350 prover d1hpnsalofscapand—Roofsgreatertban6/12 pachwln notbe considered. Replace Chimney Cap ea 50 30 80 Re place cnbnney rap Replace Roof lack ea 75 751 1501teplece Roaflack Latex Caulkwith Silicone 35 Year ea 15 5 20 to-Caulk with Ill..,35 years durability,mustmeetor evreed ASTM C834 aqulmon-ts Size:10.1 Tube,Brand:Dap or equal. 100%Silicone Caulk 35 Year ea 15 5 20100%Sllltone Caulk,35 years duabil",must creator eamed ASEM 920-86 qulremems Sze:10.1 Tube,Band:GE or N.A. Foam Tape Closed Cell 3/8X3/16x17' ea 15 5 20 Weother-seal Foam Tape,Closed Celt UV Res,bmt,Adhaslw Backing 3/8 X 3/16X17. Receptacle and Switch Gaskets ea 2 2 4 Electrical Outlet and 5wltch Soling Energy Saving Gasket. Receptacle and Switch Plates ea 2 2 4 Switth/Receptacle Plates Concealed door bottom Each 25 25 50 Doorsweep Each 25 25 50 Dual Ridge Gasket Weather Stripping Each 35 25 60 Silicone Heavy Duty Weather Strip Each 25 25 50 13.5 Watt 1100 Lumens ea 14 2 16 LED.Minimum Ughtoutput(Lumens}1,1001--,13S watts 14 Watt 1500 Lumens ea 16 2 18 LED-Minimum LlghtOutpd(Lumans):1,5001umam,14 woos Kilz Primer and Sealer 13oz can ea 8 3 11 Primerand xden vane:xnt(13 onan) Glaze Compound 30oz tube ea 8 4 12Glam compound,Six:103 of tube JeJT450 Imt,II tion of all room al—ral onaesshaB includeall labor,matedalard suppliumquiredto install new unibN accortlance m manufacturer (s)requirements,removal ofedstln unit aid properly dbmsal in acmrdanoe to EPA regulation.Unit shall be properly Wulated,sealed and auikedaroundopamang Sit Btu Energy Star Unit 150 450 EERRating:10.7cohhiher 8k Btu Energy Star Unit 150 550 EERRatlrwl0.7orhgher 10k Btu Energy Star Unit 150 600 EER Rating:10.7 or higher 12k Btu Energy Star Unit 150 750 EER Rating:10.7 or higher ISk Stu Energy Star Unit 150 750 EER Radn:10.7 or higher 18k btu energy star window unit each 1 900 1501 3050EERRadn:10.7 orhlgher 8k Btu Energy Star Unit ea 500 150 650 EERR,nng:9.9orhlgher 30k Btu Energy Star Unit ea 550 150 700 EER Rating:9.9 or higher 12k Btu Energy Star Unit ea 700 150 850 EERRatlng:9.9prhlg1ar 18k btu energy star window unit w/heateach 1050 150 1200 EER Rating:9.9 or hlghr 30"Gas Range Unit ea 450 150 600? Kitchen Stove Top,4 Burner Standard SizeAea Be 500 200 7001 _ Clean and Tune Gas Range 35 45 80 Clean And Tune Range unhand or stomTop to tourer to Readings pa p 14 Cubic Foot Top Mount Freezer ea 550 150 700 16 Cubic Foot Top Mount Freezer ea 570 150 720 t 18.5 Cubic Foot Top Mount Freezerea 750 150 900 21 Cubic Foot Top Mount Freezer ea 900 150 1050�a 22 Cubic Foot Top Mount Freezer lea 1 975 1501 112511 Attachment C:Bid Price Worksheet-Home Repair RFP 17-0500 Attachment C—Bid Price Worksheet—Revised 12/2018 Revised Attachment C-December 18' RFP 17-0500,Home Repairs �rd1PRP_'?%g�.5.'�:s�1� 3• __ �'.re+sn- _ 1� Carpentry Services and related work not specifled or mention under the Bid contract:Note:Rate shall Include trip charge,travel time,mileage,transportation cost and parking fees.The labor rate shall start upon arrival at client Carpentry rate per hour HR I 65 65 home or worksite.'ContnctcrIsresponsible for securing permit Fiberglass tub&wall kit ea 460 500 960 Fiberglass walk-in tub&wall kit ea 1972 900 2872 Fiberglass roll-in shower&wall kit ea 3123 10001 4 Vanity base w/sink ea 130 1501 280 Faucet set ea 50 100 150 Light switch ea 5 20 25 Alteration to light switch location ui 3 5 8 Drywall 1/2"green board sf 2 2 4 Drywall 1/2"board sf 1 2 2 4 3/4"subfloor remove/replace sf 2 2.5 4.5 Floorjoist insulation sf 0.5 0.85 1.35 Install pre-hung interior door 36" ea 200 150 350 Install new exterior door pre-hung 36"wood ea 240 200 440 Install new exterior door pre-hung 36"metal ea 380 200 580 Install new exterior sliding glass 36" ea 300 300 600 Remove and replace interior doorjamb ea 25 50 75 Remove and replace exterior doorjamb ea 60 50 110 Widening of doorjambs ui 0.28 0.55 0.83 Replace threshold ea 35 80 115 Remove and replace countertop If 15 15 30 Remove and replace bathroom vanity base w/sink 24" ea 130 150 280 Remove and replace bathroom vanity base w/sink 30" ea 1 170 150 320 Remove and replace shelving If 1 5 5 10 Remove and replace baseboard up to 4" If 4 3.6 7.6 Remove and replace baseboard 6" If 5 3.6 8.6 Paint baseboard If 0.5 0.5 1 Install inerior/exterior handicap grab bar 24" ea 25 15 40 Install inerior/exterior handicap grab bar 36" ea 35 15 50 Gas line steel per drop each 175 200 375 Installation of access ramp ea 1 800 400 1200 Install flooring vinyl sheet sf 2.5 2.4 4.9 Install flooring tile sf 3 4 7 Repair wood flooring sf 1.5 1.5 3 Final Clean per room ea 30 70 100 Final Clean per window ea 5 5 10 Remove and replace vinyl windows per U.I. ui 2 2 4 Remove and replace matching wood windows ui 7.5 2 9.5 Remove and install window sill interior ea 8 15 23 Remove and install window sill exterior ea 10 15 25 Replace door trim ea 1 10 20 30 Replace wood trim up to]x4 If 1 11 2 Remove deteriorated flooring on porch sf 1 2 3 a)4"x 4"treated wooden porch posts ea 25 35 60 b)4"x 6"treated wooden porch posts ea 35 35 70 Remove and replace burglar bars ea 10 20 30 Widening of exterior walkways ui 0.3 0.7 1 Widening of interior walkways if 0.21 .6 0.8 Remove and install wooden screen door ea 80 120 200 Vendor Mark Up% 20 Attachment C: Bid Price Worksheet- Home Repair RFP 17-0500