HomeMy WebLinkAboutContract 48427-CO1 FORT WORTH City of Fort Worth CITY FECRETARY
Change Order Request v'AYRACTNO. q$qo1'7-co
Project Namel Love Circle and Casino Beach Water and Sanitary Sewer Extension City Sec No. 48427
Project No.(S) 33001-01829 1 M&C I C-27979 I City Proj.No. 01829 -�
Project Description: Portions of an 8"sewer force main in Casino Beach Park,54 private grinder pumps for sewer service and an 8-inch water main to serve
Love Circle.16-inch and 24-inch water mains in Surfside Drive and Casino Beach Park.
Contractor: William J. Schultz, Inc.dba Circle C Constructio Change Order# 0 Date: 12/14/2018
City Project Mgr.1 Walter Norwood City Inspector: Ron Rackley
Phone Number:1 817-392-5026 Phone Number: 817-237-6950
Dept. Unit I Water Unit II Sewer Totals Contract Time
(Calender days)
Original Contract Amount $2,069,045.00 $1,864,450.00 $3,933,495.00 730
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $2,069,045.00 $1,864,450.00 $3,933,495.00 730
Amount of Proposed Change Order -$41,650.00 $11,880.00 -$29,770.00
Revised Contract Amount $2,027,395.00 $1,864,450.00 $3,891,845.00 730
Original Funds Available for Change Orders $146,000.00 $131,700.00 $277,700.00
Remaining Funds Available this Change Order $146,000.00 $131,700.00 $277,700.00
Additional Funding(If Necessary) $0.00 $0.00 $0.00 1 J
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT -2.63%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $4,916,868.75
JUSTIFICATION(REASONS)FOR CHANGE ORDER
This Change Order No.1 will allow for the following items:Addition of cathodic protection on water pipe under Jacksboro Highway(SH 199)
at Surfside Drive,additonal pavement repairs and disconnection of an 8 inch main to the City of Lakeside water system that is no longer
required and deletion of a water main crossing Jackboro Highway near the northside of the bridge across Lake Worth.
AO �T
C-): .o �i'
JAN 18
A by:
18 2019 2
C17Y0Fr0Fff WOR N¢ X-/' J
'I1'SECRErARYTM /konald P. Gonzales,AsS C ty Secretary ..
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and
represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.
'Contractor's Company Name Contractor Name Contractor Signature Date
Circle C Construction Teri Skelly
Inspector Y 1111 Date Project Manager Date
r/ l
Assistant Director( ater Dep Date e Co truction Supervisor(Water Dept)
Assistant C' Attorney Date Assistant City Manager :$ $> QA€ R
a( FTT a
1
F-%--%WR-' Wt>a-rH City of Fort Worth
Change Order Request
Project Name Love Circle and Casino Beach Water and Sanitary Sewer Extension City Sec No. 1 48427
Project No.(s) 33001-01829 DOE No. C-27979 City Proj.No. 1 1829
Project Portions of an 8"sewer force main in Casino Beach Park,54 private grinder pumps for sewer service and an 8-inch water
Description main to serve Love Circle. 16-inch and 24-inch water mains in Surfside Drive and Casino Beach Park.
Contractor William J.Schultz, Inc.dba Circle C Constructio Change Order# 0 Date: 12/14/2018
City Project Mgr. Walter Norwood City Inspector r Ron Rackley
ADDITIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
1-41 Full Width Asphalt Pavement 4-Inch HMAC, 8-Inch Cement Stabilized Unit I Water 550.00 SY $65.00 $35,750.00
1-54 Cathodic Protection for 36 Ich Dia.Steel casing Unit I Water 1.00 LS $2,500.00 $2,500.00
1-55 4"-12"Water Abandonment Plug Unit I Water 2.00 EA $1,500.00 $3,000.00
11-13 Simplex Grinder Pump Inc].Control Panel Unit 11 Sewer 1.00 EA $7,500.00 $7,500.00
11-54 Mobilization-Shoreview Dr. Unit II Sewer 1.00 EA $2,000.00 $2,000.00
II-55 Discharge Piping-Shoreview Dr. Unit 11 Sewer 68.00 LF $35.00 $2,380.00
Unit I Water $41,250.00
Unit 11 Sewer $11,880.00
Page 2 of 4 Additions Sub Total 1$53,130.00
P,x WO m x m City of Fort Worth
Change Order Request
Project Name Love Circle and Casino Beach Water and Sanitary Sewer Extension City Sec No. 48427
Project No.(s) 33001-01829 DOE No. C-27979 City Proj. No. 1829
Project Description Portions of an 8"sewer force main in Casino Beach Park,54 private grinder pumps for sewer service and an-8-
inch water main to serve Love Circle. 16-inch and 24-inch water mains in Surfside Drive and Casino Beach Park.
Contractor William J.Schultz, Inc.dba Circle C Constructio Change Order#0 Date 12/14/2018
City Project Mgr, Walter Norwood City Inspector on Rackley
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
1-5 21-Inch Casing(by open cut) Unit I Water 230.00 LF $280.00 $64,400.00
I-38 New Flushing Device Unit I Water 1.00 LS $18,500.00 $18,500.00
Unit I Water $82,900.00
Unit II Sewer
Page 3 of 4 Deletions Sub Total $82,900.00
MIVVBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
Page 4 of 4
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
Signature
�zJbiG�7�Y /(/GY"ltivv
Name of Employee
_ �roi c�T �v�l�Lrori�3G�''
Title
OFFICIAL. RECORD
CITY SECRETARY
FT. WORTH,TX