HomeMy WebLinkAboutContract 48427-CO1 FORT WORTH City of Fort Worth CITY FECRETARY Change Order Request v'AYRACTNO. q$qo1'7-co Project Namel Love Circle and Casino Beach Water and Sanitary Sewer Extension City Sec No. 48427 Project No.(S) 33001-01829 1 M&C I C-27979 I City Proj.No. 01829 -� Project Description: Portions of an 8"sewer force main in Casino Beach Park,54 private grinder pumps for sewer service and an 8-inch water main to serve Love Circle.16-inch and 24-inch water mains in Surfside Drive and Casino Beach Park. Contractor: William J. Schultz, Inc.dba Circle C Constructio Change Order# 0 Date: 12/14/2018 City Project Mgr.1 Walter Norwood City Inspector: Ron Rackley Phone Number:1 817-392-5026 Phone Number: 817-237-6950 Dept. Unit I Water Unit II Sewer Totals Contract Time (Calender days) Original Contract Amount $2,069,045.00 $1,864,450.00 $3,933,495.00 730 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $2,069,045.00 $1,864,450.00 $3,933,495.00 730 Amount of Proposed Change Order -$41,650.00 $11,880.00 -$29,770.00 Revised Contract Amount $2,027,395.00 $1,864,450.00 $3,891,845.00 730 Original Funds Available for Change Orders $146,000.00 $131,700.00 $277,700.00 Remaining Funds Available this Change Order $146,000.00 $131,700.00 $277,700.00 Additional Funding(If Necessary) $0.00 $0.00 $0.00 1 J CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT -2.63% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $4,916,868.75 JUSTIFICATION(REASONS)FOR CHANGE ORDER This Change Order No.1 will allow for the following items:Addition of cathodic protection on water pipe under Jacksboro Highway(SH 199) at Surfside Drive,additonal pavement repairs and disconnection of an 8 inch main to the City of Lakeside water system that is no longer required and deletion of a water main crossing Jackboro Highway near the northside of the bridge across Lake Worth. AO �T C-): .o �i' JAN 18 A by: 18 2019 2 C17Y0Fr0Fff WOR N¢ X-/' J 'I1'SECRErARYTM /konald P. Gonzales,AsS C ty Secretary .. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request. 'Contractor's Company Name Contractor Name Contractor Signature Date Circle C Construction Teri Skelly Inspector Y 1111 Date Project Manager Date r/ l Assistant Director( ater Dep Date e Co truction Supervisor(Water Dept) Assistant C' Attorney Date Assistant City Manager :$ $> QA€ R a( FTT a 1 F-%--%WR-' Wt>a-rH City of Fort Worth Change Order Request Project Name Love Circle and Casino Beach Water and Sanitary Sewer Extension City Sec No. 1 48427 Project No.(s) 33001-01829 DOE No. C-27979 City Proj.No. 1 1829 Project Portions of an 8"sewer force main in Casino Beach Park,54 private grinder pumps for sewer service and an 8-inch water Description main to serve Love Circle. 16-inch and 24-inch water mains in Surfside Drive and Casino Beach Park. Contractor William J.Schultz, Inc.dba Circle C Constructio Change Order# 0 Date: 12/14/2018 City Project Mgr. Walter Norwood City Inspector r Ron Rackley ADDITIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 1-41 Full Width Asphalt Pavement 4-Inch HMAC, 8-Inch Cement Stabilized Unit I Water 550.00 SY $65.00 $35,750.00 1-54 Cathodic Protection for 36 Ich Dia.Steel casing Unit I Water 1.00 LS $2,500.00 $2,500.00 1-55 4"-12"Water Abandonment Plug Unit I Water 2.00 EA $1,500.00 $3,000.00 11-13 Simplex Grinder Pump Inc].Control Panel Unit 11 Sewer 1.00 EA $7,500.00 $7,500.00 11-54 Mobilization-Shoreview Dr. Unit II Sewer 1.00 EA $2,000.00 $2,000.00 II-55 Discharge Piping-Shoreview Dr. Unit 11 Sewer 68.00 LF $35.00 $2,380.00 Unit I Water $41,250.00 Unit 11 Sewer $11,880.00 Page 2 of 4 Additions Sub Total 1$53,130.00 P,x WO m x m City of Fort Worth Change Order Request Project Name Love Circle and Casino Beach Water and Sanitary Sewer Extension City Sec No. 48427 Project No.(s) 33001-01829 DOE No. C-27979 City Proj. No. 1829 Project Description Portions of an 8"sewer force main in Casino Beach Park,54 private grinder pumps for sewer service and an-8- inch water main to serve Love Circle. 16-inch and 24-inch water mains in Surfside Drive and Casino Beach Park. Contractor William J.Schultz, Inc.dba Circle C Constructio Change Order#0 Date 12/14/2018 City Project Mgr, Walter Norwood City Inspector on Rackley DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 1-5 21-Inch Casing(by open cut) Unit I Water 230.00 LF $280.00 $64,400.00 I-38 New Flushing Device Unit I Water 1.00 LS $18,500.00 $18,500.00 Unit I Water $82,900.00 Unit II Sewer Page 3 of 4 Deletions Sub Total $82,900.00 MIVVBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 Page 4 of 4 Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Signature �zJbiG�7�Y /(/GY"ltivv Name of Employee _ �roi c�T �v�l�Lrori�3G�'' Title OFFICIAL. RECORD CITY SECRETARY FT. WORTH,TX