HomeMy WebLinkAboutContract 46954-CO9 CITY SECRETARY
CON i(\ACT NO. 4954-coq
FORTWORTH. City of Fort Worth
Change Order Request Breakdown
Project Namel Runway Extension Project Runway 16R, 16L,and Taxiway A City Sec# 1 46954
Client Project#(s)l WFXN5100
Contractor Lane PIVIJ Brian Fawson Inspectorl Billy Jones
Change Order Submittal# 0 Date 9/27/2018
Dept. Aviation Contract Time
Totals CD
Original Contract Amount $61,920,040.43 $61,920,040.43 791
Extras to Date $4,654,388.46 $4,654,388.46 107
Credits to Date $3,225,040.18 $3,225,040.18 0
Pending Change Orders(in M&C Process) $0.00 0
Contract Cost to Date $63,349,388.71 $63,349,388.71 898
Amount of Proposed Change Order $1 334,674.51 $1,334,674.51 58
Revised Contract Amount $64,684,063.22 $64,684,063.22 956
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00
Additional Funding(if necessary) $1,334,674.51 1 1 1 $1,334,674.51
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 4.46%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $77,400,050.54
JUST#F1C1�TIQN{�tFASONS)vFOR; HAI�IGE ORDER,
Change Order 9 is the final change order for the Runway extension project. It reconciles the as-built quantities with the actual quantities in
order to calculate the final payment amount to Lane Construction.Lane's contract is a unit price contract,which means that they get paid
based upon the actual amounts of work performed at a fixed unit price,as opposed to a single lump-sum.The change order also provides
compensation to Lane for some additional expenses they encountered during construction,primarily related to working around an active Oncor
electric line.The Oncor line provided power to the old ALSF equipment building and had to remain in place until the new ALSF equipment
shelter was constructed and provided with power.Oncor was slow to respond both with providing the new service,and with removal of the old
line.Therefore,the old line remained in service for a much longer time than expected at the start of the project.As a result,Lane's earthwork
was less efficient than planned.There were two impacts:additional trucking and placement costs;and additional project-related overhead
costs.The project team met with Lane's senior management for an explanation of the additional costs and were satisfied that they were in fact
incurred by Lane.The additional costs related to trucking and project related overhead were$1,098,058.
5 6 7 9r
a �� A
N
F SG
CORO
� TV.SFcyARy
FT. WORTH TX
FoaORTH City of Fort Worth
Change Order Additions
Project Name I Runway Extension Project Runway 16R,16L,and Taxiway A City Sec# 46954
Client Project# I WFXN5100
Contractorl Lane PM Brian Fawson Inspector'
Billy Jones
Change Order Submittal# 0 Date 9/27/2016
AUDI I IUNS
Unit ni os o a
NLWIItMb
UU9-1 ADDER FUR RUCK FUUNUA I ION wabon 100.00 LF $214.01 $21,406.bU
UE INVESTIGATION ON 16"PCCP Xviabon 7
EAGLE PARKWAY ROCK MILLING Aviation L
wabon
_77T-T__EAGLE PARKWAY THERMOPLASTIC STRIPING wabon
- N SNRW16R-02 FOUNDATION EXTENSION Aviation L
EAGLE PARKWAY LEFT TURN AND TYPE III SIGN Aviation L
U09-6 EAGLE PARKWAY ADDITIONAL bIGNAGE Aviation
C09-9 16 FOOT DOUBLE SWING UA I L viabon
GS LIDE SLOPE TOWER T P R M VAL Aviation L
EAGLE PARKWAY DOWNTIME viabon L 7.
--7GFTT-ASOS DRIVEWAY MODIFICATIONS viabon
-ZUT-TT-ORANGE SAFETY FENC viabon
EAGLE PARKWAY SET ROCK MILLINGAviation L 77 .
C09-15 TAXIWAY H HAL OFF Aviation 1.00 L 5,
U09-16 EAGLE PARKWAY FLEXBAbE via on
Aviation
RMT R ROAD DITCH 79—DIN-TA—ND AND N Aviation L
via on
779-79-AUDI I TONAL TRUCKING COSTS via on
-70T-27-LX(;Ebb MA FERIALS ON-HAND via on
PHASE
Aviation 7,452.50 SY $5.20 $38,151OU
viabon
-C7-M-4T_DEMOLISH TEMPORARY FENCING WITHOUT JERSEY BARRIER viabon
7-7 - . DEMOLISH M N IN WITH JERSEY BARRIER viabon 5. LF
77M77-DEMOLISH CONCRETE PIPE(12"-18') Aviation
viabon
viabon
- - DEMOLISH INLET Aviation 3.00 EA
G-700-4.23 DEMOLISH RAILROAD TRACK,TIES,BALLAST,HARDWARE,SIGNALS SM viabon
H-lbl-4.1 CLEARING AND GRUBBING wabon
-P-757-T7 EMBANKMENT(ZONE 1) viabon
M A NT(Z NE ) Aviation
-T-Tn7T_UNSUITABLE EXCAVATION viabon
viabon
9-INCH LIME-TREATED U Aviation 19,519.15 SY $2.00
LIME Aviation 5.
wabon
-F-M-TT EROSION CONTROL SEDIMENT LOG viabon
P- -5. H AGGREGATE BA E COURSE Aviation 7 . Y
ASPHALT SURFACE COURSE Aviation N
wabon
-7-7787-14-INCH PORTLAND CEMENT GUNCRETEPAVEMENT viabon
RUNWAY AND TAXIWAY A ( Aviation
P-67757T RUNWAYA AXIWAY PAINTING(YELLOM Aviation 6,6577F
-7-7=- RUNWAY AND TAXIWAY PAIN I ING(RED) wabon
_F-677-7�_RUNWAY AND TAXIWAY PAIN I ING(BLACK) wabon
. TEMPORARY PAVEMENT MARKINGS PAINTING(AII L R ) Aviation 5
D-7 �6_F 4 INCH SCHD 40 NON-PERF PV PIPE Aviation LF
-77UT7F 4 INCH SCHD 40 PERF PVC PIPE wabon
Aviation
F-162-5.2a TEMPORARY FEN E WITHOUT JERSEY BARRIER Aviation L 7.
TT b TEMPORARY FENCE WITH JERSEY BARRIER Aviation5. ___LF__ 5.
- -.a 24 TOO I SINGLE SWING VEHICULAR GATE Tviabon
viabon
57FIBER OPTIC CABLERAND SINGLE MODE Aviation 5. LF
L- - 1 IC# AWG 600V ABL Aviation 4,718.00 LF
Aviation
L-10-15 l/U#b AVVG bKV SHIELDED CABLE via on
L-108-9 / #2 AWG GREEN GROUND WIRE Aviation F=_E-7UFTT_12 .77
PR#19 AWG CONTROL CABLE Aviation LF
-r-TUF7-INSTALL#6 AWG B.C.COUNTERPOISE WIRE,INC via on
7TUT77 l/C#4 AWG 600V CABLE viabon
L-TTG-T- U LE 80 PVCDUIT,DIRE T BURIED Aviation 293.00 L
L- - 4"HDPE CONDUIT,DIRECTIONALLY DRILLED Aviation LF
L-110-5 2"HDPE CONDUIT,DIRECTIONALLY DRILLED viabon
-TTT-7-FAA UUC I BANK,4-WAY 4 SCHEDULE 40 PVC,CORMTETF7177707- wabon
L- -7- AA DUCTBANK, -WAY H DULE 40 PvcN RETE EN A ED Aviation LF
-F-777-1"INNER DUCT viaton
17-777-AIRFIELD UUU I BANK 1 WAY,2 INCH SCHEDULE 4u I'VU,UUNUKI,11, viabon
-E-7=- AIRFIELD DUCTBANK 1 WAY,2 INCH SCHEDULE 40 PVC,REINFORCED C Aviation 501,00 LF
L-777- N U BA K, -WAY HEDULE 40 PVC,CONCRETE ENCASED Aviation LF
L-11U-2b AIRFIELD DUCrBANK 4 WAY,J INCH SCHEDULE 4 PVC,REINFORCEDwaGon
oration
oration
L- 5- REMOVE IN-PAVEMENT UNWAY/TAXIWAY LI HTAND IN TALL EL Aviation EA
_771777—INS I ALL L-8151 I LED ELEVATED TAXIWAY EDGEDUR77MPEE I E Aviation
Change Order Additions Page 1 of 3
L-125-7 [INSTALL L-862 ELEVATED RUNWAY EDGE LIGHT,COMPLETE wabon 1 14.001 $18,200.00
PHASE Z
DEMOLISH PAVEMENT ARK oration 125,417.00
P-T5T-TT EMBANKMENT(ZONE 1) viation Y
-7-7527.T EMBANKMEN I(ZONE 2) wabon
EMBANKMENT(ZONE 3) wabon
PUTT ASPHALT SURA R E Aviation T
P-PT-9.2 IN 1 F RPORTLAND CEMENT CONCRETE PAVEMENT Aviabon Y
_75=- 14-INCH I U 18-INGH THICKENED PORTLAND CF9ER770T7TE_PTVM viabon
- - Aviabon 785.78 SY $92.00 �12'zql.16
P-620-5.1 RUNWAYANO TAXIWAY PAINTING(WHI Aviabon 7 . F
_F-6777F RUNWAYAN IWAY PAINTING(YELLOW) Aviabon 7,
77-T viation
-7-77T2F RUNWAY AND TAXIWAY FAIN I ING(BLACK) viabon
T- - T IN ( A D N SITE OR REMOVEDM STOCKPILE) Aviabon Y
L777- AWG 5KV L-824 CA9_LE Aviabon 60,840.00 LF
wabon
L-108-/ Ill(;#4/0 AWG DUCTBANK GROUND WIRE wabon
L-108-10 A GREEN GROUND WIRE Aviation LF
419 AWG CONTROL CABLE Aviation LF
-T7UFW(/8 HELIAX CABLE viabon
ITT-7- viabon
-1777-FAA DUCTBANK, -WAY T SCHEDULE 40 PVC CONCRETEENCASED Aviation 5. LF .5
L- -5 FAA DUCTBANK,7-WAY LE 40 r_vL. RE A D viabon LF $42.50
_177-77-AIRFIELD DUCTBANK I WAY,2 INCH SCHEDULE T7VC,177METE viabon
L-1 10-21 AIRFIELD DUCTBANK I WAY,2 INCH SCHLUULE 40 PVC,RMN75= viation
L-757- ANDH L RA viabon
-F-777-INSTALL L-867B JUNCTION BOX,COMPLETE wabon
IT=- REMOVE ELEVA I ED RUNWAY/iAXIWAY UGH 1,COMPLETE Aviabon
- viabon
L- - INSTALL L-852(A-D)IN-PAVEMENT I AY CEWERLINE LIGHT,COMPIAviabon EA
wabon
Aviabon
P-155-8.3 LIME Aviabon 10.74 TON $135.00 $14,274.90
_77=_ EROSION CONTROL BLAR77 viabon
- - ASPHALI SURFACE COURSE TV-1abon
viabon
5 - -IN REINFORCED RTLAN NT CONCRETE PAVEMENT Aviabon Y
7-TM-9.7 14-INCH 10 18-INCH THICKENED PORTLAND GEMEN I CONCHL FE PAVE! wabon
P-Wl-b.4 144NCH 10 18-INCH THICKENED REINFORCED PORILAND CEMENT wabon
1-9U4-b.1 SODDING viation
T-905-5.1ILING(OBTAINED ON SITE OR REMOVED FROM KPIL ) wabon
L-11U-2U AIRFIELD UUCTBANK 1 WAY,2 INCH SCHMULE 4o PVC,COR77= viation
U24 I.I Iuu REMOVE AbPHALI PAVEMENT wabon
REMOVE INLET viabon 5 A
1117.0102 MR7r STTNE RIPRADRY Aviabon Y
-79=. 2"ASPHAL I PAVEMENT TYPED viabon
Aviabon
3217.2104 L RRAIS D MARKER wabon EA
3291.0100 TOPSOIL Aviabon .7 7.
_329770T SEEDING,HYDROMULCH wabon
M=21"RCP CL Ill wabon
L III Aviabon
CONSTRUCT - 'x MB Aviabon L
-P7=. TRAFFIC CONTROL DETAILS Aviation 1.00 EA
9999.OUO2 CONNEC I TO EXISTING STORM LINE
9999.0004 wabon
TERMINAL ANCHOR N AvlaVon A
N U Aviabon
T7570T TRENCH SAFETY(WATER) wabon
_777297 12'PVC WA I ER PIPE wabon
3305.0109 TRENCH SAFETY(SEWER) Aviabon 39.00 LF $2.29 89.31
PREVIOUS CHANGE ORDERS
17 13/C#6 600V GABLE UIREC I BURY Aviation
wabon
(4)PIECE F R BA R L J Aviation A
(4)PIECES F REBAR N TUTU IN Aviabon A 57.
DUCTBANK EXPLORATION Aviabon
TWO(2)15'HDPE,DIREC MPTLY URLLEF__ wabon
-7 DRILL MP T Aviation EA 7.
ABLE / 5KW,L INSTALLED IN XI TIN U T Aviation L
REPLACE#8 5KV SUPER CONNECTOR KIT(No HEA I SHRINK) wabon
CO3-1 0 1 REPLACE 100 WA IF ISOLA I IUN I RANSFORMER IN EXISTING LIGHT wabon
CO3-14 PROVIDE
wabon
CO3-15 PROVIDECONDUIT ABOVE GROUND FOR TM RYRE A Aviabon LF
- DUMMY SPLICE Aviation EA . 5
CUT-7-L862 RUNWAY LIGHT Aviation
70T-T-120 WATT QUARTZ LAMP wabon
WATT QUARTZ LAMP Aviabon 7
_7077-PME-1 1 CONCRETE FOUNDATION viabon
viabon
C04-21 IFAA DUCT ANK,8-WAY,4"SCH 40 PVC,RLINI-ORGED CONC ENCASED wabon
AI LD DUCTBANK 4 WAY,4 INCH SCH 40 PVC, EINF N Aviabon LF 5.
viabon
Aviabon
C06-5 BOLT RE AIR viabon
REM IN-PAVEMENT AF LIGHT AND TAL _7 5" L VER I Aviabon EA
#8 5KV SUPER CONNECTOR KITS wabon
EMEN I RUNWAY TOUCHDOWN ZONE LIGHT ON E viabon
wabon
C77-77REINFORCED N RTE A NT Aviabon by $8000 77=
PORTLAND CEMENT wabon
Change Order Additions Page 2 of 3
- oration
COB-24 AIRFIELD DUCTBANK 4 WAY,4 iNCH SCH 40,CO ENC PH-3 viabon
5 BASE,TYPE A, Aviation Y
°FLEX BASE,TYPE A, - viabon
Aviation $8,368,196.28
Sub Total Additions
Change Order Additions Page 3 of 3
FORT WORTr_t City of Fort Worth
-�IV--- Change Order Deletions
Project Name Runway Extension Project Runway 16R,16L,and Taxiway A City Sec# 46954
Client Project# WFXN5100
Contractor Lane PM Brian Fawson Inspector Billy Janes
Change Order Submittal# 0 Date 9/27/2018
ULLE I IONS
Unit m os o a
PHASE 1
G-700-4.3 DEMOLISH PAVEMENT MA IN viation 6,365.00 SF
—7-7777—DEMOLISH 8 FUO I CHAIN LINK FENCING WITH MOW STRIP oration
777-T7 UEMOL16H bUU 1 16 11 Tviation
—777777 DEMOLISH UX 4'J BOX viation
DEMOLISH GATE Aviation EA
7777-TiT DEMOLISH ELECTRICAL MANHOLES AND DUCT 9ANK oration
7=77T UMT01MFRTF-TV7_ Aviation
P-152-4.2 EMBANKMENT(ZONE ) Aviation 178,076.40 CY 5.
EROSION CONTROL BLANKET Aviation
_75M797-14-INCH REINFORCED PORTLAND GEMEN I CONCRETE PAVEMENT viation
-P-TUT-TT 14-INCH 10 18-INCH IHICKENED PORTLAND
viation
1440-7718-INCH THI KENEDREINFORCED PORTLAND CEMENT COF Aviation Y 7.
P- -5.7 BITUMINOUS PRIME COAT Aviation AL
_777-77 BITUMINOUS IACK COAT Aviation
U-(Ul-�.b 42 INCH KUP CLASS III Aviation
F-162-5.1 18 FT PVC COATEDCHAIN-LINK FENCE INLU IN IP Aviation L 5
IN Aviation Y
1-90-�.2 I Ol'SUILINTFUFTITMED FROM OFF 611 E) viabon
L-11JIB-1 11C#8 AWG 5KV L-824 CABLE viation
___T7—
L-108-5 V CABLE Aviation
AWG DU TBA K GROUND WIRE Aviation L
- - viation
—T779-7—l/C#6 AWG GREEN GROUND WIRE oration
L-TWIT_ #19 AWS CONTROL CABLE Aviation
L- - FIR#19 AWG CONTROL CABLE Aviation 164.00 LF
—T7777—1/8"HELIAX CABLE viation
viation
L-110-2 HEDUL PVC CONDUIT,DIRECT BURIED Aviation LF
L- - K, -W H DULE 40 PVCN R T ENCASED Aviation 584.00 LF $28.50
17-79-717 AIRFIELD DUCTBANK 1 WAY,2 INCH SCHEDULE 40 PVG,CONGRE I E ENC viation
_777-T_AIRFIELD DUU I BANK 1 WAY,2 INCH SCHEDULE 40 PVU,K1ziNFuRCEu C viation
AIRFIELD DU TBANK 2 WAY,6 INH SCHEDULE 40 PVC,DIRECT BURIED Aviation ----LT-
777—
L- - N ALL L-862 ELEVATED RUNWAY EDGE LIGHT (COLOR Aviation A
L-12b-9 INS I ALL L-862 ELEVATED RUNWAY EUIJIE LIUH I -IX I UKL LENS(COLOR,Aviation
L-125-11 INSTALL L-862 ELEVATED RUNWAY EDGE LI(3H I ON EXIS I ING BASE,UO viation
L- - INSTALL L-850C IN-PAVEMENT RUNWAY EDGE LIGHT ON EXISTING BAS Aviation 7.00 EA __T9GOW
5- INSTALL(RELOCATED)L-804 L DL A H Aviation EA
—T7-772T-goVI)ANCE SIGN AND CONCRETE BASE,COMPLETE viation
oration
77-7 7 IN TALL L-858 UI AN N,4 MODULE,SIZE 3,ON CONCRETE BASE Aviation EA
—77=- INSTALL L-858 GUIDANCE SIGN ONE MODULE 157WER77— vratron
L-125-31 INSTALL L-858 GUIDANCE SIGN FOUR MODULE POWER KIT Aviation 2.00 EA $2,100.00 $4,200.00
P-152-4.4 UNSUITABLE EXCAVATION Aviation 2,220.00 CY
—7-755-T7 I LIME-TREATED SUBGRTDF viation
viation
viabon
_777=. K FILTER DAM Aviafion LF
-7--T=- EROSIC)NUONIHOLbEDIMENTLOG viation
-F-TM-.7.T EROSION CON]ROL BLANKET Aviation
Aviation 294.59 TON $luu.uu $29,45V.1JU
P-501-8.1 14-INCH FOR I LAEMENT UUNUKt,TIt PAVEMENT Aviabon_7=7T TEMPORARY PAVEMENT MARKINGS PAINTING(T1li7G17R9T_ Y
viation
viation
viation
SODDING Aviation Y
T-7977F TOPSOILING(FURNISHED FROM OFF SITE) viation
11512b-1 11-IBER UP I IG CA13LE 24 STRAND SINGLE MODE Aviation
AW V ABL viation
L-1-5L- -5 I # AW V viation LF .5
I/C#6 AWG bKV SHIELDED CABLE oration
oration
L- - / # AW GREEN GROUND WI viation LF .77
L- - 50 FIR#19 AWS CONTROL CABLE viation 7 L
25 PH#19 AWG CON FROL CABLE Aviation
INS I ALL#J AWG B.C.COUNTERPOISE VVIRE,INCLUDING GROUND ROD, viation
L-110-6 K, - U E 40 PVC CONCRETE EN A ED viation = LF 5
L-77-7—FAA DU TBANK, -WAYSCHEDULE 40 PVC, N A viation 5. L .5
T-777-FAA DUCTBANK,8-WAY 4'SCHEDULE 40 PVC CONCRETE ENCASED matron
-7777_FAA DUCTBANK,3-WAY 2"SCHEDULE 40 PVC CONCRETE ENCASED viation
1_7777 FAA DU TBANK, WAY 2"SCHEDULE 40 PVCENCASED viafion L .5
--
7_777T FAA DU TBANK,5-WAY 7 SCHEDULE 40 PVC CONCRETE ENCASED Aviation 145.00 L
777-7 FAA UUCIBANK,6-WAY 2"SCHEDULE 40 PVC CONCRETE ENCASED oration
-17-TT-7F-FAA UUC;I BANK,/-WAY 2 SCHEDULE 4U FVU KLINFURGED CUNURE I L oration
L-110-17 INNE DU T Aviation Z LF
L- - AIRFIELD ANK 1 WAY,2 INH SCHEDULE TUP—V—C,—C7NTR—E—T—E—E—Nviation— LF 5 .
AIRFIELD DUGTBANK 1 WAY,2 INCH SCHEDULE Q PVU,UUNURE I E LN( viation
Al RF ILLD DUC I BANK 1 WAY,2 1 NUH SCHEDULE 40 PVC,REINFORCE D C viabon
Change Order Deletions Page 1 of 2
AIRFIELD DU TBANK A SCHEDULE PVC,REINFORCED Aviation L
oration
INSI ALL L-850C IN-PAVEMENT RUNWAY EDGE LIUM 1,COMPILE I
wabon
[3212403022'ASPHALT PAVEMENT TYPED jAviatJon 1 129,161 TON 1 $98.00 12,657.68
PHA E
P-lb2-4.1 JEMBANKMENT(ZONE 1) Aviation
P-152-4.3 MBANKMERTTZ0177 Aviation W-00 _7777.7
P-lbb-6.1 6--INCH LIME-TREATED SUBGRADE Aviation
P-156-5.2 ROCK FILTER DAMSAviation 20.00----LF-
P-156-5.3 EROSION CONTROL SEDIMENT LOG
Aviation
P-bUl-6.1 14-INCH PORTLAND CEMENT CONCRETE PAVEMEN I v{ation
-7-779-T7 RUNWAY AND TAXIWAY PAINTING(WHITE) wabon
UNWAY AND TAXIWAY PAINTING(YELLOW) Aviation 1,900.50 SF
-F-'6=- RUNWAY AND TAXIWAY PAINTING(RED) oration
MUTT RUNWAY AND TAXIWAY PAINTING(BLACK) viation
-r-MU-T7 I EMPURARY PAVEMEN I MARKINGS PAIN TING(All COLORS) viation
P- T.�_REMOVAL AND REPLACEMENT OF TAXIWAY PAINTIN (WHIT) Aviation-7-7=- REMOVALAND REPLACEMENT OF TAXIWAY PAIM7�=q F
viation
viation
P-620-5.9 LA EMENT OF TAXIWAY PAINTING(BLACK) Aviation F
D-7775F 4 INH SCHD 40 NON-PERFV PIPE Aviation ____LF $15.bu
-17-77779-4 INCH SCHD 40 PERF PVC PIPE Aviation
rR=- TOPSOILING(FURNISHED FROM OFF 611 E) viation
L-777-5-INSTALL#6 A ,INCLUDING R UND RODE Aviation 14,908.OGL
-r-T9979-AIRFIELD DU TBANK I WAY,2 INCH SCHEDULE 40 PVC, E N Aviation LF
FTU9-_iT_AIRFIELD DUCTBANK I WAY,2 INCH SCHEDULE 40 PVC,CONCRETE ENC viation
L-lUb-21 IAIRHELU UUCTBANK 1 WAY,2 INCH SCHEDULE 40 PVC,REINI-ORUEU G wabon 1,940.00 LF $1 Tou
L- AIRFIELD DU TBANK I WAY,2 INH SCHEDULE 40 PVC,REIRFTR=Aviabon 3,606.00 LF
1769-77 AIRFIELD DUCTBANK 2 WAY,3 INCH SCHEDULEV N RET EN Aviation 803.00-T-7,7-7--REMOVE IN-PAVFMENT 17139`7977,U��� L 5.5
wabon
1-7757-INS[ALL L-852(A-D)IN-PAVEMENT TAXIWAY CENTERLINE LIGHT,COMPI Ovation
L- - INSTALL L-852G LED IN-PAVEMENT RUNWAYUARD LI H L Aviation A
REMOVE Aviation 5.
77T.MTF REMOVE 21"STORM LINE Ovation 12.00 LF $52.50 $IJ30.00
0241.3016 REMOVE 27"STORM LINE wabon
0241.3019 REMOVE STORM LINE Ovation LF
-OT=. REMOVE M LINE Aviation LF 7.
777507 REMOVE STORM DRAIN STRUCTURE wabon
_77TUTUT UNG GAVATION BY PLAN wabon
N Aviation Y 7.7
SPECIAL RIPRAP Aviation 910.00 SY
3137.0107 ROCK FILTER DAM Ovation
-TZfl=. 6 FLEX BASE,TYPE A,OT-7- oration
MTROT H IM Ovation 458.51N 5.
8'"LIME STABILIZEDAviation
7T1=WTUE717177= oration 14,91 1.0D
7T=. b"ASPHALT PAVEMENT TYPE B Ovation
CONCRETE3213.0102 7' PAVEMENT Aviation 720.00 SY $51.50
3217.2102 REFL RAISED MARKERI-C Aviation $7.50
3217.2103 TYPE 11-AA-4 PAVEMENT MARKERS Ovation
wabon
nT=. 36"RCP CIL III Aviation L 577.
Ovation
wabon
wabon
xDOT 540- METAL BEAM GUARD FENCE Aviation 250.00 LF 1 $46.001 $11,500.00
UUI-1 112 PH Plt-z59 CABLE DIRECT BURY Aviation
GUI-2 12b PH PL-�El CABLE DIRECT BURY wabon
COI-4 2/0 V CABLE DIRECT BUY wabon_7777-3/G#6 5kV MV-105 DIRECT BURY 7
wabon
UUZ-1 I EMPORARY PAVEMENT MARKINGS PAINTING(All COLORS) oration
oration
777- AA DUCTBANK, -WAY H 40 PVC, D Aviation 55. LF-ZUT-TF-CONNECT TO EXISTING AIRFIELD MANHOLE 5
Aviation 2.00 EA $184.25 $368.517
777-CONNECT TO EXISTING ONCOR MANHOLES oration
oration
FLY ASH Aviation 7. Y
wabon
wabon
TT-REPLACE 500 WATT ISOLATION TRANSFORMER IN EXISTING LIGHT Aviation 1.00A
-RE-PET775AM-A-M MONDARYFROM FIXTURE Aviation 1.00 EA $22.35
oration
Aviation
C04-17 INSTALL 3/4"X U ) Aviation EA
-CO- D RESISTANCE TEST,FALL-OF-POTENTIAL Aviation L
70T-7F_AIRFIELD DUCTBANK 1 WAY,2 INCH SCH 40 PVC,CUNU ENCASED oration
-76T-7T-FAA UUU I BANK,4-WAY,4SCH 40 PVC,RLINFORCED CONG ENCASED Ovation
TGT-T5--L-867B CUSTOM FIXTURE BLANKLA Aviation 30.00 EA
7- 70"LIME TREATMENT oration $3,bo
707-7-#8 bKV SUPER CONNECTOR KITS Awabon
wabon
C08-15 REM.& ALVA E FIT ASSEMBLY jAviation im EA
Aviation $7,033,521.77
Sub Total Deletions 77
Change Order Deletions Page 2 of 2
City Sec#46954
Change Order 49
IN WITNESS WHEREOF, City and Contractor have each executed this Agreement to be
effective as of the date subscribed by the City's designated Assistant City Manager ("Effective
Date").
Contractor: The Lane Construction Corporation City of Fort Worth /
Fernando Costa
By: Assistant City Manager ,. Q ' �•.
(Signature) � . T�A `
7 Date
Brian Fawson Attest:
fl
(Printed Name) City Se etary
Title: Project Engineer (Seal)
XNS
Address: 300t AeaeAgm 8 wd
f e. 2 15- M&C C-28958
TX 76 t 3 7 Date: 12/4/2018
Form 1295 No. 2018-410584
City/State/Zip: Contract Compliance Manager:
By signing, I acknowledge that I am the person
Illy/l9 responsible for the monitoring and
Date' administration of this contract, including
ensuring all performance and reporting
requirements.
APPRO AL RECOMMENDED:
Dakota Shaw
William Welstead Airport Project Coordinator
DIRECTOR,
Aviation
Approved as to Form and Legality:
o h n t�tygA
Assistari ttorney
RECORD
U;g2j ns
onAtTX00 60TM�
1/14/2019 M&C Review
Cffir i site of the City o' t VV o'th
CITY COUNCIL AGENDA ruRTIVORTI]
COUNCIL ACTION: Approved on 12/4/2018
DATE: 12/4/2018 REFERENCE C-28958 LOG NAME: 55AFW LANE CHANGE
NO.: ORDER 9
CODE: C TYPE: NOW PUBLIC CONSENT HEARING:
NO
SUBJECT. Authorize Execution of Change Order No. 9 to City Secretary Contract No. 46954 with The
Lane Construction Corporation in the Amount of$1,334,674.51 of Federal Grant Funds for
Reconciliation of Construction Costs of the Runway Extension Project Runway 16L/34R,
Runway 16R/34L, and Taxiway Alpha Located at Fort Worth Alliance Airport which
Increases the Total Cost of the Construction Project to $64,684,063.22 (COUNCIL
DISTRICT 7)
RECOMMENDATION:
It is recommended that the City Council authorize execution of Change Order No. 9 to City Secretary
Contract No. 46954 with The Lane Construction Corporation, in the amount of$1,334,674.51 of
federal grant funds, for reconciliation of construction costs of the Runway Extension Project Runway
16L/34R, Runway 16R/34L, and Taxiway Alpha Located at Fort Worth Alliance Airport which
increases the total cost of the construction project to $64,684,063.22.
DISCUSSION:
On August 4, 2015, Mayor and Council Communication (M&C C-27409)the City Council approved
the execution of a three-phase contract with The Lane Construction Corporation (Lane), in an amount
up to $61,920,040.43 for construction of runway extensions for Runway 16L/34R, Runway 16R/34L
and Taxiway Alpha at Fort Worth Alliance Airport. This project has been fully funded with federal grant
funds.
Change Order No. 9 in the amount of$1,334,674.51 is the final change order for the Runway
Extension Project. This change order reconciles the as-built quantities with the actual quantities over
all three phases of the project. This change order also reflects additional expenses in the amount of
$1,098,058.00 encumbered by the contractor due to working around an active electrical utility line
that was necessary to remain in service to power the old Approach Llighting System Flashing Lights
(ALSF) structure until the new ALSF equipment shelter was constructed. The utility line was not
relocated in sync with the project schedule due to a failure by the utility service provider to mobilize in
a timely manner. Change orders to date as percent of original contract: 4.46%.
Project expenses related to construction are summarized in the following table:
;Phase I Construction 1$36,460,076.37Tj
Phase II Construction 1$16,027,753.98
Phase III Construction 1$12,196,232.87
!Total All Phases 1$64,684,063.22
Upon approval of this M&C, total project costs for the runway construction at Alliance will consist of
the following:
!Design Agreement & Construction Phase 1$7,088,927.84
'Services, Jacobs Engineering Group, Inc.
Construction Agreement Phase I - III, The
;Lane Construction Corporation ;$64,684,063.22
http://apps.cfwnet.org/council_packet/mc_review.asp?ID=26439&coun"ildate=12/4/2018 1/3
1/14/2019 M&C Review
;Total Project Costs 1$71,772,991.06
This project was substantially completed on May 2, 2018.
The following is a history of change orders that were previously approved for this project, either by
City Council or administratively:
Change Order No. 1 was administratively approved in the amount of $46,635.03 for an alternative
to the temporary duct bank system for the new Approach Lighting System with Sequence Flashing
Lights building with a direct buried, armored cable.
Change Order No. 2 was administratively approved and reduced the contract by $11,653.06 due to
a route modification to the power and communications cable for the Inner Marker to avoid
directional drilling under the blast pad and to utilize existing concrete encased duct bank between
Taxiway A and Runway 16R.
Change Order No. 3 (M&C C-27652) increased the contract by $633,304.83 for removal of
unclassified materials, addition of materials to mitigate rain saturated soil to facilitate earthwork.
Additional work included: pipe and structure to convey storm water, a 24-inch pipe for drainage,
emergency re-cabling of the Runway 16L-34R edge light circuit and replacement of two Oncor
manholes and the addition of a 5E6 duct bank and transformer switch foundation.
Change Order No. 4 (M&C C-27972) in the amount of $164,765.40 was comprised of changes to
electrical specifications in the utility duct bank and ALSF building and paving panel/section
replacement changes.
Change Order No. 5 (M&C C-28082) in the amount of $120,001.16 included work associated with
Oncor utility relocation, airfield lighting, and new pavement at Runway 16R; additional pads to
correct sloped floor of airfield lighting vault; additional heat shrink kits to terminate new airfield
lighting fixtures; and additional rental barricades for a weekend closure.
Change Order No. 6 (M&C C-28228) in the amount of $495,664.00 included costs associated with
Oncor utility relocation and duct bank: edge lighting revisions; elevation corrections; additional
cable pulling; changes to size of duct banks for the runway end identifier lights, variance for
irrigation plan; cost to install and remove RDR foundations from plan after RDR foundations were
placed, and change in installation location of TB circuit at Taxiway H.
Change Order No. 7 reduced the contract by $107,797.65 due to a substitution of Soil-Cement
Base for Lime Treated Subgrade, reuse of existing in-pavement Approach Lighting System with
Sequence Flashing Lights, and relocation of a driveway on Eagle Parkway. This change order was
administratively approved.
Change Order No. 8 was administratively approved in the amount of $88,428.57 due to unknown
utilities encountered in the work site, implementation of additional SWPPP measures, and
additional excavation costs.
M/WBE OFFICE: The Lane Construction Corporation agrees to maintain its initial DBE commitment
of 23 percent that it made on the original contract and extend and maintain that same DBE
commitment of 23 percent to all prior change orders up to and inclusive of this Change Order No. 9.
Therefore, Lane remains in compliance with the City's DBE Ordinance and attests to its commitment
by its signature on the Acceptance of Previous DBE Commitment Form executed by an authorized
representative of its company.
Fort Worth Alliance Airport is located in COUNCIL DISTRICT 7.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are available in the current capital budget, as
appropriated, of the Municipal Airport Grants Fund and that prior to an expenditure being made, the
Aviation Department has the responsibility to verify the availability of funds. This is a reimbursement
grant.
TO
Fund Department Account Project Program Activity Budget Reference# Amount
ID ID Year Chartfield 2
FROM
Fund Department Account Project Program Activity Budget Reference# Amount
ID ID Year (Chartfield 2
http://apps.cfwnet.org/council_packet/mc_review.asp?ID=26439&councildate=12/4/2018 2/3
1/14/2019 M&C Review
Submitted for City Manager's Office by_ Fernando Costa (6122)
Originating Department Head: Bill Welstead (5402)
Additional Information Contact: Dakota Shaw (5407)
ATTACHMENTS
Form 1295.pdf
MC Map.pdf
http://apps.cfwnet.org/council_packet/mc_review.asp?ID=26439&councildate=12/4/2018 3/3